| 1 | 100-2002 |
PREPARING ROW | 721.65 | STA |
$100.00 |
$300.00 |
$156.13 |
$2,500.00 |
|
| 2 | 104-2017 |
REMOVING CONC (DRIVEWAYS) | 135 | SY |
$15.00 |
$58.03 |
$17.14 |
$26.83 |
|
| 3 | 104-2022 |
REMOVING CONC (CURB AND GUTTER) | 322 | LF |
$15.00 |
$25.02 |
$9.51 |
$10.83 |
|
| 4 | 110-2001 |
EXCAVATION (ROADWAY) | 39,930 | CY |
$17.00 |
$10.12 |
$7.35 |
$9.30 |
|
| 5 | 110-2002 |
EXCAVATION (CHANNEL) | 108 | CY |
$25.00 |
$22.88 |
$13.25 |
$30.63 |
|
| 6 | 112-2002 |
SUBGRADE WIDENING (DENS CONT) | 583.79 | STA |
$1,600.00 |
$1,791.09 |
$2,014.03 |
$658.23 |
|
| 7 | 132-2003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 8,897 | CY |
$8.00 |
$4.17 |
$15.63 |
$7.20 |
|
| 8 | 164-2036 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 43 | AC |
$565.00 |
$428.38 |
$576.41 |
$367.31 |
|
| 9 | 216-2001 |
PROOF ROLLING | 124 | HR |
$95.00 |
$29.17 |
$98.75 |
$17.28 |
|
| 10 | 247-2387 |
FL BS (CMP IN PLC)(TY A GR 2)(16") | 276,206 | SY |
$14.40 |
$15.04 |
$15.80 |
$12.89 |
|
| 11 | 310-2001 |
PRIME COAT (MC-30) | 57,084 | GAL |
$5.70 |
$4.79 |
$5.39 |
$4.28 |
|
| 12 | 314-2010 |
EMULS ASPH (EROSN CONT)(SS-1) | 2,343 | GAL |
$4.50 |
$7.01 |
$5.53 |
$3.62 |
|
| 13 | 315-2011 |
FOG SEAL (HARD RESIDUE SURFACE SEALANT) | 2,364 | GAL |
$12.00 |
$12.37 |
$12.07 |
$2.77 |
|
| 14 | 316-2407 |
ASPH(AC-3 OR AC-5) | 284,167 | GAL |
$3.95 |
$2.36 |
$4.38 |
$3.72 |
|
| 15 | 316-2547 |
AGGR (TY-PB GR-3) | 2,918 | CY |
$95.00 |
$113.32 |
$106.02 |
$93.98 |
|
| 16 | 316-2582 |
AGGR (TY-PB GR-4) | 5,102 | CY |
$95.00 |
$108.62 |
$107.32 |
$93.98 |
|
| 17 | 354-2045 |
PLANE ASPH CONC PAV (2") | 9,167 | SY |
$3.75 |
$3.31 |
$3.73 |
$2.40 |
|
| 18 | 400-2005 |
CEM STABIL BKFL | 56 | CY |
$80.00 |
$514.35 |
$139.55 |
$143.00 |
|
| 19 | 430-2035 |
CL C CONC FOR EXT STRU (CULV)(4'X3') | 25.9 | LF |
$265.00 |
$383.88 |
$384.68 |
$344.03 |
|
| 20 | 430-2037 |
CL C CONC FOR EXT STRU (CULV)(2-5'X2') | 28.6 | LF |
$465.00 |
$693.14 |
$697.76 |
$621.17 |
|
| 21 | 430-2045 |
CL C CONC FOR EXT STRU (CULV)(8'X6') | 27.2 | LF |
$475.00 |
$767.15 |
$715.96 |
$687.50 |
|
| 22 | 430-2052 |
CL C CONC FOR EXT STR (CULV) 3-5' X 2' | 14.6 | LF |
$725.00 |
$1,007.55 |
$1,007.20 |
$902.90 |
|
| 23 | 430-2060 |
CL C CONC FOR EXT STRU(CULV)(7'X3') | 20.8 | LF |
$365.00 |
$603.90 |
$527.87 |
$541.20 |
|
| 24 | 430-2066 |
CL C CONC FOR EXT STRU (CULV)(2-10'X6') | 17.8 | LF |
$1,040.00 |
$1,586.30 |
$1,601.81 |
$1,421.60 |
|
| 25 | 430-2088 |
CL C CONC FOR EXT STR (CULV)(2- 8'X5') | 44.7 | LF |
$875.00 |
$1,380.33 |
$1,310.57 |
$1,237.02 |
|
| 26 | 430-2139 |
CL C CONC FOR EXT STR (CULV)(2-8'X4') | 31.5 | LF |
$865.00 |
$1,245.86 |
$1,243.83 |
$1,116.50 |
|
| 27 | 430-2154 |
CL C CONC FOR EXT STRU (CULV)(3-8'X5') | 16.4 | LF |
$1,225.00 |
$1,881.13 |
$1,893.05 |
$1,685.82 |
|
| 28 | 430-2247 |
CL C CONC FOR EXT STRU (CULV)(4-9'X5') | 34.7 | LF |
$1,725.00 |
$2,682.27 |
$2,687.89 |
$2,403.78 |
|
| 29 | 430-2248 |
CL C CONC FOR EXT STRU(CULV)(12-10'X8') | 24.7 | LF |
$6,300.00 |
$9,315.10 |
$9,343.90 |
$8,347.92 |
|
| 30 | 430-2249 |
CL C CONC FOR EXT STRU (CULV)(9-10'X7') | 24.7 | LF |
$4,715.00 |
$6,816.00 |
$6,795.56 |
$6,108.30 |
|
| 31 | 432-2001 |
RIPRAP (CONC)(4 IN) | 6 | CY |
$445.00 |
$552.35 |
$424.72 |
$698.07 |
|
| 32 | 432-2039 |
RIPRAP (MOW STRIP)(4 IN) | 433.3 | CY |
$422.00 |
$472.57 |
$442.93 |
$426.31 |
|
| 33 | 432-2050 |
RIPRAP (CONC)(CL B)(5 IN) | 270.5 | CY |
$390.00 |
$490.98 |
$424.72 |
$440.00 |
|
| 34 | 450-2080 |
RAIL (TY T221) | 450.67 | LF |
$75.00 |
$300.45 |
$182.02 |
$96.49 |
|
| 35 | 460-2004 |
CMP (GAL STL 24 IN) | 76.4 | LF |
$54.00 |
$61.37 |
$54.61 |
$55.00 |
|
| 36 | 460-2005 |
CMP (GAL STL 30 IN) | 122.7 | LF |
$65.00 |
$76.72 |
$78.88 |
$68.75 |
|
| 37 | 464-2005 |
RC PIPE (CL III)(24 IN) | 77.6 | LF |
$50.00 |
$99.42 |
$97.08 |
$89.10 |
|
| 38 | 466-2022 |
WINGWALL (FW-0)(HW=6 FT) | 6 | EA |
$3,925.00 |
$7,579.47 |
$6,916.91 |
$6,792.50 |
|
| 39 | 466-2023 |
WINGWALL (FW-0)(HW=7 FT) | 5 | EA |
$6,040.00 |
$11,077.68 |
$11,042.79 |
$9,927.50 |
|
| 40 | 466-2024 |
WINGWALL (FW-0)(HW=8 FT) | 3 | EA |
$8,300.00 |
$17,399.02 |
$13,833.82 |
$15,592.50 |
|
| 41 | 466-2025 |
WINGWALL (FW-0)(HW=9 FT) | 2 | EA |
$10,440.00 |
$23,174.15 |
$17,595.65 |
$20,768.00 |
|
| 42 | 466-2065 |
HEADWALL (CH-FW-0)(DIA= 24 IN) | 3 | EA |
$2,000.00 |
$3,129.98 |
$3,033.73 |
$2,805.00 |
|
| 43 | 466-2067 |
HEADWALL (CH-FW-0)(DIA= 30 IN) | 2 | EA |
$3,000.00 |
$4,173.31 |
$3,640.48 |
$3,740.00 |
|
| 44 | 467-2067 |
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1)(C) | 1 | EA |
$6,040.00 |
$1,098.56 |
$9,707.95 |
$7,941.00 |
|
| 45 | 467-2108 |
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C) | 2 | EA |
$4,200.00 |
$8,272.97 |
$7,887.71 |
$7,414.00 |
|
| 46 | 467-2113 |
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C) | 10 | EA |
$1,415.00 |
$5,155.27 |
$3,397.78 |
$4,620.00 |
|
| 47 | 467-2126 |
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C) | 2 | EA |
$4,800.00 |
$9,205.83 |
$9,101.20 |
$8,250.00 |
|
| 48 | 467-2131 |
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C) | 8 | EA |
$3,665.00 |
$8,407.99 |
$7,887.71 |
$7,535.00 |
|
| 49 | 467-2136 |
SET (TY I)(S= 9 FT)(HW= 6 FT)(4:1)(C) | 4 | EA |
$2,765.00 |
$9,389.95 |
$6,795.56 |
$8,415.00 |
|
| 50 | 467-2224 |
SET (TY II)(24 IN)(RCP)(4:1)(C) | 3 | EA |
$1,200.00 |
$2,130.84 |
$1,213.49 |
$1,909.60 |
|
| 51 | 467-2262 |
SET (TY II)(24 IN)(CMP)(4:1)(C) | 6 | EA |
$1,000.00 |
$1,534.31 |
$1,092.14 |
$1,375.00 |
|
| 52 | 467-2264 |
SET (TY II)(30 IN)(CMP)(4:1)(C) | 6 | EA |
$1,200.00 |
$2,798.57 |
$2,244.96 |
$2,508.00 |
|
| 53 | 500-2001 |
MOBILIZATION | 1 | LS |
$859,966.38 |
$1,631,301.00 |
$1,129,488.09 |
$2,000,000.00 |
|
| 54 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 28 | MO |
$12,000.00 |
$9,352.16 |
$9,001.91 |
$6,907.27 |
|
| 55 | 529-2004 |
CONC CURB & GUTTER (TY II) | 288 | LF |
$38.00 |
$36.82 |
$35.19 |
$37.73 |
|
| 56 | 530-2010 |
DRIVEWAYS (CONC) | 135 | SY |
$85.00 |
$104.33 |
$104.38 |
$102.87 |
|
| 57 | 530-2011 |
DRIVEWAYS (ACP) | 620 | SY |
$43.00 |
$114.24 |
$64.04 |
$44.27 |
|
| 58 | 530-2012 |
DRIVEWAYS (SURF TREAT) | 4,889 | SY |
$34.00 |
$29.04 |
$31.41 |
$20.02 |
|
| 59 | 531-2024 |
CONC SIDEWALK (5") | 52 | SY |
$99.00 |
$116.61 |
$111.00 |
$127.93 |
|
| 60 | 531-2041 |
CURB RAMPS (TY 10) | 6 | EA |
$1,700.00 |
$2,270.77 |
$1,516.87 |
$2,035.00 |
|
| 61 | 533-2006 |
SHOULDER TEXTURING (MILLED)(ASPHALT) | 141,794 | LF |
$0.2000 |
$0.2000 |
$0.1820 |
$0.0700 |
|
| 62 | 540-2002 |
MTL W-BEAM GD FEN (STEEL POST) | 8,125 | LF |
$24.00 |
$20.38 |
$23.40 |
$18.26 |
|
| 63 | 540-2011 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$1,976.00 |
$3,051.00 |
$2,016.27 |
$1,694.00 |
|
| 64 | 540-2044 |
DOWNSTREAM ANCHOR TERMINAL(DAT)SECTION | 31 | EA |
$1,281.00 |
$951.27 |
$1,219.72 |
$852.50 |
|
| 65 | 540-2045 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 400 | LF |
$20.00 |
$17.37 |
$34.85 |
$15.57 |
|
| 66 | 540-2046 |
MTL BM GD FEN TRANS (NON-SYM) | 4 | EA |
$1,000.00 |
$675.10 |
$1,182.38 |
$605.00 |
|
| 67 | 542-2001 |
REMOVING METAL BEAM GUARD FENCE | 1,100 | LF |
$2.50 |
$3.07 |
$3.11 |
$2.75 |
|
| 68 | 542-2002 |
REMOVING TERMINAL ANCHOR SECTION | 6 | EA |
$150.00 |
$306.86 |
$217.81 |
$275.00 |
|
| 69 | 544-2013 |
GDRAIL END TRT(INSTALL)(HBA POST) | 31 | EA |
$2,245.00 |
$2,516.26 |
$2,563.89 |
$2,255.00 |
|
| 70 | 552-2004 |
WIRE FENCE (TY D) | 318 | LF |
$20.00 |
$24.55 |
$13.35 |
$22.00 |
|
| 71 | 552-2007 |
GATE (TY 3) | 15 | EA |
$500.00 |
$1,227.44 |
$1,334.84 |
$1,100.00 |
|
| 72 | 644-2001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 15 | EA |
$450.00 |
$521.66 |
$400.00 |
$467.50 |
|
| 73 | 644-2004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 2 | EA |
$500.00 |
$767.15 |
$625.00 |
$687.50 |
|
| 74 | 644-2025 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 3 | EA |
$683.00 |
$797.84 |
$650.00 |
$715.00 |
|
| 75 | 644-2056 |
RELOCATE SM RD SN SUP & AM TY 10BWG | 4 | EA |
$400.00 |
$429.61 |
$350.00 |
$385.00 |
|
| 76 | 644-2058 |
RELOCATE SM RD SN SUP & AM TY S80 | 6 | EA |
$300.00 |
$429.61 |
$75.00 |
$385.00 |
|
| 77 | 644-2060 |
REMOVE SM RD SN SUP & AM | 28 | EA |
$55.00 |
$92.06 |
$75.00 |
$82.50 |
|
| 78 | 658-2259 |
INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) | 18 | EA |
$20.00 |
$18.41 |
$15.00 |
$16.50 |
|
| 79 | 658-2260 |
INSTL DEL ASSM (D-SW)SZ (TYC)GF1 | 452 | EA |
$11.00 |
$18.41 |
$15.00 |
$16.50 |
|
| 80 | 658-2316 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 55 | EA |
$44.00 |
$18.41 |
$15.00 |
$54.51 |
|
| 81 | 662-2067 |
WK ZN PAV MRK REMOV (W) 4" (SLD) | 108,594 | LF |
$0.6000 |
$0.2100 |
$0.5460 |
$0.1900 |
|
| 82 | 662-2099 |
WK ZN PAV MRK REMOV (Y) 4" (SLD) | 108,594 | LF |
$0.6000 |
$0.2100 |
$0.5460 |
$0.1900 |
|
| 83 | 662-2113 |
WK ZN PAV MRK SHT TERM (TAB) TY W | 10,789 | EA |
$1.50 |
$2.87 |
$1.66 |
$0.9700 |
|
| 84 | 662-2115 |
WK ZN PAV MRK SHT TERM (TAB) TY Y-2 | 7,196 | EA |
$1.50 |
$2.90 |
$1.66 |
$0.9900 |
|
| 85 | 666-2142 |
REF PAV MRK TY II (W) 4" (BRK) | 35,990 | LF |
$0.1400 |
$0.2100 |
$0.1940 |
$0.1900 |
|
| 86 | 666-2145 |
REF PAV MRK TY II (W) 4" (SLD) | 143,815 | LF |
$0.1400 |
$0.1800 |
$0.1940 |
$0.1700 |
|
| 87 | 666-2178 |
REF PAV MRK TY II (Y) 4" (SLD) | 143,815 | LF |
$0.1400 |
$0.1800 |
$0.1940 |
$0.1700 |
|
| 88 | 666-2189 |
PAVEMENT SEALER 4" | 4,574 | LF |
$0.1900 |
$0.4900 |
$0.1820 |
$0.4400 |
|
| 89 | 668-2105 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 1,196 | LF |
$13.00 |
$13.50 |
$14.56 |
$12.10 |
|
| 90 | 672-2012 |
REFL PAV MRKR TY I-C | 1,801 | EA |
$3.00 |
$3.07 |
$3.64 |
$2.75 |
|
| 91 | 672-2015 |
REFL PAV MRKR TY II-A-A | 901 | EA |
$3.00 |
$3.07 |
$3.64 |
$2.75 |
|
| 92 | 677-2001 |
ELIM EXT PAV MRK & MRKS ( 4") | 54,022 | LF |
$1.14 |
$1.36 |
$1.23 |
$0.3600 |
|
| 93 | 677-2005 |
ELIM EXT PAV MRK & MRKS (12") | 240 | LF |
$1.00 |
$7.19 |
$3.38 |
$5.50 |
|
| 94 | 678-2001 |
PAV SURF PREP FOR MRK ( 4") | 4,574 | LF |
$0.3600 |
$0.3100 |
$0.5820 |
$0.5300 |
|
| 95 | 678-2006 |
PAV SURF PREP FOR MRK (24") | 1,196 | LF |
$3.00 |
$1.84 |
$2.43 |
$2.20 |
|
| 96 | 1122-2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 156 | SY |
$10.00 |
$11.91 |
$10.14 |
$20.90 |
|
| 97 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 156 | SY |
$2.30 |
$2.80 |
$2.30 |
$12.10 |
|
| 98 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 3,460 | LF |
$6.00 |
$3.30 |
$7.13 |
$4.40 |
|
| 99 | 1122-2049 |
BIOGRD EROSN CONT LOGS (18" DIA)INSTALL | 38,079 | LF |
$4.50 |
$5.59 |
$5.20 |
$4.40 |
|
| 100 | 1122-2056 |
BIODEGRADBLE EROSION CONTROL LOGS REMOV | 38,079 | LF |
$1.00 |
$0.7000 |
$3.78 |
$0.5500 |
|
| 101 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 3,460 | LF |
$0.7500 |
$1.33 |
$2.34 |
$1.10 |
|
| 102 | 3259-2002 |
FAST TRACK CONCRETE PAVEMENT(CPCD)(10") | 9,167 | SY |
$102.00 |
$107.40 |
$132.27 |
$116.02 |
|
| 103 | 3267-2048 |
D-GR HMA(SQ) TY-C SAC-B PG70-22 | 2,017 | TON |
$135.00 |
$143.66 |
$139.37 |
$156.20 |
|
| 104 | 3270-2048 |
SUPERPAVE MIXTURES SP-C SAC-B PG70-22 | 58,923 | TON |
$95.00 |
$89.60 |
$90.33 |
$108.05 |
|
| 105 | 5369-2001 |
CENTERLINE TEXTURING | 708.97 | STA |
$30.00 |
$24.55 |
$23.06 |
$8.80 |
|
| 106 | 8251-2002 |
RE PM W/RET REQ TY I(W)4"(BRK)(090MIL) | 35,840 | LF |
$0.3500 |
$0.3700 |
$0.3460 |
$0.3300 |
|
| 107 | 8251-2005 |
RE PM W/RET REQ TY I(W)4"(SLD)(090MIL) | 143,226 | LF |
$0.3300 |
$0.3600 |
$0.3460 |
$0.3200 |
|
| 108 | 8251-2017 |
RE PM W/RET REQ TY I(Y)4"(SLD)(090MIL) | 143,227 | LF |
$0.3300 |
$0.3600 |
$0.3460 |
$0.3200 |
|