117Let jobs
$288,149,578Total low bids
$309,884,148Total estimates
-7.0%Low bids vs estimates
Mar 2018 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Mar 27, 2018 | 6320-72-001RMC - 632072001 | Yoakum |
SIGNAL INSTALLATIONSH 83 · | $177,744 | $218,450 | WILLIS ELECTRIC CO., LP | +22.9% | 1 |
| Mar 22, 2018 | 6329-06-001RMC - 632906001 | Hopkins Paris |
ON CALL DITCH AND CULVERT CLEANINGSH 19 · | $275,000 | $246,510 | ANCHOR CONTRACTING, LLC | -10.4% | 3 |
| Mar 22, 2018 | 6328-85-001RMC - 632885001 | Maverick Laredo |
CLEANING/SWEEPING OF HIGHWAYS AND LITTER REMOVALUS 277 · | $273,192 | $236,521 | CTX SPECIAL SERVICES CO LLC | -13.4% | 3 |
| Mar 22, 2018 | 6328-58-001RMC - 632858001 | Webb Laredo |
LANDSCAPE MAINTENANCEIH 35 · | $226,584 | $198,697 | RK POWER DRIVE SERVICES, INC. | -12.3% | 2 |
| Mar 22, 2018 | 6328-91-001RMC - 632891001 | Webb Laredo |
LANDSCAPE MAINTENANCESL 20 · | $226,874 | $187,339 | RK POWER DRIVE SERVICES, INC. | -17.4% | 3 |
| Mar 22, 2018 | 6326-09-001BPM - 632609001 | Grayson Paris |
BPM-ABUTMENT EROSION REPAIRUS 82 · | $100,710 | $95,594 | HARTBEAT CONSTRUCTION | -5.1% | 11 |
| Mar 22, 2018 | 6329-05-001RMC - 632905001 | Hopkins Paris |
CLEANING AND SWEEPING HIGHWAYSIH 30 · | $78,600 | $68,219 | MORTON ENTERPRISE | -13.2% | 2 |
| Mar 21, 2018 | 6328-54-001RMC - 632854001 | San Jacinto Lufkin |
TREE REMOVAL AND TRIMMINGUS 59 · | $263,825 | $212,000 | K & R CONTRACTORS | -19.6% | 11 |
| Mar 21, 2018 | 6329-65-001RMC - 632965001 | Gray Amarillo |
TREE REMOVALUS 60 · | $153,072 | $132,500 | EASTGATE SERVICES | -13.4% | 7 |
| Mar 20, 2018 | 6323-78-001RMC - 632378001 | Hays Austin |
INSTALL TRAFFIC SIGNALSRM 2325 · | $195,232 | $183,026 | SIGNAL SERVICES GROUP INC. | -6.3% | 3 |
| Mar 14, 2018 | 6320-97-001BPM - 632097001 | Atascosa San Antonio |
REPAIR RIPRAP SLOPE AT OVERPASSIH 37 · | $221,848 | $235,947 | TREVWAY, INC. | +6.4% | 9 |
| Mar 14, 2018 | 6327-99-001RMC - 632799001 | Angelina Lufkin |
LARGE SIGNS MAINTENANCEUS 59 · | $204,400 | $229,180 | VACA UNDERGROUND UTILITIES INC | +12.1% | 4 |
| Mar 14, 2018 | 6328-12-001RMC - 632812001 | Guadalupe San Antonio |
PICNIC AREA MAINT AND LITTER REMOVALIH 10 · | $205,140 | $180,900 | BIG TEX LAWN SERVICE | -11.8% | 2 |
| Mar 14, 2018 | 6325-82-001RMC - 632582001 | Uvalde San Antonio |
STRUCTURESRM 187 · | $95,775 | $86,490 | BECK-REIT & SONS, LTD. | -9.7% | 3 |
| Mar 14, 2018 | 6326-59-001RMC - 632659001 | Bexar San Antonio |
CONCRETE RAIL AND RETAINING WALL REPAIRIH 10 · | $72,262 | $86,469 | TREVWAY, INC. | +19.7% | 4 |
| Mar 9, 2018 | 6330-87-001SUP - 633087001 | Chambers Beaumont |
ANAHUAC JANITORIALFM 563 · | $5,471 | $5,471 | TIBH INDUSTRIES, INC. | 0.0% | 1 |
| Mar 8, 2018 | 6318-83-001BPM - 631883001 | Webb Laredo |
REHABILITATION OF VARIOUS BRIDGE FACILITIESIH 35 · | $205,920 | $194,391 | SCR CIVIL CONSTRUCTION, LLC | -5.6% | 4 |
| Mar 7, 2018 | 2744-01-011STP 1702(640)MM | Montgomery Houston |
RECONSTRUCT TO A 4 LANE DIVIDED CURB & GUTTERFM 2854 · | $21,958,755 | $18,657,275 | HARPER BROTHERS CONSTRUCTION LLC | -15.0% | 9 |
| Mar 7, 2018 | 1567-01-037C 1567-1-37 | Denton Dallas |
WIDEN TWO LANE RURAL TO SIX LANE URBAN DIVIDEDFM 720 · | $18,430,889 | $18,011,511 | MARIO SINACOLA & SONS EXCAVATING, INC. | -2.3% | 9 |
| Mar 7, 2018 | 0479-01-019STP 2018(622) | Reeves Odessa |
ROADWAY REHABILITATIONSH 302 · | $11,505,347 | $12,502,318 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +8.7% | 5 |
| Mar 7, 2018 | 0005-01-107NH 2018(618) | Ector Odessa |
ROADWAY REHABILITATIONBI 20-E · | $11,389,746 | $11,187,689 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -1.8% | 3 |
| Mar 7, 2018 | 0453-02-018C 453-2-18 | Crosby Lubbock |
PAVEMENT REPAIR, LEVEL-UP, OVERLAYUS 62 · | $10,520,730 | $8,589,408 | ALLEN BUTLER CONSTRUCTION, INC. | -18.4% | 4 |
| Mar 7, 2018 | 0675-06-096C 675-6-96 | Walker Bryan |
HMA OVERLAYIH 45 · | $8,390,404 | $6,333,634 | KNIFE RIVER CORPORATION - SOUTH | -24.5% | 5 |
| Mar 7, 2018 | 0372-01-102NH 2018(632) | San Patricio Corpus Christi |
OVERLAY ROADWAY (NB AND SB LANES)US 77 · | $5,331,334 | $5,675,787 | BAY LTD. | +6.5% | 4 |
| Mar 7, 2018 | 0182-02-038C 182-2-38 | Comanche Brownwood |
BASE OVERLAY,2 COURSE SURF TRT, ACPSH 36 · | $5,217,798 | $5,024,304 | JAY MILLS CONTRACTING, INCORPORATED | -3.7% | 5 |
| Mar 7, 2018 | 0024-01-103NH 2018(592) | Uvalde San Antonio |
OVERLAY &PAVEMENT MARKINGSUS 90 · | $6,480,344 | $4,809,679 | HUNTER INDUSTRIES, LTD. | -25.8% | 5 |
| Mar 7, 2018 | 2552-03-063C 2552-3-63 | El Paso El Paso |
CONSTRUCT TYPE 1 NOISE WALLSSL 375 · | $3,032,389 | $4,497,506 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +48.3% | 5 |
| Mar 7, 2018 | 0277-03-027STP 2018(648)HES | Cass Atlanta |
TEXTURIZE SHOULDERS & CL TEXTURINGSH 77 · | $3,682,677 | $3,512,191 | EAST TEXAS BRIDGE, INC. | -4.6% | 3 |
| Mar 7, 2018 | 0026-01-027STP 2018(604) | Gonzales Yoakum |
PAVEMENT REPAIR AND RESURFACINGUS 90 · | $2,938,546 | $2,613,601 | HUNTER INDUSTRIES, LTD. | -11.1% | 4 |
| Mar 7, 2018 | 6324-89-001RMC - 632489001 | Zavala Laredo |
BLADE LEVEL UP/OVERLAY AND PAVEMENT EDGE REPAIRFM 2691 · | $2,947,542 | $2,366,031 | RAY FARIS, INC. | -19.7% | 7 |
| Mar 7, 2018 | 1978-01-056NH 2018(573) | Tarrant Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKFM 1938 · | $2,676,224 | $2,235,383 | THE LANE CONSTRUCTION CORPORATION | -16.5% | 5 |
| Mar 7, 2018 | 0009-04-066NH 2018(575) | Rockwall Dallas |
SLOPE FAILURE REPAIRSH 66 · | $2,559,869 | $2,226,102 | IOWA BRIDGE & CULVERT, LC | -13.0% | 10 |
| Mar 7, 2018 | 1330-01-063NH 2018(572) | Tarrant Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKFM 1187 · | $2,383,449 | $2,137,400 | PEACHTREE CONSTRUCTION, LTD. | -10.3% | 4 |
| Mar 7, 2018 | 0269-03-035STP 2018(605)HES | Lavaca Yoakum |
SAFETY TREAT FIXED OBJECTSUS 77A · | $2,139,692 | $2,082,955 | RELMCO, INC. | -2.7% | 4 |
| Mar 7, 2018 | 0492-05-026BR 2018(611) | Smith Tyler |
REPLACE BRIDGE & APPROACHESFM 346 · | $2,475,603 | $2,029,446 | STATELINE CONSTRUCTION, LLC | -18.0% | 7 |
| Mar 7, 2018 | 6326-55-001RMC - 632655001 | Jefferson Beaumont |
FULL DEPTH CONCRETE PAVEMENT REPAIRIH 10 · | $1,835,312 | $1,818,400 | DBI SERVICES, LLC | -0.9% | 3 |
| Mar 7, 2018 | 0178-01-036NH 2018(659) | Harris Houston |
CONC REPAIR, MILL, SC & 1" TOMSH 35 · | $1,727,028 | $1,495,895 | ANGEL BROTHERS HOLDINGS CORP. | -13.4% | 3 |
| Mar 7, 2018 | 0006-03-134NH 2018(584) | Nolan Abilene |
TRT BASE,1-CST,4"SPC & LTD C&GIH 20 · | $2,124,098 | $1,487,307 | NOBLES ROAD CONSTRUCTION, INC. | -30.0% | 4 |
| Mar 7, 2018 | 0816-02-079CC 816-2-79 | Denton Dallas |
INTERSECTION IMPROVEMENTSFM 455 · | $1,498,249 | $1,280,177 | JAGOE-PUBLIC COMPANY | -14.6% | 4 |
| Mar 7, 2018 | 0047-06-162NH 2018(576) | Collin Dallas |
FULL DEPTH CONCRETE REPAIRUS 75 · | $1,120,624 | $1,230,203 | O. TREVINO CONSTRUCTION, LLC | +9.8% | 4 |
| Mar 7, 2018 | 0010-13-094STP 2018(644)HESG | Bowie Atlanta |
ACP SURFACE & PAV MARKINGSUS 67 · | $1,100,251 | $1,149,722 | EAST TEXAS BRIDGE, INC. | +4.5% | 3 |
| Mar 7, 2018 | 0906-00-159STP 2018(620) | Ector Odessa |
NON-IH PAVEMENT MARKINGSVA · | $1,017,314 | $1,063,374 | VIZCAINO, L.P. | +4.5% | 9 |
| Mar 7, 2018 | 0209-07-045STP 2018(589)HES | McLennan Waco |
SFTY TR FX OBJFM 933 · | $1,052,703 | $1,033,600 | TTG UTILITIES, LP | -1.8% | 7 |
| Mar 7, 2018 | 0906-00-161STP 2018(621) | Ector Odessa |
IH PAVEMENT MARKINGS_(2018)VA · | $970,006 | $1,029,976 | VIZCAINO, L.P. | +6.2% | 7 |
| Mar 7, 2018 | 0733-03-054STP 2018(586) | Taylor Abilene |
OVERLAYFM 126 · | $1,231,339 | $1,017,875 | J. H. STRAIN & SONS, INC. | -17.3% | 6 |
| Mar 7, 2018 | 6313-48-001RMC - 631348001 | Harris Houston |
REPLACE LONGITUDINAL JOINT STAPLESIH 45 · | $1,025,040 | $996,577 | SELECT STRIPING LLC | -2.8% | 6 |
| Mar 7, 2018 | 6327-42-001RMC - 632742001 | Harris Houston |
FRACTURE CRITICAL BRIDGE REPAIRSIH 10 · | $796,440 | $976,280 | ISI CONTRACTING, INC. | +22.6% | 3 |
| Mar 7, 2018 | 6326-88-001RMC - 632688001 | Fort Bend Houston |
REFLECTIVE PAVEMENT MARKING (GRAPHICS)SH 6 · | $1,316,684 | $965,116 | PROFESSIONAL TRAFFIC CONTROL LLC | -26.7% | 4 |
| Mar 7, 2018 | 6318-59-001RMC - 631859001 | Parker Fort Worth |
REFLECTORIZED PVMT MARKINGS AND MARKERSIH 20 · | $1,316,644 | $935,509 | STRIPING TECHNOLOGY, L.P. | -28.9% | 6 |
| Mar 7, 2018 | 6325-49-001RMC - 632549001 | Denton Dallas |
FULL DEPTH CONCRETE REPAIRIH 35 · | $997,102 | $857,457 | ROY JORGENSEN ASSOCIATES, INC. | -14.0% | 7 |
| Mar 7, 2018 | 0221-02-026STP 2018(610)HES | Red River Paris |
HAZARD ELIMINATION & SAFETYUS 271 · | $944,080 | $841,028 | HIGHWAY 19 CONSTRUCTION LLC | -10.9% | 11 |
| Mar 7, 2018 | 6322-21-001RMC - 632221001 | Chambers Beaumont |
OVERLAYFM 2354 · | $974,093 | $839,543 | ANGEL BROTHERS HOLDINGS CORP. | -13.8% | 4 |
| Mar 7, 2018 | 0910-16-125BR 1602(655) | Smith Tyler |
REPLACE BRIDGE & APPROACHESCR · | $895,229 | $833,389 | STATELINE CONSTRUCTION, LLC | -6.9% | 10 |
| Mar 7, 2018 | 0178-04-005STP 2018(663)HES | Brazoria Houston |
TPGRADING TRAFFIC SIGNALSFM 523 · | $917,620 | $801,469 | THIRD COAST SERVICES LLC | -12.7% | 4 |
| Mar 7, 2018 | 0836-02-071NH 2018(411) | Bell Waco |
MILL/OVLYSH 195 · | $969,052 | $796,526 | LONE STAR PAVING COMPANY | -17.8% | 5 |
| Mar 7, 2018 | 0052-13-005STP 2018(603) | Lamb Lubbock |
INTERSECTION IMPROVEMENTSSL 430 · | $628,879 | $746,928 | ALLEN BUTLER CONSTRUCTION, INC. | +18.8% | 3 |
| Mar 7, 2018 | 0978-02-078C 978-2-78 | Galveston Houston |
REPLACE MBGF, LEVEL UP, TOMFM 3436 · | $652,508 | $625,529 | DURWOOD GREENE CONSTRUCTION CO. | -4.1% | 3 |
| Mar 7, 2018 | 6318-34-001BPM - 631834001 | El Paso El Paso |
BPMIH 10 · | $578,302 | $585,141 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +1.2% | 3 |
| Mar 7, 2018 | 0905-00-075STP 2018(796) | Lubbock Lubbock |
RAISED PAVEMENT MARKERSVA · | $626,567 | $514,252 | CROSS PLUS CONSTRUCTION, LLC | -17.9% | 5 |
| Mar 7, 2018 | 0522-03-026STP 2018(612) | Van Zandt Tyler |
GR, STRS, ACP BS & SURF, C&GFM 16 · | $468,471 | $496,651 | REYNOLDS & KAY, LTD. | +6.0% | 7 |
| Mar 7, 2018 | 6328-47-001RMC - 632847001 | Ector Odessa |
BRIDGE REPAIR CALL OUTIH 20 · | $521,375 | $453,300 | SCR CIVIL CONSTRUCTION, LLC | -13.1% | 5 |
| Mar 7, 2018 | 6327-01-001BPM - 632701001 | Bexar San Antonio |
BRIDGE PREVENTATIVE MAINTENANCESH 16 · | $534,335 | $427,360 | RELMCO, INC. | -20.0% | 14 |
| Mar 7, 2018 | 6322-47-001RMC - 632247001 | Harris Houston |
GUARDRAIL REPAIRSH 249 · | $347,520 | $340,930 | ROY JORGENSEN ASSOCIATES, INC. | -1.9% | 3 |
| Mar 7, 2018 | 6319-45-001RMC - 631945001 | Young Wichita Falls |
GUARDRAIL UPGRADEUS 380 · | $367,420 | $339,981 | HJC FARMS, INC. | -7.5% | 8 |
| Mar 7, 2018 | 6327-56-001RMC - 632756001 | Dallas Dallas |
FLEXIBLE PAVEMENT REPAIRIH 20 · | $445,718 | $300,520 | FOUTSCO PAVING COMPANY, LLC | -32.6% | 3 |
| Mar 7, 2018 | 0908-00-085NH 2018(587) | Taylor Abilene |
BRIDGE REPAIRVA · | $504,145 | $258,870 | AW&E CONSTRUCTION LLC | -48.7% | 12 |
| Mar 6, 2018 | 0072-06-075C 72-6-75 | Kendall San Antonio |
GRAD, BS, STR, SURF, PVMT MRKGIH 10 · | $66,431,418 | $64,660,757 | STERLING DELAWARE HOLDING COMPANY, INC. | -2.7% | 9 |
| Mar 6, 2018 | 0063-06-098NH 2018(795) | Shelby Lufkin |
PLANE, LEVEL-UP AND PFCUS 96 · | $10,450,233 | $9,572,121 | MOORE BROTHERS CONSTRUCTION COMPANY | -8.4% | 4 |
| Mar 6, 2018 | 0077-01-029STP 2018(602) | Reagan San Angelo |
ACP OVERLAY AND SAFETY TREAT FIXED OBJECTSUS 67 · | $7,686,245 | $6,531,381 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -15.0% | 5 |
| Mar 6, 2018 | 0196-03-262NH 2018(582) | Dallas Dallas |
SLOPE FAILURE REPAIRIH 35E · | $4,323,787 | $6,356,006 | SEMA CONSTRUCTION, INC. | +47.0% | 6 |
| Mar 6, 2018 | 0196-03-276NH 2018(578) | Dallas Dallas |
SLOPE FAILURE REPAIRIH 35E · | $4,465,956 | $6,021,377 | ALTUS CONSTRUCTION LLC | +34.8% | 7 |
| Mar 6, 2018 | 0343-03-028STP 2018(571) | Erath Fort Worth |
GR, BS, DR, SC, PAVMT MARKSH 108 · | $8,994,687 | $5,937,215 | JAY MILLS CONTRACTING, INCORPORATED | -34.0% | 4 |
| Mar 6, 2018 | 0191-01-085NH 1702(418) | Smith Tyler |
PLNG,BS RPR,OCST,PFC,SPRPV,MBGF,SHLDR TXT,PV MKUS 69 · | $3,729,276 | $3,628,777 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -2.7% | 5 |
| Mar 6, 2018 | 0684-01-069NH 2018(643) | Cameron Pharr |
REHABILITATE PAVEMENTFM 511 · | $3,589,601 | $3,399,954 | TEXAS SAI, INC. | -5.3% | 7 |
| Mar 6, 2018 | 0221-05-090STP 2018(646) | Titus Atlanta |
PLANE ACP, ACP SURF, & PAV MARKUS 271 · | $2,616,224 | $2,501,082 | RK HALL, LLC | -4.4% | 3 |
| Mar 6, 2018 | 0586-01-066NH 2018(666) | Brazoria Houston |
SC, LEVEL UP, W/ LP DETRS & O/LSH 332 · | $3,226,591 | $2,395,790 | DURWOOD GREENE CONSTRUCTION CO. | -25.7% | 3 |
| Mar 6, 2018 | 0848-04-046STP 2018(596) | Medina San Antonio |
REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSFM 462 · | $2,386,370 | $1,968,967 | DEAN WORD COMPANY, LTD. | -17.5% | 10 |
| Mar 6, 2018 | 0011-01-036C 11-1-36 | Taylor Abilene |
MILL,SPOT REPAIR & OVERLAYSH 351 · | $1,812,752 | $1,708,497 | FOUTSCO PAVING COMPANY, LLC | -5.8% | 5 |
| Mar 6, 2018 | 0500-01-145NH 2018(664) | Galveston Houston |
BASE REP, MILLING, SEAL COAT, O/LIH 45 · | $1,604,393 | $1,551,544 | ANGEL BROTHERS HOLDINGS CORP. | -3.3% | 2 |
| Mar 6, 2018 | 0846-03-046STP 2018(607) | Matagorda Yoakum |
ACP OVERLAYFM 521 · | $1,783,799 | $1,521,680 | DURWOOD GREENE CONSTRUCTION CO. | -14.7% | 4 |
| Mar 6, 2018 | 0018-03-049NH 2018(729) | Webb Laredo |
BASE,ACP,GRADE,STR,SIGN,PAVMRKIH 35 · | $1,398,324 | $1,521,455 | REIM CONSTRUCTION, INC. | +8.8% | 7 |
| Mar 6, 2018 | 0913-27-061BR 2018(876) | Victoria Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,735,266 | $1,477,750 | SB CONTRACTORS LLC | -14.8% | 7 |
| Mar 6, 2018 | 0914-00-397STP 2018(597) | Travis Austin |
FY 2018 NON-SITE SPECIFIC SIGNALSVA · | $1,449,796 | $1,469,946 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +1.4% | 2 |
| Mar 6, 2018 | 0010-19-012STP 2018(645)HES | Bowie Atlanta |
SAFETY TREAT FIXED OBJECTSFM 991 · | $1,965,619 | $1,463,551 | CDM HOLDINGS, LLC | -25.5% | 11 |
| Mar 6, 2018 | 2745-01-008STP 2018(581) | Collin Dallas |
BASE REPAIR, OVERLAYFM 2755 · | $1,612,085 | $1,442,158 | FOUTSCO PAVING COMPANY, LLC | -10.5% | 6 |
| Mar 6, 2018 | 6323-37-001RMC - 632337001 | Harris Houston |
MNT OF VIVDSIH 610 · | $1,440,676 | $1,364,234 | THIRD COAST SERVICES LLC | -5.3% | 4 |
| Mar 6, 2018 | 2266-02-139NH 2018(574) | Tarrant Fort Worth |
REPAIR CONC, DIAMOND GRIND, PAV MARKSH 360 · | $2,030,813 | $1,297,565 | INTERSTATE IMPROVEMENT, INC. | -36.1% | 6 |
| Mar 6, 2018 | 0220-05-070STP 2018(636)MM | Cameron Pharr |
INSTALL TRAFFIC SIGNAL AND SIDEWALKSSH 48 · | $1,212,067 | $1,198,847 | THE LEVY COMPANY, INC. | -1.1% | 4 |
| Mar 6, 2018 | 0573-05-019STP 2018(606) | De Witt Yoakum |
ACP OVERLAYFM 240 · | $1,414,962 | $1,191,777 | DEAN WORD COMPANY, LTD. | -15.8% | 6 |
| Mar 6, 2018 | 0039-17-196BR 2018(635) | Hidalgo Pharr |
INSTALL DEFLECTION WALLS,PAINT AND_SEAL JOINTSIH 2 · | $1,200,278 | $1,104,702 | IOC COMPANY LLC | -8.0% | 3 |
| Mar 6, 2018 | 1157-01-014BR 2018(614) | Angelina Lufkin |
BRIDGE REPLACEMENTFM 841 · | $1,080,170 | $1,023,278 | STATELINE CONSTRUCTION, LLC | -5.3% | 7 |
| Mar 6, 2018 | 0910-12-125BR 1602(651) | Van Zandt Tyler |
REPLACE BRIDGE AND APPROACHESCR · | $999,557 | $904,835 | B & E CONSTRUCTION INC | -9.5% | 11 |
| Mar 6, 2018 | 0593-01-123C 593-1-123 | Liberty Beaumont |
LEVEL-UP/OVERLAYSH 321 · | $1,209,749 | $845,385 | SMITH & COMPANY | -30.1% | 5 |
| Mar 6, 2018 | 6318-29-001BPM - 631829001 | Hidalgo Pharr |
BPMFM 1015 · | $906,326 | $827,634 | VALLEY INFRASTRUCTURE, INC. | -8.7% | 5 |
| Mar 6, 2018 | 0902-39-021BR 2007(456) | Palo Pinto Fort Worth |
REPLACE BRIDGE AND APPROACHESCR · | $830,122 | $826,138 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -0.5% | 10 |
| Mar 6, 2018 | 0049-01-090NH 2018(588) | McLennan Waco |
UNDERSEAL/LEVELUP/OVERLAYSH 6 · | $1,112,890 | $720,812 | OLDCASTLE MATERIALS TEXAS, INC. | -35.2% | 4 |
| Mar 6, 2018 | 6324-96-001RMC - 632496001 | Navarro Dallas |
FULL DEPTH CONCRETE REPAIRSH 31 · | $738,900 | $715,958 | O. TREVINO CONSTRUCTION, LLC | -3.1% | 4 |
| Mar 6, 2018 | 0831-02-020STP 2018(591)HES | Limestone Waco |
SFTY TR FX OBJSFM 342 · | $729,363 | $698,267 | BEAR CREEK CONTRACTING, LLC | -4.3% | 6 |
| Mar 6, 2018 | 0177-01-103NH 2018(613) | Polk Lufkin |
OVERLAY WITH PFC_(NORTH BOUND LANES ONLY)US 59 · | $636,072 | $562,885 | SMITH & COMPANY | -11.5% | 4 |
| Mar 6, 2018 | 6326-62-001RMC - 632662001 | Montgomery Houston |
MILL AND OVERLAYIH 45 · | $463,800 | $551,281 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +18.9% | 7 |
1–100 of 117Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.