JAMES CONSTRUCTION GROUP, L.L.C.

Texas bid history

‹ All contractors

272BidsSep 11, 2013 to Mar 5, 2021
43Wins (low bidder)
15.8%Win rate
$499,096,905Total won

Bid history

ExcelCSV
Let dateCCSJProjectRankTheir bidLow bidvs low
Mar 5, 2021 2524-02-025 ADD SHOULDERS, SEAL COAT AND 1.5 IN ACP OVERLAYBrazoria · Houston 3 of 5 $12,622,398 $11,769,391DURWOOD GREENE CONSTRUCTION… +7.2%
Mar 5, 2021 1776-02-019 CONSTRUCT NEW ROADWAY LANESHays · Austin 5 of 12 $6,354,364 $5,959,526HUNTER INDUSTRIES, LTD. +6.6%
Mar 4, 2021 0598-02-118 MILL, SEAL COAT AND 1.5 IN PFC OVERLAYBrazoria · Houston 3 of 4 $11,013,163 $9,211,640DURWOOD GREENE CONSTRUCTION… +19.6%
Feb 5, 2021 0050-04-027 BASE REPAIR, PLANING, SEAL COAT, PFC OVERLAYWaller · Houston 4 of 5 $6,197,344 $5,294,014VULCAN CONSTRUCTION +17.1%
Feb 4, 2021 0005-14-067 CONSTRUCT BRIDGEMidland · Odessa 1 of 7 $36,305,216 $36,305,216 Won
Feb 4, 2021 1685-01-110 2.5 " PLANING, SEAL COAT, TOM OVERLAYHarris · Houston 3 of 3 $5,434,934 $3,598,843ANGEL BROTHERS HOLDINGS COR… +51.0%
Feb 4, 2021 0111-01-095 RESTORATION OF ROADWAYHarris · Houston 4 of 4 $1,303,220 $969,114DURWOOD GREENE CONSTRUCTION… +34.5%
Feb 4, 2021 0179-02-085 PLANING, PAVEMENT REPAIR, SEAL COAT AND 1.5" HMABrazoria · Houston 4 of 6 $1,160,545 $858,674DURWOOD GREENE CONSTRUCTION… +35.2%
Feb 4, 2021 6361-79-001 MISCELLANEOUS BRIDGE REPAIRHoward · Abilene 5 of 14 $560,800 $425,867MPB, INC. +31.7%
Jan 8, 2021 0005-14-084 CONSTRUCT NEW INTERCHANGEMidland · Odessa 2 of 4 $61,880,088 $59,101,874PULICE CONSTRUCTION, INC. +4.7%
Jan 8, 2021 2524-02-022 REPLACE BRIDGE AND APPROACHESBrazoria · Houston 9 of 9 $16,243,055 $12,141,992COPASA INC +33.8%
Jan 7, 2021 1685-05-115 SURFACING/ROADWAY RESTORATIONHarris · Houston 4 of 5 $2,274,478 $1,616,650ANGEL BROTHERS HOLDINGS COR… +40.7%
Jan 7, 2021 0906-00-203 BRIDGE JOINT REPAIR PROGRAM (2021)Ector · Odessa 5 of 12 $1,400,000 $1,267,114SCR CIVIL CONSTRUCTION, LLC +10.5%
Jan 6, 2021 6365-64-001 CLEAN & SEAL JOINTS/EROSION CNTRL/CONC REPAIRChambers · Beaumont 2 of 9 $72,293 $72,198TALBRAN ENTERPRISES LLC +0.1%
Dec 17, 2020 6369-07-001 SCOUR REPAIR & PILE REPAIRFreestone · Bryan 8 of 11 $128,345 $70,040GV LANDSCAPE AND CONSTRUCTI… +83.2%
Dec 16, 2020 6372-63-001 REHABILITATION OF A BRIDGE FACILITYMaverick · Laredo 4 of 4 $292,836 $161,400GIBSON & ASSOCIATES, INC. +81.4%
Dec 8, 2020 6354-93-001 BRIDGE JOINT CLEANING AND SEALINGGregg · Tyler 5 of 6 $219,402 $161,490TALBRAN ENTERPRISES LLC +35.9%
Dec 3, 2020 6370-37-001 2021 BRIDGE PREVENTATIVE MAINTENANCECottle · Childress 4 of 15 $414,440 $359,682ROAD DOCTORS LLC +15.2%
Dec 3, 2020 6366-39-001 BRIDGE FACILITIES CLEAN/RESEAL EXPANSION JOINTSLa Salle · Laredo 1 of 8 $396,495 $396,495 Won
Dec 3, 2020 6366-45-001 BRIDGE PREVENTIVE MAINTENANCEMcLennan · Waco 1 of 9 $623,661 $623,661 Won
Dec 2, 2020 2523-02-068 CONSTRUCTION OF SUPER 2 HIGHWAYBrazoria · Houston 3 of 5 $37,859,839 $28,859,306ANGEL BROTHERS HOLDINGS COR… +31.2%
Dec 2, 2020 0494-08-015 RESTORATION OF EXISTING ROADGlasscock · San Angelo 4 of 8 $28,692,683 $25,932,283RK HALL, LLC +10.6%
Nov 19, 2020 6368-29-001 REPAIR OF EXISTING BRIDGE BEAMPalo Pinto · Fort Worth 2 of 7 $46,365 $41,824TEXCON GENERAL CONTRACTORS +10.9%
Nov 5, 2020 0143-07-039 REPLACE BRIDGE AND APPROACHESGonzales · Yoakum 7 of 8 $9,269,938 $8,424,542ANGEL BROTHERS HOLDINGS COR… +10.0%
Nov 5, 2020 1400-02-025 SFT- SAFETY IMPROVEMENT PROJECTGrimes · Bryan 6 of 6 $8,842,716 $6,403,546LARRY YOUNG PAVING, INC. +38.1%
Nov 5, 2020 6365-28-001 FY 2021 BPM PROJECTMoore · Amarillo 2 of 6 $698,663 $666,090PBX BRIDGE COMPANY +4.9%
Nov 5, 2020 6370-22-001 BRIDGE JOINT REPAIREctor · Odessa 7 of 14 $265,712 $173,811SCOTT TUCKER CONSTRUCTION C… +52.9%
Nov 4, 2020 0535-07-050 ACP OVERLAYFayette · Yoakum 4 of 4 $11,872,065 $10,399,532HUNTER INDUSTRIES, LTD. +14.2%
Oct 2, 2020 0294-02-023 SUPER 2 PASSING LANESGaines · Lubbock 6 of 8 $57,752,000 $48,813,790JAMES HAMILTON CONSTRUCTION… +18.3%
Oct 2, 2020 0508-01-345 CONSTRUCT EAST BOUND ENTRANCE RAMPHarris · Houston 6 of 8 $16,171,890 $14,598,296SER CONSTRUCTION PARTNERS, … +10.8%
Oct 2, 2020 0909-40-076 REPLACE BRIDGE AND APPROACHESLimestone · Waco 7 of 9 $1,037,037 $733,162FUQUA CONSTRUCTION CO., INC. +41.4%
Oct 2, 2020 0598-02-119 CONSTRUCT NEW 2-LANE NB FRONTAGE ROADBrazoria · Houston 5 of 10 $5,156,925 $4,797,529SER CONSTRUCTION PARTNERS, … +7.5%
Oct 1, 2020 1259-01-043 RECONSTRUCT & WIDEN FROM 2 TO 4 LANESMontgomery · Houston 1 of 11 $14,690,168 $14,690,168 Won
Oct 1, 2020 2553-01-115 CONVERT TO 4 LANE FRWY W/2 LANE NB&SB FRONTAGE RDAngelina · Lufkin 5 of 5 $25,914,307 $19,326,241LONGVIEW BRIDGE AND ROAD, L… +34.1%
Oct 1, 2020 2087-01-021 BR - BRIDGE REPLACEMENTMilam · Bryan 4 of 8 $1,428,086 $1,185,696SB CONTRACTORS LLC +20.4%
Sep 15, 2020 6340-84-001 CLN & SEAL EXIST BRIDGE JTS, DECK REPAIRFort Bend · Houston 1 of 9 $144,187 $144,187 Won
Sep 4, 2020 1685-03-098 WIDEN FROM 4 TO 6 LANES & CONSTRUCT 4-LN OVERPASSHarris · Houston 3 of 5 $75,740,164 $70,042,726WEBBER, LLC +8.1%
Sep 4, 2020 2399-01-074 WIDEN NON-FREEWAY FACILITYBrazos · Bryan 4 of 7 $55,543,814 $50,398,943KNIFE RIVER CORPORATION - S… +10.2%
Sep 4, 2020 0088-01-069 PAVEMENT REPAIR AND STRUCTURAL OVERLAYBee · Corpus Christi 6 of 6 $19,955,095 $15,920,071SMITH & COMPANY +25.3%
Sep 4, 2020 0114-11-082 CONSTRUCT U-TURNWaller · Houston 9 of 12 $5,872,696 $4,591,144ISI CONTRACTING, INC. +27.9%
Sep 3, 2020 0265-02-036 CONSTRUCT 4-LANE OVERPASSES AT ROSS RD AND KELLAMTravis · Austin 4 of 6 $70,435,340 $61,227,248ZACHRY CONSTRUCTION CORPORA… +15.0%
Sep 3, 2020 0265-14-008 CONSTRUCT BRIDGE AND APPROACHESFayette · Yoakum 5 of 11 $15,017,305 $13,635,356ANGEL BROTHERS HOLDINGS COR… +10.1%
Sep 3, 2020 1986-01-065 CONSTRUCT DRAINAGE CULVERTS&REPLACE CONCRETE PVMNTMontgomery · Houston 4 of 13 $3,706,078 $3,360,867RAC INDUSTRIES, LLC +10.3%
Sep 3, 2020 1413-01-018 SURFACING/ROADWAY RESTORATIONBrazoria · Houston 2 of 5 $1,510,823 $1,468,982ANGEL BROTHERS HOLDINGS COR… +2.8%
Sep 3, 2020 1415-03-012 CONSTRUCT NOISE BARRIERFort Bend · Houston 9 of 13 $1,441,734 $1,285,464TEXAS WALL & LANDSCAPE +12.2%
Aug 6, 2020 0006-02-125 CONCRETE MEDIAN BARRIERNolan · Abilene 1 of 7 $4,724,453 $4,724,453 Won
Aug 6, 2020 0006-07-085 CONCRETE MEDIAN BARRIERCallahan · Abilene 2 of 5 $4,401,261 $4,097,727HJC FARMS, INC. +7.4%
Aug 6, 2020 0200-14-097 SFT - SAFETY IMPROVEMENT PROJECTJefferson · Beaumont 2 of 4 $2,476,075 $2,456,628FLOVERA CONSTRUCTION SERVIC… +0.8%
Aug 5, 2020 0179-02-087 SURFACING/ROADWAY RESTORATIONBrazoria · Houston 2 of 3 $10,769,738 $10,077,740DURWOOD GREENE CONSTRUCTION… +6.9%
Aug 5, 2020 0114-09-077 MILL AND INLAYWashington · Bryan 3 of 4 $3,491,278 $2,697,458KNIFE RIVER CORPORATION - S… +29.4%
Jul 9, 2020 0216-01-057 CONSTRUCT GRADE SEPARATIONComal · San Antonio 7 of 8 $16,848,173 $14,284,639HUNTER INDUSTRIES, LTD. +17.9%
Jul 9, 2020 0088-05-104 INSTALL MEDIAN BARRIER AND WIDEN ROADWAYVictoria · Yoakum 2 of 3 $7,072,205 $6,878,588HUNTER INDUSTRIES, LTD. +2.8%
Jul 9, 2020 0179-03-034 PFC OVERLAYBrazoria · Houston 2 of 3 $5,397,419 $5,289,598ANGEL BROTHERS HOLDINGS COR… +2.0%
Jul 9, 2020 0231-03-147 CONSTRUCT WEST TO EAST TURNAROUND @ FM 2410Bell · Waco 2 of 3 $3,612,620 $3,098,000J.D. ABRAMS, L.P. +16.6%
Jul 8, 2020 1685-03-058 WIDEN FROM 4 TO 6 LANESHarris · Houston 4 of 6 $62,018,391 $58,199,301ANGEL BROTHERS HOLDINGS COR… +6.6%
Jul 8, 2020 0523-08-007 WIDENING OF A NON-FREEWAYMontgomery · Houston 3 of 7 $32,618,733 $29,787,408LINDSEY CONSTRUCTION, INC. +9.5%
Jul 8, 2020 0015-08-147 INTERCHANGE (NEW OR RECONSTRUCTED)Williamson · Austin 3 of 6 $62,326,327 $61,721,948J.D. ABRAMS, L.P. +1.0%
Jul 8, 2020 0100-08-095 SURFACING/ROADWAY RESTORATIONBee · Corpus Christi 4 of 7 $17,744,622 $14,739,738HUNTER INDUSTRIES, LTD. +20.4%
Jun 5, 2020 0028-14-091 WIDEN EXISTING MAINLANES FROM 4 TO 6 LANESOrange · Beaumont 2 of 3 $55,725,861 $52,363,934WILLIAMS BROTHERS CONSTRUCT… +6.4%
Jun 5, 2020 0923-06-058 REPLACE BRIDGE AND APPROACHESBrown · Brownwood 7 of 7 $817,903 $570,000PIERCE R & B LLC +43.5%
Jun 4, 2020 0231-04-060 WIDEN FROM FOUR TO SIX LANES AND RESURFACEBell · Waco 1 of 4 $39,466,124 $39,466,124 Won
Jun 4, 2020 2093-01-010 WIDEN FROM 2 LANES TO 4-LANE DIVIDEDFort Bend · Houston 1 of 10 $36,717,603 $36,717,603 Won
Jun 4, 2020 0907-13-012 BRIDGE REPLACEMENTRunnels · San Angelo 3 of 4 $3,127,062 $2,384,074RELMCO, INC. +31.2%
Jun 4, 2020 0923-09-063 REPLACE BRIDGE AND APPROACHESEastland · Brownwood 5 of 5 $1,319,951 $858,823HODGES AND SON CONSTRUCTION… +53.7%
Jun 4, 2020 0923-17-079 REPLACE BRIDGE AND APPROACHESComanche · Brownwood 6 of 6 $1,345,884 $939,512KNIFE RIVER CORPORATION - S… +43.3%
May 8, 2020 1835-02-059 CONSTRUCT SIDEWALK AND PEDESTRIAN BRIDGEBell · Waco 3 of 8 $2,683,873 $2,447,065TTG UTILITIES, LP +9.7%
May 8, 2020 0610-07-113 GR,STR,BASE,SURF & PAV MRKBowie · Atlanta 3 of 6 $91,297,978 $88,870,749LONGVIEW BRIDGE AND ROAD, L… +2.7%
May 7, 2020 0923-17-087 REPLACE BRIDGE AND APPROACHESComanche · Brownwood 9 of 10 $801,975 $591,668ENCINO LANDSCAPE, INC. +35.5%
Apr 9, 2020 3545-02-010 CONSTRUCT OVERPASSHays · Austin 3 of 5 $6,632,257 $5,882,254HUNTER INDUSTRIES, LTD. +12.8%
Apr 9, 2020 0111-04-035 PAVEMENT REPAIR, SEAL COAT AND 1.5 IN PFC OVERLAYBrazoria · Houston 2 of 3 $2,206,675 $1,947,783DURWOOD GREENE CONSTRUCTION… +13.3%
Apr 9, 2020 0028-01-099 BASE REPAIR, MILL, OVERLAY ROAD & SHOULDERSHarris · Houston 1 of 4 $1,366,271 $1,366,271 Won
Apr 9, 2020 6354-37-001 ACP OVERLAYBrazoria · Houston 4 of 4 $943,815 $781,875CORNERSTONE PAVING AND CONS… +20.7%
Apr 9, 2020 6359-80-001 CALLOUT BRIDGE REPAIREctor · Odessa 4 of 5 $825,422 $490,575SCR CIVIL CONSTRUCTION, LLC +68.3%
Apr 9, 2020 6360-25-001 BRIDGE REPAIR (CALLOUT)Pecos · Odessa 4 of 6 $825,422 $429,900RELMCO, INC. +92.0%
Apr 8, 2020 0808-01-061 BRIDGE RE-DECKING. CONCRETE OVERLAY BRIDGE REHAB.Falls · Waco 1 of 4 $1,990,000 $1,990,000 Won
Mar 19, 2020 6353-27-001 BPM-CONCRETE BEAM AND STRUCTURE REPAIRHopkins · Paris 2 of 9 $188,049 $182,140GIBSON & ASSOCIATES, INC. +3.2%
Mar 5, 2020 6340-20-001 MILL AND OVERLAYMontgomery · Houston 1 of 4 $620,838 $620,838 Won
Mar 4, 2020 3545-02-008 CONSTRUCT TWO LANES AND SHOULDERSHays · Austin 1 of 9 $14,699,792 $14,699,792 Won
Mar 4, 2020 1004-02-017 PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAYBrazoria · Houston 3 of 3 $3,096,295 $2,696,289DURWOOD GREENE CONSTRUCTION… +14.8%
Mar 4, 2020 1258-04-062 CONSTRUCTION OF AN OVERLAYHarris · Houston 3 of 3 $2,177,936 $2,091,002ANGEL BROTHERS HOLDINGS COR… +4.2%
Mar 4, 2020 0014-07-102 OVERLAYHill · Waco 4 of 4 $6,068,328 $3,699,699THE TRUESDELL CORPORATION +64.0%
Mar 4, 2020 6340-83-001 MISCELLANEOUS BRIDGE REPAIRWaller · Houston 2 of 6 $177,608 $149,525SCR CIVIL CONSTRUCTION, LLC +18.8%
Feb 7, 2020 0120-05-026 REHAB & WIDEN ROADWAYHamilton · Waco 4 of 5 $6,831,683 $5,387,759BIG CREEK CONSTRUCTION, LTD. +26.8%
Feb 7, 2020 0177-03-103 OV-OVERLAYLiberty · Beaumont 3 of 5 $2,703,984 $2,133,678SMITH & COMPANY +26.7%
Feb 7, 2020 0543-01-065 PLANING, SEAL COAT, ACP OVERLAY AND TEXTURINGWaller · Houston 2 of 5 $1,756,752 $1,597,357ANGEL BROTHERS HOLDINGS COR… +10.0%
Feb 7, 2020 0367-01-070 OV-OVERLAYChambers · Beaumont 3 of 3 $2,993,360 $2,844,750ANGEL BROTHERS HOLDINGS COR… +5.2%
Feb 7, 2020 6352-82-001 BRIDGE PREVENTATIVE MAINTENANCEWheeler · Childress 3 of 8 $778,799 $697,998SCOTT TUCKER CONSTRUCTION C… +11.6%
Feb 6, 2020 0050-05-067 SURFACING/ROADWAY RESTORATIONWaller · Houston 1 of 5 $5,433,537 $5,433,537 Won
Feb 6, 2020 0271-09-023 ADD 5 FT SHLDR, PLANING, LEVEL-UP AND 1.5 IN PFCWaller · Houston 1 of 5 $1,784,542 $1,784,542 Won
Feb 6, 2020 6339-17-001 MISCELLANEOUS BRIDGE REPAIRTaylor · Abilene 1 of 11 $798,994 $798,994 Won
Jan 23, 2020 6352-27-001 BRIDGE BEAM REPAIRSTom Green · San Angelo 2 of 6 $92,370 $72,200SJ&J CONSTRUCTION, LLC +27.9%
Jan 10, 2020 6347-85-001 OVERLAY AND PAVEMENT REPAIRLiberty · Beaumont 4 of 4 $1,297,743 $993,503ANGEL BROTHERS HOLDINGS COR… +30.6%
Dec 4, 2019 0176-03-097 HIGHWAY IMPROVEMENTAngelina · Lufkin 4 of 6 $157,174,494 $140,865,929SACYR CONSTRUCTION USA LLC +11.6%
Dec 4, 2019 2940-02-011 SEAL COAT, ACP OVERLAY, SIGNING & PVMT MARKFort Bend · Houston 3 of 5 $1,167,149 $1,038,126DURWOOD GREENE CONSTRUCTION… +12.4%
Dec 4, 2019 1187-02-018 REPL BR & APPRSMcLennan · Waco 3 of 6 $695,360 $663,130KNIFE RIVER CORPORATION - S… +4.9%
Dec 3, 2019 1258-04-063 PLANING, UNDERSEAL, OVERLAY & PAVEMENT MARKINGSHarris · Houston 2 of 3 $12,531,255 $11,892,688ANGEL BROTHERS HOLDINGS COR… +5.4%
Dec 3, 2019 0480-08-027 RECONSTRUCT BRIDGE AND APPROACHESSan Saba · Brownwood 1 of 3 $5,068,391 $5,068,391 Won
Nov 15, 2019 6346-13-001 BRIDGE REPAIRSRunnels · San Angelo 2 of 13 $104,879 $95,000MAD ENERGY SERVICE LLC +10.4%
Nov 15, 2019 6346-14-001 BRIDGE REPAIRSIrion · San Angelo 2 of 12 $99,692 $99,000MAD ENERGY SERVICE LLC +0.7%
Nov 15, 2019 6352-49-001 BRIDGE REPAIRSConcho · San Angelo 2 of 12 $159,566 $157,962SCOTT TUCKER CONSTRUCTION C… +1.0%
Nov 15, 2019 6346-12-001 BRIDGE REPAIRSCrockett · San Angelo 1 of 15 $141,455 $141,455 Won
Nov 12, 2019 6351-36-001 CONCRETE SPALL REPAIRFort Bend · Houston 4 of 5 $436,716 $280,700ISI CONTRACTING, INC. +55.6%
Nov 6, 2019 0185-01-030 WIDEN FROM TWO TO FOUR LANE DIVIDED HIGHWAYBell · Waco 2 of 4 $77,818,176 $77,807,569J.D. ABRAMS, L.P. +0.0%
Nov 6, 2019 0266-01-083 OVERLAYFayette · Yoakum 3 of 3 $16,572,740 $15,790,738HUNTER INDUSTRIES, LTD. +5.0%
Nov 6, 2019 0508-01-353 BRIDGE REPLACEMENTHarris · Houston 2 of 6 $6,570,000 $6,382,061NBG CONSTRUCTORS, INC. +2.9%
Nov 5, 2019 0271-02-049 WIDEN FREEWAYAustin · Yoakum 2 of 4 $192,205,823 $184,551,690WEBBER, LLC +4.1%
Oct 3, 2019 0456-01-047 REHABILITATE EXISTING ROADFreestone · Bryan 2 of 4 $15,979,479 $14,892,846KNIFE RIVER CORPORATION - S… +7.3%
Oct 3, 2019 0471-04-030 SUPER-2 HIGHWAYCaldwell · Austin 5 of 6 $15,484,259 $12,225,105ANGEL BROTHERS HOLDINGS COR… +26.7%
Oct 2, 2019 0089-03-091 PLANING AND ACP OVERLAYJackson · Yoakum 2 of 3 $13,783,213 $12,833,114HUNTER INDUSTRIES, LTD. +7.4%
Oct 2, 2019 0909-38-079 REPL BR & APPRSFalls · Waco 3 of 6 $410,517 $362,831ELLIS-MCGINNIS CONSTRUCTION… +13.1%
Sep 6, 2019 0188-02-029 WIDEN NON-FREEWAY FROM TWO TO FOUR LANESFort Bend · Houston 3 of 5 $89,960,978 $81,760,171PULICE CONSTRUCTION, INC. +10.0%
Sep 6, 2019 0188-02-036 WIDEN NON FREEWAY FROM TWO TO FOUR LANESFort Bend · Houston 3 of 5 $45,670,643 $42,315,989PULICE CONSTRUCTION, INC. +7.9%
Sep 6, 2019 0271-09-024 BASE REPAIR, PLANING, SEAL COAT & 1.5" ACP OVERLAYWaller · Houston 3 of 3 $3,704,948 $3,290,507DURWOOD GREENE CONSTRUCTION… +12.6%
Sep 6, 2019 0543-03-076 BASE REPAIR, PLANING AND 2" ACP OVERLAYFort Bend · Houston 3 of 3 $1,085,711 $791,784ANGEL BROTHERS HOLDINGS COR… +37.1%
Sep 5, 2019 0188-03-019 WIDEN NON-FREEWAY FROM TWO TO FOUR LANESBrazoria · Houston 4 of 5 $90,763,637 $75,955,686PULICE CONSTRUCTION, INC. +19.5%
Sep 5, 2019 0027-03-073 MILL AND INLAYColorado · Yoakum 2 of 4 $4,493,672 $3,987,941ANGEL BROTHERS HOLDINGS COR… +12.7%
Sep 5, 2019 1912-01-021 BRIDGE REPLACEMENTMontgomery · Houston 1 of 6 $6,264,644 $6,264,644 Won
Sep 5, 2019 0508-01-359 CONSTRUCT RAMPSHarris · Houston 1 of 7 $4,637,319 $4,637,319 Won
Aug 7, 2019 2133-02-014 REHABILITATION OF EXISTING ROADMilam · Bryan 1 of 5 $17,254,988 $17,254,988 Won
Aug 7, 2019 3048-01-017 ADD LEFT TURN LANE AND ACP OVERLAYFort Bend · Houston 1 of 3 $2,581,584 $2,581,584 Won
Aug 6, 2019 0683-01-056 INTERSECTION & OPERATIONAL IMPROVEMENTSWilliamson · Austin 3 of 5 $28,628,627 $27,468,704BRIDGES AND ROADS, LLC +4.2%
Aug 6, 2019 3538-01-036 WIDEN FROM 2 TO 4 LANESMontgomery · Houston 1 of 5 $65,322,057 $65,322,057 Won
Aug 6, 2019 0063-06-099 BRIDGE MAINTENANCEShelby · Lufkin 2 of 7 $3,724,216 $3,364,209GIBSON & ASSOCIATES, INC. +10.7%
Jun 5, 2019 0909-38-082 REPL BR & APPRSFalls · Waco 3 of 6 $979,663 $887,644ELLIS-MCGINNIS CONSTRUCTION… +10.4%
Jun 5, 2019 0346-02-016 INCREASE SUPERELEVATIONJackson · Yoakum 2 of 3 $1,367,153 $1,235,556HUNTER INDUSTRIES, LTD. +10.7%
Jun 4, 2019 0231-03-145 WDN, BS, STR, SURFBell · Waco 3 of 4 $46,824,871 $44,733,666J.D. ABRAMS, L.P. +4.7%
Jun 4, 2019 0016-04-117 FREEWAY OPERATIONAL IMPROVEMENTSComal · San Antonio 6 of 7 $85,765,928 $73,245,147WEBBER, LLC +17.1%
May 8, 2019 0265-04-062 STR, GR, BASE, HMACP & PVMT MRKSBastrop · Austin 7 of 9 $59,444,042 $50,359,853CAPITAL EXCAVATION COMPANY +18.0%
May 8, 2019 3538-01-035 WIDEN FROM 2 TO 4 LANESMontgomery · Houston 2 of 9 $39,340,558 $36,793,630WILLIAMS BROTHERS CONSTRUCT… +6.9%
May 8, 2019 0266-05-048 ADD 2 LANES FOR 4-LANE UNDIVIDEDWharton · Yoakum 3 of 4 $10,133,596 $9,682,167HUNTER INDUSTRIES, LTD. +4.7%
May 8, 2019 0188-01-039 SPALL REP, SEAL COAT, 3/4" TOM, SIGN, PAV MRKFort Bend · Houston 1 of 3 $949,220 $949,220 Won
May 7, 2019 0909-38-080 REPL BR & APPRSLimestone · Waco 1 of 8 $933,888 $933,888 Won
May 7, 2019 0048-09-029 WDN, GR, STRS, SURFHill · Waco 2 of 12 $134,741,101 $133,117,086SACYR CONSTRUCTION USA LLC +1.2%
May 7, 2019 0838-03-024 SHOULDERS, BASE REP, O/L, BRIDGE & PV MRKSFort Bend · Houston 3 of 3 $7,823,734 $7,225,989DURWOOD GREENE CONSTRUCTION… +8.3%
May 7, 2019 0027-01-044 CONSTRUCT ONE WAY BRIDGE AND APPRColorado · Yoakum 3 of 4 $8,968,167 $8,244,675HARPER BROTHERS CONSTRUCTIO… +8.8%
May 7, 2019 0179-04-099 ACP OVERLAY AND ADD SHOULDERSMatagorda · Yoakum 4 of 4 $8,280,871 $7,279,319DURWOOD GREENE CONSTRUCTION… +13.8%
Apr 3, 2019 0172-05-115 GR, RV, DR, BR, RET WALL, CUL, SIGN, PV MKEllis · Dallas 2 of 9 $38,693,345 $37,276,577OHL USA, INC. +3.8%
Apr 3, 2019 2250-02-017 INSTALL MEDIAN CONCRETE BARRIERSDenton · Dallas 3 of 10 $3,248,954 $3,179,441ED BELL CONSTRUCTION COMPANY +2.2%
Apr 2, 2019 0173-02-071 REHAB EXISTING ROADWAY AND ADD SHOULDERSKaufman · Dallas 8 of 9 $41,937,718 $36,563,467STERLING DELAWARE HOLDING C… +14.7%
Apr 2, 2019 0015-13-396 GR, BASE, STRUCT, HMACP & PVMT MKSTravis · Austin 1 of 4 $24,590,929 $24,590,929 Won
Apr 2, 2019 0065-07-062 WIDEN FREEWAY FROM 4 TO 6 LANESJefferson · Beaumont 2 of 4 $23,501,496 $21,735,072ANGEL BROTHERS HOLDINGS COR… +8.1%
Apr 2, 2019 0015-09-193 GR,BASE,HMACP,SIGNS & PVMT MRKSWilliamson · Austin 4 of 5 $11,150,134 $10,705,999JORDAN FOSTER CONSTRUCTION,… +4.1%
Apr 2, 2019 0909-22-176 REPL BR & APPRSMcLennan · Waco 2 of 8 $926,612 $863,438KNIFE RIVER CORPORATION - S… +7.3%
Mar 6, 2019 0015-08-141 REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHESWilliamson · Austin 3 of 7 $16,757,648 $15,048,230DAN WILLIAMS COMPANY +11.4%
Mar 6, 2019 0446-03-047 REPLACE BRIDGE AND APPROACHESColorado · Yoakum 2 of 3 $14,017,708 $10,990,759EARTH BUILDERS, L.P. +27.5%
Mar 6, 2019 6334-17-001 REPAIR SLOPE FAILURESHarris · Houston 1 of 6 $2,794,173 $2,794,173 Won
Mar 5, 2019 1062-04-022 WIDEN TO 4-LANE DIVIDEDHarris · Houston 5 of 9 $47,118,515 $43,751,963TRIPLE B SERVICES LLP +7.7%
Mar 5, 2019 0909-38-081 REPL BR & APPRSFalls · Waco 2 of 6 $1,420,657 $1,340,677ELLIS-MCGINNIS CONSTRUCTION… +6.0%
Feb 6, 2019 3173-01-004 RESTORE EXISTING ROADWAYWharton · Yoakum 3 of 6 $3,795,374 $3,597,289ANGEL BROTHERS HOLDINGS COR… +5.5%
Feb 6, 2019 2136-01-015 REPL BR & APPRSBell · Waco 3 of 3 $5,648,539 $5,238,854CAPITAL EXCAVATION COMPANY +7.8%
Feb 5, 2019 0508-02-120 CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGEChambers · Beaumont 3 of 6 $40,446,041 $35,023,919COPASA, INC. +15.5%
Jan 9, 2019 0015-08-142 GRADING, BASE, HMACP, PVMRK & SIGNSWilliamson · Austin 3 of 6 $14,869,338 $13,145,763DAN WILLIAMS COMPANY +13.1%
Jan 9, 2019 1418-01-012 BASE REPAIR,ACP OVERLAY AND PAVEMENT MARKINGSWaller · Houston 4 of 4 $1,775,771 $1,597,058ANGEL BROTHERS HOLDINGS COR… +11.2%
Jan 9, 2019 0471-05-046 INSTALL TRAFFIC SIGNALBastrop · Austin 4 of 4 $789,267 $568,729THE LEVY COMPANY, INC. +38.8%
Jan 9, 2019 0836-02-075 INSTLL SGNLS AND SGNSBell · Waco 2 of 4 $329,212 $288,045AUSTIN TRAFFIC SIGNAL CONST… +14.3%
Jan 8, 2019 0089-07-146 CONSTRUCT FRONTAGE ROADSWharton · Yoakum 3 of 7 $37,621,363 $34,757,445SER CONSTRUCTION PARTNERS, … +8.2%
Jan 8, 2019 0457-03-028 REHABILITATE EXISTING ROADWashington · Bryan 4 of 4 $7,996,958 $6,487,935BIG CREEK CONSTRUCTION, LTD. +23.3%
Dec 6, 2018 2819-01-009 REHABILITATE EXISTING ROADWAYWharton · Yoakum 3 of 4 $3,495,590 $2,898,132BRANNAN PAVING CO., LTD. +20.6%
Dec 6, 2018 1302-03-010 RESTORATION OF EXISTING ROADWAYWharton · Yoakum 5 of 6 $3,579,151 $2,932,384REXCO CONSTRUCTION SERVICES… +22.1%
Dec 6, 2018 0162-01-094 IMPRV SGNLMcLennan · Waco 1 of 5 $85,121 $85,121 Won
Nov 7, 2018 0114-05-037 GR, BASE, STRS, HMACP & PVMT MRKSBastrop · Austin 6 of 7 $38,413,405 $34,428,168ANGEL BROTHERS HOLDINGS COR… +11.6%
Nov 7, 2018 0836-02-025 SAFETY LIGHTINGBell · Waco 6 of 10 $341,149 $281,766VACA UNDERGROUND UTILITIES … +21.1%
Nov 7, 2018 2817-01-010 ADD 4' SHOULDER AND OVERLAYFort Bend · Houston 3 of 3 $5,167,510 $4,321,825DURWOOD GREENE CONSTRUCTION… +19.6%
Nov 7, 2018 0604-01-043 WIDEN PAVED SURFACEMatagorda · Yoakum 3 of 3 $1,005,592 $594,008REXCO CONSTRUCTION SERVICES… +69.3%
Nov 7, 2018 0092-13-024 REPLACE BRIDGE AND APPROACHESNavarro · Dallas 11 of 15 $9,407,310 $7,970,000PIERCE R & B LLC +18.0%
Nov 6, 2018 0697-02-039 RECONST BRGS, GR, BS, SURF, PVT MRKHenderson · Tyler 3 of 5 $47,378,062 $43,069,729AUSTIN BRIDGE & ROAD SERVIC… +10.0%
Nov 6, 2018 0389-05-124 REPL MEDIAN RAIL W/CTB,REPL ILLUM POLE ASSEMBLIESHarris · Houston 1 of 7 $1,819,178 $1,819,178 Won
Oct 3, 2018 0440-06-018 ADD ONE LANE IN EACH DIRECTIONTravis · Austin 2 of 4 $67,881,390 $65,209,105OHL USA, INC. +4.1%
Sep 7, 2018 0177-03-096 WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADSLiberty · Beaumont 1 of 4 $102,150,732 $102,150,732 Won
Aug 8, 2018 3158-01-032 WIDEN TO 4-LANE DIVIDED URBANMontgomery · Houston 3 of 3 $10,100,313 $9,047,341SMITH & COMPANY +11.6%
Aug 8, 2018 0523-08-014 BASE REPAIR, OCST, LEVEL UP, OVMontgomery · Houston 6 of 6 $4,699,564 $3,164,973ANGEL BROTHERS HOLDINGS COR… +48.5%
Aug 7, 2018 0080-11-001 GR, DR, STR, BS AND PAVEMENTHood · Fort Worth 4 of 9 $71,618,821 $60,713,830ZACHRY CONSTRUCTION CORPORA… +18.0%
Aug 7, 2018 0177-14-010 RECONSTRUCT AND WIDEN TO A 4 LANEMontgomery · Houston 6 of 9 $16,115,762 $14,347,429ISI CONTRACTING, INC. +12.3%
Aug 7, 2018 0089-06-090 ACP OVERLAYWharton · Yoakum 1 of 4 $7,009,734 $7,009,734 Won
Jul 11, 2018 0739-02-162 WIDEN FREEWAY FROM 4 TO 6 LANESJefferson · Beaumont 3 of 5 $150,953,736 $128,399,060JOHNSON BROS. CORPORATION, … +17.6%
Jul 11, 2018 0543-02-065 WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAYFort Bend · Houston 3 of 7 $19,239,966 $18,950,220SER CONSTRUCTION PARTNERS, … +1.5%
Jul 11, 2018 0027-06-051 ADD 10-FT SHLDRS, O/L & REPLACE BRIDGE CULVERTSFort Bend · Houston 2 of 4 $13,324,396 $13,229,156DURWOOD GREENE CONSTRUCTION… +0.7%
Jul 11, 2018 0184-01-063 WDN RDWY & ADD PASS LNSCoryell · Waco 5 of 5 $15,044,981 $11,187,471BIG CREEK CONSTRUCTION, LTD. +34.5%
Jul 11, 2018 0015-08-140 STRCT, GRADING, HMACPWilliamson · Austin 7 of 7 $7,711,972 $6,748,949CAPITAL EXCAVATION COMPANY +14.3%
Jul 11, 2018 0909-39-127 REPL BR & APPRSCoryell · Waco 6 of 7 $1,334,655 $1,020,198CAPITAL EXCAVATION COMPANY +30.8%
Jul 10, 2018 0200-11-095 WIDEN FREEWAY FROM 4 TO 6 LANESJefferson · Beaumont 3 of 3 $34,051,087 $31,528,539OLDCASTLE MATERIALS TEXAS, … +8.0%
Jul 10, 2018 0089-18-003 BASE REPAIR, PLANING, ACP OL, SIGNING & PVMT MARKFort Bend · Houston 5 of 5 $1,880,601 $1,518,767DURWOOD GREENE CONSTRUCTION… +23.8%
Jun 6, 2018 0440-06-018 ADD ONE LANE IN EACH DIRECTIONTravis · Austin 2 of 5 $70,771,649 $69,910,317WEBBER, LLC +1.2%
Jun 6, 2018 0192-01-093 WIDEN FROM 6 TO 8 LANESFort Bend · Houston 7 of 8 $8,979,494 $6,992,340RAGLE CONSTRUCTION, INC. +28.4%
Jun 6, 2018 0912-37-228 BRIDGE REPLACEMENTMontgomery · Houston 5 of 9 $1,516,394 $1,087,297FORDE CONSTRUCTION COMPANY,… +39.5%
Jun 6, 2018 0909-40-074 REHAB BR & APPRSLimestone · Waco 2 of 5 $1,518,371 $1,515,689ELLIS-MCGINNIS CONSTRUCTION… +0.2%
Jun 6, 2018 6327-53-001 REHAB ROADWAY AND ACP OVERLAYColorado · Yoakum 3 of 3 $383,251 $299,561ANGEL BROTHERS HOLDINGS COR… +27.9%
Jun 5, 2018 2938-02-022 PAVMT REPAIR AND ACP OVERLAYBrazoria · Houston 3 of 3 $3,557,380 $2,791,369ANGEL BROTHERS HOLDINGS COR… +27.4%
Jun 5, 2018 1259-01-042 WIDEN FROM 2 TO 4 LANES WITH CLTLMontgomery · Houston 5 of 6 $16,299,286 $14,962,668ANGEL BROTHERS HOLDINGS COR… +8.9%
Jun 5, 2018 0716-02-042 ADD SHOULDERSColorado · Yoakum 7 of 7 $4,690,959 $3,476,586GLENN FUQUA, INC. +34.9%
Jun 5, 2018 3050-03-021 REPLACE BRIDGE AND APPROACHESHarris · Houston 4 of 10 $8,455,495 $7,552,754J.D. ABRAMS, L.P. +12.0%
Jun 5, 2018 0231-03-146 RDWY RECONFIGBell · Waco 2 of 3 $5,172,421 $4,549,398CAPITAL EXCAVATION COMPANY +13.7%
May 2, 2018 0200-02-039 GR STRS BASE & SURFAngelina · Lufkin 3 of 6 $75,623,320 $71,614,967JOHNSON BROS. CORPORATION, … +5.6%
May 2, 2018 0320-03-099 REPLACE DECK AND STRUCTURAL REPAIRSWilliamson · Austin 2 of 8 $1,193,427 $1,149,643DAN WILLIAMS COMPANY +3.8%
May 2, 2018 0605-01-064 PAVEMENT REPAIR AND RESURFACINGMatagorda · Yoakum 1 of 4 $2,986,655 $2,986,655 Won
May 2, 2018 0389-05-116 WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANESHarris · Houston 5 of 5 $251,404,777 $201,835,273WEBBER, LLC +24.6%
May 2, 2018 0997-03-007 REPAIR AND RESURFACE HIGHWAYNavarro · Dallas 5 of 6 $16,439,852 $12,773,112BIG CREEK CONSTRUCTION, LTD. +28.7%
May 1, 2018 0320-03-092 BRIDGE WIDENING & REPLACE APPROACHESWilliamson · Austin 4 of 9 $392,121 $330,318DAN WILLIAMS COMPANY +18.7%
Apr 4, 2018 1400-04-037 WIDEN TO 4-LANE DIVIDED RURALMontgomery · Houston 1 of 6 $18,498,791 $18,498,791 Won
Apr 4, 2018 0909-22-175 REPL BR & APPRSMcLennan · Waco 4 of 9 $690,882 $586,253PROJECT ALLIED RESOURCES, L… +17.8%
Apr 3, 2018 3538-01-045 CONSTRUCT_GRADE SEPARATIONMontgomery · Houston 5 of 11 $26,561,438 $23,483,270ARANDA BROTHERS CONSTRUCTIO… +13.1%
Apr 3, 2018 0508-04-162 GRADE SEPARATION, REHAB & EXTEND FRONTAGE ROADSJefferson · Beaumont 4 of 7 $20,326,163 $18,747,291STERLING DELAWARE HOLDING C… +8.4%
Apr 3, 2018 0179-04-097 ACP OVERLAY,INSTALL ACCELERATION LN,AND TRF SIGNALMatagorda · Yoakum 1 of 4 $5,092,450 $5,092,450 Won
Apr 3, 2018 0833-03-036 WDN GR, STRS & SURFMcLennan · Waco 4 of 4 $14,158,030 $11,487,770BIG CREEK CONSTRUCTION, LTD. +23.2%
Apr 3, 2018 6319-72-001 ACP OVERLAYBrazoria · Houston 4 of 5 $740,029 $648,550DURWOOD GREENE CONSTRUCTION… +14.1%
Mar 7, 2018 2744-01-011 RECONSTRUCT TO A 4 LANE DIVIDED CURB & GUTTERMontgomery · Houston 2 of 9 $18,846,723 $18,657,275HARPER BROTHERS CONSTRUCTIO… +1.0%
Mar 7, 2018 0178-01-036 CONC REPAIR, MILL, SC & 1" TOMHarris · Houston 3 of 3 $1,668,879 $1,495,895ANGEL BROTHERS HOLDINGS COR… +11.6%
Mar 6, 2018 0586-01-066 SC, LEVEL UP, W/ LP DETRS & O/LBrazoria · Houston 3 of 3 $3,042,652 $2,395,790DURWOOD GREENE CONSTRUCTION… +27.0%
Mar 6, 2018 0846-03-046 ACP OVERLAYMatagorda · Yoakum 2 of 4 $1,593,823 $1,521,680DURWOOD GREENE CONSTRUCTION… +4.7%
Mar 6, 2018 6326-62-001 MILL AND OVERLAYMontgomery · Houston 5 of 7 $753,079 $551,281CORNERSTONE PAVING AND CONS… +36.6%
Feb 2, 2018 1258-02-037 BASE REPAIR AND OVERLAYFort Bend · Houston 1 of 4 $781,727 $781,727 Won
Feb 2, 2018 0408-02-046 REPLACE BRIDGE AND APPROACHESAustin · Yoakum 8 of 10 $4,510,654 $3,793,060ANGEL BROTHERS HOLDINGS COR… +18.9%
Feb 1, 2018 0055-08-099 GR, STRS & SURFMcLennan · Waco 3 of 8 $22,942,424 $20,587,595BIG CREEK CONSTRUCTION, LTD. +11.4%
Feb 1, 2018 1594-02-012 REPLACE BRIDGE AND APPROACHESCoryell · Waco 3 of 8 $1,232,368 $1,048,921KNIFE RIVER CORPORATION - S… +17.5%
Feb 1, 2018 0192-03-017 PAVMT REPAIR AND ACP OVERLAYBrazoria · Houston 3 of 3 $1,947,331 $1,534,309ANGEL BROTHERS HOLDINGS COR… +26.9%
Dec 6, 2017 0440-06-017 ADD ONE LANE IN EACH DIRECTIONTravis · Austin 6 of 12 $40,328,828 $36,726,431OHL USA, INC. +9.8%
Dec 6, 2017 0231-03-143 WDN, BS, STR, SURFBell · Waco 4 of 6 $8,222,283 $7,287,694BIG CREEK CONSTRUCTION, LTD. +12.8%
Dec 5, 2017 0008-13-221 GR,DR,BS,STR,PAV,ITS,SGNL,ILLUM & SGNTarrant · Fort Worth 6 of 11 $184,824,899 $173,724,095FLATIRON CONSTRUCTORS, INC. +6.4%
Nov 3, 2017 0015-05-049 TRUSS CLEANING AND PAINTINGBell · Waco 1 of 8 $1,599,938 $1,599,938 Won
Nov 3, 2017 0231-04-056 SAFETY TREAT FIXED OBJECTSBell · Waco 8 of 9 $1,317,125 $1,063,872BEAR CREEK CONTRACTING, LLC +23.8%
Nov 3, 2017 0187-02-066 ACP OVERLAYAustin · Yoakum 4 of 6 $1,326,363 $1,151,605ANGEL BROTHERS HOLDINGS COR… +15.2%
Nov 2, 2017 0912-71-386 GR, STRS & SURFHarris · Houston 1 of 9 $18,871,436 $18,871,436 Won
Oct 4, 2017 0027-10-071 REPLACE BRIDGE AND APPROACHESHarris · Houston 3 of 12 $3,995,167 $3,815,251HARPER BROTHERS CONSTRUCTIO… +4.7%
Oct 4, 2017 0111-03-031 WIDEN TO 4-LN & CONSTR RR GR SEPARATIONFort Bend · Houston 2 of 11 $35,392,687 $34,567,384PULICE CONSTRUCTION, INC. +2.4%
Oct 4, 2017 1414-05-014 BASE REPAIR AND OVERLAYFort Bend · Houston 1 of 6 $851,224 $851,224 Won
Oct 3, 2017 0320-02-036 WDN, GR, SURF, ADD PASS LNSBell · Waco 4 of 6 $7,019,799 $6,123,478BIG CREEK CONSTRUCTION, LTD. +14.6%
Sep 7, 2017 0858-02-021 REHABILITATE EXISTING ROADMilam · Bryan 4 of 12 $1,581,361 $1,428,674CORNERSTONE PAVING AND CONS… +10.7%
Aug 9, 2017 0675-07-101 WIDEN FREEWAY (SIX LANES)Walker · Bryan 5 of 5 $135,872,446 $122,051,473JOHNSON BROS. CORPORATION, … +11.3%
Aug 9, 2017 0739-02-161 WIDEN FREEWAY FROM 4 TO 6 LANESJefferson · Beaumont 2 of 2 $119,880,038 $108,315,368WILLIAMS BROTHERS CONSTRUCT… +10.7%
Aug 9, 2017 0752-04-024 WDN, GR, BS, SURF, ADD SHLDRSFalls · Waco 3 of 5 $4,268,056 $3,524,689BIG CREEK CONSTRUCTION, LTD. +21.1%
Aug 9, 2017 3510-06-014 CONSTRUCT SOUNDWALLHarris · Houston 6 of 10 $3,907,716 $3,375,271TEXAS WALL & LANDSCAPE +15.8%
Aug 9, 2017 0262-07-033 REPLACE EXISTING BRIDGEMilam · Bryan 2 of 9 $696,807 $668,668KNIFE RIVER CORPORATION - S… +4.2%
Aug 8, 2017 0912-71-386 GR, STRS & SURFHarris · Houston 2 of 9 $17,969,017 $17,962,352ANGEL BROTHERS HOLDINGS COR… +0.0%
Jul 12, 2017 0089-06-088 ACP OVERLAYWharton · Yoakum 1 of 5 $8,161,720 $8,161,720 Won
Jul 12, 2017 0271-14-231 RECONSTRUCT FRTG RDSHarris · Houston 9 of 9 $10,033,814 $7,781,945MAIN LANE INDUSTRIES LTD. +28.9%
Jul 12, 2017 0232-02-021 REPL BR & APPRSFalls · Waco 2 of 7 $1,610,442 $1,598,159KNIFE RIVER CORPORATION - S… +0.8%
Jul 11, 2017 0162-02-031 GR, STRS & SURFHill · Waco 2 of 9 $68,724,106 $63,963,885SUNDT CONSTRUCTION, INC. +7.4%
Jul 11, 2017 1411-02-011 RESTORE ROADWAYAustin · Yoakum 6 of 7 $5,026,350 $4,469,342GLENN FUQUA, INC. +12.5%
Jul 11, 2017 0179-14-008 OVERLAY AND PAVEMENT WIDENINGMatagorda · Yoakum 1 of 3 $1,611,273 $1,611,273 Won
Jul 11, 2017 0240-03-036 SAFETY TREAT FIXED OBJECTSWharton · Yoakum 5 of 8 $2,383,359 $1,947,826SB CONTRACTORS LLC +22.4%
Jun 7, 2017 0271-04-071 CONST 1 MORE ML EACH DIRECTION AND REPLACE BRIDGESWaller · Houston 2 of 5 $142,921,884 $141,496,478WILLIAMS BROTHERS CONSTRUCT… +1.0%
Jun 7, 2017 0065-06-063 CONSTRUCT FRONTAGE ROADS OVER PINE ISLAND BAYOUHardin · Beaumont 2 of 3 $10,892,413 $10,637,780STERLING DELAWARE HOLDING C… +2.4%
Jun 7, 2017 0912-71-896 CONSTRUCT 4 LANE DIVIDED SECTIONHarris · Houston 2 of 8 $6,504,509 $6,095,884SER CONSTRUCTION PARTNERS, … +6.7%
Jun 7, 2017 0027-03-071 CONSTRUCT SUPER 2 LANESColorado · Yoakum 3 of 6 $4,698,540 $4,487,327BIG CREEK CONSTRUCTION, LTD. +4.7%
Jun 6, 2017 0027-06-046 REPLACE EXISTING RAILROAD UNDERPASSFort Bend · Houston 1 of 4 $24,827,885 $24,827,885 Won
Jun 6, 2017 0912-72-336 CONST RAILROAD GRADE SEPERATIONHarris · Houston 2 of 9 $11,716,805 $11,194,639STERLING DELAWARE HOLDING C… +4.7%
Jun 6, 2017 0917-12-080 REPLACE EXISTING BRIDGE FACILITYMilam · Bryan 4 of 11 $542,744 $447,590ELLIS-MCGINNIS CONSTRUCTION… +21.3%
May 2, 2017 0027-01-040 CONSTRUCT ONE WAY BRIDGE AND APPROACHES(WESTBOUND)Colorado · Yoakum 3 of 4 $7,794,973 $7,142,388ISI CONTRACTING, INC. +9.1%
Apr 5, 2017 0178-02-088 ADD LEFT TURN LANEBrazoria · Houston 3 of 3 $291,452 $261,916DURWOOD GREENE CONSTRUCTION… +11.3%
Apr 5, 2017 0266-06-047 PAVEMENT REPAIR AND SURFACINGWharton · Yoakum 2 of 4 $1,765,222 $1,713,209HUNTER INDUSTRIES, LTD. +3.0%
Apr 5, 2017 1308-01-024 REPLACE BRIDGE & APPROACHESBell · Waco 2 of 10 $2,954,521 $2,950,399J.D. ABRAMS, L.P. +0.1%
Apr 4, 2017 3422-01-011 1.5 INCH PLANING, 1.5 INCH ACP OVERLY, PAV MRKSFort Bend · Houston 3 of 5 $610,057 $563,996MAIN LANE INDUSTRIES LTD. +8.2%
Apr 4, 2017 2697-01-034 SAFETY TREAT FIXED OBJECTSMatagorda · Yoakum 6 of 7 $5,032,429 $3,844,068REXCO CONSTRUCTION SERVICES… +30.9%
Apr 4, 2017 0912-71-003 ROADWAY RECONSTRUCTIONHarris · Houston 4 of 6 $13,292,570 $12,380,277J.D. ABRAMS, L.P. +7.4%
Mar 7, 2017 0543-03-072 BASE REPAIR AND OVERLAYFort Bend · Houston 1 of 3 $1,849,420 $1,849,420 Won
Mar 7, 2017 0724-01-050 ADD LEFT TURN LANECoryell · Waco 2 of 4 $5,233,000 $4,345,841BIG CREEK CONSTRUCTION, LTD. +20.4%
Feb 3, 2017 0497-03-009 RESTORE ROADWAYJackson · Yoakum 7 of 7 $3,039,737 $2,063,461GLENN FUQUA, INC. +47.3%
Feb 3, 2017 0912-34-143 CONSTRUCT 4-LN DIVIDED ROADWAYFort Bend · Houston 5 of 11 $4,277,349 $3,825,527SER CONSTRUCTION PARTNERS, … +11.8%
Feb 2, 2017 1965-01-006 BASE REPAIR AND 1.5" OVERLAYFort Bend · Houston 2 of 4 $1,774,870 $1,774,561DURWOOD GREENE CONSTRUCTION… +0.0%
Jan 5, 2017 0211-10-042 INCREASE SUPERELEVATIONColorado · Yoakum 3 of 3 $974,800 $714,921HUNTER INDUSTRIES, LTD. +36.4%
Jan 5, 2017 0598-02-100 MILL, SEAL & PFC O/LBrazoria · Houston 3 of 3 $6,888,637 $4,993,780ANGEL BROTHERS HOLDINGS COR… +37.9%
Jan 4, 2017 0027-07-032 REPLACE RAILROAD UNDERPASSFort Bend · Houston 5 of 12 $19,053,761 $18,405,189ANGEL BROTHERS HOLDINGS COR… +3.5%
Nov 4, 2016 0028-11-179 WIDEN EXISTING MAINLANES FROM 4 TO 6 LANESOrange · Beaumont 1 of 6 $12,418,604 $12,418,604 Won
Oct 5, 2016 0088-05-092 CONSTRUCT 4-LANE OVERPASSVictoria · Yoakum 2 of 3 $10,249,650 $8,914,435HUNTER INDUSTRIES, LTD. +15.0%
Nov 5, 2013 0050-06-081 WIDEN TO 8 MAIN LNS WITH 2 REVERSIBLE MANAGED LNSHarris · Houston 6 of 7 $97,391,473 $85,215,954WILLIAMS BROTHERS CONSTRUCT… +14.3%
Nov 5, 2013 0976-01-019 WIDEN FROM 2 TO 4-LANE DIVIDED WITH CURB & GUTTERHarris · Houston 2 of 4 $13,899,309 $13,285,921TEXAS STERLING CONSTRUCTION… +4.6%
Nov 5, 2013 6261-82-001 DISTRICT WIDE SEAL COATFayette · Yoakum 3 of 5 $4,369,342 $4,198,102BRANNAN PAVING CO., LTD. +4.1%
Oct 9, 2013 0188-09-043 INSTALL LEFT TURN LANEFort Bend · Houston 1 of 6 $180,487 $180,487 Won
Oct 9, 2013 0025-06-052 SEAL COATGonzales · Yoakum 5 of 6 $6,282,142 $5,288,543F. N. PLOCH CONSTRUCTION CO… +18.8%
Oct 8, 2013 2133-03-019 PROVIDE ADDITIONAL PAVEMENT WIDTHMilam · Bryan 6 of 6 $4,009,918 $3,309,495GLENN FUQUA, INC. +21.2%
Sep 11, 2013 0508-01-276 REPLACE BRG AND APPROACHHarris · Houston 6 of 6 $40,382,149 $34,623,242OHL USA, INC. +16.6%
Sep 11, 2013 0179-05-002 SL ACP O/L & PV MRKSBrazoria · Houston 2 of 3 $4,060,748 $3,985,333DURWOOD GREENE CONSTRUCTION… +1.9%