73Let jobs
$444,788,090Total low bids
$474,152,580Total estimates
-6.2%Low bids vs estimates
Dec 2017 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Dec 18, 2017 | 6318-91-001BPM - 631891001 | Maverick Laredo |
REHABILITATION OF VARIOUS BRIDGE FACILITUS 277 · | $297,801 | $385,594 | DELGADO'S CONTRACTORS, LLC | +29.5% | 2 |
| Dec 18, 2017 | 6319-00-001BPM - 631900001 | Dimmit Laredo |
REHABILITAION OF VARIOUS BRIDGE FACILITISH 85 · | $131,226 | $222,330 | L.C. JORDAN & SON | +69.4% | 1 |
| Dec 6, 2017 | 0271-17-163NH 2018(375) | Harris Houston |
CONSTRUCT BUSWAY FACILITYIH 610 · | $54,926,974 | $57,190,569 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | +4.1% | 5 |
| Dec 6, 2017 | 0440-06-017CC 440-6-17 | Travis Austin |
ADD ONE LANE IN EACH DIRECTIONSH 130 · | $39,118,063 | $36,726,431 | OHL USA, INC. | -6.1% | 12 |
| Dec 6, 2017 | 0095-07-059STP 2018(257) | Van Zandt Tyler |
SEAL COAT AND PAVEMENT MARKINGSUS 80 · | $9,975,779 | $10,067,448 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | +0.9% | 2 |
| Dec 6, 2017 | 2262-01-016STP 2018(090) | Ward Odessa |
SEAL COATFM 1776 · | $10,662,258 | $9,505,066 | RONALD R. WAGNER & CO., LP | -10.9% | 4 |
| Dec 6, 2017 | 0079-05-057NH 2018(326) | Erath Fort Worth |
SEAL COATUS 67 · | $9,544,909 | $8,357,384 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | -12.4% | 3 |
| Dec 6, 2017 | 2121-01-091CM 2018(087) | El Paso El Paso |
REHAB AND OPERATIONAL IMPROVEMENTSIH 10 · | $7,890,471 | $7,550,372 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -4.3% | 4 |
| Dec 6, 2017 | 0231-03-143NH 2018(347) | Bell Waco |
WDN, BS, STR, SURFUS 190 · | $7,986,415 | $7,287,694 | BIG CREEK CONSTRUCTION, LTD. | -8.7% | 6 |
| Dec 6, 2017 | 0141-14-016STP 2018(362) | Sutton San Angelo |
SEAL COATSL 467 · | $6,211,380 | $5,905,799 | RONALD R. WAGNER & CO., LP | -4.9% | 6 |
| Dec 6, 2017 | 0116-04-100NH 2018(317) | Brazos Bryan |
OVERLAYSH 21 · | $8,203,254 | $5,427,954 | KNIFE RIVER CORPORATION - SOUTH | -33.8% | 3 |
| Dec 6, 2017 | 1708-01-013STP 2018(372) | Fannin Paris |
REHABILITATION OF EXISTING ROADFM 1752 · | $5,340,551 | $4,843,712 | HIGHWAY 19 CONSTRUCTION LLC | -9.3% | 5 |
| Dec 6, 2017 | 0032-05-041STP 2018(478) | King Childress |
REHABLITATION OF EXISTING ROADWAYUS 83 · | $4,540,628 | $4,186,076 | ZACK BURKETT CO. | -7.8% | 4 |
| Dec 6, 2017 | 0393-03-034STP 2018(353) | Panola Atlanta |
PLANING,SURF,BRDG RAIL,MBGF&PV MRKSSH 149 · | $4,532,494 | $4,016,607 | MADDEN CONTRACTING COMPANY, LLC. | -11.4% | 4 |
| Dec 6, 2017 | 0150-05-048STP 2018(466) | Burnet Austin |
REPAIR, MILL, SEAL COAT, LEVEL UP & OVERLAYSH 29 · | $5,250,030 | $3,931,926 | OLDCASTLE MATERIALS TEXAS, INC. | -25.1% | 6 |
| Dec 6, 2017 | 0786-01-083STP 2018(376) | Jefferson Beaumont |
WIDEN TO FOUR LANES WITH A CENTER LEFT TURN LANEFM 364 · | $3,319,928 | $3,523,495 | OLDCASTLE MATERIALS TEXAS, INC. | +6.1% | 6 |
| Dec 6, 2017 | 1711-01-029STP 2017(404) | Young Wichita Falls |
REHAB, WIDEN & OVERLAYFM 1769 · | $3,913,381 | $3,310,004 | JAGOE-PUBLIC COMPANY | -15.4% | 5 |
| Dec 6, 2017 | 0132-02-033NH 2018(344) | Dickens Childress |
ASPHALTIC CONCRETE PAVEMENT OVERLAYUS 82 · | $2,703,474 | $2,645,236 | ZACK BURKETT CO. | -2.2% | 4 |
| Dec 6, 2017 | 0574-01-029BR 2018(319) | Navarro Dallas |
REPLACE BRIDGE AND APPROACHESSH 309 · | $3,112,387 | $2,595,950 | PIERCE R & B LLC | -16.6% | 13 |
| Dec 6, 2017 | 0125-02-033STP 2018(350) | Throckmorton Wichita Falls |
OVERLAYUS 183 · | $1,655,323 | $1,743,253 | ZACK BURKETT CO. | +5.3% | 1 |
| Dec 6, 2017 | 0150-02-040STP 2018(465) | Llano Austin |
LEVEL UP AND SEAL COATSH 29 · | $1,896,114 | $1,617,039 | OLDCASTLE MATERIALS TEXAS, INC. | -14.7% | 7 |
| Dec 6, 2017 | 0200-01-083NH 2016(424) | Angelina Lufkin |
RESURFACE WITH THIN OVERLAY MIXTUREUS 69 · | $1,593,129 | $1,576,982 | MOORE BROTHERS CONSTRUCTION COMPANY | -1.0% | 2 |
| Dec 6, 2017 | 0047-01-069NH 2018(371) | Grayson Paris |
MISCELLANEOUS CONSTRUCTIONUS 75 · | $1,331,980 | $1,374,640 | WINDING ROAD CONSTRUCTION, INC. | +3.2% | 3 |
| Dec 6, 2017 | 0187-04-032STP 2018(356)HES | Austin Yoakum |
SAFETY TREAT FIXED OBJECTSSH 36 · | $885,294 | $1,049,635 | ISI CONTRACTING, INC. | +18.6% | 3 |
| Dec 6, 2017 | 0389-06-107NH 2018(377) | Galveston Houston |
RAISE APPROACH AT BRIDGESH 146 · | $210,153 | $219,473 | ISI CONTRACTING, INC. | +4.4% | 6 |
| Dec 6, 2017 | 0210-02-024STP 2018(354)HESG | Milam Bryan |
INSTALLATION OF FLASHING BEACONUS 77 · | $53,895 | $57,717 | SOUTH RANGER CONSTRUCTION, INC. | +7.1% | 5 |
| Dec 5, 2017 | 0008-13-221NH 2018(321) | Tarrant Fort Worth |
GR,DR,BS,STR,PAV,ITS,SGNL,ILLUM & SGNIH 820 · | $187,793,662 | $173,724,095 | FLATIRON CONSTRUCTORS, INC. | -7.5% | 11 |
| Dec 5, 2017 | 0009-18-020STP 2018(474) | Hopkins Paris |
SEAL COATBU 67-V · | $11,003,332 | $11,652,175 | BRANNAN PAVING CO., LTD. | +5.9% | 2 |
| Dec 5, 2017 | 0039-08-100NH 2018(333) | Cameron Pharr |
CONSTRUCT NB FRONTAGE ROAD OVERPASSESIH 69E · | $9,905,939 | $10,510,082 | FOREMOST PAVING, INC. | +6.1% | 4 |
| Dec 5, 2017 | 0033-05-092NH 2018(342) | Jones Abilene |
SEAL COATUS 83 · | $11,050,919 | $9,187,305 | NORTHEASTERN PAVERS, INC. | -16.9% | 5 |
| Dec 5, 2017 | 0020-06-017NH 2018(338) | Presidio El Paso |
PREVENTATIVE MAINTENANCEUS 90 · | $9,946,177 | $7,823,712 | RONALD R. WAGNER & CO., LP | -21.3% | 3 |
| Dec 5, 2017 | 0005-05-109NH 2018(341) | Howard Abilene |
SPOT BASE REPAIR, 1-CST, 2"SMA-D OVERLAYIH 20 · | $7,326,676 | $6,798,902 | PRICE CONSTRUCTION, LTD. | -7.2% | 2 |
| Dec 5, 2017 | 0074-06-221NH 2018(335) | Nueces Corpus Christi |
MILL,UNDERSEAL,OVERLAY AND NOVACHIPIH 37 · | $4,515,458 | $4,615,768 | BAY LTD. | +2.2% | 2 |
| Dec 5, 2017 | 6324-63-001RMC - 632463001 | Potter Amarillo |
MISC ROADWAY REPAIRSIH 40 · | $4,539,110 | $4,503,545 | J. LEE MILLIGAN, INC. | -0.8% | 4 |
| Dec 5, 2017 | 0009-15-027STP 2018(367) | Hunt Paris |
REHABILITATION OF EXISTING ROADUS 69 · | $3,111,945 | $3,331,592 | OLDCASTLE MATERIALS TEXAS, INC. | +7.1% | 7 |
| Dec 5, 2017 | 0437-02-014STP 2018(312) | Callahan Abilene |
REHABILITATIONUS 283 · | $3,782,032 | $3,117,046 | CONTRACT PAVING CO. | -17.6% | 5 |
| Dec 5, 2017 | 0043-05-107BR 2018(349) | Wilbarger Wichita Falls |
DECK AND CONCRETE STRUCTURE REPAIRUS 287 · | $2,278,333 | $1,842,668 | GIBSON & ASSOCIATES, INC. | -19.1% | 8 |
| Dec 5, 2017 | 0153-01-013NH 2018(469) | Caldwell Austin |
INTERSECTION IMPROVEMENTSUS 183 · | $2,017,885 | $1,769,284 | DEAN WORD COMPANY, LTD. | -12.3% | 10 |
| Dec 5, 2017 | 0118-08-074STP 2018(366)HES | Nacogdoches Lufkin |
IMPROVE GUARDRAIL AND SAFETY TREATSH 21 · | $1,840,142 | $1,578,551 | A R BROTHERS CONSTRUCTION SERVICES, INC. | -14.2% | 9 |
| Dec 5, 2017 | 0912-00-523NH 2018(110) | Harris Houston |
INSTALL TRAFFIC SIGNALS (SITE SPECIFIC)VA · | $1,543,446 | $1,468,618 | STATEWIDE TRAFFIC SIGNAL COMPANY | -4.8% | 4 |
| Dec 5, 2017 | 1980-01-008STP 2018(373)HES | Fannin Paris |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 1629 · | $1,631,487 | $1,344,263 | SAMMY GIST ENTERPRISES, INC. | -17.6% | 9 |
| Dec 5, 2017 | 1202-03-014STP 2018(470)HES | Williamson Austin |
UPGRADE MBGF AND SAFETY TREAT FIXED OBJECTSFM 1063 · | $1,241,553 | $1,248,579 | RELMCO, INC. | +0.6% | 9 |
| Dec 5, 2017 | 6314-76-001RMC - 631476001 | Tarrant Fort Worth |
ROADSIDE MOWING,LITTER REMOVAL,HERBICIDEIH 20 · | $981,191 | $1,174,492 | ICA MAINTENANCE, INC. | +19.7% | 1 |
| Dec 5, 2017 | 6315-39-001RMC - 631539001 | Tarrant Fort Worth |
SWEEPING & DEBRIS REMOVALIH 20 · | $849,179 | $830,132 | ICA MAINTENANCE, INC. | -2.2% | 4 |
| Dec 5, 2017 | 2304-02-042STP 2018(348) | Bell Waco |
SEAL/LVL UP/OVLYFM 2410 · | $884,323 | $795,656 | LONE STAR PAVING COMPANY | -10.0% | 6 |
| Dec 5, 2017 | 6322-66-001RMC - 632266001 | Gonzales Yoakum |
CLEANING & SEALING OF BRIDGE JOINTSUA 90 · | $874,535 | $721,216 | CHAMPION INFRASTRUCTURE, LLC | -17.5% | 4 |
| Dec 5, 2017 | 0907-00-167STP 2018(364) | Tom Green San Angelo |
PAVEMENT MARKINGSVA · | $804,425 | $689,377 | L&L COMPANY | -14.3% | 11 |
| Dec 5, 2017 | 0089-12-004STP 2018(355)HES | Jackson Yoakum |
SAFETY TREAT FIXED OBJECTS & WIDEN ROADWAYSL 522 · | $680,230 | $679,501 | ISI CONTRACTING, INC. | -0.1% | 5 |
| Dec 5, 2017 | 6325-30-001RMC - 632530001 | Howard Abilene |
CALL OUT TRAFFIC CONTROLIH 20 · | $747,734 | $643,378 | ALTUS TRAFFIC MANAGEMENT LLC | -14.0% | 4 |
| Dec 5, 2017 | 6317-18-001RMC - 631718001 | Ellis Dallas |
VEGETATION MANAGEMENTIH 45 · | $482,220 | $598,948 | C & C MOWING CONTRACTORS, INC. | +24.2% | 5 |
| Dec 5, 2017 | 6317-30-001RMC - 631730001 | Pecos Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 10 · | $572,375 | $550,585 | BARRICADES UNLIMITED | -3.8% | 4 |
| Dec 5, 2017 | 0901-27-048STP 2017(408)TAPS | Red River Paris |
CONSTRUCT SHARED USE PATHVA · | $525,629 | $519,917 | SAMMY GIST ENTERPRISES, INC. | -1.1% | 3 |
| Dec 5, 2017 | 6317-12-001RMC - 631712001 | El Paso El Paso |
CLEANING & SWEEPINGIH 10 · | $323,640 | $513,970 | E. G. L. CONSTRUCTION, INC. | +58.8% | 1 |
| Dec 5, 2017 | 6315-96-001RMC - 631596001 | Tarrant Fort Worth |
ROADWAY ILLUMINATION MAINTENANCEIH 20 · | $498,779 | $493,025 | SIEMENS INDUSTRY, INC. | -1.2% | 4 |
| Dec 5, 2017 | 6320-93-001RMC - 632093001 | Dallas Dallas |
REPAIR/REPLACE CONCRETE BARRIERSH 78 · | $576,885 | $490,535 | GIBSON & ASSOCIATES, INC. | -15.0% | 3 |
| Dec 5, 2017 | 6324-05-001RMC - 632405001 | Hopkins Paris |
ON CALL TREE TRIMMINGSH 19 · | $320,500 | $476,000 | CROSS PLUS CONSTRUCTION, LLC | +48.5% | 2 |
| Dec 5, 2017 | 6324-31-001BPM - 632431001 | Angelina Lufkin |
BRIDGE PREVENTATIVE MAINTENANCEUS 59 · | $403,099 | $464,563 | CHAMPION INFRASTRUCTURE, LLC | +15.2% | 4 |
| Dec 5, 2017 | 6324-51-001RMC - 632451001 | El Paso El Paso |
BARRICADES,SIGNS,TRAFFIC CONTROLIH 10 · | $396,280 | $463,020 | LESNA CONSTRUCTION, INC. | +16.8% | 3 |
| Dec 5, 2017 | 6315-38-001RMC - 631538001 | Tarrant Fort Worth |
ROADWAY SIGN MAINTENANCEIH 30 · | $499,996 | $457,747 | SELECT STRIPING LLC | -8.4% | 3 |
| Dec 5, 2017 | 6324-50-001RMC - 632450001 | El Paso El Paso |
BARRICADES,SIGNS AND TRAFFIC CONTROLIH 10 · | $362,800 | $445,800 | LESNA CONSTRUCTION, INC. | +22.9% | 3 |
| Dec 5, 2017 | 6324-65-001RMC - 632465001 | Culberson El Paso |
POTHOLE REPAIRRM 652 · | $447,775 | $433,000 | MIJELUM | -3.3% | 2 |
| Dec 5, 2017 | 0698-02-052STP 2018(336)HES | Hidalgo Pharr |
PROF EDGELINE MRKS,RAISED CENTERLINE RUMBLE STRIPSFM 88 · | $676,225 | $428,221 | PAVEMENT MARKINGS INC. | -36.7% | 4 |
| Dec 5, 2017 | 6317-26-001RMC - 631726001 | Wise Fort Worth |
ROADSIDE MOWINGUS 81 · | $432,656 | $393,071 | CROSS PLUS CONSTRUCTION, LLC | -9.1% | 3 |
| Dec 5, 2017 | 6324-20-001RMC - 632420001 | Tom Green San Angelo |
RETRACE PAVEMENT MARKINGS AND MARKERSUS 67 · | $392,307 | $341,836 | FLAT LINE, INC. | -12.9% | 10 |
| Dec 5, 2017 | 6323-58-001RMC - 632358001 | Lamar Paris |
ON CALL RAISED PAVEMENT MARKERSUS 82 · | $433,825 | $334,862 | BRYDL CONTRACTING, INC. | -22.8% | 6 |
| Dec 5, 2017 | 0913-09-062BR 2014(697) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $339,811 | $324,876 | CONSTAR CONSTRUCTION | -4.4% | 9 |
| Dec 5, 2017 | 6299-80-001RMC - 629980001 | Erath Fort Worth |
FULL WIDTH MOWINGUS 67 · | $312,920 | $308,379 | CROSS PLUS CONSTRUCTION, LLC | -1.5% | 4 |
| Dec 5, 2017 | 6323-50-001RMC - 632350001 | Fannin Paris |
MOWING HIGHWAY RIGHT OF WAYSH 56 · | $310,972 | $292,651 | BRYDL CONTRACTING, INC. | -5.9% | 5 |
| Dec 5, 2017 | 0055-06-033BR 2018(345) | Coryell Waco |
BRIDGE MAINTENANCEUS 84 · | $369,124 | $277,779 | ELLIS-MCGINNIS CONSTRUCTION CO. | -24.7% | 12 |
| Dec 5, 2017 | 0063-10-013STP 2018(351)HES | Panola Atlanta |
SAFETY LIGHTING AT INTERSECTIONUS 59 · | $262,171 | $260,188 | SOUTH TEXAS ILLUMINATION, LLC | -0.8% | 4 |
| Dec 5, 2017 | 3417-03-023CC 3417-3-23 | Travis Austin |
CONSTURCTION OF MEDIAN AND LEFT TURN LANEFM 734 · | $257,674 | $248,444 | AARON CONCRETE CONTRACTORS, L.P. | -3.6% | 5 |
| Dec 5, 2017 | 0218-01-095STP 2018(352)HES | Bowie Atlanta |
SIGNALS & SAFETY LIGHTINGUS 59 · | $184,240 | $175,785 | SOUTH TEXAS ILLUMINATION, LLC | -4.6% | 5 |
| Dec 5, 2017 | 0910-16-143STP 2018(481) | Smith Tyler |
CONSTRUCT SIDEWALKS AND CURB RAMPSVA · | $133,671 | $126,560 | ENCINO LANDSCAPE, INC. | -5.3% | 14 |
1–73 of 73
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.