| 1 | 104-6054 |
REMOVING CONCRETE(MOW STRIP) | 2,530 | LF |
$8.00 |
$5.00 |
$6.63 |
$10.00 |
|
| 2 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 321 | SY |
$5.50 |
$4.00 |
$5.00 |
$4.05 |
|
| 3 | 168-6001 |
VEGETATIVE WATERING | 2.7 | MG |
$125.00 |
$200.00 |
$100.00 |
$80.00 |
|
| 4 | 340-6246 |
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP) | 2,796 | TON |
$110.00 |
$119.81 |
$111.74 |
$113.00 |
|
| 5 | 340-6272 |
TACK COAT | 1,736 | GAL |
$4.50 |
$4.90 |
$2.35 |
$7.00 |
|
| 6 | 420-6066 |
CL C CONC (RAIL FOUNDATION) | 96 | CY |
$650.00 |
$450.00 |
$549.38 |
$830.00 |
|
| 7 | 500-6001 |
MOBILIZATION | 1 | LS |
$190,618.25 |
$200,000.00 |
$240,000.00 |
$260,500.00 |
|
| 8 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$2,500.00 |
$3,100.00 |
$10,000.00 |
$1,000.00 |
|
| 9 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,000 | LF |
$6.00 |
$4.50 |
$5.00 |
$5.55 |
|
| 10 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,000 | LF |
$1.00 |
$4.50 |
$1.00 |
$1.05 |
|
| 11 | 514-6001 |
PERM CTB (SGL SLOPE) (TY 1) (42 ) | 25,380 | LF |
$50.00 |
$62.00 |
$61.40 |
$70.25 |
|
| 12 | 514-6047 |
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION) | 577 | LF |
$180.00 |
$200.00 |
$93.00 |
$235.00 |
|
| 13 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,700 | LF |
$2.50 |
$3.00 |
$1.34 |
$3.95 |
|
| 14 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 8 | EA |
$200.00 |
$200.00 |
$267.91 |
$200.00 |
|
| 15 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 9 | EA |
$250.00 |
$250.00 |
$267.91 |
$325.00 |
|
| 16 | 543-6021 |
REMOVE CABLE BARRIER | 23,683 | LF |
$2.50 |
$3.00 |
$2.95 |
$3.10 |
|
| 17 | 543-6022 |
REMOVE CABLE BARRIER TERMINAL SECTION | 18 | EA |
$400.00 |
$400.00 |
$514.39 |
$325.00 |
|
| 18 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 9 | EA |
$300.00 |
$300.00 |
$428.66 |
$440.00 |
|
| 19 | 6185-6002 |
TMA (STATIONARY) | 196 | DAY |
$250.00 |
$250.00 |
$410.07 |
$400.00 |
|