104BidsOct 5, 2016 to Feb 1, 2023
12Wins (low bidder)
11.5%Win rate
$254,844,526Total won
Competitor scorecard
Last 5 years in Texas14.3%Win rate2 of 14 bids
+27.6%Average bid vs estimate
+17.1%Winning bids vs estimate
+20.5%Over the low bid when they loseAverage field: 5.9 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| JAMES CONSTRUCTION GROUP, LLC | 6 | 3 | 3 | 50% |
| R CONSTRUCTION CIVIL, LLC | 6 | 4 | 2 | 67% |
| SER CONSTRUCTION PARTNERS, LLC | 6 | 3 | 3 | 50% |
| ISI CONTRACTING, INC. | 5 | 2 | 3 | 40% |
| TEXAS MATERIALS GROUP, INC. | 5 | 4 | 1 | 80% |
| RAGLE CONSTRUCTION, INC. | 4 | 3 | 1 | 75% |
| NBG CONSTRUCTORS, INC. | 4 | 1 | 3 | 25% |
| HARPER BROTHERS CONSTRUCTION LLC | 4 | 3 | 1 | 75% |
| MAIN LANE INDUSTRIES LTD. | 4 | 2 | 2 | 50% |
| ED BELL CONSTRUCTION COMPANY | 3 | 3 | 0 | 100% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Feb 1, 2023 | 0912-72-406 | BRIDGE REPLACEMENTHarris · Houston | 8 of 9 | $4,833,670 | $4,303,858ARANDA BROTHERS CONSTRUCTIO… | +12.3% |
| Feb 1, 2023 | 0912-72-558 | BRIDGE REPLACEMENTBrazoria · Houston | 3 of 6 | $2,828,628 | $2,503,744ARANDA BROTHERS CONSTRUCTIO… | +13.0% |
| Nov 2, 2022 | 0114-11-086 | CONSTRUCT FRONTAGE ROADSWaller · Houston | 2 of 8 | $10,963,075 | $10,942,905ISI CONTRACTING, INC. | +0.2% |
| Oct 6, 2022 | 1412-03-038 | HIGHWAY IMPROVEMENTWharton · Yoakum | 3 of 5 | $15,386,133 | $14,535,848JAMES CONSTRUCTION GROUP, L… | +5.8% |
| Sep 8, 2022 | 0027-12-158 | BRIDGE REPLACEMENTFort Bend · Houston | 3 of 5 | $7,084,065 | $5,893,967NBG CONSTRUCTORS, INC. | +20.2% |
| Aug 4, 2022 | 0114-11-086 | CONSTRUCT FRONTAGE ROADSWaller · Houston | 2 of 9 | $11,086,022 | $10,998,209SER CONSTRUCTION PARTNERS, … | +0.8% |
| Jun 30, 2022 | 0162-04-057 | BRIDGE REPLACEMENTNavarro · Dallas | 2 of 6 | $6,083,414 | $5,998,923MP HEAVY CONSTRUCTION INC | +1.4% |
| Jun 29, 2022 | 0451-03-013 | GR,PVMT,STR,SIGNSCollin · Dallas | 1 of 5 | $31,480,213 | $31,480,213 | Won |
| Jun 29, 2022 | 0389-13-039 | CONSTRUCT BRIDGEHarris · Houston | 2 of 5 | $24,955,650 | $24,851,806ISI CONTRACTING, INC. | +0.4% |
| Jun 29, 2022 | 0675-08-114 | CONSTRUCT FRONTAGE ROADSMontgomery · Houston | 3 of 8 | $7,813,755 | $7,473,853JAMES CONSTRUCTION GROUP, L… | +4.5% |
| Jun 29, 2022 | 6401-72-001 | CONCRETE SPALL REPAIRHarris · Houston | 3 of 3 | $5,762,726 | $2,439,368ISI CONTRACTING, INC. | +136.2% |
| Mar 4, 2022 | 0095-04-069 | INTERSECTION IMPROVEMENTS AND BRIDGE REPLACEMENTKaufman · Dallas | 1 of 3 | $15,839,362 | $15,839,362 | Won |
| Mar 3, 2022 | 0136-01-066 | BRIDGE REPLACEMENTHunt · Paris | 3 of 4 | $3,218,522 | $2,620,776HIGHWAY 19 CONSTRUCTION LLC | +22.8% |
| Dec 1, 2021 | 0110-05-126 | REPLACE SB FRONTAGE ROAD BRIDGE AND APPROACHESHarris · Houston | 6 of 7 | $8,558,683 | $6,683,534ARANDA BROTHERS CONSTRUCTIO… | +28.1% |
| Nov 4, 2021 | 0902-90-117 | RECONSTRUCT EXISTING ROADWAYTarrant · Fort Worth | 6 of 7 | $7,259,528 | $6,339,143SEMA CONSTRUCTION, INC. | +14.5% |
| Sep 1, 2021 | 2898-01-012 | SURFACING/ROADWAY RESTORATIONWaller · Houston | 1 of 5 | $5,061,781 | $5,061,781 | Won |
| Aug 5, 2021 | 2941-02-062 | INSTALL RAISED MEDIANHarris · Houston | 2 of 4 | $3,986,238 | $3,615,523MBN ENTERPRISES LLC | +10.3% |
| Aug 4, 2021 | 1259-01-044 | RECONSTRUCT & WIDEN FROM 2 TO 4 LANESMontgomery · Houston | 7 of 7 | $19,978,085 | $16,095,271JAMES CONSTRUCTION GROUP, L… | +24.1% |
| Aug 4, 2021 | 0162-01-097 | CONSTRUCT NEW OVERPASS AND APPROACHESMcLennan · Waco | 5 of 5 | $16,495,327 | $11,321,680WEBBER, LLC | +45.7% |
| Jul 1, 2021 | 0912-56-056 | REPLACE BRIDGE AND APPROACHESWaller · Houston | 7 of 10 | $781,393 | $560,102TREVWAY, INC. | +39.5% |
| Jun 4, 2021 | 0914-33-068 | CONSTRUCT NEW ROADHays · Austin | 8 of 10 | $20,211,140 | $17,724,256J3 COMPANY, LLC | +14.0% |
| Jun 4, 2021 | 0073-02-080 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TBexar · San Antonio | 7 of 9 | $4,830,943 | $4,316,413SALINAS CONSTRUCTION TECHNO… | +11.9% |
| Apr 8, 2021 | 0521-05-148 | SURFACING/ROADWAY RESTORATIONBexar · San Antonio | 2 of 8 | $23,585,187 | $22,297,586AUSTIN BRIDGE & ROAD SERVIC… | +5.8% |
| Apr 7, 2021 | 1188-02-100 | HIGHWAY IMPROVEMENTMidland · Odessa | 7 of 8 | $21,937,568 | $18,245,178JONES BROS. DIRT & PAVING C… | +20.2% |
| Apr 7, 2021 | 0016-08-039 | BRIDGE REPLACEMENTBexar · San Antonio | 7 of 8 | $8,407,776 | $6,974,797RELMCO, INC. | +20.5% |
| Mar 5, 2021 | 1776-02-019 | CONSTRUCT NEW ROADWAY LANESHays · Austin | 10 of 12 | $6,924,981 | $5,959,526HUNTER INDUSTRIES, LTD. | +16.2% |
| Feb 4, 2021 | 0005-14-067 | CONSTRUCT BRIDGEMidland · Odessa | 2 of 7 | $37,379,669 | $36,305,216JAMES CONSTRUCTION GROUP, L… | +3.0% |
| Dec 2, 2020 | 2523-02-068 | CONSTRUCTION OF SUPER 2 HIGHWAYBrazoria · Houston | 4 of 5 | $38,332,628 | $28,859,306ANGEL BROTHERS HOLDINGS COR… | +32.8% |
| Nov 5, 2020 | 0092-01-057 | REPLACE BRIDGE AND APPROACHESDallas · Dallas | 3 of 13 | $15,268,336 | $14,944,473AUSTIN BRIDGE & ROAD SERVIC… | +2.2% |
| Oct 2, 2020 | 0508-01-345 | CONSTRUCT EAST BOUND ENTRANCE RAMPHarris · Houston | 8 of 8 | $17,196,494 | $14,598,296SER CONSTRUCTION PARTNERS, … | +17.8% |
| Oct 2, 2020 | 0598-02-119 | CONSTRUCT NEW 2-LANE NB FRONTAGE ROADBrazoria · Houston | 7 of 10 | $5,215,094 | $4,797,529SER CONSTRUCTION PARTNERS, … | +8.7% |
| Oct 2, 2020 | 0197-03-054 | CONSTRUCT NEW 2-LANE FRONTAGE RDS & RAMP MODSKaufman · Dallas | 5 of 9 | $14,810,995 | $12,972,961AUSTIN BRIDGE & ROAD SERVIC… | +14.2% |
| Oct 1, 2020 | 1259-01-043 | RECONSTRUCT & WIDEN FROM 2 TO 4 LANESMontgomery · Houston | 6 of 11 | $15,910,437 | $14,690,168JAMES CONSTRUCTION GROUP, L… | +8.3% |
| Sep 4, 2020 | 2351-01-017 | GR, STR, BASE, CRCP, PVMT MKGSCollin · Dallas | 7 of 12 | $34,541,528 | $29,721,073AUSTIN BRIDGE & ROAD SERVIC… | +16.2% |
| Sep 3, 2020 | 1986-01-065 | CONSTRUCT DRAINAGE CULVERTS&REPLACE CONCRETE PVMNTMontgomery · Houston | 8 of 13 | $4,191,285 | $3,360,867RAC INDUSTRIES, LLC | +24.7% |
| Aug 5, 2020 | 2073-01-010 | WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/FLUSHGregg · Tyler | 4 of 4 | $17,073,908 | $13,220,500EAST TEXAS BRIDGE, INC. | +29.1% |
| Jul 9, 2020 | 0216-01-057 | CONSTRUCT GRADE SEPARATIONComal · San Antonio | 6 of 8 | $15,320,486 | $14,284,639HUNTER INDUSTRIES, LTD. | +7.3% |
| Jun 4, 2020 | 0135-10-057 | ADD RAISED MEDIAN LEFT & RIGHT TURN LN & RESTRIPEDenton · Dallas | 4 of 8 | $22,183,370 | $21,269,537RAGLE CONSTRUCTION, INC. | +4.3% |
| May 8, 2020 | 1433-01-029 | INTERSECT OPER IMPROV & INCL WIDEN CIBOLO CRK BRDGBexar · San Antonio | 7 of 10 | $8,107,023 | $6,580,023HARPER BROTHERS CONSTRUCTIO… | +23.2% |
| Mar 4, 2020 | 0430-01-057 | RECNST 4LN UNDIVIDED RUR TO 4 LN DIVIDED URBDallas · Dallas | 4 of 8 | $14,561,391 | $13,666,181ED BELL CONSTRUCTION COMPANY | +6.6% |
| Dec 3, 2019 | 0598-02-126 | INTERSECTION IMPROVEMENTBrazoria · Houston | 4 of 8 | $2,917,414 | $2,759,899ANGEL BROTHERS HOLDINGS COR… | +5.7% |
| Nov 6, 2019 | 2455-01-031 | WIDEN NON-FREEWAYGrayson · Paris | 5 of 5 | $39,553,719 | $31,389,823ZACHRY CONSTRUCTION CORPORA… | +26.0% |
| Oct 3, 2019 | 0720-03-141 | CONSTRUCT RAMPSHarris · Houston | 1 of 7 | $2,241,514 | $2,241,514 | Won |
| Oct 2, 2019 | 0008-16-042 | CONSTRUCT NEW ROADWAY LANESTarrant · Fort Worth | 7 of 8 | $26,898,489 | $21,436,037SEMA CONSTRUCTION, INC. | +25.5% |
| Sep 5, 2019 | 0508-01-359 | CONSTRUCT RAMPSHarris · Houston | 3 of 7 | $4,863,924 | $4,637,319JAMES CONSTRUCTION GROUP, L… | +4.9% |
| Aug 6, 2019 | 0188-09-042 | WIDEN FROM 2 TO 4 LANESFort Bend · Houston | 5 of 8 | $2,762,331 | $2,399,432MBN ENTERPRISES LLC | +15.1% |
| Jun 4, 2019 | 0366-03-068 | REHABILITATE AND WIDEN TO ADD SHOULDERSGuadalupe · San Antonio | 2 of 6 | $25,602,253 | $24,608,309HUNTER INDUSTRIES, LTD. | +4.0% |
| Jun 4, 2019 | 0028-01-098 | UPGRADE DRAINAGE STRUCTURESHarris · Houston | 2 of 2 | $2,217,540 | $2,098,041MAIN LANE INDUSTRIES LTD. | +5.7% |
| May 8, 2019 | 0313-02-057 | REHABILITATION OF EXISTING ROADParker · Fort Worth | 1 of 5 | $23,361,070 | $23,361,070 | Won |
| May 8, 2019 | 0912-31-296 | REPLACE BRIDGE AND APPROACHESBrazoria · Houston | 1 of 6 | $2,849,524 | $2,849,524 | Won |
| May 7, 2019 | 0912-73-183 | CONSTRUCT NEW ROADSGalveston · Houston | 3 of 4 | $8,182,306 | $6,676,661ANGEL BROTHERS HOLDINGS COR… | +22.6% |
| May 7, 2019 | 0915-17-067 | REPLACE BRIDGE AND APPROACHESComal · San Antonio | 8 of 11 | $2,131,912 | $1,589,567SB CONTRACTORS LLC | +34.1% |
| Apr 3, 2019 | 0072-06-074 | RECONFG RAMPS & WIDEN FR TO CONVERT TO ONE WAY OPKendall · San Antonio | 2 of 6 | $18,556,157 | $18,335,085AUSTIN BRIDGE & ROAD SERVIC… | +1.2% |
| Apr 3, 2019 | 0912-72-363 | RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS,Harris · Houston | 3 of 4 | $19,373,405 | $17,999,505HARPER BROTHERS CONSTRUCTIO… | +7.6% |
| Apr 3, 2019 | 0172-05-115 | GR, RV, DR, BR, RET WALL, CUL, SIGN, PV MKEllis · Dallas | 7 of 9 | $41,256,425 | $37,276,577OHL USA, INC. | +10.7% |
| Apr 2, 2019 | 0173-02-071 | REHAB EXISTING ROADWAY AND ADD SHOULDERSKaufman · Dallas | 1 of 9 | $36,563,467 | $36,563,467 | Won |
| Apr 2, 2019 | 0072-06-084 | OVERLAY & PVMNT MARKINGS ON MAIN LNSKendall · San Antonio | 5 of 6 | $22,498,800 | $20,658,006CLARK CONSTRUCTION OF TEXAS… | +8.9% |
| Mar 5, 2019 | 1062-04-022 | WIDEN TO 4-LANE DIVIDEDHarris · Houston | 8 of 9 | $50,439,532 | $43,751,963TRIPLE B SERVICES LLP | +15.3% |
| Feb 5, 2019 | 2452-04-016 | EXPAND FROM 2 LANES TO 4 LANE DIVIDEDBexar · San Antonio | 7 of 14 | $21,234,677 | $20,172,902MARIO SINACOLA & SONS EXCAV… | +5.3% |
| Jan 8, 2019 | 0089-07-146 | CONSTRUCT FRONTAGE ROADSWharton · Yoakum | 7 of 7 | $46,543,101 | $34,757,445SER CONSTRUCTION PARTNERS, … | +33.9% |
| Jan 8, 2019 | 0581-01-137 | REPLACE BRIDGE AND APPROACHESDallas · Dallas | 5 of 8 | $6,714,858 | $6,192,206RAGLE CONSTRUCTION, INC. | +8.4% |
| Nov 7, 2018 | 0092-13-024 | REPLACE BRIDGE AND APPROACHESNavarro · Dallas | 9 of 15 | $9,090,402 | $7,970,000PIERCE R & B LLC | +14.1% |
| Oct 3, 2018 | 1890-01-046 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSBexar · San Antonio | 4 of 7 | $18,551,343 | $16,483,393Curran Contracting Company | +12.5% |
| Sep 7, 2018 | 0364-01-148 | GR,BS,DR,PAV,STR,ITS,PAV MK, SIGNTarrant · Fort Worth | 4 of 10 | $21,457,749 | $20,514,949AUSTIN BRIDGE & ROAD SERVIC… | +4.6% |
| Aug 8, 2018 | 2230-01-013 | GRAD, STR, BASE, SURFBexar · San Antonio | 2 of 8 | $17,970,589 | $17,810,211DAN WILLIAMS COMPANY | +0.9% |
| Aug 7, 2018 | 0718-02-045 | GRADING, STRUCTURES, PAVEMENT & STRTarrant · Fort Worth | 5 of 9 | $53,760,261 | $48,586,586WEBBER, LLC | +10.6% |
| Aug 7, 2018 | 0016-03-103 | REPLACE BRIDGE & APPROACHESHays · Austin | 5 of 6 | $34,021,931 | $31,736,977WEBBER, LLC | +7.2% |
| Aug 7, 2018 | 0177-14-010 | RECONSTRUCT AND WIDEN TO A 4 LANEMontgomery · Houston | 7 of 9 | $16,320,649 | $14,347,429ISI CONTRACTING, INC. | +13.8% |
| Jul 10, 2018 | 0081-04-025 | WIDEN 2 TO 6 LANE DIVIDED & REPLACE RR STRDenton · Dallas | 2 of 9 | $44,281,031 | $43,621,757SEMA CONSTRUCTION, INC. | +1.5% |
| Jun 6, 2018 | 2679-02-008 | RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDEDCollin · Dallas | 3 of 5 | $22,767,756 | $21,833,190MARIO SINACOLA & SONS EXCAV… | +4.3% |
| Jun 6, 2018 | 1479-01-024 | EXPAND FROM 2 LANES TO 4 LANES DIVIDEDBexar · San Antonio | 6 of 8 | $43,813,121 | $40,398,632HARPER BROTHERS CONSTRUCTIO… | +8.5% |
| Jun 6, 2018 | 0932-01-090 | REPLACE BRIDGE AND APPROACHESJefferson · Beaumont | 3 of 5 | $16,016,152 | $14,655,685JENSEN CONSTRUCTION COMPANY… | +9.3% |
| Jun 6, 2018 | 1068-04-119 | CONSTRUCT 0/4 LN FRTG RDS AND RAMP MODIFICATIONSDallas · Dallas | 8 of 10 | $42,718,119 | $37,840,878SEMA CONSTRUCTION, INC. | +12.9% |
| May 1, 2018 | 1051-01-037 | WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDEDEllis · Dallas | 1 of 11 | $32,207,127 | $32,207,127 | Won |
| Apr 4, 2018 | 1290-02-017 | RECONST & WIDEN 2 LN.RURAL TO 4 LN.DIVIDED,ULT_6Rockwall · Dallas | 6 of 10 | $21,949,227 | $20,669,106ED BELL CONSTRUCTION COMPANY | +6.2% |
| Apr 3, 2018 | 3538-01-045 | CONSTRUCT_GRADE SEPARATIONMontgomery · Houston | 8 of 11 | $27,734,386 | $23,483,270ARANDA BROTHERS CONSTRUCTIO… | +18.1% |
| Apr 3, 2018 | 0508-04-162 | GRADE SEPARATION, REHAB & EXTEND FRONTAGE ROADSJefferson · Beaumont | 1 of 7 | $18,747,291 | $18,747,291 | Won |
| Mar 7, 2018 | 2744-01-011 | RECONSTRUCT TO A 4 LANE DIVIDED CURB & GUTTERMontgomery · Houston | 6 of 9 | $19,518,402 | $18,657,275HARPER BROTHERS CONSTRUCTIO… | +4.6% |
| Mar 7, 2018 | 1567-01-037 | WIDEN TWO LANE RURAL TO SIX LANE URBAN DIVIDEDDenton · Dallas | 3 of 9 | $18,930,873 | $18,011,511MARIO SINACOLA & SONS EXCAV… | +5.1% |
| Mar 6, 2018 | 0072-06-075 | GRAD, BS, STR, SURF, PVMT MRKGKendall · San Antonio | 1 of 9 | $64,660,757 | $64,660,757 | Won |
| Feb 2, 2018 | 6325-63-001 | REPLACE CULVERT STRUCTUREHays · Austin | 7 of 10 | $346,532 | $260,107DAN WILLIAMS COMPANY | +33.2% |
| Feb 1, 2018 | 0142-05-080 | WIDEN RDWY TO PROVIDE PASS LN & OPERATIONAL IMPROVKerr · San Antonio | 3 of 8 | $9,949,980 | $8,690,980ANGEL BROTHERS HOLDINGS COR… | +14.5% |
| Feb 1, 2018 | 0055-08-099 | GR, STRS & SURFMcLennan · Waco | 6 of 8 | $23,646,612 | $20,587,595BIG CREEK CONSTRUCTION, LTD. | +14.9% |
| Dec 6, 2017 | 0440-06-017 | ADD ONE LANE IN EACH DIRECTIONTravis · Austin | 12 of 12 | $46,600,972 | $36,726,431OHL USA, INC. | +26.9% |
| Dec 6, 2017 | 0574-01-029 | REPLACE BRIDGE AND APPROACHESNavarro · Dallas | 9 of 13 | $3,311,328 | $2,595,950PIERCE R & B LLC | +27.6% |
| Nov 3, 2017 | 2374-01-180 | CONSTRUCT NOISE WALLS AT VARIOUS LOCATIONSDallas · Dallas | 4 of 9 | $13,516,107 | $11,750,607AUSTIN BRIDGE & ROAD SERVIC… | +15.0% |
| Nov 2, 2017 | 0912-71-386 | GR, STRS & SURFHarris · Houston | 6 of 9 | $20,665,055 | $18,871,436JAMES CONSTRUCTION GROUP, L… | +9.5% |
| Oct 4, 2017 | 0111-03-031 | WIDEN TO 4-LN & CONSTR RR GR SEPARATIONFort Bend · Houston | 7 of 11 | $36,887,028 | $34,567,384PULICE CONSTRUCTION, INC. | +6.7% |
| Aug 8, 2017 | 0912-71-386 | GR, STRS & SURFHarris · Houston | 6 of 9 | $20,790,728 | $17,962,352ANGEL BROTHERS HOLDINGS COR… | +15.7% |
| Jul 11, 2017 | 0162-02-031 | GR, STRS & SURFHill · Waco | 8 of 9 | $80,685,771 | $63,963,885SUNDT CONSTRUCTION, INC. | +26.1% |
| Jul 11, 2017 | 0216-01-036 | GRADING, STRUCTURES, BASE AND SURFACEComal · San Antonio | 4 of 8 | $46,117,883 | $42,308,391HUNTER INDUSTRIES, LTD. | +9.0% |
| Jun 7, 2017 | 0065-06-063 | CONSTRUCT FRONTAGE ROADS OVER PINE ISLAND BAYOUHardin · Beaumont | 1 of 3 | $10,637,780 | $10,637,780 | Won |
| Jun 7, 2017 | 0081-13-057 | CONSTRUCT 2 LANE NORTHBOUND FRONTAGE ROADDenton · Dallas | 4 of 6 | $16,521,880 | $15,229,274ED BELL CONSTRUCTION COMPANY | +8.5% |
| Jun 6, 2017 | 2374-04-049 | CONSTRUCTION OF FRONTAGE ROADSDallas · Dallas | 7 of 7 | $63,472,678 | $54,241,512FLUOR HEAVY CIVIL, LLC | +17.0% |
| Jun 6, 2017 | 0912-72-336 | CONST RAILROAD GRADE SEPERATIONHarris · Houston | 1 of 9 | $11,194,639 | $11,194,639 | Won |
| Jun 6, 2017 | 0314-07-052 | GRADING, STRUCTURES AND PAVEMENTParker · Fort Worth | 2 of 8 | $29,999,375 | $29,849,946ED BELL CONSTRUCTION COMPANY | +0.5% |
| Apr 4, 2017 | 0912-71-003 | ROADWAY RECONSTRUCTIONHarris · Houston | 5 of 6 | $13,398,755 | $12,380,277J.D. ABRAMS, L.P. | +8.2% |
| Mar 7, 2017 | 0016-05-115 | REPLACE EXIST BRIDGE, CONSTRUCT NEW TURNAROUNDSComal · San Antonio | 12 of 12 | $8,876,986 | $7,256,065ANDERSON COLUMBIA CO., INC. | +22.3% |
| Feb 3, 2017 | 0912-34-143 | CONSTRUCT 4-LN DIVIDED ROADWAYFort Bend · Houston | 8 of 11 | $4,474,154 | $3,825,527SER CONSTRUCTION PARTNERS, … | +17.0% |
| Feb 3, 2017 | 0363-03-049 | RECONSTRUCT BRIDGE & CHANNELTarrant · Fort Worth | 5 of 7 | $6,215,724 | $5,252,178DCI CONTRACTING, INC. | +18.3% |
| Jan 4, 2017 | 0027-07-032 | REPLACE RAILROAD UNDERPASSFort Bend · Houston | 9 of 12 | $20,453,919 | $18,405,189ANGEL BROTHERS HOLDINGS COR… | +11.1% |
| Nov 4, 2016 | 0028-11-179 | WIDEN EXISTING MAINLANES FROM 4 TO 6 LANESOrange · Beaumont | 2 of 6 | $14,023,217 | $12,418,604JAMES CONSTRUCTION GROUP, L… | +12.9% |
| Nov 3, 2016 | 0902-48-722 | GR, BS, STR & STRIPINGTarrant · Fort Worth | 2 of 10 | $9,934,526 | $9,048,794J.D. ABRAMS, L.P. | +9.8% |
| Oct 5, 2016 | 0088-05-092 | CONSTRUCT 4-LANE OVERPASSVictoria · Yoakum | 3 of 3 | $11,630,681 | $8,914,435HUNTER INDUSTRIES, LTD. | +30.5% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.