94BidsOct 8, 2013 to Jan 8, 2025
16Wins (low bidder)
17.0%Win rate
$47,514,424Total won
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Jan 8, 2025 | 0921-02-492 | Mile 1 West Rd. - 0921-02-492Hidalgo · Pharr | 3 of 4 | $3,030,168 | $2,537,955TEXAS CORDIA CONSTRUCTION, … | +19.4% |
| Jan 7, 2025 | 0913-20-099 | CR 5206 REPLACE BRIDGE 2612Austin · Yoakum | 4 of 9 | $1,999,363 | $1,737,587STX CIVIL | +15.1% |
| Mar 6, 2024 | 0913-26-064 | BRIDGE REPLACEMENTColorado · Yoakum | 4 of 8 | $2,900,849 | $2,752,207TREVWAY, INC. | +5.4% |
| Mar 6, 2024 | 0089-10-030 | BRIDGE REPLACEMENTWharton · Yoakum | 6 of 6 | $1,879,751 | $1,257,172R CONSTRUCTION CIVIL, LLC | +49.5% |
| Dec 6, 2023 | 0978-01-039 | HIGHWAY IMPROVEMENTGalveston · Houston | 4 of 6 | $644,666 | $519,798RAGLE CONSTRUCTION, INC. | +24.0% |
| Feb 1, 2023 | 0912-72-406 | BRIDGE REPLACEMENTHarris · Houston | 1 of 9 | $4,303,858 | $4,303,858 | Won |
| Feb 1, 2023 | 0912-72-558 | BRIDGE REPLACEMENTBrazoria · Houston | 1 of 6 | $2,503,744 | $2,503,744 | Won |
| Nov 3, 2022 | 0862-01-057 | BRIDGE REPLACEMENTHidalgo · Pharr | 5 of 5 | $3,151,699 | $1,917,664TEXAS CORDIA CONSTRUCTION, … | +64.4% |
| Nov 3, 2022 | 0913-28-082 | BRIDGE REPLACEMENTFayette · Yoakum | 3 of 8 | $1,394,996 | $1,338,297HODGES AND SON CONSTRUCTION… | +4.2% |
| Aug 4, 2022 | 0912-73-223 | CONSTRUCT PEDESTRIAN INFRASTRUCTUREGalveston · Houston | 3 of 6 | $4,724,809 | $4,496,853SER CONSTRUCTION PARTNERS, … | +5.1% |
| Aug 4, 2022 | 0912-72-397 | CONSTRUCT NEW 5 FT SIDEWALKS ALONG CITY OWNED RDSHarris · Houston | 3 of 9 | $1,232,234 | $1,108,603MBN ENTERPRISES LLC | +11.2% |
| Jun 30, 2022 | 0912-31-307 | BRIDGE REPLACEMENTBrazoria · Houston | 3 of 3 | $3,939,754 | $3,440,533R CONSTRUCTION CIVIL, LLC | +14.5% |
| Dec 2, 2021 | 0026-02-037 | BICYCLE AND PEDESTRIAN IMPROVEMENTSFayette · Yoakum | 3 of 4 | $3,219,996 | $2,774,625TREVWAY, INC. | +16.1% |
| Dec 1, 2021 | 0110-05-126 | REPLACE SB FRONTAGE ROAD BRIDGE AND APPROACHESHarris · Houston | 1 of 7 | $6,683,534 | $6,683,534 | Won |
| Oct 12, 2021 | 6385-17-001 | BRIDGE REPLACEMENTHarris · Houston | 5 of 5 | $406,253 | $269,956STATELINE CONSTRUCTION, LLC | +50.5% |
| Aug 5, 2021 | 0912-72-352 | REPLACE BRIDGE AND APPROACHESHarris · Houston | 1 of 2 | $599,801 | $599,801 | Won |
| Aug 5, 2021 | 0902-38-129 | BRIDGE REPLACEMENTParker · Fort Worth | 4 of 4 | $1,333,265 | $919,705ED BELL CONSTRUCTION COMPANY | +45.0% |
| Aug 4, 2021 | 0008-05-031 | CONSTRUCT PEDESTRIAN INFRASTRUCTURETarrant · Fort Worth | 3 of 7 | $1,842,123 | $1,663,321ENCINO LANDSCAPE, INC. | +10.7% |
| Jul 2, 2021 | 0912-73-212 | REPLACE BRIDGE AND APPROACHESGalveston · Houston | 2 of 6 | $480,316 | $474,034TREVWAY, INC. | +1.3% |
| Jul 1, 2021 | 0912-56-056 | REPLACE BRIDGE AND APPROACHESWaller · Houston | 3 of 10 | $671,332 | $560,102TREVWAY, INC. | +19.9% |
| Feb 5, 2021 | 0976-03-111 | CONSTRUCT CURB RAMPS AND SIGNAL IMPROVEMENTSGalveston · Houston | 4 of 9 | $2,914,820 | $2,777,975TI-ZACK CONCRETE, INC. | +4.9% |
| Feb 5, 2021 | 6371-36-001 | SLOPE REPAIR, INSTALL STEEL PILINGGalveston · Houston | 8 of 11 | $632,400 | $471,058FORDE CONSTRUCTION COMPANY,… | +34.3% |
| Dec 2, 2020 | 0596-02-040 | REPLACE BRIDGE AND APPROACHESEllis · Dallas | 15 of 16 | $3,579,286 | $2,491,390KNIFE RIVER CORPORATION - S… | +43.7% |
| Nov 5, 2020 | 0918-11-096 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 12 of 14 | $1,203,760 | $839,520STATELINE CONSTRUCTION, LLC | +43.4% |
| Nov 4, 2020 | 0172-01-056 | CONSTRUCT PEDESTRIAN INFRASTRUCTURETarrant · Fort Worth | 3 of 8 | $6,310,270 | $5,671,661RAGLE CONSTRUCTION, INC. | +11.3% |
| Oct 2, 2020 | 0598-02-119 | CONSTRUCT NEW 2-LANE NB FRONTAGE ROADBrazoria · Houston | 8 of 10 | $5,527,501 | $4,797,529SER CONSTRUCTION PARTNERS, … | +15.2% |
| Oct 2, 2020 | 6359-99-001 | EROSION REPAIR SH 99Harris · Houston | 3 of 7 | $5,863,710 | $4,645,804FORDE CONSTRUCTION COMPANY,… | +26.2% |
| Oct 1, 2020 | 0912-00-580 | SIDEWALK AND ADA RAMP CONSTRUCTIONHarris · Houston | 1 of 9 | $877,513 | $877,513 | Won |
| Sep 4, 2020 | 0523-10-042 | INTERSECTION IMPROVEMENTSMontgomery · Houston | 6 of 8 | $1,448,548 | $1,099,713MAIN LANE INDUSTRIES LTD. | +31.7% |
| Sep 4, 2020 | 0177-07-001 | PROP. RT TN LN AT W. CLAYTON & U- TURN AT BF 1960AHarris · Houston | 2 of 8 | $445,994 | $395,975MAIN LANE INDUSTRIES LTD. | +12.6% |
| Sep 3, 2020 | 1415-03-012 | CONSTRUCT NOISE BARRIERFort Bend · Houston | 13 of 13 | $2,518,347 | $1,285,464TEXAS WALL & LANDSCAPE | +95.9% |
| Aug 6, 2020 | 0902-48-892 | BRIDGE REPLACEMENTTarrant · Fort Worth | 8 of 9 | $817,079 | $516,409IBCTX, LLC | +58.2% |
| Aug 6, 2020 | 6360-28-001 | ROADWAY IMPROVEMENTSHarris · Houston | 9 of 9 | $2,696,223 | $1,915,650ISI CONTRACTING, INC. | +40.7% |
| Aug 5, 2020 | 0902-48-850 | BRIDGE REPLACEMENTTarrant · Fort Worth | 8 of 8 | $936,112 | $533,000FLUOR HEAVY CIVIL, LLC | +75.6% |
| Aug 5, 2020 | 0920-02-091 | BRIDGELiberty · Beaumont | 5 of 5 | $1,006,431 | $777,586TEXAS MATERIALS GROUP, INC. | +29.4% |
| May 8, 2020 | 0912-72-391 | WIDENING TO A 4-LANE DIVIDED ROADWAYHarris · Houston | 7 of 7 | $24,575,161 | $20,384,047SER CONSTRUCTION PARTNERS, … | +20.6% |
| May 8, 2020 | 0912-31-310 | BICYCLE INFRASTRUCTURE IMPROVEMENTSBrazoria · Houston | 4 of 5 | $2,659,996 | $2,194,263ANGEL BROTHERS HOLDINGS COR… | +21.2% |
| May 8, 2020 | 0976-03-104 | CONSTRUCTION OF A 10' WIDE SHARED USED PATHGalveston · Houston | 1 of 11 | $2,146,674 | $2,146,674 | Won |
| May 7, 2020 | 0508-01-357 | BICYCLE AND PEDESTRIAN IMPROVEMENTSHarris · Houston | 9 of 13 | $6,947,862 | $5,499,460SER CONSTRUCTION PARTNERS, … | +26.3% |
| Mar 13, 2020 | 6352-78-001 | BRIDGE REPAIRMontgomery · Houston | 1 of 6 | $177,150 | $177,150 | Won |
| Mar 5, 2020 | 0912-72-348 | REPLACE BRIDGES AND APPROACHESHarris · Houston | 1 of 5 | $2,898,014 | $2,898,014 | Won |
| Mar 5, 2020 | 0500-03-640 | REHABILITATION OF EXISTING ROADHarris · Houston | 3 of 3 | $4,187,766 | $2,587,343MAIN LANE INDUSTRIES LTD. | +61.9% |
| Mar 4, 2020 | 0902-38-128 | BICYCLE AND PEDESTRIAN IMPROVEMENTSParker · Fort Worth | 8 of 13 | $884,050 | $772,789TI-ZACK CONCRETE, INC. | +14.4% |
| Dec 4, 2019 | 3256-02-098 | EB RAMP & FRONTAGE RD WIDENING AND STRIPINGHarris · Houston | 1 of 5 | $734,299 | $734,299 | Won |
| Dec 3, 2019 | 0912-72-573 | MISCELLANEOUS WORK SOUND WALL CONSTRUCTIONHarris · Houston | 9 of 11 | $4,041,788 | $2,945,247TRICON PRECAST, LTD. | +37.2% |
| Dec 3, 2019 | 0598-02-126 | INTERSECTION IMPROVEMENTBrazoria · Houston | 7 of 8 | $3,284,682 | $2,759,899ANGEL BROTHERS HOLDINGS COR… | +19.0% |
| Nov 6, 2019 | 0508-01-353 | BRIDGE REPLACEMENTHarris · Houston | 6 of 6 | $8,490,042 | $6,382,061NBG CONSTRUCTORS, INC. | +33.0% |
| Aug 6, 2019 | 0188-09-042 | WIDEN FROM 2 TO 4 LANESFort Bend · Houston | 4 of 8 | $2,693,209 | $2,399,432MBN ENTERPRISES LLC | +12.2% |
| Aug 6, 2019 | 1804-01-079 | BRIDGE MAINTENANCEHidalgo · Pharr | 5 of 5 | $2,743,988 | $1,760,708CLORE EQUIPMENT LLC | +55.8% |
| Jan 8, 2019 | 1685-05-110 | CONSTRUCT SIDEWALKSHarris · Houston | 4 of 12 | $2,943,719 | $2,789,053PAUL J. SCARIANO, INC. | +5.5% |
| Aug 7, 2018 | 0921-06-303 | CONST SIDEWALKS, CROSSWALKS,& PATHSCameron · Pharr | 1 of 3 | $361,733 | $361,733 | Won |
| Jul 10, 2018 | 0921-02-305 | REPLACE BRIDGE & RECONSTRUCT APPROACHESHidalgo · Pharr | 3 of 5 | $1,392,133 | $1,276,034TEXAS CORDIA CONSTRUCTION, … | +9.1% |
| May 2, 2018 | 1005-02-001 | WIDEN FROM 2 TO 4-LANE DIVIDED W/CURB & GUTTERHarris · Houston | 6 of 6 | $2,078,182 | $1,763,846TRIPLE B SERVICES LLP | +17.8% |
| May 1, 2018 | 0912-72-333 | REPLACE BRIDGE AND APPROACHESHarris · Houston | 2 of 5 | $1,181,971 | $1,137,428NBG CONSTRUCTORS, INC. | +3.9% |
| Apr 3, 2018 | 3538-01-045 | CONSTRUCT_GRADE SEPARATIONMontgomery · Houston | 1 of 11 | $23,483,270 | $23,483,270 | Won |
| Apr 3, 2018 | 2980-01-013 | CONCRETE FULL DEPTH REPAIRDenton · Dallas | 7 of 9 | $3,093,295 | $2,203,011O. TREVINO CONSTRUCTION, LLC | +40.4% |
| Apr 3, 2018 | 6323-92-001 | INSTALLATION/REMOVAL OF LARGE/SMALL SIGNHidalgo · Pharr | 3 of 4 | $1,279,721 | $867,630THE LEVY COMPANY, INC. | +47.5% |
| Mar 7, 2018 | 2744-01-011 | RECONSTRUCT TO A 4 LANE DIVIDED CURB & GUTTERMontgomery · Houston | 3 of 9 | $18,907,827 | $18,657,275HARPER BROTHERS CONSTRUCTIO… | +1.3% |
| Mar 7, 2018 | 6322-47-001 | GUARDRAIL REPAIRHarris · Houston | 3 of 3 | $526,250 | $340,930ROY JORGENSEN ASSOCIATES, I… | +54.4% |
| Mar 7, 2018 | 6325-49-001 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 6 of 7 | $1,132,559 | $857,457ROY JORGENSEN ASSOCIATES, I… | +32.1% |
| Mar 6, 2018 | 0684-01-069 | REHABILITATE PAVEMENTCameron · Pharr | 3 of 7 | $3,527,439 | $3,399,954TEXAS SAI, INC. | +3.7% |
| Mar 6, 2018 | 6318-29-001 | BPMHidalgo · Pharr | 2 of 5 | $862,305 | $827,634VALLEY INFRASTRUCTURE, INC. | +4.2% |
| Feb 1, 2018 | 1012-03-018 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 16 of 18 | $3,224,196 | $1,885,537L & N BRIDGE, LLC | +71.0% |
| Jan 9, 2018 | 6325-52-001 | REPAIR STORM SEWER AND EROSIONHarris · Houston | 4 of 7 | $164,354 | $126,727MAIN LANE INDUSTRIES LTD. | +29.7% |
| Dec 6, 2017 | 0389-06-107 | RAISE APPROACH AT BRIDGEGalveston · Houston | 5 of 6 | $411,431 | $219,473ISI CONTRACTING, INC. | +87.5% |
| Nov 3, 2017 | 0912-71-799 | GR, BS, REMOVE STRM SWR & PAVHarris · Houston | 3 of 7 | $4,528,880 | $3,745,731RAGLE CONSTRUCTION, INC. | +20.9% |
| Nov 3, 2017 | 3256-01-109 | CONSTRUCT 6 TO 8 FT SIDEWALKHarris · Houston | 4 of 9 | $524,523 | $487,000RAGLE CONSTRUCTION, INC. | +7.7% |
| Oct 4, 2017 | 0027-10-071 | REPLACE BRIDGE AND APPROACHESHarris · Houston | 6 of 12 | $4,155,040 | $3,815,251HARPER BROTHERS CONSTRUCTIO… | +8.9% |
| Aug 9, 2017 | 2374-05-081 | UPGRADE BRIDGE & APPROACH RAILINGTarrant · Fort Worth | 7 of 7 | $1,291,380 | $966,661IOWA BRIDGE & CULVERT, LC | +33.6% |
| Aug 9, 2017 | 0051-02-100 | ADD RIGHT TURN LANESHarris · Houston | 4 of 4 | $446,748 | $345,346MAIN LANE INDUSTRIES LTD. | +29.4% |
| Aug 9, 2017 | 3510-06-014 | CONSTRUCT SOUNDWALLHarris · Houston | 8 of 10 | $4,308,893 | $3,375,271TEXAS WALL & LANDSCAPE | +27.7% |
| Aug 9, 2017 | 0912-31-221 | CONSTRUCTION OF BRIDGE REPLACEMENT AND APPROACHESBrazoria · Houston | 1 of 4 | $602,389 | $602,389 | Won |
| Aug 9, 2017 | 2266-02-146 | SAFETY TREAT FIXED OBJECTSTarrant · Fort Worth | 1 of 8 | $281,936 | $281,936 | Won |
| Aug 8, 2017 | 0921-02-212 | REPLACE OFF-SYSTEM BRIDGEHidalgo · Pharr | 4 of 4 | $1,478,086 | $1,033,763IOC COMPANY LLC | +43.0% |
| Jul 18, 2017 | 6311-71-001 | FULL DEPTH REPAIR OF EXISTING CONCRETETarrant · Fort Worth | 4 of 5 | $261,468 | $243,481IIPL USA LLC | +7.4% |
| Jul 18, 2017 | 6313-83-001 | REMOVE AND RESET CULVERTSHarris · Houston | 3 of 6 | $279,396 | $242,184MAIN LANE INDUSTRIES LTD. | +15.4% |
| Jul 12, 2017 | 0271-14-231 | RECONSTRUCT FRTG RDSHarris · Houston | 4 of 9 | $8,079,801 | $7,781,945MAIN LANE INDUSTRIES LTD. | +3.8% |
| Jun 7, 2017 | 0912-71-896 | CONSTRUCT 4 LANE DIVIDED SECTIONHarris · Houston | 6 of 8 | $6,715,401 | $6,095,884SER CONSTRUCTION PARTNERS, … | +10.2% |
| Jun 7, 2017 | 0598-02-047 | CONSTRUCT NB EXIT AND ENTR RAMPS AND TIE-IN ROADBrazoria · Houston | 5 of 7 | $2,612,561 | $2,336,954ISI CONTRACTING, INC. | +11.8% |
| Jun 6, 2017 | 0912-72-336 | CONST RAILROAD GRADE SEPERATIONHarris · Houston | 8 of 9 | $13,674,582 | $11,194,639STERLING DELAWARE HOLDING C… | +22.2% |
| Mar 8, 2017 | 6295-90-001 | BRIDGE PREVENTATIVE MAINTENANCECameron · Pharr | 1 of 3 | $455,673 | $455,673 | Won |
| Mar 8, 2017 | 0921-02-318 | CONSTRUCT CURB RAMPS AND SIDEWALKSHidalgo · Pharr | 3 of 4 | $1,706,784 | $1,608,279SOUTH TEXAS ILLUMINATION, L… | +6.1% |
| Mar 7, 2017 | 6287-23-001 | DRAINAGE IMPROVEMENTSCameron · Pharr | 2 of 5 | $537,699 | $482,939TEXAS CORDIA CONSTRUCTION, … | +11.3% |
| Feb 3, 2017 | 0912-34-143 | CONSTRUCT 4-LN DIVIDED ROADWAYFort Bend · Houston | 11 of 11 | $5,869,525 | $3,825,527SER CONSTRUCTION PARTNERS, … | +53.4% |
| Feb 2, 2017 | 1062-03-051 | SFTY TR FX OBJSMontgomery · Houston | 4 of 8 | $1,360,127 | $978,908MAIN LANE INDUSTRIES LTD. | +38.9% |
| Jan 5, 2017 | 3312-02-014 | REALIGN ROADWAYGalveston · Houston | 2 of 2 | $2,415,137 | $2,299,181MAIN LANE INDUSTRIES LTD. | +5.0% |
| Jan 4, 2017 | 0331-04-067 | CONST. SIDEWALKS, RAMPS AND CURBSCameron · Pharr | 2 of 9 | $3,541,702 | $3,452,509REIM CONSTRUCTION, INC. | +2.6% |
| Dec 1, 2016 | 0271-05-042 | RAMP RELOCATIONFort Bend · Houston | 8 of 11 | $2,968,535 | $2,297,995ISI CONTRACTING, INC. | +29.2% |
| Nov 4, 2016 | 0502-01-212 | DRAINAGE IMPROVEMENT IN SECTIONSHarris · Houston | 1 of 7 | $992,122 | $992,122 | Won |
| Nov 3, 2016 | 3510-04-053 | ADD UTN, LT TN LNS & REBUILD SIGNALFort Bend · Houston | 4 of 7 | $2,351,088 | $2,240,983MAR-CON SERVICES, LLC | +4.9% |
| Nov 3, 2016 | 0921-06-286 | CONSTRUCT SIDEWALKS AND ADA RAMPSCameron · Pharr | 1 of 6 | $412,715 | $412,715 | Won |
| Nov 12, 2013 | 6262-83-001 | CHANNEL DEBRIS REMOVAL AND DISPOSALHarris · Houston | 3 of 5 | $185,878 | $133,935FORDE CONSTRUCTION COMPANY,… | +38.8% |
| Oct 9, 2013 | 0912-31-265 | REPLACE BRIDGE AND APPROACHESBrazoria · Houston | 5 of 6 | $486,749 | $448,818JOHN REED AND COMPANY, LLC | +8.5% |
| Oct 8, 2013 | 0912-34-159 | REPLACE BRIDGE AND APPROACHESFort Bend · Houston | 2 of 5 | $503,518 | $395,576JOHN REED AND COMPANY, LLC | +27.3% |
Active prime contracts 1
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0912-72-406Let Feb 1, 2023 | HarrisHouston · CS | BRIDGE REPLACEMENT | $4,558,884 | 95% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.