| 1 | 100-2002 |
PREPARING ROW | 3.7 | STA |
$700.00 |
$8,000.00 |
$2,000.00 |
$4,500.00 |
$5,000.00 |
$3,250.00 |
$7,450.00 |
| 2 | 104-2009 |
REMOVING CONC (RIPRAP) | 98 | SY |
$18.00 |
$3.00 |
$25.00 |
$3.00 |
$25.00 |
$9.00 |
$15.00 |
| 3 | 105-2008 |
REMOVING STAB BASE AND ASPH PAV (6") | 76.4 | SY |
$3.10 |
$3.00 |
$6.00 |
$36.00 |
$25.00 |
$50.00 |
$65.00 |
| 4 | 110-2001 |
EXCAVATION (ROADWAY) | 523 | CY |
$6.00 |
$15.00 |
$6.00 |
$12.00 |
$10.00 |
$5.00 |
$22.00 |
| 5 | 110-2002 |
EXCAVATION (CHANNEL) | 140 | CY |
$5.00 |
$15.00 |
$10.00 |
$23.00 |
$8.00 |
$7.00 |
$15.50 |
| 6 | 132-2006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 267 | CY |
$4.00 |
$15.00 |
$10.00 |
$13.00 |
$15.00 |
$11.25 |
$29.00 |
| 7 | 161-2009 |
EROSION CONTROL COMPOST | 148 | CY |
$18.00 |
$2.00 |
$25.00 |
$39.00 |
$40.00 |
$15.35 |
$52.00 |
| 8 | 162-2002 |
BLOCK SODDING | 2,849 | SY |
$3.00 |
$3.00 |
$4.00 |
$4.00 |
$3.00 |
$4.00 |
$3.30 |
| 9 | 164-2045 |
STRAW OR HAY MULCHING | 1,330 | SY |
$0.1500 |
$0.1000 |
$0.5000 |
$0.2600 |
$0.1600 |
$1.00 |
$0.1800 |
| 10 | 164-2051 |
DRILL SEED (TEMP)(WARM OR COOL) | 1,330 | SY |
$0.1500 |
$0.1000 |
$0.5000 |
$0.5100 |
$0.1600 |
$1.00 |
$0.1800 |
| 11 | 166-2001 |
FERTILIZER | 1.24 | AC |
$500.00 |
$400.00 |
$700.00 |
$1,000.00 |
$500.00 |
$1,250.00 |
$510.00 |
| 12 | 168-2001 |
VEGETATIVE WATERING | 155.02 | MG |
$15.00 |
$10.00 |
$25.00 |
$40.00 |
$20.00 |
$35.00 |
$34.50 |
| 13 | 292-2007 |
ASPHALT STAB BASE (GR 2)(PG 64) | 427.13 | TON |
$60.00 |
$74.00 |
$90.00 |
$90.00 |
$85.00 |
$105.00 |
$115.00 |
| 14 | 305-2038 |
SALV, HAUL & STKPL RCL APH PV (5 TO 9") | 76.4 | SY |
$2.00 |
$5.00 |
$10.00 |
$4.00 |
$45.00 |
$50.00 |
$52.00 |
| 15 | 400-2005 |
CEM STABIL BKFL | 26 | CY |
$28.00 |
$40.00 |
$85.00 |
$36.00 |
$70.00 |
$33.00 |
$160.00 |
| 16 | 409-2001 |
PRESTR CONC PIL (16 IN SQ) | 384 | LF |
$72.00 |
$140.00 |
$80.00 |
$155.00 |
$120.00 |
$195.00 |
$120.00 |
| 17 | 420-2003 |
CL C CONC (ABUT) | 27.6 | CY |
$688.00 |
$1,000.00 |
$1,030.00 |
$750.00 |
$1,400.00 |
$850.00 |
$1,100.00 |
| 18 | 420-2029 |
CL S CONC (SLAB) | 35.6 | CY |
$554.00 |
$800.00 |
$845.00 |
$600.00 |
$800.00 |
$550.00 |
$850.00 |
| 19 | 420-2031 |
CL S CONC (SHEAR KEY) | 8.6 | CY |
$0.6000 |
$250.00 |
$375.00 |
$365.00 |
$300.00 |
$215.00 |
$450.00 |
| 20 | 425-2007 |
PRESTR CONC BOX BEAM (5B20) | 387 | LF |
$174.00 |
$180.00 |
$200.00 |
$195.00 |
$181.00 |
$195.00 |
$180.00 |
| 21 | 432-2002 |
RIPRAP (CONC)(5 IN) | 43 | CY |
$415.00 |
$350.00 |
$600.00 |
$350.00 |
$500.00 |
$325.00 |
$325.00 |
| 22 | 450-2161 |
RAIL (TY T223) | 162 | LF |
$82.00 |
$80.00 |
$89.00 |
$110.00 |
$80.00 |
$65.00 |
$140.00 |
| 23 | 464-2007 |
RC PIPE (CL III)(30 IN) | 115 | LF |
$63.00 |
$50.00 |
$110.00 |
$100.00 |
$80.00 |
$114.00 |
$110.00 |
| 24 | 464-2009 |
RC PIPE (CL III)(36 IN) | 90 | LF |
$73.00 |
$60.00 |
$140.00 |
$123.00 |
$100.00 |
$147.00 |
$160.00 |
| 25 | 467-2290 |
SET (TY II)(30 IN)(RCP)(6:1)(P) | 2 | EA |
$2,000.00 |
$800.00 |
$3,500.00 |
$1,600.00 |
$2,400.00 |
$2,232.00 |
$2,000.00 |
| 26 | 467-2292 |
SET (TY II)(36 IN)(RCP)(6:1)(P) | 2 | EA |
$3,200.00 |
$700.00 |
$4,800.00 |
$3,000.00 |
$4,600.00 |
$4,525.00 |
$2,500.00 |
| 27 | 496-2006 |
REMOV STR (HEADWALL) | 4 | EA |
$617.00 |
$1,500.00 |
$600.00 |
$900.00 |
$500.00 |
$2,500.00 |
$610.00 |
| 28 | 496-2007 |
REMOV STR (PIPE) | 124 | LF |
$15.00 |
$5.00 |
$20.00 |
$22.00 |
$35.00 |
$12.00 |
$13.50 |
| 29 | 496-2009 |
REMOV STR (BRIDGE 0-99 FT LENGTH) | 1 | EA |
$20,000.00 |
$35,000.00 |
$20,000.00 |
$15,000.00 |
$20,000.00 |
$25,000.00 |
$12,500.00 |
| 30 | 500-2001 |
MOBILIZATION | 1 | LS |
$35,400.00 |
$40,000.00 |
$45,000.00 |
$47,000.00 |
$46,000.00 |
$20,540.00 |
$53,301.62 |
| 31 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$3,000.00 |
$800.00 |
$1,200.00 |
$500.00 |
$500.00 |
$950.00 |
$4,500.00 |
| 32 | 540-2011 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$1,450.00 |
$1,600.00 |
$1,750.00 |
$1,300.00 |
$1,500.00 |
$1,925.00 |
$1,800.00 |
| 33 | 544-2006 |
GDRAIL END TRT(INST)(WOOD POST)(TY III) | 3 | EA |
$2,550.00 |
$2,400.00 |
$2,500.00 |
$1,900.00 |
$2,600.00 |
$3,235.00 |
$2,900.00 |
| 34 | 644-2001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$330.00 |
$495.00 |
$850.00 |
$700.00 |
$500.00 |
$500.00 |
$690.00 |
| 35 | 658-2241 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) | 12 | EA |
$32.00 |
$36.00 |
$30.00 |
$18.00 |
$35.00 |
$68.25 |
$31.00 |
| 36 | 658-2259 |
INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) | 6 | EA |
$25.00 |
$8.00 |
$20.00 |
$8.00 |
$8.00 |
$36.00 |
$20.50 |
| 37 | 666-2012 |
REFL PAV MRK TY I (W) 4" (SLD)(100MIL) | 730 | LF |
$0.5000 |
$1.00 |
$1.25 |
$1.08 |
$1.00 |
$2.00 |
$1.20 |
| 38 | 666-2111 |
REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) | 730 | LF |
$0.4500 |
$1.00 |
$1.25 |
$1.08 |
$1.00 |
$2.00 |
$1.20 |
| 39 | 672-2015 |
REFL PAV MRKR TY II-A-A | 10 | EA |
$4.00 |
$5.00 |
$10.00 |
$4.46 |
$5.00 |
$15.00 |
$5.70 |
| 40 | 678-2001 |
PAV SURF PREP FOR MRK ( 4") | 1,460 | LF |
$0.0500 |
$0.0100 |
$0.1000 |
$0.0300 |
$0.0300 |
$0.2500 |
$0.0100 |
| 41 | 1122-2001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 120 | LF |
$23.50 |
$60.00 |
$30.00 |
$53.00 |
$60.00 |
$35.00 |
$52.00 |
| 42 | 1122-2009 |
ROCK FILTER DAMS (REMOVE) | 120 | LF |
$10.00 |
$10.00 |
$10.00 |
$22.00 |
$10.00 |
$10.00 |
$17.00 |
| 43 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 330 | LF |
$4.40 |
$3.00 |
$7.00 |
$2.50 |
$3.00 |
$5.00 |
$5.70 |
| 44 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 330 | LF |
$2.50 |
$1.00 |
$1.00 |
$1.00 |
$0.5000 |
$1.00 |
$1.70 |
| 45 | 3267-2119 |
D-GR HMA(SQ) TY-D SAC-A PG70-22 | 106.73 | TON |
$70.00 |
$120.00 |
$175.00 |
$167.00 |
$150.00 |
$187.00 |
$120.00 |
| 46 | 3267-2122 |
D-GR HMA(SQ) TY-D PG70-22 | 106.73 | TON |
$65.08 |
$120.00 |
$175.00 |
$167.00 |
$150.00 |
$187.00 |
$120.00 |