On a TxDOT letting the lowest bid wins. Win Price predicts that low bid for every advertised job, from thousands of past Texas lettings, the plan holders on the job and how each of them bids. Put in your number and see your odds of coming in lowest.
1. The low bid
The most likely low bid and the range it should land in, against the engineer's estimate, before anyone opens a bid.
2. The field
Which plan holders are likely to turn in a bid, how many to expect, and how far under the estimate each one usually goes.
3. Your odds
Enter your total or upload your priced items. See your chance of being lowest, and the lines that cost you the job.
| Lets | CCSJ | Where | Work | Estimate | Predicted low | Likely range | Bidders | |
|---|---|---|---|---|---|---|---|---|
| Nov 29, 2026 | 6513-67-001 | ZavalaLaredo · US0083 | Routine Maintenance Project - Sealed | $296,881 | $266,565-10.2% vs est. | $230,793 – $296,881 | 3.8 | Check my bid |
| Dec 1, 2026 | 0092-03-053 | EllisDallas · FM 664, IH 45 | Interchange (New or Reconstructed) | $116,656,531 | $108,646,063-6.9% vs est. | $99,567,726 – $116,059,716 | 10.017 plan holders | Check my bid |
| Dec 1, 2026 | 6482-46-001 | TarrantFort Worth · IH0035W | Routine Maintenance Project - Sealed | $27,875,745 | $24,216,843-13.1% vs est. | $21,884,870 – $26,906,156 | 3.48 plan holders | Check my bid |
| Dec 1, 2026 | 0354-04-043 | WinklerOdessa · SH 115 | Super-2 Highway | $25,229,401 | $21,638,244-14.2% vs est. | $19,528,605 – $23,880,125 | 4.17 plan holders | Check my bid |
| Dec 1, 2026 | 0528-01-113 | HidalgoPharr · SH 107 | Widen Non-Freeway | $24,134,502 | $20,938,672-13.2% vs est. | $18,811,518 – $23,058,066 | 3.66 plan holders | Check my bid |
| Dec 1, 2026 | 0095-07-062 | Anderson, Cherokee, Gregg, Henderson, Rusk, Smith, Van Zandt, WoodTyler · FM 16, FM 17, FM 1845, FM 2494, FM 2495, FM 2661, FM 314, FM 316, FM 317, FM 321, FM 344, FM 515, FM 782, FM 837, FM 840, FM 848, FM 855, FS 782, RM 3054, SH 154, SH 21, SH 294, SH 322, SH 334, SH 42, SH 64, SL 62, SS 364, US 271, US 80, Various | Seal Coat | $23,738,912 | $21,264,805-10.4% vs est. | $18,668,588 – $23,809,806 | 1.83 plan holders | Check my bid |
| Dec 1, 2026 | 0035-01-036 | Concho, RunnelsSan Angelo · FM 2134, US 83 | Overlay | $17,029,710 | $14,736,484-13.5% vs est. | $13,273,907 – $16,421,018 | 3.66 plan holders | Check my bid |
| Dec 1, 2026 | 3524-01-008 | HoodFort Worth · SL 567 | Rehabilitation of Existing Road | $16,526,560 | $14,565,968-11.9% vs est. | $12,720,527 – $16,060,133 | 3.66 plan holders | Check my bid |
| Dec 1, 2026 | 0405-01-027 | Concho, Glasscock, SterlingSan Angelo · SH 158, US 87 | Seal Coat | $13,888,098 | $12,474,728-10.2% vs est. | $10,962,419 – $13,697,167 | 1.83 plan holders | Check my bid |
| Dec 1, 2026 | 1598-01-023 | Erath, Hood, Jack, Johnson, Palo Pinto, Parker, Tarrant, WiseFort Worth · FM 167, FM 1810, FM 2265, FM 2303, FM 2331, FM 3450, FM 4, FM 51, FM 730, RM 2871, SH 144, SH 16, SH 171, SH 59, Various | Seal Coat | $13,619,545 | $12,278,592-9.8% vs est. | $10,639,771 – $13,447,420 | 2.34 plan holders | Check my bid |
| Dec 1, 2026 | 0005-08-107 | Borden, Fisher, Howard, Jones, Kent, Mitchell, Nolan, Scurry, Shackelford, TaylorAbilene · BI 20N, BS 208B, BU 84J, FM 1170, FM 1605, FM 2833, FM 3326, FM 3525, FM 669, FM 700, FM 707, IH 20, SH 163, SH 208, SH 70, US 180, US 84 | Seal Coat | $12,574,772 | $11,430,691-9.1% vs est. | $10,066,485 – $12,575,447 | 1.83 plan holders | Check my bid |
| Dec 1, 2026 | 0693-03-046 | ScurryAbilene · SH 350 | Overlay | $11,054,519 | $9,784,220-11.5% vs est. | $8,694,489 – $10,813,379 | 4.28 plan holders | Check my bid |
| Dec 1, 2026 | 0918-47-460 | DallasDallas · W PLEASANT RUN RD, WESTMORELAND | Bridge Replacement | $8,607,909 | $7,442,344-13.5% vs est. | $6,645,299 – $8,094,035 | 9.817 plan holders | Check my bid |
| Dec 1, 2026 | 0113-13-193 | TravisAustin · SL 275, SL 360 | Overlay | $8,182,630 | $7,217,150-11.8% vs est. | $6,478,482 – $8,003,744 | 4.17 plan holders | Check my bid |
| Dec 1, 2026 | 0252-01-084 | BurnetAustin · US 281 | Intersection & Operational Imprv | $6,953,263 | $6,165,742-11.3% vs est. | $5,562,077 – $6,766,846 | 6.010 plan holders | Check my bid |
| Dec 1, 2026 | 0893-04-015 | Angelina, ShelbyLufkin · FM 2026, FM 328, Various | Safety Improvement Projects | $4,851,340 | $4,387,279-9.6% vs est. | $3,976,457 – $4,802,649 | 3.05 plan holders | Check my bid |
| Dec 1, 2026 | 2635-03-031 | Potter, RandallAmarillo · FM 2590 | Overlay | $4,418,881 | $4,032,661-8.7% vs est. | $3,626,623 – $4,439,289 | 1.23 plan holders | Check my bid |
| Dec 1, 2026 | 0913-00-140 | De WittYoakum · Various | Bridge Maintenance | $4,401,018 | $3,870,142-12.1% vs est. | $3,490,467 – $4,260,904 | 5.910 plan holders | Check my bid |
| Dec 1, 2026 | 0924-00-133 | El PasoEl Paso · Various | Traffic Control Devices | $3,554,027 | $3,179,045-10.6% vs est. | $2,870,445 – $3,543,987 | 2.44 plan holders | Check my bid |
| Dec 1, 2026 | 0627-04-070 | NewtonBeaumont · FM 1416 | Overlay | $3,184,851 | $2,895,426-9.1% vs est. | $2,621,681 – $3,189,319 | 1.83 plan holders | Check my bid |
| Dec 1, 2026 | 0916-36-024 | KarnesCorpus Christi · COUNTY ROAD 326 | Bridge Replacement | $3,101,274 | $2,701,743-12.9% vs est. | $2,381,334 – $2,973,087 | 6.211 plan holders | Check my bid |
| Dec 1, 2026 | 6508-44-001 | ChildressChildress · US0287 | Material Maintenance Project | $2,591,200 | $2,366,014-8.7% vs est. | $2,130,859 – $2,589,646 | 1.83 plan holders | Check my bid |
| Dec 1, 2026 | 1718-05-021 | AndrewsOdessa · FM 1788 | Safety Improvement Projects | $2,153,994 | $1,918,010-11.0% vs est. | $1,722,954 – $2,132,497 | 3.05 plan holders | Check my bid |
| Dec 1, 2026 | 0905-00-136 | LubbockLubbock · Various | Bridge Maintenance | $1,934,816 | $1,628,618-15.8% vs est. | $1,431,210 – $1,802,636 | 9.015 plan holders | Check my bid |
| Dec 1, 2026 | 0923-00-085 | EastlandBrownwood · Various | Traffic Control Devices | $1,889,401 | $1,720,829-8.9% vs est. | $1,516,727 – $1,894,124 | 1.83 plan holders | Check my bid |
| Dec 1, 2026 | 6511-43-001 | McLennanWaco · SH0006 | Material Maintenance Project | $1,886,091 | $1,684,492-10.7% vs est. | $1,514,127 – $1,840,114 | 3.67 plan holders | Check my bid |
| Dec 1, 2026 | 1062-01-218 | MontgomeryHouston · FM 1485 | Overlay | $1,271,319 | $1,119,562-11.9% vs est. | $973,362 – $1,243,448 | 4.17 plan holders | Check my bid |
| Dec 1, 2026 | 6504-82-001 | McLennanWaco · SH0006 | Routine Maintenance Project - Sealed | $1,049,092 | $887,085-15.4% vs est. | $771,049 – $1,002,442 | 6.010 plan holders | Check my bid |
| Dec 1, 2026 | 6505-42-001 | GreggTyler · SL0281 | Material Maintenance Project | $1,020,300 | $937,738-8.1% vs est. | $831,241 – $1,019,629 | 3.26 plan holders | Check my bid |
| Dec 1, 2026 | 0917-31-041 | MadisonBryan · Various | Safety Improvement Projects | $126,512 | $114,613-9.4% vs est. | $101,948 – $126,512 | 4.910 plan holders | Check my bid |
| Dec 2, 2026 | 0070-01-056 | Coke, Concho, Edwards, Glasscock, Kimble, Menard, Reagan, Real, Runnels, Schleicher, Tom GreenSan Angelo · FM 1223, FM 1678, FM 1874, FM 2406, FM 2742, FM 2873, FM 3463, RM 1555, RM 2401, RM 335, SH 158, SH 208, SH 41, SL 110, US 190, US 377 | Seal Coat | $9,464,478 | $8,649,737-8.6% vs est. | $7,740,584 – $9,416,928 | 1.83 plan holders | Check my bid |
| Dec 2, 2026 | 6512-67-001 | HidalgoPharr · IH0002 | Material Maintenance Project - Sealed | $9,038,132 | $8,209,744-9.2% vs est. | $7,366,761 – $8,931,649 | 1.83 plan holders | Check my bid |
| Dec 2, 2026 | 0042-01-032 | Carson, PotterAmarillo · IH 40, SS 228, US 287 | Safety Improvement Projects | $7,782,909 | $7,076,202-9.1% vs est. | $6,349,092 – $7,744,260 | 2.44 plan holders | Check my bid |
| Dec 2, 2026 | 1469-01-025 | Hood, Johnson, ParkerFort Worth · FM 167, FM 1718, FM 5 | Seal Coat | $6,142,029 | $5,414,483-11.8% vs est. | $4,883,862 – $5,970,267 | 5.49 plan holders | Check my bid |
| Dec 2, 2026 | 0048-04-111 | EllisDallas · IH 35E | Rehabilitation of Existing Road | $6,007,682 | $5,297,453-11.8% vs est. | $4,865,016 – $5,805,517 | 5.310 plan holders | Check my bid |
| Dec 2, 2026 | 0104-07-027 | Brewster, PresidioEl Paso · US 385, US 67 | Seal Coat | $5,924,303 | $5,488,464-7.4% vs est. | $4,902,063 – $5,945,632 | 1.22 plan holders | Check my bid |
| Dec 2, 2026 | 0028-03-119 | Hardin, Liberty, NewtonBeaumont · SH 326, US 190, US 90 | Bridge Maintenance | $5,428,043 | $4,563,168-15.9% vs est. | $4,001,500 – $5,036,024 | 10.117 plan holders | Check my bid |
| Dec 2, 2026 | 0905-06-129 | LubbockLubbock · Various | Rehabilitation of Existing Road | $3,128,110 | $2,733,437-12.6% vs est. | $2,416,684 – $3,013,848 | 5.49 plan holders | Check my bid |
| Dec 2, 2026 | 0366-01-084 | HaysAustin · SH 123 | Bridge Replacement | $2,818,472 | $2,374,380-15.8% vs est. | $2,112,576 – $2,617,789 | 10.518 plan holders | Check my bid |
| Dec 2, 2026 | 1743-01-012 | HarrisHouston · FM 1876 | Overlay | $2,783,535 | $2,437,506-12.4% vs est. | $2,157,076 – $2,721,481 | 4.78 plan holders | Check my bid |
| Dec 2, 2026 | 0011-06-050 | Jones, ShackelfordAbilene · FM 1084, FM 1226, FM 576, US 180 | Overlay | $2,781,404 | $2,447,057-12.0% vs est. | $2,182,055 – $2,720,085 | 4.27 plan holders | Check my bid |
| Dec 2, 2026 | 0500-04-145 | Galveston, MontgomeryHouston · FM 1488, IH 45 | Intersection & Operational Imprv | $2,699,624 | $2,272,825-15.8% vs est. | $1,996,405 – $2,529,137 | 8.615 plan holders | Check my bid |
| Dec 2, 2026 | 6510-95-001 | PecosOdessa · IH0010 | Routine Maintenance Project | $2,486,888 | $2,186,424-12.1% vs est. | $1,965,674 – $2,437,179 | 4.17 plan holders | Check my bid |
| Dec 2, 2026 | 0904-00-229 | PotterAmarillo · Various | Safety Improvement Projects | $2,090,094 | $1,887,704-9.7% vs est. | $1,671,202 – $2,082,530 | 2.44 plan holders | Check my bid |
| Dec 2, 2026 | 1127-05-024 | EctorOdessa · FM 866 | Safety Improvement Projects | $2,084,737 | $1,857,709-10.9% vs est. | $1,667,407 – $2,067,217 | 3.05 plan holders | Check my bid |
| Dec 2, 2026 | 0211-03-039 | LeeAustin · US 77 | Overlay | $1,977,990 | $1,740,477-12.0% vs est. | $1,543,524 – $1,930,743 | 3.56 plan holders | Check my bid |
| Dec 2, 2026 | 0914-00-513 | TravisAustin · Various | Overlay | $1,909,738 | $1,695,490-11.2% vs est. | $1,514,562 – $1,882,604 | 2.75 plan holders | Check my bid |
| Dec 2, 2026 | 0913-00-134 | De WittYoakum · Various | Traffic Control Devices | $1,866,640 | $1,660,217-11.1% vs est. | $1,471,489 – $1,845,299 | 3.66 plan holders | Check my bid |
| Dec 2, 2026 | 0923-00-086 | BrownBrownwood · Various | Traffic Control Devices | $1,832,003 | $1,670,024-8.8% vs est. | $1,470,955 – $1,836,812 | 1.83 plan holders | Check my bid |
| Dec 2, 2026 | 2850-01-020 | WalkerBryan · FM 2821 | Intersection & Operational Imprv | $1,793,073 | $1,560,888-12.9% vs est. | $1,368,331 – $1,742,521 | 5.39 plan holders | Check my bid |
| Dec 2, 2026 | 0911-28-062 | HoustonLufkin · COUNTY ROAD 2065 | Bridge Replacement | $1,597,562 | $1,367,225-14.4% vs est. | $1,204,037 – $1,527,874 | 6.813 plan holders | Check my bid |
| Dec 2, 2026 | 6508-52-001 | TarrantFort Worth · IH0030 | Routine Maintenance Project - Sealed | $1,475,661 | $1,224,347-17.0% vs est. | $1,078,923 – $1,385,380 | 7.315 plan holders | Check my bid |
| Dec 2, 2026 | 0002-02-065 | El PasoEl Paso · FM 258, PEBBLE HILLS BLVD, SH 20, SHADOW MTN, US 62 | Safety Improvement Projects | $1,370,184 | $1,203,617-12.2% vs est. | $1,060,962 – $1,339,606 | 4.48 plan holders | Check my bid |
| Dec 2, 2026 | 0156-07-115 | WichitaWichita Falls · IH 44 | Safety Improvement Projects | $1,210,801 | $1,062,475-12.3% vs est. | $935,717 – $1,181,628 | 4.78 plan holders | Check my bid |
| Dec 2, 2026 | 0016-08-053 | BexarSan Antonio · SL 368 | Pedestrian, Sidewalks & Curb Ramps | $1,151,070 | $959,106-16.7% vs est. | $846,552 – $1,079,971 | 7.716 plan holders | Check my bid |
| Dec 2, 2026 | 6511-12-001 | Live OakCorpus Christi · US0281 | Routine Maintenance Project - Sealed | $1,019,175 | $907,927-10.9% vs est. | $800,790 – $1,008,755 | 3.05 plan holders | Check my bid |
| Dec 2, 2026 | 0916-27-016 | RefugioCorpus Christi · MULLENS BAYOU RD | Bridge Replacement | $882,212 | $778,469-11.8% vs est. | $688,375 – $858,715 | 4.48 plan holders | Check my bid |
| Dec 2, 2026 | 0917-16-046 | Freestone, LeonBryan · Various | Safety Improvement Projects | $184,986 | $164,740-10.9% vs est. | $146,173 – $182,004 | 5.410 plan holders | Check my bid |
| Dec 3, 2026 | 6512-18-001 | JeffersonBeaumont · US0069 | Material Maintenance Project - Sealed | $879,500 | $842,930-4.2% vs est. | $742,967 – $921,710 | 1.03 plan holders | Check my bid |
| Dec 3, 2026 | 6512-22-001 | OrangeBeaumont · FM0105 | Material Maintenance Project - Sealed | $729,900 | $700,681-4.0% vs est. | $620,659 – $769,242 | 1.02 plan holders | Check my bid |
| Dec 3, 2026 | 6513-16-001 | LibertyBeaumont · US0090 | Material Maintenance Project - Sealed | $688,500 | $661,285-4.0% vs est. | $587,039 – $726,128 | 1.02 plan holders | Check my bid |
| Dec 3, 2026 | 6502-57-001 | DentonDallas · IH0035 | Routine Maintenance Project - Sealed | $637,400 | $555,724-12.8% vs est. | $472,914 – $622,703 | 3.87 plan holders | Check my bid |
| Dec 3, 2026 | 6507-34-001 | EllisDallas · IH0035E | Routine Maintenance Project | $572,500 | $534,290-6.7% vs est. | $467,667 – $587,339 | 1.74 plan holders | Check my bid |
| Dec 3, 2026 | 6511-59-001 | LubbockLubbock · IH0027 | Routine Maintenance Project - Sealed | $542,225 | $509,501-6.0% vs est. | $445,014 – $563,898 | 1.22 plan holders | Check my bid |
| Dec 3, 2026 | 6502-79-001 | EllisDallas · IH0035E | Routine Maintenance Project - Sealed | $523,050 | $460,382-12.0% vs est. | $392,390 – $516,889 | 3.66 plan holders | Check my bid |
| Dec 3, 2026 | 6508-10-001 | CollinDallas · US0075 | Routine Maintenance Project - Sealed | $437,898 | $385,435-12.0% vs est. | $329,574 – $433,293 | 3.79 plan holders | Check my bid |
| Dec 3, 2026 | 6511-55-001 | TerryLubbock · US0062 | Routine Maintenance Project - Sealed | $421,350 | $392,498-6.8% vs est. | $342,262 – $433,388 | 1.83 plan holders | Check my bid |
| Dec 3, 2026 | 6508-07-001 | CollinDallas · US0075 | Routine Maintenance Project - Sealed | $403,750 | $369,619-8.5% vs est. | $317,158 – $412,480 | 2.44 plan holders | Check my bid |
| Dec 3, 2026 | 6511-56-001 | TerryLubbock · US0062 | Routine Maintenance Project - Sealed | $381,375 | $356,047-6.6% vs est. | $311,567 – $392,428 | 1.83 plan holders | Check my bid |
| Dec 3, 2026 | 6511-58-001 | LambLubbock · US0084 | Routine Maintenance Project - Sealed | $381,375 | $361,169-5.3% vs est. | $317,634 – $397,798 | 1.22 plan holders | Check my bid |
| Dec 3, 2026 | 6511-61-001 | LubbockLubbock · IH0027 | Routine Maintenance Project - Sealed | $380,750 | $337,202-11.4% vs est. | $291,314 – $378,814 | 3.8 | Check my bid |
| Dec 3, 2026 | 6503-02-001 | EllisDallas · FM0876 | Material Maintenance Project | $378,125 | $364,413-3.6% vs est. | $321,334 – $391,209 | 1.73 plan holders | Check my bid |
| Dec 3, 2026 | 6511-57-001 | LambLubbock · US0084 | Routine Maintenance Project - Sealed | $353,850 | $335,434-5.2% vs est. | $295,039 – $369,663 | 1.22 plan holders | Check my bid |
| Dec 3, 2026 | 6508-09-001 | CollinDallas · US0380 | Routine Maintenance Project - Sealed | $295,106 | $262,421-11.1% vs est. | $226,760 – $294,358 | 3.78 plan holders | Check my bid |
| Dec 3, 2026 | 6505-10-001 | NavarroDallas · IH0045 | Routine Maintenance Project - Sealed | $283,568 | $262,268-7.5% vs est. | $226,479 – $290,025 | 2.44 plan holders | Check my bid |
| Dec 3, 2026 | 6511-60-001 | LubbockLubbock · IH0027 | Routine Maintenance Project - Sealed | $256,375 | $244,303-4.7% vs est. | $217,557 – $269,994 | 1.22 plan holders | Check my bid |
| Dec 3, 2026 | 6511-66-001 | EllisDallas · FM0876 | Material Maintenance Project | $231,000 | $218,922-5.2% vs est. | $193,078 – $236,609 | 2.95 plan holders | Check my bid |
| Dec 3, 2026 | 6508-31-001 | KaufmanDallas · FM2728 | Material Maintenance Project | $208,000 | $195,552-6.0% vs est. | $172,274 – $212,473 | 3.36 plan holders | Check my bid |
| Dec 3, 2026 | 6508-08-001 | CollinDallas · US0075 | Routine Maintenance Project - Sealed | $177,825 | $169,146-4.9% vs est. | $148,863 – $185,461 | 1.83 plan holders | Check my bid |
| Dec 3, 2026 | 6508-30-001 | DentonDallas · IH0035W | Routine Maintenance Project - Sealed | $126,550 | $119,174-5.8% vs est. | $105,346 – $131,370 | 2.76 plan holders | Check my bid |
| Dec 3, 2026 | 6503-03-001 | EllisDallas · FM0876 | Material Maintenance Project | $120,000 | $117,633-2.0% vs est. | $106,666 – $129,239 | 1.73 plan holders | Check my bid |
| Dec 3, 2026 | 6508-11-001 | CollinDallas · US0075 | Routine Maintenance Project - Sealed | $115,770 | $105,908-8.5% vs est. | $92,366 – $118,390 | 3.87 plan holders | Check my bid |
| Dec 3, 2026 | 6498-22-001 | CollinDallas · US0075 | Routine Maintenance Project - Sealed | $87,676 | $84,159-4.0% vs est. | $74,420 – $94,190 | 2.56 plan holders | Check my bid |
| Dec 8, 2026 | 6499-91-001 | WallerHouston · US0290 | Bridge Preventative Maintenance - Sealed | $758,000 | $667,086-12.0% vs est. | $571,555 – $749,371 | 4.5 | Check my bid |
| Dec 8, 2026 | 6506-76-001 | MontgomeryHouston · IH0045 | Routine Maintenance Project - Sealed | $725,905 | $644,353-11.2% vs est. | $563,013 – $720,528 | 3.57 plan holders | Check my bid |
| Dec 8, 2026 | 6506-38-001 | HarrisHouston · IH0069 | Routine Maintenance Project - Sealed | $666,517 | $586,551-12.0% vs est. | $504,734 – $660,385 | 4.1 | Check my bid |
| Dec 8, 2026 | 6505-24-001 | EctorOdessa · IH0020 | Routine Maintenance Project - Sealed | $665,370 | $611,355-8.1% vs est. | $533,428 – $681,052 | 2.44 plan holders | Check my bid |
| Dec 8, 2026 | 6506-85-001 | MontgomeryHouston · IH0045 | Routine Maintenance Project - Sealed | $629,321 | $596,568-5.2% vs est. | $522,255 – $663,205 | 1.01 plan holders | Check my bid |
| Dec 8, 2026 | 6510-87-001 | EctorOdessa · IH0020 | Bridge Preventative Maintenance - Sealed | $607,000 | $538,305-11.3% vs est. | $470,808 – $593,304 | 4.27 plan holders | Check my bid |
| Dec 8, 2026 | 6504-29-001 | GalvestonHouston · SH0087 | Routine Maintenance Project - Sealed | $495,189 | $448,706-9.4% vs est. | $388,971 – $498,331 | 3.17 plan holders | Check my bid |
| Dec 8, 2026 | 6509-26-001 | Fort BendHouston · US0059 | Routine Maintenance Project - Sealed | $410,070 | $366,256-10.7% vs est. | $319,472 – $408,489 | 3.78 plan holders | Check my bid |
| Dec 8, 2026 | 6506-83-001 | MontgomeryHouston · IH0045 | Routine Maintenance Project - Sealed | $367,699 | $350,935-4.6% vs est. | $310,041 – $387,818 | 1.01 plan holders | Check my bid |
| Dec 8, 2026 | 6506-82-001 | MontgomeryHouston · IH0045 | Routine Maintenance Project - Sealed | $334,340 | $319,207-4.5% vs est. | $282,817 – $352,603 | 1.01 plan holders | Check my bid |
| Dec 8, 2026 | 6513-10-001 | EctorOdessa · BI0020E | Material Maintenance Project | $286,800 | $278,043-3.1% vs est. | $253,340 – $300,322 | 1.22 plan holders | Check my bid |
| Dec 8, 2026 | 6502-84-001 | HarrisHouston · FM1093 | Routine Maintenance Project - Sealed | $261,585 | $250,006-4.4% vs est. | $223,752 – $275,891 | 1.01 plan holders | Check my bid |
| Dec 8, 2026 | 6512-48-001 | TerrellOdessa · US0090 | Routine Maintenance Project | $106,560 | $102,045-4.2% vs est. | $92,707 – $111,469 | 1.74 plan holders | Check my bid |
| Dec 9, 2026 | 6510-86-001 | El PasoEl Paso · IH0010 | Routine Maintenance Project | $963,350 | $850,265-11.7% vs est. | $744,171 – $950,344 | 4.3 | Check my bid |
| Dec 9, 2026 | 6513-02-001 | ChildressChildress · US0287 | Routine Maintenance Project - Sealed | $529,190 | $484,326-8.5% vs est. | $423,287 – $536,976 | 2.65 plan holders | Check my bid |
| Dec 10, 2026 | 6508-64-001 | La SalleLaredo · IH0035 | Material Maintenance Project - Sealed | $850,150 | $806,235-5.2% vs est. | $711,897 – $875,816 | 1.83 plan holders | Check my bid |
| Dec 10, 2026 | 6511-62-001 | StonewallAbilene · US0083 | Routine Maintenance Project - Sealed | $682,373 | $627,914-8.0% vs est. | $547,226 – $696,984 | 2.15 plan holders | Check my bid |
| Dec 10, 2026 | 6509-62-001 | Val VerdeLaredo · US0090 | Routine Maintenance Project - Sealed | $680,095 | $635,402-6.6% vs est. | $557,766 – $705,805 | 1.83 plan holders | Check my bid |
| Dec 10, 2026 | 6510-72-001 | JonesAbilene · FM0126 | Routine Maintenance Project - Sealed | $571,125 | $525,270-8.0% vs est. | $457,899 – $583,178 | 2.35 plan holders | Check my bid |
| Dec 10, 2026 | 6508-63-001 | La SalleLaredo · IH0035 | Routine Maintenance Project - Sealed | $489,500 | $466,451-4.7% vs est. | $410,087 – $516,115 | 1.22 plan holders | Check my bid |
| Dec 10, 2026 | 6504-73-001 | SmithTyler · IH0020 | Routine Maintenance Project - Sealed | $311,575 | $293,184-5.9% vs est. | $259,379 – $322,793 | 1.84 plan holders | Check my bid |
| Dec 10, 2026 | 6512-97-001 | Val VerdeLaredo · SH0163 | Routine Maintenance Project - Sealed | $111,879 | $102,929-8.0% vs est. | $88,406 – $115,020 | 3.7 | Check my bid |
| Dec 11, 2026 | 6512-19-001 | BowieAtlanta · US0059 | Routine Maintenance Project - Sealed | $935,100 | $864,684-7.5% vs est. | $755,576 – $957,031 | 1.84 plan holders | Check my bid |
| Dec 11, 2026 | 6509-76-001 | HarrisonAtlanta · US0080 | Routine Maintenance Project | $324,574 | $310,314-4.4% vs est. | $277,590 – $337,099 | 1.23 plan holders | Check my bid |
| Dec 11, 2026 | 6509-77-001 | TitusAtlanta · US0271 | Routine Maintenance Project | $283,652 | $269,340-5.0% vs est. | $240,232 – $291,482 | 1.83 plan holders | Check my bid |
| Dec 11, 2026 | 6509-78-001 | BowieAtlanta · US0259 | Routine Maintenance Project | $252,868 | $242,370-4.2% vs est. | $218,450 – $263,027 | 1.23 plan holders | Check my bid |
| Dec 11, 2026 | 6509-75-001 | CassAtlanta · FM0251 | Routine Maintenance Project | $231,926 | $220,495-4.9% vs est. | $198,679 – $239,579 | 1.83 plan holders | Check my bid |
| Dec 11, 2026 | 6509-71-001 | PanolaAtlanta · US0059 | Routine Maintenance Project | $216,492 | $207,882-4.0% vs est. | $188,299 – $225,988 | 1.23 plan holders | Check my bid |
| Dec 11, 2026 | 6509-73-001 | UpshurAtlanta · FM0556 | Routine Maintenance Project | $207,284 | $199,325-3.8% vs est. | $180,444 – $216,673 | 1.22 plan holders | Check my bid |
| Dec 11, 2026 | 6509-72-001 | MorrisAtlanta · FM0161 | Routine Maintenance Project | $198,632 | $189,002-4.8% vs est. | $171,109 – $206,232 | 1.83 plan holders | Check my bid |
| Dec 11, 2026 | 6509-74-001 | MarionAtlanta · SH0049 | Routine Maintenance Project | $172,467 | $164,577-4.6% vs est. | $149,077 – $179,599 | 1.84 plan holders | Check my bid |
| Dec 11, 2026 | 6509-79-001 | BowieAtlanta · IH0030 | Routine Maintenance Project | $169,432 | $163,178-3.7% vs est. | $147,646 – $177,904 | 1.22 plan holders | Check my bid |
| Dec 15, 2026 | 6513-22-001 | KarnesCorpus Christi · US0181 | Material Maintenance Project | $800,000 | $718,936-10.1% vs est. | $641,595 – $786,332 | 4.05 plan holders | Check my bid |
| Dec 15, 2026 | 6513-21-001 | Jim WellsCorpus Christi · US0281 | Material Maintenance Project | $780,000 | $701,672-10.0% vs est. | $626,591 – $767,005 | 4.05 plan holders | Check my bid |
| Dec 15, 2026 | 6513-20-001 | San PatricioCorpus Christi · US0181 | Material Maintenance Project | $754,000 | $680,260-9.8% vs est. | $607,348 – $742,306 | 4.05 plan holders | Check my bid |
| Dec 15, 2026 | 6513-40-001 | HarrisHouston · US0290 | Routine Maintenance Project - Sealed | $711,194 | $624,235-12.2% vs est. | $536,280 – $703,677 | 4.1 | Check my bid |
| Dec 15, 2026 | 6511-45-001 | McLennanWaco · US0084 | Routine Maintenance Project | $633,642 | $559,108-11.8% vs est. | $491,944 – $625,077 | 4.1 | Check my bid |
| Dec 15, 2026 | 6513-19-001 | GoliadCorpus Christi · US0059 | Material Maintenance Project | $300,000 | $282,799-5.7% vs est. | $253,429 – $303,962 | 3.45 plan holders | Check my bid |
| Dec 15, 2026 | 6511-69-001 | BrazosBryan · SH0006 | Material Maintenance Project | $245,508 | $229,133-6.7% vs est. | $205,991 – $249,357 | 3.42 plan holders | Check my bid |
| Dec 15, 2026 | 6512-86-001 | GrimesBryan · FM0244 | Routine Maintenance Project | $210,153 | $191,993-8.6% vs est. | $171,222 – $211,059 | 3.81 plan holders | Check my bid |
| Dec 15, 2026 | 6512-83-001 | KimbleSan Angelo · US0377 | Material Maintenance Project | $153,230 | $145,248-5.2% vs est. | $129,710 – $158,521 | 3.45 plan holders | Check my bid |
| Dec 15, 2026 | 6464-60-001 | RobertsonBryan · US0079 | Routine Maintenance Project | $122,000 | $113,289-7.1% vs est. | $100,289 – $125,050 | 3.72 plan holders | Check my bid |
| Dec 15, 2026 | 6510-27-001 | NuecesCorpus Christi · US0181 | Routine Maintenance Project - Sealed | $88,668 | $82,823-6.6% vs est. | $71,576 – $92,568 | 3.5 | Check my bid |
| Dec 16, 2026 | 6509-00-001 | ParkerFort Worth · IH0020 | Routine Maintenance Project - Sealed | $886,974 | $769,868-13.2% vs est. | $660,429 – $868,072 | 4.4 | Check my bid |
| Dec 17, 2026 | 6511-76-001 | GraysonParis · US0075 | Routine Maintenance Project - Sealed | $487,915 | $430,151-11.8% vs est. | $376,095 – $477,937 | 3.91 plan holders | Check my bid |
| Dec 17, 2026 | 6513-00-001 | HopkinsParis · IH0030 | Routine Maintenance Project - Sealed | $287,282 | $256,472-10.7% vs est. | $222,406 – $286,191 | 3.9 | Check my bid |
| Dec 17, 2026 | 6513-09-001 | HopkinsParis · IH0030 | Routine Maintenance Project - Sealed | $125,450 | $114,549-8.7% vs est. | $100,099 – $127,229 | 3.91 plan holders | Check my bid |
| Dec 21, 2026 | 6511-16-001 | VictoriaYoakum · US0077 | Routine Maintenance Project - Sealed | $999,500 | $881,810-11.8% vs est. | $767,438 – $980,350 | 4.41 plan holders | Check my bid |
| Dec 21, 2026 | 6508-68-001 | BrewsterEl Paso · SH0118 | Material Maintenance Project | $743,050 | $671,585-9.6% vs est. | $593,339 – $736,072 | 3.91 plan holders | Check my bid |
| Dec 21, 2026 | 6513-37-001 | MooreAmarillo · US0087 | Routine Maintenance Project - Sealed | $598,500 | $529,443-11.5% vs est. | $454,606 – $593,966 | 4.0 | Check my bid |
| Jan 6, 2027 | 0265-03-042 | BastropAustin · SH 71 | Interchange (New or Reconstructed) | $49,159,553 | $44,038,101-10.4% vs est. | $40,909,960 – $48,465,773 | 5.8 | Check my bid |
| Jan 6, 2027 | 0249-07-072 | JackFort Worth · US 281 | Interchange (New or Reconstructed) | $34,966,830 | $30,820,917-11.9% vs est. | $27,998,014 – $33,751,143 | 5.4 | Check my bid |
| Jan 6, 2027 | 0016-05-133 | ComalSan Antonio · IH 35 | Overlay | $16,478,234 | $14,021,232-14.9% vs est. | $12,583,784 – $15,663,320 | 5.0 | Check my bid |
| Jan 6, 2027 | 0136-05-049 | Delta, LamarParis · SH 19 | Overlay | $13,004,091 | $11,443,943-12.0% vs est. | $10,069,598 – $12,549,343 | 5.0 | Check my bid |
| Jan 6, 2027 | 0445-01-072 | Colorado, Gonzales, LavacaYoakum · UA 90 | Overlay | $12,372,894 | $10,890,233-12.0% vs est. | $9,668,087 – $12,041,634 | 5.1 | Check my bid |
| Jan 6, 2027 | 0085-01-053 | Bowie, MorrisAtlanta · FM 561, US 259 | Overlay | $7,996,510 | $7,023,973-12.2% vs est. | $6,300,783 – $7,766,049 | 5.2 | Check my bid |
| Jan 6, 2027 | 0495-03-070 | Van ZandtTyler · IH 20 | New Location Non-Freeway | $6,110,601 | $5,374,000-12.1% vs est. | $4,814,322 – $5,939,742 | 5.4 | Check my bid |
| Jan 6, 2027 | 0049-09-103 | Brazos, FreestoneBryan · BS 6R, US 84 | Bridge Maintenance | $5,234,866 | $4,594,063-12.2% vs est. | $4,114,429 – $5,086,913 | 5.6 | Check my bid |
| Jan 6, 2027 | 1057-03-060 | CameronPharr · FM 510 | Rehabilitation of Existing Road | $5,174,097 | $4,550,021-12.1% vs est. | $4,120,368 – $5,014,288 | 5.4 | Check my bid |
| Jan 6, 2027 | 0054-06-109 | Brown, ColemanBrownwood · FM 2524, SH 153, US 67 | Overlay | $4,925,730 | $4,304,240-12.6% vs est. | $3,858,325 – $4,765,119 | 5.5 | Check my bid |
| Jan 6, 2027 | 0389-05-134 | HarrisHouston · SH 146 | Transportation Non-Roadway | $4,320,890 | $3,759,175-13.0% vs est. | $3,304,435 – $4,163,479 | 5.6 | Check my bid |
| Jan 6, 2027 | 0910-00-170 | SmithTyler · Various | Traffic Control Devices | $3,654,646 | $3,180,412-13.0% vs est. | $2,795,819 – $3,533,162 | 5.4 | Check my bid |
| Jan 6, 2027 | 1728-02-069 | ComalSan Antonio · FM 306 | Safety Improvement Projects | $3,646,201 | $3,172,028-13.0% vs est. | $2,792,596 – $3,525,204 | 5.6 | Check my bid |
| Jan 6, 2027 | 3312-02-019 | GalvestonHouston · FM 270 | Overlay | $3,480,730 | $3,020,449-13.2% vs est. | $2,663,004 – $3,359,208 | 5.5 | Check my bid |
| Jan 6, 2027 | 1685-02-058 | HarrisHouston · FM 1960 | Safety Improvement Projects | $3,426,835 | $2,961,982-13.6% vs est. | $2,604,132 – $3,297,997 | 5.7 | Check my bid |
| Jan 6, 2027 | 6509-80-001 | BowieAtlanta · IH0030 | Material Maintenance Project | $3,332,165 | $2,912,005-12.6% vs est. | $2,580,872 – $3,229,196 | 5.4 | Check my bid |
| Jan 6, 2027 | 0172-09-047 | TarrantFort Worth · US 287 | Rehabilitation of Existing Road | $2,919,363 | $2,528,631-13.4% vs est. | $2,208,225 – $2,817,461 | 5.4 | Check my bid |
| Jan 6, 2027 | 0089-15-019 | Colorado, Matagorda, WhartonYoakum · BS 71F, BU 59S, FM 2540, SH 35, SH 71 | Pedestrian, Sidewalks & Curb Ramps | $2,767,889 | $2,417,881-12.6% vs est. | $2,163,893 – $2,671,616 | 5.8 | Check my bid |
| Jan 6, 2027 | 6496-63-001 | BurnetAustin · US0281 | Routine Maintenance Project - Sealed | $2,048,175 | $1,757,519-14.2% vs est. | $1,529,176 – $1,972,780 | 5.1 | Check my bid |
| Jan 6, 2027 | 0179-02-092 | BrazoriaHouston · SH 35 | Bridge Maintenance | $2,043,210 | $1,764,721-13.6% vs est. | $1,540,524 – $1,975,566 | 5.5 | Check my bid |
| Jan 6, 2027 | 0906-00-273 | EctorOdessa · Various | Bridge Maintenance | $2,041,975 | $1,769,105-13.4% vs est. | $1,550,705 – $1,976,435 | 5.4 | Check my bid |
| Jan 6, 2027 | 6496-57-001 | BlancoAustin · US0281 | Material Maintenance Project | $1,990,050 | $1,734,416-12.8% vs est. | $1,518,645 – $1,926,928 | 5.1 | Check my bid |
| Jan 6, 2027 | 0001-04-109 | El PasoEl Paso · US 85 | Safety Improvement Projects | $1,898,569 | $1,649,346-13.1% vs est. | $1,452,529 – $1,844,969 | 5.2 | Check my bid |
| Jan 6, 2027 | 6512-38-001 | BosqueWaco · SH0006 | Material Maintenance Project | $1,579,936 | $1,392,341-11.9% vs est. | $1,235,225 – $1,538,220 | 4.8 | Check my bid |
| Jan 6, 2027 | 6513-51-001 | NolanMaintenance Division · IH0020 | Material Maintenance Project | $1,515,000 | $1,340,022-11.5% vs est. | $1,171,595 – $1,484,300 | 4.8 | Check my bid |
| Jan 6, 2027 | 0925-00-085 | ChildressChildress · Various | Traffic Control Devices | $1,490,805 | $1,291,456-13.4% vs est. | $1,129,191 – $1,448,506 | 5.2 | Check my bid |
| Jan 6, 2027 | 6513-45-001 | GrayAmarillo · SH0070 | Material Maintenance Project | $1,408,564 | $1,251,718-11.1% vs est. | $1,100,623 – $1,382,364 | 4.6 | Check my bid |
| Jan 6, 2027 | 6513-05-001 | TitusMaintenance Division · IH0030 | Material Maintenance Project | $1,404,700 | $1,244,537-11.4% vs est. | $1,091,445 – $1,379,770 | 4.7 | Check my bid |
| Jan 6, 2027 | 0918-47-586 | DallasDallas · Various | Bridge Maintenance | $1,371,728 | $1,186,109-13.5% vs est. | $1,021,696 – $1,330,528 | 5.1 | Check my bid |
| Jan 6, 2027 | 0069-10-003 | HowardAbilene · US 87 | Bridge Maintenance | $1,356,095 | $1,178,443-13.1% vs est. | $1,017,797 – $1,321,365 | 5.0 | Check my bid |
| Jan 6, 2027 | 6503-99-001 | JeffersonBeaumont · IH0010 | Routine Maintenance Project - Sealed | $1,328,803 | $1,148,202-13.6% vs est. | $994,649 – $1,294,475 | 4.7 | Check my bid |
| Jan 6, 2027 | 6506-09-001 | KaufmanDallas · IH0020 | Routine Maintenance Project - Sealed | $1,306,469 | $1,124,528-13.9% vs est. | $961,277 – $1,264,810 | 4.7 | Check my bid |
| Jan 6, 2027 | 6496-54-001 | TravisAustin · IH0035 | Routine Maintenance Project - Sealed | $1,299,670 | $1,115,219-14.2% vs est. | $957,826 – $1,260,032 | 4.8 | Check my bid |
| Jan 6, 2027 | 6513-38-001 | JeffersonBeaumont · SH0347 | Material Maintenance Project - Sealed | $1,231,500 | $1,077,519-12.5% vs est. | $936,248 – $1,205,743 | 4.7 | Check my bid |
| Jan 6, 2027 | 6512-37-001 | BellWaco · SH0036 | Material Maintenance Project | $1,086,157 | $969,543-10.7% vs est. | $854,018 – $1,069,174 | 4.4 | Check my bid |
| Jan 6, 2027 | 1685-05-141 | HarrisHouston · SH 6 | Safety Improvement Projects | $1,071,674 | $936,257-12.6% vs est. | $815,938 – $1,049,791 | 4.8 | Check my bid |
| Jan 6, 2027 | 0922-00-092 | WebbLaredo · Various | Safety Improvement Projects | $1,060,926 | $933,757-12.0% vs est. | $811,922 – $1,040,642 | 4.7 | Check my bid |
| Jan 6, 2027 | 0700-04-056 | Llano, TravisAustin · SH 71, Various | Bridge Maintenance | $700,723 | $614,881-12.3% vs est. | $526,401 – $688,296 | 4.5 | Check my bid |
| Jan 6, 2027 | 6513-53-001 | GuadalupeMaintenance Division · SH0046 | Material Maintenance Project | $481,740 | $441,885-8.3% vs est. | $384,083 – $483,238 | 3.6 | Check my bid |
| Jan 7, 2027 | 0440-05-015 | Travis, WilliamsonAustin · SH 130, SH 45 | Widen Freeway | $210,801,460 | $190,188,639-9.8% vs est. | $174,889,172 – $211,376,944 | 5.7 | Check my bid |
| Jan 7, 2027 | 0024-08-152 | BexarSan Antonio · US 90 | Safety Improvement Projects | $14,023,512 | $12,061,909-14.0% vs est. | $10,805,955 – $13,528,339 | 5.1 | Check my bid |
| Jan 7, 2027 | 0063-04-069 | PanolaAtlanta · US 59 | Overlay | $6,932,121 | $6,090,396-12.1% vs est. | $5,472,241 – $6,731,988 | 5.3 | Check my bid |
| Jan 7, 2027 | 1530-01-012 | ScurryAbilene · FM 1609 | Widen Non-Freeway | $5,191,836 | $4,554,818-12.3% vs est. | $4,056,289 – $5,027,732 | 5.5 | Check my bid |
| Jan 7, 2027 | 0527-06-022 | Fort BendHouston · FM 360 | Overlay | $3,778,339 | $3,283,670-13.1% vs est. | $2,893,138 – $3,650,521 | 5.5 | Check my bid |
| Jan 7, 2027 | 0045-19-066 | Fannin, GraysonParis · US 82 | Bridge Maintenance | $3,108,693 | $2,706,831-12.9% vs est. | $2,382,071 – $3,005,811 | 5.6 | Check my bid |
| Jan 7, 2027 | 0336-03-082 | AngelinaLufkin · SH 103 | Overlay | $3,001,030 | $2,622,466-12.6% vs est. | $2,332,753 – $2,904,468 | 5.5 | Check my bid |
| Jan 7, 2027 | 0128-04-045 | McCullochBrownwood · US 190 | Rehabilitation of Existing Road | $2,972,327 | $2,587,407-13.0% vs est. | $2,290,917 – $2,866,411 | 5.5 | Check my bid |
| Jan 7, 2027 | 0906-00-296 | EctorOdessa · Various | Bridge Maintenance | $2,887,932 | $2,514,252-12.9% vs est. | $2,211,736 – $2,792,326 | 5.6 | Check my bid |
| Jan 7, 2027 | 6513-47-001 | HutchinsonAmarillo · SH0207 | Material Maintenance Project | $2,648,344 | $2,318,006-12.5% vs est. | $2,050,713 – $2,562,929 | 5.2 | Check my bid |
| Jan 7, 2027 | 0908-00-135 | TaylorAbilene · Various | Traffic Control Devices | $2,223,712 | $1,912,523-14.0% vs est. | $1,679,275 – $2,141,493 | 5.4 | Check my bid |
| Jan 7, 2027 | 0508-01-401 | HarrisHouston · IH 10 | Bridge Maintenance | $1,892,530 | $1,635,331-13.6% vs est. | $1,427,062 – $1,832,732 | 5.4 | Check my bid |
| Jan 7, 2027 | 0922-33-246 | WebbLaredo · Various | Texas Park and Wildlife | $1,794,109 | $1,561,267-13.0% vs est. | $1,366,759 – $1,739,429 | 5.2 | Check my bid |
| Jan 7, 2027 | 0914-00-584 | TravisAustin · Various | Bridge Maintenance | $1,628,329 | $1,402,626-13.9% vs est. | $1,219,337 – $1,575,088 | 5.3 | Check my bid |
| Jan 7, 2027 | 0594-03-029 | RuskTyler · FM 225 | Safety Improvement Projects | $1,474,875 | $1,283,904-12.9% vs est. | $1,123,324 – $1,439,497 | 5.1 | Check my bid |
| Jan 7, 2027 | 0914-00-518 | TravisAustin · Various | Traffic Control Devices | $1,170,970 | $1,013,357-13.5% vs est. | $879,634 – $1,139,898 | 4.9 | Check my bid |
| Jan 7, 2027 | 0914-00-510 | TravisAustin · Various | Bridge Maintenance | $1,030,008 | $893,306-13.3% vs est. | $767,314 – $1,004,507 | 4.8 | Check my bid |
| Jan 7, 2027 | 0922-33-217 | WebbLaredo · LOWRY LN | Bridge Replacement | $766,971 | $681,413-11.2% vs est. | $592,783 – $760,583 | 4.4 | Check my bid |
| Jan 7, 2027 | 0111-08-130 | BrazoriaHouston · SH 288 | Bridge Maintenance | $744,996 | $658,154-11.7% vs est. | $568,458 – $738,786 | 4.3 | Check my bid |
| Jan 7, 2027 | 1062-02-030 | HarrisHouston · FM 1485 | Overlay | $724,764 | $641,957-11.4% vs est. | $558,445 – $718,883 | 4.3 | Check my bid |
| Jan 7, 2027 | 0910-00-151 | SmithTyler · Various | Bridge Maintenance | $714,808 | $634,591-11.2% vs est. | $547,507 – $708,096 | 4.3 | Check my bid |
| Jan 7, 2027 | 0014-01-032 | TarrantFort Worth · BU 287P | Safety Improvement Projects | $606,395 | $535,646-11.7% vs est. | $467,422 – $600,635 | 4.2 | Check my bid |
| Jan 7, 2027 | 0718-01-077 | DentonDallas · FM 156 | Safety Improvement Projects | $504,590 | $444,808-11.8% vs est. | $383,541 – $500,511 | 4.1 | Check my bid |
| Jan 7, 2027 | 0598-02-133 | BrazoriaHouston · SH 288 | Bridge Maintenance | $470,290 | $419,467-10.8% vs est. | $364,548 – $469,243 | 4.0 | Check my bid |
| Jan 7, 2027 | 0227-06-033 | Dawson, HockleyLubbock · SH 137, US 180, US 385 | Safety Improvement Projects | $374,764 | $336,089-10.3% vs est. | $292,775 – $374,450 | 3.8 | Check my bid |
| Jan 7, 2027 | 0902-20-242 | WiseFort Worth · Various | Safety Improvement Projects | $276,185 | $248,675-10.0% vs est. | $215,414 – $276,302 | 3.8 | Check my bid |
Predicted low = the most likely low bid. Likely range = the middle half: the low bid lands inside it about half the time. Bidders = expected bids from the plan holders (or, before plans are out, what similar jobs drew). Always confirm against the official proposal.