| 1 | 100-6002 |
PREPARING ROW | 8 | STA |
$1,300.00 |
$3,500.00 |
$2,000.00 |
$3,000.00 |
$17,000.00 |
$1,500.00 |
$2,000.00 |
$4,227.29 |
$5,500.00 |
| 2 | 105-6108 |
RMV STAB BASE & ASPH PV (17") | 1,812 | SY |
$5.00 |
$3.78 |
$9.00 |
$6.00 |
$3.40 |
$9.20 |
$11.00 |
$6.69 |
$16.00 |
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 938 | CY |
$11.00 |
$10.60 |
$10.00 |
$15.00 |
$54.03 |
$10.00 |
$20.00 |
$14.09 |
$15.50 |
| 4 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 1,227 | CY |
$15.00 |
$19.41 |
$10.92 |
$12.00 |
$11.44 |
$20.00 |
$7.00 |
$12.68 |
$22.00 |
| 5 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 4,099 | SY |
$0.6000 |
$2.63 |
$0.9200 |
$1.15 |
$1.10 |
$4.00 |
$2.00 |
$0.7000 |
$2.25 |
| 6 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 2,050 | SY |
$0.2000 |
$0.4500 |
$0.5200 |
$0.5000 |
$0.5000 |
$0.5400 |
$1.00 |
$0.8300 |
$0.5600 |
| 7 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 2,050 | SY |
$0.2000 |
$0.4200 |
$0.5200 |
$0.5000 |
$0.5000 |
$0.5400 |
$1.00 |
$0.8300 |
$0.5600 |
| 8 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 4,099 | SY |
$0.3000 |
$0.5600 |
$0.6800 |
$0.7000 |
$0.6500 |
$0.6500 |
$1.00 |
$0.4900 |
$0.7200 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 123 | MG |
$15.00 |
$48.61 |
$8.87 |
$40.00 |
$18.27 |
$35.00 |
$80.00 |
$87.31 |
$250.00 |
| 10 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 2,135 | SY |
$1.30 |
$1.07 |
$1.20 |
$1.25 |
$1.15 |
$1.12 |
$1.00 |
$2.11 |
$1.28 |
| 11 | 247-6312 |
FL BS (CMP IN PLC)(TY D GR1-2)(8") | 1,996 | SY |
$15.00 |
$17.31 |
$16.42 |
$15.00 |
$16.76 |
$18.53 |
$20.00 |
$18.32 |
$16.25 |
| 12 | 275-6001 |
CEMENT | 20 | TON |
$170.00 |
$189.08 |
$171.15 |
$170.00 |
$147.32 |
$140.72 |
$190.00 |
$225.46 |
$240.00 |
| 13 | 275-6010 |
CEMENT TREAT (SUBGRADE) (8") | 1,996 | SY |
$4.70 |
$6.98 |
$3.67 |
$4.00 |
$5.18 |
$6.73 |
$4.00 |
$3.52 |
$7.00 |
| 14 | 316-6026 |
ASPH (HFRS-2P) | 499 | GAL |
$3.90 |
$5.40 |
$19.50 |
$6.00 |
$4.60 |
$5.60 |
$5.00 |
$7.05 |
$15.00 |
| 15 | 316-6403 |
AGGR (TY-B GR-5 OR TY-L GR-5) | 15 | CY |
$110.00 |
$459.18 |
$475.00 |
$350.00 |
$401.00 |
$336.00 |
$425.00 |
$422.73 |
$610.00 |
| 16 | 400-6005 |
CEM STABIL BKFL | 89 | CY |
$180.00 |
$124.75 |
$150.00 |
$165.00 |
$133.13 |
$220.00 |
$220.00 |
$195.32 |
$100.00 |
| 17 | 416-6001 |
DRILL SHAFT (18 IN) | 152 | LF |
$150.00 |
$95.07 |
$118.65 |
$115.00 |
$89.58 |
$95.20 |
$104.00 |
$125.98 |
$247.00 |
| 18 | 416-6004 |
DRILL SHAFT (36 IN) | 448 | LF |
$300.00 |
$174.75 |
$211.05 |
$215.00 |
$165.31 |
$184.80 |
$375.00 |
$234.88 |
$260.00 |
| 19 | 420-6013 |
CL C CONC (ABUT) | 46.2 | CY |
$850.00 |
$748.69 |
$738.00 |
$800.00 |
$634.90 |
$1,100.00 |
$885.00 |
$955.00 |
$2,075.00 |
| 20 | 420-6029 |
CL C CONC (CAP) | 29.8 | CY |
$1,000.00 |
$976.75 |
$850.00 |
$1,000.00 |
$1,005.60 |
$1,100.00 |
$950.00 |
$1,100.00 |
$3,161.00 |
| 21 | 420-6037 |
CL C CONC (COLUMN) | 39.3 | CY |
$1,030.00 |
$893.35 |
$748.00 |
$800.00 |
$971.40 |
$1,200.00 |
$979.00 |
$1,250.00 |
$3,161.00 |
| 22 | 422-6001 |
REINF CONC SLAB | 7,650 | SF |
$22.00 |
$16.94 |
$26.09 |
$20.00 |
$19.31 |
$22.00 |
$20.00 |
$22.00 |
$47.90 |
| 23 | 422-6015 |
APPROACH SLAB | 47 | CY |
$600.00 |
$420.29 |
$446.25 |
$645.00 |
$475.16 |
$500.00 |
$573.00 |
$850.00 |
$782.00 |
| 24 | 425-6036 |
PRESTR CONC GIRDER (TX34) | 894.01 | LF |
$160.00 |
$148.33 |
$141.94 |
$230.00 |
$124.04 |
$148.69 |
$130.00 |
$220.00 |
$171.50 |
| 25 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 1,540 | CY |
$120.00 |
$146.94 |
$142.80 |
$89.00 |
$131.81 |
$143.53 |
$175.00 |
$275.00 |
$95.00 |
| 26 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 39 | CY |
$425.00 |
$360.38 |
$614.25 |
$480.00 |
$528.62 |
$475.00 |
$679.00 |
$550.00 |
$700.00 |
| 27 | 450-6006 |
RAIL (TY T223) | 502 | LF |
$110.00 |
$70.14 |
$96.00 |
$115.00 |
$75.26 |
$120.00 |
$160.00 |
$112.00 |
$195.00 |
| 28 | 454-6004 |
ARMOR JOINT (SEALED) | 67 | LF |
$90.00 |
$125.82 |
$90.38 |
$105.00 |
$76.20 |
$78.25 |
$131.07 |
$65.00 |
$118.00 |
| 29 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$75,000.00 |
$40,000.00 |
$55,440.00 |
$119,000.00 |
$137,743.10 |
$137,760.00 |
$90,000.00 |
$127,046.83 |
$136,700.00 |
| 30 | 500-6001 |
MOBILIZATION | 1 | LS |
$126,000.00 |
$100,000.00 |
$119,212.73 |
$130,000.00 |
$142,151.04 |
$154,603.85 |
$151,300.00 |
$125,000.00 |
$170,000.00 |
| 31 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$2,000.00 |
$1,753.51 |
$1,129.80 |
$2,500.00 |
$2,725.48 |
$4,475.00 |
$4,500.00 |
$2,489.87 |
$4,000.00 |
| 32 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 90 | LF |
$30.00 |
$31.88 |
$33.60 |
$33.00 |
$32.00 |
$34.80 |
$30.00 |
$35.23 |
$35.56 |
| 33 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 90 | LF |
$10.00 |
$10.80 |
$10.50 |
$10.00 |
$10.00 |
$16.31 |
$11.00 |
$16.91 |
$11.00 |
| 34 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 111 | SY |
$35.00 |
$23.22 |
$26.25 |
$15.00 |
$25.00 |
$33.87 |
$13.00 |
$19.73 |
$28.00 |
| 35 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 111 | SY |
$10.00 |
$10.80 |
$10.50 |
$5.00 |
$10.00 |
$14.39 |
$5.00 |
$14.09 |
$11.00 |
| 36 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,669 | LF |
$3.00 |
$2.10 |
$3.04 |
$4.50 |
$2.90 |
$3.00 |
$4.00 |
$5.64 |
$3.22 |
| 37 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,669 | LF |
$0.7000 |
$0.7100 |
$0.7800 |
$0.7500 |
$0.7500 |
$1.00 |
$2.00 |
$1.41 |
$0.8300 |
| 38 | 530-6005 |
DRIVEWAYS (ACP) | 125 | SY |
$40.00 |
$56.50 |
$63.00 |
$39.00 |
$94.17 |
$56.00 |
$37.00 |
$70.45 |
$75.00 |
| 39 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 317 | LF |
$26.00 |
$25.39 |
$22.68 |
$18.00 |
$21.60 |
$24.64 |
$23.00 |
$33.11 |
$24.50 |
| 40 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$1,800.00 |
$2,009.58 |
$1,690.50 |
$2,000.00 |
$1,610.00 |
$1,624.00 |
$1,542.00 |
$2,620.92 |
$1,610.00 |
| 41 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,000.00 |
$2,890.12 |
$2,913.75 |
$2,550.00 |
$2,775.00 |
$3,024.00 |
$2,871.00 |
$3,769.33 |
$3,000.00 |
| 42 | 552-6005 |
GATE (TY 1) | 1 | EA |
$1,500.00 |
$864.33 |
$757.00 |
$500.00 |
$1,500.00 |
$896.00 |
$851.00 |
$1,056.82 |
$890.00 |
| 43 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$520.00 |
$813.56 |
$627.17 |
$750.00 |
$507.50 |
$806.40 |
$766.00 |
$1,061.05 |
$800.00 |
| 44 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$25.00 |
$16.21 |
$19.06 |
$20.00 |
$21.30 |
$20.16 |
$19.00 |
$21.14 |
$20.00 |
| 45 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 6 | EA |
$40.00 |
$30.25 |
$24.51 |
$35.00 |
$29.70 |
$34.72 |
$33.00 |
$39.45 |
$34.50 |
| 46 | 666-6224 |
PAVEMENT SEALER 4" | 1,060 | LF |
$0.2000 |
$0.4800 |
$0.2100 |
$1.00 |
$0.7000 |
$0.2300 |
$1.00 |
$0.9900 |
$0.2300 |
| 47 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 1,584 | LF |
$0.6000 |
$2.96 |
$0.8400 |
$1.00 |
$1.40 |
$0.9000 |
$1.00 |
$1.97 |
$0.8900 |
| 48 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 1,584 | LF |
$0.6000 |
$2.96 |
$0.8400 |
$1.00 |
$1.40 |
$0.9000 |
$1.00 |
$1.97 |
$0.8900 |
| 49 | 672-6009 |
REFL PAV MRKR TY II-A-A | 20 | EA |
$4.00 |
$39.98 |
$7.35 |
$10.00 |
$5.00 |
$7.84 |
$5.00 |
$7.05 |
$7.80 |
| 50 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 1,060 | LF |
$0.1000 |
$0.4500 |
$0.1000 |
$1.00 |
$0.5500 |
$0.1100 |
$1.00 |
$0.7800 |
$0.1300 |
| 51 | 678-6033 |
PAV SURF PREP FOR MRK (RPM) | 20 | EA |
$1.00 |
$0.3900 |
$1.05 |
$1.00 |
$0.7500 |
$1.12 |
$1.00 |
$1.06 |
$1.13 |
| 52 | 3077-6013 |
SP MIXES SP-C SAC-B PG64-22 | 329 | TON |
$80.00 |
$156.66 |
$166.00 |
$105.00 |
$135.00 |
$185.00 |
$154.00 |
$210.00 |
$150.00 |
| 53 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 14 | DAY |
$160.00 |
$162.06 |
$107.14 |
$100.00 |
$803.57 |
$95.00 |
$86.00 |
$211.36 |
$1,000.00 |