Contact information
- Phone
- (432) 332-0721
- Address
- 1401 S. GRANDVIEW AVE., ODESSA, TX 79761
- TxDOT prequalification
- Construction qualified
127BidsOct 8, 2013 to Aug 6, 2026
62Wins (low bidder)
48.8%Win rate
$987,895,915Total won
Competitor scorecard
Last 5 years in Texas52.3%Win rate34 of 65 bids
+11.8%Average bid vs estimate
-5.6%Winning bids vs estimate
+27.8%Over the low bid when they loseAverage field: 4.2 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| FNF CONSTRUCTION, INC. | 33 | 22 | 11 | 67% |
| REECE ALBERT, INC. | 30 | 19 | 11 | 63% |
| RAGLE CONSTRUCTION, INC. | 30 | 21 | 9 | 70% |
| RK HALL, LLC | 24 | 17 | 7 | 71% |
| A. L. HELMCAMP, INC. | 19 | 14 | 5 | 74% |
| KIEWIT INFRASTRUCTURE SOUTH CO. | 11 | 10 | 1 | 91% |
| CK NEWBERRY, LLC | 11 | 10 | 1 | 91% |
| DAN WILLIAMS COMPANY | 9 | 7 | 2 | 78% |
| FNH CONSTRUCTION, LLC | 8 | 5 | 3 | 63% |
| JAMES HAMILTON CONSTRUCTION CO. | 7 | 5 | 2 | 71% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Aug 6, 2026 | 2528-01-006 | FM_2448_WIDEN_AND_OVERLAY_REEVES_COUNTYReeves · Odessa | 4 of 5 | $10,147,938 | $8,604,312DAN WILLIAMS COMPANY | +17.9% |
| Aug 5, 2026 | 0441-09-054 | IH10_1.2MI_E_OF_FM3078_1.6MI_W_FM2903Reeves · Odessa | 3 of 5 | $18,237,509 | $14,980,840FNF CONSTRUCTION, INC. | +21.7% |
| Jul 2, 2026 | 0005-04-084 | IH20_RampReversal_SH137_BI20-F EASTMartin · Odessa | 4 of 4 | $11,127,859 | $8,792,883GILVIN-TERRILL, LTD. | +26.6% |
| Jul 1, 2026 | 2370-01-009 | FM3334_SH17_Old DairyReeves · Odessa | 2 of 4 | $7,372,325 | $7,369,594A. L. HELMCAMP, INC. | +0.0% |
| Jul 1, 2026 | 0229-01-042 | US385_AT S SL338Ector · Odessa | 1 of 6 | $53,657,268 | $53,657,268 | Won |
| May 7, 2026 | 0463-07-055 | SH302_MarianDriveTurnLanesEctor · Odessa | 3 of 3 | $2,077,778 | $1,275,100RAGLE CONSTRUCTION, INC. | +63.0% |
| May 6, 2026 | 0572-01-076 | OVERLAY_SH302_SH158_SL338Ector · Odessa | 1 of 5 | $9,284,543 | $9,284,543 | Won |
| Apr 8, 2026 | 1823-01-011 | FM1208_FM1212_MIDLAND_C/LMartin · Odessa | 1 of 5 | $9,373,792 | $9,373,792 | Won |
| Apr 7, 2026 | 2005-03-009 | FM1882_SP450_TO_BI20_REHABEctor · Odessa | 1 of 3 | $10,253,366 | $10,253,366 | Won |
| Feb 5, 2026 | 0140-03-052 | IH10_W_OF_WFM11_TO_FM2886Pecos · Odessa | 2 of 7 | $14,827,560 | $14,714,263FNF CONSTRUCTION, INC. | +0.8% |
| Feb 4, 2026 | 0103-01-046 | SH17_AT_COUNTY_ROAD_131Reeves · Odessa | 4 of 4 | $3,083,366 | $1,752,100A. L. HELMCAMP, INC. | +76.0% |
| Jan 6, 2026 | 0572-01-074 | RCUT_SH302_AT_FM_866Ector · Odessa | 3 of 3 | $16,519,822 | $16,211,726REECE ALBERT, INC. | +1.9% |
| Dec 3, 2025 | 0906-00-256 | US385-1Ector · Odessa | 5 of 5 | $11,668,844 | $6,185,733SCOUT 5 CONSTRUCTION LLC | +88.6% |
| Dec 2, 2025 | 1188-02-111 | SL250_AT_Todd Rd.Midland · Odessa | 1 of 3 | $19,237,652 | $19,237,652 | Won |
| Dec 2, 2025 | 0354-04-044 | SH115_Super2_3MI_S_AndrewsCL_AndrewsCLWinkler · Odessa | 1 of 5 | $24,397,885 | $24,397,885 | Won |
| Nov 6, 2025 | 6485-71-001 | 6485-71-001 Mill & InlayEctor · Odessa | 4 of 4 | $2,167,897 | $1,760,245RAGLE CONSTRUCTION, INC. | +23.2% |
| Nov 6, 2025 | 0354-04-041 | SH115__FM874_3MI_S_ANDREWS_C/LWinkler · Odessa | 1 of 6 | $28,204,481 | $28,204,481 | Won |
| Oct 9, 2025 | 0463-02-080 | SH158@WADLEYMidland · Odessa | 3 of 4 | $10,277,740 | $7,380,828RAGLE CONSTRUCTION, INC. | +39.2% |
| Oct 9, 2025 | 0479-04-055 | SH302_STANDARD_AVE_SH18Winkler · Odessa | 3 of 6 | $14,715,927 | $14,074,053RAGLE CONSTRUCTION, INC. | +4.6% |
| Oct 8, 2025 | 0463-02-079 | SH158 @CR 60Midland · Odessa | 1 of 4 | $6,106,365 | $6,106,365 | Won |
| Oct 8, 2025 | 0076-07-037 | US67_EAST_OF_CR225_SH329Upton · Odessa | 1 of 5 | $25,682,913 | $25,682,913 | Won |
| Sep 5, 2025 | 0380-09-104 | OVERLAY_0380-09Midland · Odessa | 1 of 5 | $5,391,295 | $5,391,295 | Won |
| Sep 5, 2025 | 0380-06-019 | SH 349 Overlay-FM 2052 to MartinDawson · Lubbock | 9 of 9 | $39,739,285 | $17,135,619RK HALL, LLC | +131.9% |
| Sep 4, 2025 | 6487-53-001 | 6487-53-001 Mill and InlayMidland · Odessa | 2 of 4 | $1,634,481 | $1,532,796RK HALL, LLC | +6.6% |
| Jul 2, 2025 | 0292-04-063 | SH18_S_OF_IH20_S_OF_FM1776Ward · Odessa | 1 of 7 | $17,279,720 | $17,279,720 | Won |
| Jul 1, 2025 | 6482-23-001 | 6482-23-001 Mill & InlayPecos · Odessa | 2 of 5 | $1,811,167 | $1,781,182REECE ALBERT, INC. | +1.7% |
| Jun 5, 2025 | 0906-00-256 | US385-1Ector · Odessa | 4 of 4 | $11,102,993 | $8,360,128GREY SKY CONSTRUCTION LLC | +32.8% |
| Jun 5, 2025 | 0005-04-083 | IH20_E_StantonInterchange_HowardCL_RehabMartin · Odessa | 1 of 5 | $11,318,569 | $11,318,569 | Won |
| Jun 4, 2025 | 0463-01-024 | SH158-1/2Ector · Odessa | 1 of 3 | $5,970,353 | $5,970,353 | Won |
| Apr 3, 2025 | 0139-08-040 | US285_0.7MI_N_GOMEZ_RD_1.8 MI N IH 10Pecos · Odessa | 1 of 6 | $26,858,499 | $26,858,499 | Won |
| Mar 5, 2025 | 0139-03-053 | US285_OverlayCR232_SH302Reeves · Odessa | 2 of 6 | $10,994,155 | $10,373,162FNF CONSTRUCTION, INC. | +6.0% |
| Feb 6, 2025 | 0354-01-056 | SH_115_WINKLER_COUNTY_REHABWinkler · Odessa | 1 of 7 | $2,658,948 | $2,658,948 | Won |
| Jan 8, 2025 | 0076-07-040 | US67_REAGAN_C/L_E_OF_CR225Upton · Odessa | 1 of 4 | $13,723,466 | $13,723,466 | Won |
| Nov 7, 2024 | 0003-06-103 | IH20_W_OF_FM2903_W_CR210_OVERLAYReeves · Odessa | 2 of 6 | $33,447,219 | $31,497,131FNF CONSTRUCTION, INC. | +6.2% |
| Nov 6, 2024 | 0003-06-101 | IH20_0.35 MI W of CR 210_0.15MI_W_CR209Reeves · Odessa | 2 of 6 | $33,068,621 | $27,943,635FNF CONSTRUCTION, INC. | +18.3% |
| Jun 6, 2024 | 1155-01-017 | HIGHWAY IMPROVEMENTMartin · Odessa | 1 of 4 | $26,967,769 | $26,967,769 | Won |
| Mar 6, 2024 | 0003-08-065 | HIGHWAY IMPROVEMENTReeves · Odessa | 3 of 3 | $26,264,817 | $17,782,450A. L. HELMCAMP, INC. | +47.7% |
| Mar 5, 2024 | 0441-07-074 | ROADWAY REHABILITATIONPecos · Odessa | 2 of 4 | $13,787,816 | $12,743,573FNF CONSTRUCTION, INC. | +8.2% |
| Feb 1, 2024 | 0004-07-138 | ROADWAY REHABILITATIONEctor · Odessa | 1 of 3 | $24,827,053 | $24,827,053 | Won |
| Jan 5, 2024 | 1188-02-118 | INTERSECTION & OPERATIONAL IMPROVEMENTSMidland · Odessa | 3 of 3 | $2,452,102 | $1,609,467REECE ALBERT, INC. | +52.4% |
| Dec 6, 2023 | 6437-49-001 | MILL AND INLAYMidland · Odessa | 2 of 5 | $2,555,837 | $2,233,068FNF CONSTRUCTION, INC. | +14.5% |
| Dec 5, 2023 | 2224-01-119 | HIGHWAY IMPROVEMENTEctor · Odessa | 1 of 2 | $7,949,950 | $7,949,950 | Won |
| Oct 6, 2023 | 1371-01-023 | WIDEN ROAD - ADD SHOULDERSWinkler · Odessa | 1 of 4 | $19,548,505 | $19,548,505 | Won |
| Oct 6, 2023 | 1718-07-045 | INTERSECTION IMPROVEMENTMidland · Odessa | 1 of 3 | $10,681,717 | $10,681,717 | Won |
| Sep 6, 2023 | 3570-01-012 | HIGHWAY IMPROVEMENTEctor · Odessa | 2 of 3 | $5,378,197 | $5,107,417REECE ALBERT, INC. | +5.3% |
| Sep 6, 2023 | 2005-02-017 | HIGHWAY IMPROVEMENTEctor · Odessa | 1 of 4 | $10,165,599 | $10,165,599 | Won |
| Aug 2, 2023 | 0103-01-044 | HIGHWAY IMPROVEMENTReeves · Odessa | 1 of 5 | $6,972,496 | $6,972,496 | Won |
| Jun 27, 2023 | 0548-02-043 | INTERSECTION IMPROVEMENTMartin · Odessa | 1 of 5 | $5,880,108 | $5,880,108 | Won |
| May 5, 2023 | 2568-01-009 | WIDEN ROAD - ADD SHOULDERSUpton · Odessa | 1 of 2 | $17,171,718 | $17,171,718 | Won |
| Mar 8, 2023 | 6407-96-001 | MILL AND INLAYReeves · Odessa | 4 of 5 | $2,917,078 | $1,668,546DAN WILLIAMS COMPANY | +74.8% |
| Feb 2, 2023 | 3571-02-008 | ROADWAY REHABILITATIONMidland · Odessa | 1 of 3 | $5,214,763 | $5,214,763 | Won |
| Jan 5, 2023 | 0229-04-060 | ROADWAY REHABILITATIONUpton · Odessa | 1 of 2 | $5,995,947 | $5,995,947 | Won |
| Nov 2, 2022 | 2906-01-006 | ROADWAY REHABILITATIONMidland · Odessa | 1 of 2 | $16,251,844 | $16,251,844 | Won |
| Oct 6, 2022 | 0354-04-040 | ROADWAY REHABILITATIONWinkler · Odessa | 3 of 4 | $8,728,599 | $8,225,180RK HALL, LLC | +6.1% |
| Sep 7, 2022 | 0076-06-037 | WIDEN ROAD - ADD LANESUpton · Odessa | 1 of 3 | $26,727,485 | $26,727,485 | Won |
| Aug 4, 2022 | 0354-06-030 | CONSTRUCT BRIDGEAndrews · Odessa | 2 of 2 | $37,953,959 | $36,740,467FNF CONSTRUCTION, INC. | +3.3% |
| Aug 3, 2022 | 0906-32-059 | HAZARD ELIMINATION & SAFETYMidland · Odessa | 2 of 3 | $448,473 | $418,688FNH CONSTRUCTION, LLC | +7.1% |
| Jun 30, 2022 | 0292-01-034 | HIGHWAY IMPROVEMENTWinkler · Odessa | 1 of 3 | $37,268,536 | $37,268,536 | Won |
| Jun 29, 2022 | 0139-03-048 | BRIDGE REPLACEMENT & SUPER 2Reeves · Odessa | 1 of 3 | $46,043,243 | $46,043,243 | Won |
| Jun 29, 2022 | 0005-03-068 | RAILROAD CROSSING IMPROVEMENTSMidland · Odessa | 3 of 3 | $20,000,000 | $11,943,374ALTUS CONSTRUCTION LLC | +67.5% |
| Mar 4, 2022 | 1189-01-020 | HIGHWAY IMPROVEMENTWinkler · Odessa | 1 of 3 | $14,858,747 | $14,858,747 | Won |
| Jan 7, 2022 | 0228-06-092 | HIGHWAY IMPROVEMENTEctor · Odessa | 1 of 2 | $6,752,984 | $6,752,984 | Won |
| Jan 7, 2022 | 2296-02-026 | CONSTRUCT BRIDGEMidland · Odessa | 2 of 4 | $29,396,575 | $27,535,250REECE ALBERT, INC. | +6.8% |
| Jan 7, 2022 | 0228-04-043 | ROADWAY REHABILITATIONAndrews · Odessa | 2 of 5 | $38,540,785 | $37,642,802REECE ALBERT, INC. | +2.4% |
| Dec 1, 2021 | 0463-03-052 | ROADWAY REHABILITATIONMidland · Odessa | 1 of 6 | $6,727,054 | $6,727,054 | Won |
| Nov 4, 2021 | 6389-06-001 | MILL AND INLAYEctor · Odessa | 5 of 5 | $2,612,340 | $1,381,358DAN WILLIAMS COMPANY | +89.1% |
| Sep 2, 2021 | 6385-77-001 | MILL AND INLAYMidland · Odessa | 2 of 5 | $1,073,357 | $1,066,555FNF CONSTRUCTION, INC. | +0.6% |
| Jul 1, 2021 | 0139-06-021 | WIDEN ROAD - ADD LANESReeves · Odessa | 3 of 5 | $62,841,143 | $58,528,501KIEWIT INFRASTRUCTURE SOUTH… | +7.4% |
| Jun 4, 2021 | 0075-02-026 | WIDEN ROAD - ADD LANES AND SHOULDERSPecos · Odessa | 1 of 7 | $35,754,470 | $35,754,470 | Won |
| May 6, 2021 | 6376-42-001 | MILL AND INLAYPecos · Odessa | 3 of 4 | $2,135,963 | $1,687,006REECE ALBERT, INC. | +26.6% |
| May 5, 2021 | 0887-01-039 | INTERSECTION IMPROVEMENTS & SAFETY LIGHTINGMidland · Odessa | 2 of 4 | $5,394,152 | $4,744,172RAGLE CONSTRUCTION, INC. | +13.7% |
| Apr 7, 2021 | 1188-02-100 | HIGHWAY IMPROVEMENTMidland · Odessa | 1 of 8 | $18,245,178 | $18,245,178 | Won |
| Feb 4, 2021 | 0005-14-067 | CONSTRUCT BRIDGEMidland · Odessa | 3 of 7 | $37,992,933 | $36,305,216JAMES CONSTRUCTION GROUP, L… | +4.6% |
| Jan 8, 2021 | 6366-81-001 | MILL AND INLAYEctor · Odessa | 2 of 4 | $2,232,963 | $1,923,614DAN WILLIAMS COMPANY | +16.1% |
| Dec 2, 2020 | 0494-08-015 | RESTORATION OF EXISTING ROADGlasscock · San Angelo | 6 of 8 | $31,688,013 | $25,932,283RK HALL, LLC | +22.2% |
| Nov 5, 2020 | 0887-01-039 | INTERSECTION IMPROVEMENTS & SAFETY LIGHTINGMidland · Odessa | 2 of 4 | $5,807,630 | $5,154,489BT CONSTRUCTORS, LLC | +12.7% |
| Oct 2, 2020 | 0005-03-079 | ROADWAY REHABILITATION & INTERSECTION IMPROVEMENTSMidland · Odessa | 1 of 3 | $11,162,709 | $11,162,709 | Won |
| Oct 1, 2020 | 2224-01-099 | CONSTRUCT NEW INTERCHANGEEctor · Odessa | 3 of 7 | $17,888,378 | $15,760,358RAGLE CONSTRUCTION, INC. | +13.5% |
| Sep 4, 2020 | 6355-29-001 | MILL AND INLAYAndrews · Odessa | 4 of 4 | $2,925,303 | $2,138,496RK HALL, LLC | +36.8% |
| Sep 3, 2020 | 0479-04-038 | ROADWAY REHABILITATIONWinkler · Odessa | 3 of 6 | $45,724,330 | $43,485,105JOHNSON BROS. CORPORATION, … | +5.1% |
| Jul 8, 2020 | 0228-06-086 | ROADWAY REHABILITATION & SAFETY IMPROVEMENTEctor · Odessa | 1 of 4 | $20,120,000 | $20,120,000 | Won |
| May 8, 2020 | 1183-01-014 | ROADWAY REHABILITATIONReeves · Odessa | 1 of 7 | $62,350,992 | $62,350,992 | Won |
| Mar 5, 2020 | 0228-06-081 | CONSTRUCT NEW INTERCHANGEEctor · Odessa | 1 of 2 | $25,331,612 | $25,331,612 | Won |
| Feb 7, 2020 | 0005-02-118 | ROADWAY REHABILITATIONMidland · Odessa | 2 of 5 | $12,747,582 | $12,018,225REECE ALBERT, INC. | +6.1% |
| Feb 6, 2020 | 0228-06-090 | ROADWAY REHABILITATIONEctor · Odessa | 4 of 4 | $18,107,238 | $11,688,883REECE ALBERT, INC. | +54.9% |
| Dec 4, 2019 | 0380-17-005 | ROADWAY REHABILITATIONMartin · Odessa | 1 of 4 | $7,548,488 | $7,548,488 | Won |
| Dec 3, 2019 | 0380-09-092 | MILL,INLAY,SUBGRADE WIDENING,SIGNS,&PAVEMENT MARKMidland · Odessa | 1 of 5 | $27,958,084 | $27,958,084 | Won |
| Nov 6, 2019 | 0292-04-065 | ROADWAY REHABILITATIONWard · Odessa | 3 of 4 | $9,989,859 | $6,516,032FNF CONSTRUCTION, INC. | +53.3% |
| Oct 2, 2019 | 0139-05-048 | ROADWAY REHABILITATIONReeves · Odessa | 3 of 4 | $7,533,627 | $6,540,325DAN WILLIAMS COMPANY | +15.2% |
| Apr 3, 2019 | 0076-01-029 | ROADWAY WIDENING TO A MODIFIED SUPER 2Pecos · Odessa | 4 of 4 | $65,986,735 | $48,936,556JOHNSON BROS. CORPORATION, … | +34.8% |
| Jan 9, 2019 | 1188-02-087 | CONSTRUCT NEW INTERCHANGEMidland · Odessa | 1 of 3 | $24,267,703 | $24,267,703 | Won |
| Dec 6, 2018 | 1717-02-023 | ROADWAY RESTORATIONMidland · Odessa | 2 of 4 | $12,999,888 | $12,942,828DELHUR INDUSTRIES, INC. | +0.4% |
| Dec 6, 2018 | 6338-09-001 | MILL AND INLAYMidland · Odessa | 2 of 2 | $2,564,100 | $1,551,893FNF CONSTRUCTION, INC. | +65.2% |
| Dec 5, 2018 | 1717-01-010 | ROADWAY RESTORATIONEctor · Odessa | 1 of 5 | $16,701,305 | $16,701,305 | Won |
| Nov 7, 2018 | 2224-01-100 | RECONSTRUCT INTERSECTIONEctor · Odessa | 2 of 3 | $3,371,840 | $3,012,163FNH CONSTRUCTION, LLC | +11.9% |
| Oct 3, 2018 | 1188-02-107 | WIDENING AND REHABILITATIONMidland · Odessa | 3 of 4 | $9,285,275 | $6,656,390RK HALL, LLC | +39.5% |
| Oct 2, 2018 | 0004-02-058 | RECONSTRUCT PAVEMENTWard · Odessa | 1 of 5 | $24,141,875 | $24,141,875 | Won |
| Sep 6, 2018 | 0441-07-071 | RECONSTRUCT PAVEMENTPecos · Odessa | 3 of 5 | $8,053,294 | $6,847,259FNF CONSTRUCTION, INC. | +17.6% |
| Aug 8, 2018 | 0380-07-026 | ARMORING WITH OVERLAYMartin · Odessa | 1 of 4 | $15,052,677 | $15,052,677 | Won |
| Jul 11, 2018 | 0005-15-088 | REVERSAL OF EB ON/OFF RAMPSMidland · Odessa | 3 of 3 | $7,069,880 | $4,875,448REECE ALBERT, INC. | +45.0% |
| Jul 10, 2018 | 0906-32-054 | IMPROVE TRAFFIC SIGNALS,ADD RT LANEMidland · Odessa | 2 of 2 | $2,634,281 | $1,801,684REECE ALBERT, INC. | +46.2% |
| Jun 5, 2018 | 0292-02-040 | ROADWAY REHABILITATIONWinkler · Odessa | 1 of 4 | $11,998,399 | $11,998,399 | Won |
| May 2, 2018 | 0229-03-035 | WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAYCrane · Odessa | 2 of 6 | $22,191,142 | $20,285,449DELHUR INDUSTRIES, INC. | +9.4% |
| May 2, 2018 | 0626-01-007 | REHAB PARK ROADS,PARKING LOTS AND CAMPSITEReeves · Odessa | 2 of 4 | $608,572 | $560,740FNH CONSTRUCTION, LLC | +8.5% |
| May 2, 2018 | 1639-01-014 | ROADWAY REHABILITATIONReeves · Odessa | 1 of 5 | $10,632,822 | $10,632,822 | Won |
| May 1, 2018 | 0380-09-087 | ROADWAY REHABILITATIONMidland · Odessa | 1 of 4 | $8,191,798 | $8,191,798 | Won |
| Apr 4, 2018 | 3570-01-009 | REALIGN EXISTING ROADWAY AND APPROACHESEctor · Odessa | 1 of 4 | $1,899,900 | $1,899,900 | Won |
| Apr 3, 2018 | 1717-02-022 | ROADWAY RESTORATIONMidland · Odessa | 1 of 4 | $3,144,999 | $3,144,999 | Won |
| Mar 7, 2018 | 0479-01-019 | ROADWAY REHABILITATIONReeves · Odessa | 1 of 5 | $12,502,318 | $12,502,318 | Won |
| Mar 7, 2018 | 0005-01-107 | ROADWAY REHABILITATIONEctor · Odessa | 1 of 3 | $11,187,689 | $11,187,689 | Won |
| Mar 6, 2018 | 0077-01-029 | ACP OVERLAY AND SAFETY TREAT FIXED OBJECTSReagan · San Angelo | 1 of 5 | $6,531,381 | $6,531,381 | Won |
| Feb 1, 2018 | 0548-05-049 | RECONSTRUCT AND WIDENAndrews · Odessa | 1 of 7 | $11,368,798 | $11,368,798 | Won |
| Nov 3, 2017 | 0005-04-071 | REHABILITATION OF EXISTING ROADMartin · Odessa | 2 of 5 | $6,087,454 | $5,784,005PRICE CONSTRUCTION, LTD. | +5.2% |
| Oct 3, 2017 | 6320-17-001 | REWORK RAISED MEDIANEctor · Odessa | 1 of 4 | $399,515 | $399,515 | Won |
| Aug 8, 2017 | 0139-03-039 | ROADWAY WIDENING TO A MODIFIED SUPER 2Reeves · Odessa | 2 of 8 | $15,229,979 | $15,005,109FNF CONSTRUCTION, INC. | +1.5% |
| Jul 12, 2017 | 0140-11-044 | PLANE, EMULSION TREAT, SURFACE TREATMENT & OVERLAYCrockett · San Angelo | 5 of 6 | $5,256,148 | $4,567,929REECE ALBERT, INC. | +15.1% |
| Jul 11, 2017 | 6318-81-001 | MILL AND INLAYEctor · Odessa | 1 of 5 | $2,236,409 | $2,236,409 | Won |
| Jun 7, 2017 | 0463-03-049 | PAVEMENT OVERLAYMidland · Odessa | 2 of 5 | $4,082,490 | $3,997,555FNF CONSTRUCTION, INC. | +2.1% |
| Jun 6, 2017 | 0493-01-013 | ROADWAY RESTORATIONReeves · Odessa | 2 of 4 | $6,472,683 | $5,983,269CI CONSTRUCTORS, INC. | +8.2% |
| Mar 8, 2017 | 0139-08-037 | ROADWAY WIDENINGPecos · Odessa | 5 of 6 | $1,624,021 | $1,244,957REECE ALBERT, INC. | +30.4% |
| Feb 3, 2017 | 1188-02-096 | FRONTAGE ROAD REHABILITATIONMidland · Odessa | 1 of 4 | $5,830,487 | $5,830,487 | Won |
| Jan 4, 2017 | 0380-09-081 | ROADWAY REHABILITATIONMidland · Odessa | 4 of 4 | $4,512,588 | $3,699,830PRICE CONSTRUCTION, LTD. | +22.0% |
| Nov 4, 2016 | 0004-04-087 | UPGRADES TO MEET FREEWAY STANDARDSWard · Odessa | 1 of 4 | $13,195,417 | $13,195,417 | Won |
| Nov 3, 2016 | 1718-07-042 | PAVEMENT STRUCTURE AND SAFETYMidland · Odessa | 1 of 3 | $6,917,372 | $6,917,372 | Won |
| Nov 6, 2013 | 0380-09-080 | FLEX BASE,CEMENT TRT,AND SURF TREATMidland · Odessa | 1 of 2 | $17,020,878 | $17,020,878 | Won |
| Oct 8, 2013 | 0405-01-024 | GRADING, BASE, STRUCTURES, SURFACINGGlasscock · San Angelo | 4 of 4 | $25,306,504 | $19,242,154REECE ALBERT, INC. | +31.5% |
| Oct 8, 2013 | 0463-03-042 | RESTORATIONMidland · Odessa | 1 of 3 | $10,798,004 | $10,798,004 | Won |
Active prime contracts 13
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0354-04-044Let Dec 2, 2025 | WinklerOdessa · SH 115 | WIDEN FREEWAY | $25,593,201 | 15% | |
| 1188-02-111Let Dec 2, 2025 | MidlandOdessa · SL 250 | HAZARD ELIMINATION & SAFETY | $20,524,193 | 25% | |
| 0354-04-041Let Nov 6, 2025 | WinklerOdessa · SH 115 | WIDEN FREEWAY | $29,653,896 | 19% | |
| 0076-07-037Let Oct 8, 2025 | UptonOdessa · US 67 | WIDEN NON-FREEWAY | $27,335,957 | 18% | |
| 0463-02-079Let Oct 8, 2025 | MidlandOdessa · SH 158 | TRAFFIC SIGNAL | $6,361,562 | 4% | |
| 0380-09-104Let Sep 5, 2025 | MidlandOdessa · SH 349 | OVERLAY | $8,686,228 | 106% | |
| 0292-04-063Let Jul 2, 2025 | WardOdessa · SH 18 | REHABILITATION OF EXISTING ROAD | $18,378,293 | 80% | |
| 0463-01-024Let Jun 4, 2025 | EctorOdessa · SH 158 | HAZARD ELIMINATION & SAFETY | $6,053,247 | 107% | |
| 0139-08-040Let Apr 3, 2025 | PecosOdessa · US 285 | WIDEN FREEWAY | $27,673,482 | 21% | |
| 0076-07-040Let Jan 8, 2025 | UptonOdessa · US 67 | REHABILITATION OF EXISTING ROAD | $13,869,247 | 91% | |
| 1155-01-017Let Jun 6, 2024 | MartinOdessa · FM 846 | REHABILITATION OF EXISTING ROAD | $28,245,967 | 93% | |
| 0076-06-037Let Sep 7, 2022 | UptonOdessa · US 67 | WIDEN NON-FREEWAY | $29,018,097 | 89% | |
| 0075-02-026Let Jun 4, 2021 | PecosOdessa · US 67 | REHABILITATION OF EXISTING ROAD | $41,634,268 | 115% |
Subcontracts on active jobs 1
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0906-00-236Let May 3, 2024 | WILLIS ELECTRIC CO., LP | EctorOdessa | TRAFFIC SIGNAL | 25.65% | $727,198 |