247BidsDec 1, 2016 to Nov 7, 2018
54Wins (low bidder)
21.9%Win rate
$204,825,208Total won
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 7, 2018 | 0120-05-025 | INCREASE SUPERELEVATIONHamilton · Waco | 2 of 4 | $615,862 | $571,907BIG CREEK CONSTRUCTION, LTD. | +7.7% |
| Nov 7, 2018 | 0044-07-071 | PAVEMENT REPAIR AND OVERLAYCooke · Wichita Falls | 5 of 6 | $5,374,929 | $4,475,655JAGOE-PUBLIC COMPANY | +20.1% |
| Nov 6, 2018 | 0056-02-033 | WDN SHLDRS & ADD PASS LNSLimestone · Waco | 3 of 5 | $9,835,873 | $9,187,964BIG CREEK CONSTRUCTION, LTD. | +7.1% |
| Nov 6, 2018 | 0920-39-025 | CONSTRUCT SIDEWALKSChambers · Beaumont | 7 of 12 | $1,368,490 | $1,106,084TREVWAY, INC. | +23.7% |
| Nov 6, 2018 | 6312-48-001 | REHAB EXISTING ROADWAY/OVERLAY/STRIPINGJasper · Beaumont | 1 of 3 | $497,996 | $497,996 | Won |
| Nov 6, 2018 | 6331-77-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRJasper · Beaumont | 1 of 6 | $897,768 | $897,768 | Won |
| Oct 3, 2018 | 6332-64-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 1 of 3 | $843,261 | $843,261 | Won |
| Oct 2, 2018 | 2061-02-030 | REHAB & WDN RDWYMcLennan · Waco | 3 of 4 | $10,396,249 | $9,997,468BIG CREEK CONSTRUCTION, LTD. | +4.0% |
| Oct 2, 2018 | 6331-57-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 4 of 4 | $680,285 | $622,434PEACHTREE CONSTRUCTION, LTD. | +9.3% |
| Sep 7, 2018 | 1290-03-024 | REHABILITATE HIGHWAYRockwall · Dallas | 5 of 8 | $1,380,544 | $1,258,635AUSTIN BRIDGE & ROAD SERVIC… | +9.7% |
| Sep 7, 2018 | 6330-81-001 | US 96 ETC., EROSION & SCOUR REPAIRJasper · Beaumont | 5 of 6 | $469,906 | $296,106L.C. JORDAN & SON | +58.7% |
| Sep 7, 2018 | 6331-43-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRNavarro · Dallas | 3 of 3 | $1,804,847 | $655,526KNIFE RIVER CORPORATION - S… | +175.3% |
| Sep 6, 2018 | 1094-04-016 | BASE RPR, OVERLAY, PAVMT MARKJohnson · Fort Worth | 2 of 4 | $1,875,581 | $1,866,926PEACHTREE CONSTRUCTION, LTD. | +0.5% |
| Sep 6, 2018 | 0197-04-080 | MILL, OVERLAY & MRKINGS; BRIDGE RAIL REPLACEKaufman · Dallas | 1 of 6 | $6,161,838 | $6,161,838 | Won |
| Aug 8, 2018 | 3417-01-029 | PAVEMENT REPAIR, UNDERSEAL & OVERLAYTravis · Austin | 3 of 6 | $2,965,930 | $2,822,373AUSTIN MATERIALS, LLC | +5.1% |
| Aug 8, 2018 | 2293-01-030 | TOM OVERLAYHays · Austin | 7 of 7 | $635,649 | $409,850LONE STAR PAVING COMPANY | +55.1% |
| Aug 8, 2018 | 0116-01-039 | LEVEL-UP, FULL DEPTH REPAIR & TOMLee · Austin | 2 of 7 | $12,815,105 | $12,787,554BIG CREEK CONSTRUCTION, LTD. | +0.2% |
| Aug 8, 2018 | 0322-01-049 | MILL, SEAL & TOM OVERLAYBastrop · Austin | 5 of 5 | $1,496,955 | $1,130,212LONE STAR PAVING COMPANY | +32.4% |
| Aug 8, 2018 | 0920-03-034 | REPLACE BRIDGEHardin · Beaumont | 2 of 4 | $669,079 | $586,642STATELINE CONSTRUCTION, LLC | +14.1% |
| Aug 7, 2018 | 6328-20-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIREllis · Dallas | 4 of 5 | $2,336,406 | $1,981,809FOUTSCO PAVING COMPANY, LLC | +17.9% |
| Aug 7, 2018 | 0134-12-005 | BASE RPR, MILL, OVERLAY, PAVMT MARKWise · Fort Worth | 6 of 6 | $1,209,114 | $963,087FOUTSCO PAVING COMPANY, LLC | +25.5% |
| Aug 7, 2018 | 0286-03-017 | LEVEL-UP, FULL DEPTH REPAIR AND TOMCaldwell · Austin | 6 of 6 | $6,988,210 | $5,221,959ANGEL BROTHERS HOLDINGS COR… | +33.8% |
| Aug 7, 2018 | 0113-13-175 | MILL & INLAYTravis · Austin | 5 of 6 | $5,247,957 | $3,958,942LONE STAR PAVING COMPANY | +32.6% |
| Aug 7, 2018 | 0214-03-036 | RETROFIT BRIDGE BENTSNewton · Beaumont | 5 of 5 | $4,223,954 | $2,799,158STATELINE CONSTRUCTION, LLC | +50.9% |
| Jul 11, 2018 | 0184-01-063 | WDN RDWY & ADD PASS LNSCoryell · Waco | 2 of 5 | $11,814,287 | $11,187,471BIG CREEK CONSTRUCTION, LTD. | +5.6% |
| Jul 11, 2018 | 0064-08-057 | OVERLAY EXISTING ROADWAYJasper · Beaumont | 1 of 3 | $11,208,279 | $11,208,279 | Won |
| Jul 11, 2018 | 3199-01-008 | GR, BS, OCST, ACP SURF, STRS, PV MKAnderson · Tyler | 7 of 8 | $3,119,136 | $2,573,742A. L. HELMCAMP, INC. | +21.2% |
| Jul 11, 2018 | 0320-05-015 | MILL/SEAL/OVLYBell · Waco | 3 of 5 | $3,268,229 | $2,938,131BIG CREEK CONSTRUCTION, LTD. | +11.2% |
| Jul 11, 2018 | 2362-01-036 | SEAL & OVERLAYMcLennan · Waco | 2 of 3 | $2,209,860 | $2,101,672KNIFE RIVER CORPORATION - S… | +5.1% |
| Jul 11, 2018 | 0164-01-071 | PFC SURF,BRG RAIL,MBGF,PVT MRKGHenderson · Tyler | 4 of 4 | $1,441,961 | $1,161,999LONGVIEW BRIDGE AND ROAD, L… | +24.1% |
| Jul 11, 2018 | 0421-01-045 | GRD, BSE,SURF, PAV'T MARKINGSMedina · San Antonio | 7 of 10 | $2,401,962 | $2,041,003HUNTER INDUSTRIES, LTD. | +17.7% |
| Jul 11, 2018 | 0092-13-028 | FLEXIBLE PAVEMENT REPAIRNavarro · Dallas | 2 of 4 | $2,270,147 | $2,108,967O. TREVINO CONSTRUCTION, LLC | +7.6% |
| Jul 11, 2018 | 1091-03-012 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERSRockwall · Dallas | 2 of 4 | $4,614,443 | $4,349,077ED BELL CONSTRUCTION COMPANY | +6.1% |
| Jul 11, 2018 | 0014-05-039 | MISC SPOT PAVEMENT REPAIRSHill · Waco | 1 of 4 | $1,999,585 | $1,999,585 | Won |
| Jul 11, 2018 | 0120-01-019 | MISC SPOT PAVEMENT REPAIRHamilton · Waco | 1 of 5 | $1,642,122 | $1,642,122 | Won |
| Jul 11, 2018 | 0533-01-020 | LEVEL-UP AND SEAL COATBurnet · Austin | 4 of 7 | $2,022,679 | $1,963,010LONE STAR PAVING COMPANY | +3.0% |
| Jul 10, 2018 | 0200-11-095 | WIDEN FREEWAY FROM 4 TO 6 LANESJefferson · Beaumont | 1 of 3 | $31,528,539 | $31,528,539 | Won |
| Jul 10, 2018 | 2417-02-016 | BS REPR, MILL, OV, PAV MK, MBGFJohnson · Fort Worth | 2 of 4 | $1,937,190 | $1,839,668PEACHTREE CONSTRUCTION, LTD. | +5.3% |
| Jul 10, 2018 | 0184-04-050 | MISC SPOT PAVEMENT REPAIRSBell · Waco | 3 of 5 | $2,515,660 | $2,282,822LONE STAR PAVING COMPANY | +10.2% |
| Jul 10, 2018 | 0065-05-145 | MILL AND OVERLAY EXISTING ROADWAYHardin · Beaumont | 1 of 3 | $6,772,232 | $6,772,232 | Won |
| Jul 10, 2018 | 1746-01-027 | WDN, OV, BS REPCollin · Dallas | 3 of 8 | $5,900,889 | $5,440,852A. L. HELMCAMP, INC. | +8.5% |
| Jul 10, 2018 | 0014-08-084 | MISC SPOT PAVEMENT REPAIRSMcLennan · Waco | 1 of 3 | $810,416 | $810,416 | Won |
| Jun 6, 2018 | 6328-04-001 | FLEXIBLE PAVEMENT REPAIRCollin · Dallas | 3 of 3 | $1,914,828 | $791,257WEST TEXAS REBAR PLACERS IN… | +142.0% |
| Jun 6, 2018 | 6324-95-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRJohnson · Fort Worth | 5 of 5 | $2,536,779 | $1,881,428NORTHEASTERN PAVERS, INC. | +34.8% |
| Jun 6, 2018 | 0932-01-090 | REPLACE BRIDGE AND APPROACHESJefferson · Beaumont | 4 of 5 | $17,431,319 | $14,655,685JENSEN CONSTRUCTION COMPANY… | +18.9% |
| Jun 6, 2018 | 1068-04-174 | REPLACE PERMEABLE FRICTION COURSEDallas · Dallas | 2 of 3 | $1,911,027 | $1,903,536FOUTSCO PAVING COMPANY, LLC | +0.4% |
| Jun 6, 2018 | 0424-01-058 | PFC SURF, BRG RAIL, MBGF, PV MKSmith · Tyler | 4 of 4 | $2,242,213 | $1,834,285DREWERY CONSTRUCTION COMPAN… | +22.2% |
| Jun 6, 2018 | 1179-01-043 | BASE RPR, OVERLAY, PAVMT MARKWise · Fort Worth | 4 of 5 | $3,289,579 | $2,881,535THE LANE CONSTRUCTION CORPO… | +14.2% |
| Jun 6, 2018 | 0200-14-085 | REPAINT STRUCTURES WITH SPOT REPAIRJefferson · Beaumont | 3 of 4 | $11,275,590 | $8,319,407CEKRA INC. | +35.5% |
| Jun 6, 2018 | 0700-03-142 | TOM AND PFC OVERLAYTravis · Austin | 4 of 5 | $5,070,774 | $4,059,393LONE STAR PAVING COMPANY | +24.9% |
| Jun 5, 2018 | 0197-02-121 | SLOPE FAILURE REPAIRSDallas · Dallas | 2 of 4 | $11,590,645 | $11,432,222AUSTIN BRIDGE & ROAD SERVIC… | +1.4% |
| Jun 5, 2018 | 0352-01-061 | BASE RPR, OVERLAY, PAVMT MARKWise · Fort Worth | 4 of 4 | $6,479,660 | $5,522,922JAGOE-PUBLIC COMPANY | +17.3% |
| Jun 5, 2018 | 1603-03-040 | BASE RPR, MILL, OVERLAY, PAVMT MARKTarrant · Fort Worth | 5 of 7 | $2,651,462 | $2,474,193AUSTIN BRIDGE & ROAD SERVIC… | +7.2% |
| Jun 5, 2018 | 0095-03-093 | BASE REPAIR AND OVERLAYKaufman · Dallas | 1 of 6 | $11,461,243 | $11,461,243 | Won |
| Jun 5, 2018 | 6328-41-001 | FLEXIBLE PAVEMENT REPAIRKaufman · Dallas | 3 of 5 | $2,411,785 | $1,759,443A. L. HELMCAMP, INC. | +37.1% |
| May 15, 2018 | 6325-53-001 | WIDEN PAVEMENTFalls · Waco | 2 of 3 | $170,358 | $164,979KNIFE RIVER CORPORATION - S… | +3.3% |
| May 2, 2018 | 0367-02-075 | REHABILITATION AND RAISING ROADWAYGalveston · Houston | 1 of 3 | $20,817,021 | $20,817,021 | Won |
| May 2, 2018 | 3207-01-011 | GR, BS, DR, PAVMT MARKJohnson · Fort Worth | 2 of 4 | $5,895,588 | $5,771,223JAY MILLS CONTRACTING, INCO… | +2.2% |
| May 2, 2018 | 0028-07-052 | UPGRADE BRIDGE AND APPROACH RAILINGJefferson · Beaumont | 1 of 8 | $237,658 | $237,658 | Won |
| May 2, 2018 | 0014-03-095 | CONC PAV RPR, MILL, OVERLAY, PAVMTJohnson · Fort Worth | 1 of 4 | $10,321,477 | $10,321,477 | Won |
| May 2, 2018 | 0883-02-086 | BS, ACP, MILLED RUMBLE STRIPSOrange · Beaumont | 1 of 3 | $1,139,721 | $1,139,721 | Won |
| May 2, 2018 | 0008-09-036 | BASE RPR, OVERLAY, PAVEMENT MARKParker · Fort Worth | 5 of 5 | $5,481,034 | $5,012,311NORTHEASTERN PAVERS, INC. | +9.4% |
| May 2, 2018 | 0008-05-027 | BASE RPR, MILL, OVERLAY, PAVMT MARKTarrant · Fort Worth | 1 of 4 | $5,833,765 | $5,833,765 | Won |
| May 2, 2018 | 1566-01-011 | DEPTH REPAIR, UNDERSEAL & THIN OVWilliamson · Austin | 1 of 4 | $2,389,609 | $2,389,609 | Won |
| May 2, 2018 | 0334-05-032 | REPAIR, LEVEL-UP & SEAL COATLee · Austin | 4 of 8 | $1,597,409 | $1,244,148LONE STAR PAVING COMPANY | +28.4% |
| May 2, 2018 | 0231-01-056 | PLANING AND ACP OVERLAYLampasas · Brownwood | 2 of 4 | $687,114 | $667,334LONE STAR PAVING COMPANY | +3.0% |
| May 2, 2018 | 0232-05-016 | SEAL/OVLYBell · Waco | 1 of 5 | $888,222 | $888,222 | Won |
| May 2, 2018 | 0109-02-026 | PLNG,ACP,OCST,PFC,PVT MRKGAnderson · Tyler | 3 of 5 | $4,565,108 | $3,987,345BIG CREEK CONSTRUCTION, LTD. | +14.5% |
| May 1, 2018 | 3372-01-016 | BASE RPR, OVERLAY, PAVMT MARKJohnson · Fort Worth | 3 of 3 | $2,275,659 | $2,090,428NORTHEASTERN PAVERS, INC. | +8.9% |
| May 1, 2018 | 0071-05-031 | REPAIR, LEVEL-UP & SEAL COATMason · Austin | 2 of 5 | $3,492,604 | $2,985,946LONE STAR PAVING COMPANY | +17.0% |
| May 1, 2018 | 0877-03-025 | REPLACE BRIDGE AND APPROACHESTyler · Beaumont | 3 of 4 | $605,767 | $539,689DREWERY CONSTRUCTION COMPAN… | +12.2% |
| May 1, 2018 | 1024-01-074 | WIDEN PAVED SURFACE WIDTH, INSTALL CONTINUOUS TURNChambers · Beaumont | 1 of 2 | $1,709,304 | $1,709,304 | Won |
| May 1, 2018 | 6322-30-001 | OVERLAY AND PAVEMENT REPAIRLiberty · Beaumont | 5 of 5 | $895,974 | $797,673SMITH & COMPANY | +12.3% |
| May 1, 2018 | 6327-39-001 | MILL/INLAY/LEVEL UP/OVERLAYJasper · Beaumont | 1 of 2 | $1,990,002 | $1,990,002 | Won |
| Apr 4, 2018 | 1290-01-012 | GR, BASE, ACP OVERLAY, PVMT MKGSRockwall · Dallas | 2 of 8 | $2,807,406 | $2,750,740D. L. LENNON INCORPORATED -… | +2.1% |
| Apr 4, 2018 | 6328-81-001 | MILL & OVERLAYKarnes · Corpus Christi | 5 of 10 | $3,384,209 | $3,057,188ANGEL BROTHERS HOLDINGS COR… | +10.7% |
| Apr 4, 2018 | 1420-02-012 | PROVIDE ADDITIONAL SURFACE_WIDTHChambers · Beaumont | 2 of 4 | $336,989 | $328,472CORNERSTONE PAVING AND CONS… | +2.6% |
| Apr 4, 2018 | 0365-01-046 | BASE RPR, MILL, OVERLAY, PAVMT MARKParker · Fort Worth | 7 of 8 | $936,735 | $810,035NORTHEASTERN PAVERS, INC. | +15.6% |
| Apr 4, 2018 | 0305-07-062 | BASE REPAIR, OCST, ACP, STRIPEOrange · Beaumont | 2 of 3 | $3,422,999 | $3,213,536PTSS INVESTMENTS, LLC | +6.5% |
| Apr 4, 2018 | 1179-03-010 | BASE RPR, MILL, OVERLAY, PAVMT MARKParker · Fort Worth | 6 of 7 | $1,482,454 | $1,285,250NORTHEASTERN PAVERS, INC. | +15.3% |
| Apr 4, 2018 | 0055-08-119 | MILL/PFC OVLYMcLennan · Waco | 3 of 4 | $5,332,746 | $4,721,563KNIFE RIVER CORPORATION - S… | +12.9% |
| Apr 3, 2018 | 6320-07-001 | REHAB ROADWAY_& RE-SURFACETyler · Beaumont | 1 of 4 | $1,927,852 | $1,927,852 | Won |
| Apr 3, 2018 | 6315-63-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRTarrant · Fort Worth | 3 of 3 | $1,295,250 | $827,500FNH CONSTRUCTION, LLC | +56.5% |
| Apr 3, 2018 | 6316-23-001 | ADD LEFT TURN LANEMcLennan · Waco | 3 of 5 | $427,041 | $342,755KNIFE RIVER CORPORATION - S… | +24.6% |
| Apr 3, 2018 | 0508-04-162 | GRADE SEPARATION, REHAB & EXTEND FRONTAGE ROADSJefferson · Beaumont | 2 of 7 | $18,760,267 | $18,747,291STERLING DELAWARE HOLDING C… | +0.1% |
| Apr 3, 2018 | 0245-02-031 | FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRKVan Zandt · Tyler | 11 of 14 | $12,457,808 | $9,587,788BIG CREEK CONSTRUCTION, LTD. | +29.9% |
| Apr 3, 2018 | 0171-03-067 | BASE RPR, MILL, OVERLAY, PAVMT MARKParker · Fort Worth | 5 of 8 | $3,617,786 | $3,096,311JAGOE-PUBLIC COMPANY | +16.8% |
| Apr 3, 2018 | 0833-03-036 | WDN GR, STRS & SURFMcLennan · Waco | 3 of 4 | $11,993,210 | $11,487,770BIG CREEK CONSTRUCTION, LTD. | +4.4% |
| Apr 3, 2018 | 0008-03-116 | BASE RPR, MILL, OVERLAY, PAVMT MARKParker · Fort Worth | 6 of 10 | $4,925,142 | $4,502,729THE LANE CONSTRUCTION CORPO… | +9.4% |
| Apr 3, 2018 | 0009-12-211 | REHABILITATION OF EXISTING ROADWAYRockwall · Dallas | 1 of 3 | $3,411,243 | $3,411,243 | Won |
| Mar 7, 2018 | 0522-03-026 | GR, STRS, ACP BS & SURF, C&GVan Zandt · Tyler | 7 of 7 | $688,772 | $496,651REYNOLDS & KAY, LTD. | +38.7% |
| Mar 7, 2018 | 1330-01-063 | BASE RPR, MILL, OVERLAY, PAVMT MARKTarrant · Fort Worth | 2 of 4 | $2,260,941 | $2,137,400PEACHTREE CONSTRUCTION, LTD. | +5.8% |
| Mar 7, 2018 | 0836-02-071 | MILL/OVLYBell · Waco | 2 of 5 | $801,724 | $796,526LONE STAR PAVING COMPANY | +0.7% |
| Mar 7, 2018 | 1978-01-056 | BASE RPR, MILL, OVERLAY, PAVMT MARKTarrant · Fort Worth | 4 of 5 | $2,539,774 | $2,235,383THE LANE CONSTRUCTION CORPO… | +13.6% |
| Mar 7, 2018 | 0182-02-038 | BASE OVERLAY,2 COURSE SURF TRT, ACPComanche · Brownwood | 5 of 5 | $5,963,972 | $5,024,304JAY MILLS CONTRACTING, INCO… | +18.7% |
| Mar 7, 2018 | 6322-21-001 | OVERLAYChambers · Beaumont | 2 of 4 | $908,262 | $839,543ANGEL BROTHERS HOLDINGS COR… | +8.2% |
| Mar 7, 2018 | 6326-55-001 | FULL DEPTH CONCRETE PAVEMENT REPAIRJefferson · Beaumont | 2 of 3 | $1,936,025 | $1,818,400DBI SERVICES, LLC | +6.5% |
| Mar 7, 2018 | 6327-56-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 3 of 3 | $364,226 | $300,520FOUTSCO PAVING COMPANY, LLC | +21.2% |
| Mar 6, 2018 | 0049-01-090 | UNDERSEAL/LEVELUP/OVERLAYMcLennan · Waco | 1 of 4 | $720,812 | $720,812 | Won |
| Mar 6, 2018 | 2745-01-008 | BASE REPAIR, OVERLAYCollin · Dallas | 3 of 6 | $1,584,978 | $1,442,158FOUTSCO PAVING COMPANY, LLC | +9.9% |
| Mar 6, 2018 | 0191-01-085 | PLNG,BS RPR,OCST,PFC,SPRPV,MBGF,SHLDR TXT,PV MKSmith · Tyler | 3 of 5 | $3,816,364 | $3,628,777DREWERY CONSTRUCTION COMPAN… | +5.2% |
| Mar 6, 2018 | 0508-02-121 | EXTEND WB TURN LANEChambers · Beaumont | 4 of 6 | $246,353 | $235,049TREVWAY, INC. | +4.8% |
| Mar 6, 2018 | 3043-01-011 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHTyler · Beaumont | 1 of 7 | $509,224 | $509,224 | Won |
| Mar 6, 2018 | 0593-01-123 | LEVEL-UP/OVERLAYLiberty · Beaumont | 5 of 5 | $1,036,389 | $845,385SMITH & COMPANY | +22.6% |
| Mar 6, 2018 | 6327-54-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 2 of 3 | $566,847 | $472,960FOUTSCO PAVING COMPANY, LLC | +19.9% |
| Mar 6, 2018 | 6326-56-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRSJefferson · Beaumont | 2 of 4 | $572,410 | $537,909CORNERSTONE PAVING AND CONS… | +6.4% |
| Mar 6, 2018 | 6326-82-001 | RAIL UPGRADE/JOINT/CONCRETE REP/CLEAN&SEChambers · Beaumont | 1 of 6 | $335,276 | $335,276 | Won |
| Feb 2, 2018 | 0008-03-107 | BASE RPR, MILL, OVERLAY, PAVMT MARKParker · Fort Worth | 5 of 8 | $2,436,798 | $2,047,763NORTHEASTERN PAVERS, INC. | +19.0% |
| Feb 2, 2018 | 3330-01-010 | SEAL/OVLYMcLennan · Waco | 2 of 4 | $919,306 | $845,728KNIFE RIVER CORPORATION - S… | +8.7% |
| Feb 2, 2018 | 0114-20-011 | MILL AND INLAYTravis · Austin | 3 of 5 | $1,373,412 | $1,158,086LONE STAR PAVING COMPANY | +18.6% |
| Feb 2, 2018 | 1309-01-033 | BASE RPR, MILL, OVERLAY, PAVMT MARKJack · Fort Worth | 6 of 9 | $4,262,606 | $3,522,043THE LANE CONSTRUCTION CORPO… | +21.0% |
| Feb 2, 2018 | 6323-89-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAYNavarro · Dallas | 4 of 6 | $1,257,185 | $397,396KNIFE RIVER CORPORATION - S… | +216.4% |
| Feb 2, 2018 | 6322-91-001 | OVERLAY ROADWAYOrange · Beaumont | 1 of 5 | $999,987 | $999,987 | Won |
| Feb 2, 2018 | 0774-03-014 | WDN, GR, SURF, ADD SHLDRSHamilton · Waco | 1 of 7 | $3,288,709 | $3,288,709 | Won |
| Feb 2, 2018 | 0499-03-058 | INST CONT TURN LANE & RUMBLE STRIPSOrange · Beaumont | 1 of 4 | $6,632,538 | $6,632,538 | Won |
| Feb 2, 2018 | 0164-03-053 | BS RPR,PLNG,SUPRPVE,OCST,PFC,MBGF,SGNS,PV MKHenderson · Tyler | 3 of 7 | $3,030,058 | $2,687,805BIG CREEK CONSTRUCTION, LTD. | +12.7% |
| Feb 2, 2018 | 0048-03-091 | BASE REPAIR AND OVERLAYEllis · Dallas | 6 of 8 | $1,588,345 | $829,774KNIFE RIVER CORPORATION - S… | +91.4% |
| Feb 1, 2018 | 6311-53-001 | REHABILITATE ROADWAYS-TERRELL STATE HOSPITALKaufman · Dallas | 2 of 4 | $455,936 | $439,867FNH CONSTRUCTION, LLC | +3.7% |
| Feb 1, 2018 | 6324-58-001 | US 190 ETC FLEX PAVE STRUCTURE REPJasper · Beaumont | 3 of 5 | $572,089 | $562,947A. L. HELMCAMP, INC. | +1.6% |
| Feb 1, 2018 | 6320-56-001 | MILL AND OVERLAYLiberty · Beaumont | 4 of 5 | $1,202,771 | $1,042,371ANGEL BROTHERS HOLDINGS COR… | +15.4% |
| Feb 1, 2018 | 0055-08-099 | GR, STRS & SURFMcLennan · Waco | 7 of 8 | $24,870,169 | $20,587,595BIG CREEK CONSTRUCTION, LTD. | +20.8% |
| Feb 1, 2018 | 0239-02-037 | PAVEMENT REPAIR AND OVERLAYMontague · Wichita Falls | 5 of 5 | $1,714,250 | $1,182,794THE LANE CONSTRUCTION CORPO… | +44.9% |
| Feb 1, 2018 | 0173-03-040 | HMAC OV AND SPOT BASE REPAIRKaufman · Dallas | 2 of 8 | $1,894,017 | $1,757,484IOC COMPANY LLC | +7.8% |
| Feb 1, 2018 | 0211-02-026 | LEVEL-UP, FULL DEPTH REPAIR AND TOMLee · Austin | 6 of 7 | $7,343,194 | $5,387,886BIG CREEK CONSTRUCTION, LTD. | +36.3% |
| Feb 1, 2018 | 0593-01-120 | INSTALL TURN LANE, PASSING LANES & RUMBLE STRIPSLiberty · Beaumont | 4 of 4 | $6,082,689 | $5,234,742ANGEL BROTHERS HOLDINGS COR… | +16.2% |
| Feb 1, 2018 | 0833-03-049 | TOM OVLYMcLennan · Waco | 2 of 4 | $287,946 | $278,607KNIFE RIVER CORPORATION - S… | +3.4% |
| Jan 5, 2018 | 0683-01-095 | MILL, SEAL & INLAYWilliamson · Austin | 4 of 5 | $1,996,581 | $1,482,656LONE STAR PAVING COMPANY | +34.7% |
| Jan 4, 2018 | 6316-01-001 | CONST & REPAIRS AT DENTON ST SUPPORT LIVING CENTERDenton · Dallas | 3 of 3 | $305,142 | $286,661JAGOE-PUBLIC COMPANY | +6.4% |
| Dec 6, 2017 | 0231-03-143 | WDN, BS, STR, SURFBell · Waco | 2 of 6 | $7,646,377 | $7,287,694BIG CREEK CONSTRUCTION, LTD. | +4.9% |
| Dec 6, 2017 | 0786-01-083 | WIDEN TO FOUR LANES WITH A CENTER LEFT TURN LANEJefferson · Beaumont | 1 of 6 | $3,523,495 | $3,523,495 | Won |
| Dec 6, 2017 | 0150-05-048 | REPAIR, MILL, SEAL COAT, LEVEL UP & OVERLAYBurnet · Austin | 1 of 6 | $3,931,926 | $3,931,926 | Won |
| Dec 6, 2017 | 0150-02-040 | LEVEL UP AND SEAL COATLlano · Austin | 1 of 7 | $1,617,039 | $1,617,039 | Won |
| Dec 5, 2017 | 2304-02-042 | SEAL/LVL UP/OVLYBell · Waco | 3 of 6 | $807,729 | $795,656LONE STAR PAVING COMPANY | +1.5% |
| Dec 5, 2017 | 0009-15-027 | REHABILITATION OF EXISTING ROADHunt · Paris | 1 of 7 | $3,331,592 | $3,331,592 | Won |
| Nov 3, 2017 | 6317-52-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 2 of 2 | $1,301,804 | $1,099,347PEACHTREE CONSTRUCTION, LTD. | +18.4% |
| Nov 2, 2017 | 0471-02-071 | REPAIR, LEVEL-UP AND SEAL COATHays · Austin | 5 of 7 | $966,004 | $630,023LONE STAR PAVING COMPANY | +53.3% |
| Nov 2, 2017 | 6317-51-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 2 of 2 | $1,195,152 | $1,027,494PEACHTREE CONSTRUCTION, LTD. | +16.3% |
| Oct 4, 2017 | 0385-02-029 | GR, BS AND PAVEMENTHood · Fort Worth | 4 of 8 | $2,805,426 | $2,113,790KNIFE RIVER CORPORATION - S… | +32.7% |
| Oct 4, 2017 | 6314-67-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRTarrant · Fort Worth | 4 of 4 | $863,480 | $444,444VANN/ELLI, INC. | +94.3% |
| Oct 4, 2017 | 6317-50-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 2 of 2 | $2,495,781 | $871,400PEACHTREE CONSTRUCTION, LTD. | +186.4% |
| Oct 3, 2017 | 0320-02-036 | WDN, GR, SURF, ADD PASS LNSBell · Waco | 3 of 6 | $6,824,970 | $6,123,478BIG CREEK CONSTRUCTION, LTD. | +11.5% |
| Oct 3, 2017 | 0183-01-043 | ACP OVERLAYComanche · Brownwood | 4 of 11 | $1,039,893 | $918,208KNIFE RIVER CORPORATION - S… | +13.3% |
| Oct 3, 2017 | 0683-01-094 | MILL, OVERLAY, RESTRIPE FROM 4 LN TO 6 LN DIVIDEDWilliamson · Austin | 4 of 4 | $620,379 | $471,769AUSTIN MATERIALS, LLC | +31.5% |
| Oct 3, 2017 | 6317-37-001 | FLEXIBLE PAVEMENT REPAIRDallas · Dallas | 2 of 2 | $1,999,458 | $690,775PEACHTREE CONSTRUCTION, LTD. | +189.5% |
| Sep 7, 2017 | 6320-46-001 | OVERLAY, PLANING, MBGF, BRIDGE RAILLeon · Bryan | 4 of 4 | $3,326,739 | $2,153,410BIG CREEK CONSTRUCTION, LTD. | +54.5% |
| Aug 9, 2017 | 0108-11-019 | REHABILITATION OF EXISTING ROADRains · Paris | 1 of 7 | $6,503,123 | $6,503,123 | Won |
| Aug 9, 2017 | 0752-04-024 | WDN, GR, BS, SURF, ADD SHLDRSFalls · Waco | 4 of 5 | $5,902,596 | $3,524,689BIG CREEK CONSTRUCTION, LTD. | +67.5% |
| Aug 9, 2017 | 0016-02-148 | MILL, SEAL & PFCHays · Austin | 7 of 7 | $1,555,450 | $1,054,132AUSTIN MATERIALS, LLC | +47.6% |
| Aug 9, 2017 | 2866-01-009 | PROV ADDTL PV SURF WDTHLimestone · Waco | 4 of 6 | $1,972,649 | $1,299,987BIG CREEK CONSTRUCTION, LTD. | +51.7% |
| Aug 9, 2017 | 0920-38-187 | RESURFACE ROADWAYJefferson · Beaumont | 1 of 3 | $1,690,882 | $1,690,882 | Won |
| Aug 9, 2017 | 6317-19-001 | OVERLAYLiberty · Beaumont | 4 of 5 | $705,632 | $605,867SMITH & COMPANY | +16.5% |
| Aug 8, 2017 | 0920-30-079 | REPLACE BRIDGE AND APPROACHESOrange · Beaumont | 4 of 7 | $386,071 | $316,837WIDGEON CONSTRUCTION, INC. | +21.9% |
| Aug 8, 2017 | 0265-07-049 | ACP OVERLAYFayette · Yoakum | 2 of 7 | $2,453,527 | $2,399,995LONE STAR PAVING COMPANY | +2.2% |
| Aug 8, 2017 | 0197-05-054 | FLBS PVMT REPAIR, LEVEL UP, SEALCOAT & PVMT MRKSKaufman · Dallas | 3 of 7 | $1,518,334 | $1,419,580O. TREVINO CONSTRUCTION, LLC | +7.0% |
| Aug 8, 2017 | 0387-01-014 | WIDEN, OVERLAY, BASE REPAIRCollin · Dallas | 2 of 6 | $1,509,335 | $1,442,556JAGOE-PUBLIC COMPANY | +4.6% |
| Aug 8, 2017 | 0197-03-073 | BASE REPAIR,LEVEL UP,OVERLAYKaufman · Dallas | 2 of 6 | $2,523,613 | $2,389,678IOC COMPANY LLC | +5.6% |
| Jul 12, 2017 | 1091-04-022 | PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAYRockwall · Dallas | 4 of 7 | $12,740,731 | $11,599,739ED BELL CONSTRUCTION COMPANY | +9.8% |
| Jul 12, 2017 | 0028-06-078 | GR, BS,STR,PVMTJefferson · Beaumont | 1 of 4 | $1,139,171 | $1,139,171 | Won |
| Jul 12, 2017 | 3092-01-009 | SAFETY TREAT FIXED OBJECTSTyler · Beaumont | 1 of 5 | $1,224,578 | $1,224,578 | Won |
| Jul 12, 2017 | 0920-38-256 | REPLACE BRIDGE AND APPROACHESJefferson · Beaumont | 3 of 4 | $254,696 | $225,289NORMAN HIGHWAY CONSTRUCTORS… | +13.1% |
| Jul 12, 2017 | 0495-01-074 | MILL AND OVERLAY EXISTING FREEWAYKaufman · Dallas | 1 of 6 | $9,178,945 | $9,178,945 | Won |
| Jul 12, 2017 | 0914-00-407 | ASPHALTIC PAVEMENT REPAIRSTravis · Austin | 2 of 4 | $2,560,636 | $2,168,168AUSTIN MATERIALS, LLC | +18.1% |
| Jul 12, 2017 | 0245-06-081 | PLNING,BASE REPAIR,MEMB UNDRSL,SUPER PAV,PV MKSmith · Tyler | 4 of 6 | $4,104,984 | $3,624,096MADDEN CONTRACTING COMPANY,… | +13.3% |
| Jul 12, 2017 | 6317-22-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAYKaufman · Dallas | 3 of 5 | $2,896,173 | $2,604,374JOHNSON BROS. CORPORATION, … | +11.2% |
| Jul 11, 2017 | 0118-10-057 | REMOVE & REPLACE 2 STRUCTURESSan Augustine · Lufkin | 5 of 5 | $6,754,697 | $5,292,159DREWERY CONSTRUCTION COMPAN… | +27.6% |
| Jul 11, 2017 | 1109-01-021 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHJasper · Beaumont | 3 of 6 | $606,576 | $499,478DREWERY CONSTRUCTION COMPAN… | +21.4% |
| Jul 11, 2017 | 2977-01-008 | BASE REPAIR, LEVEL UP, OVERLAYCollin · Dallas | 4 of 6 | $1,695,330 | $1,562,282AUSTIN BRIDGE & ROAD SERVIC… | +8.5% |
| Jul 11, 2017 | 0918-47-118 | RECONSTRUCT PARK ROAD INCLUDING PARKING LOTSDallas · Dallas | 4 of 7 | $1,108,687 | $1,037,211TEXAS-REYES GROUP LTD. | +6.9% |
| Jul 11, 2017 | 6300-65-001 | KEENE POT HOLE REPAIR FY17Johnson · Fort Worth | 1 of 6 | $1,728,825 | $1,728,825 | Won |
| Jun 7, 2017 | 0065-06-063 | CONSTRUCT FRONTAGE ROADS OVER PINE ISLAND BAYOUHardin · Beaumont | 3 of 3 | $10,999,133 | $10,637,780STERLING DELAWARE HOLDING C… | +3.4% |
| Jun 7, 2017 | 0593-01-114 | OVERLAY EXISTING ROADWAYLiberty · Beaumont | 2 of 4 | $1,053,457 | $1,050,837CORNERSTONE PAVING AND CONS… | +0.2% |
| Jun 7, 2017 | 0920-06-033 | REPLACE BRIDGE AND APPROACHESNewton · Beaumont | 1 of 4 | $646,004 | $646,004 | Won |
| Jun 7, 2017 | 1835-02-054 | MILL/INLAYBell · Waco | 3 of 4 | $994,540 | $897,190BIG CREEK CONSTRUCTION, LTD. | +10.9% |
| Jun 7, 2017 | 6315-72-001 | BASE FAILURE PAVEMENT REPAIRCoryell · Waco | 2 of 6 | $325,939 | $305,221BIG CREEK CONSTRUCTION, LTD. | +6.8% |
| Jun 7, 2017 | 6315-76-001 | MILL AND INLAYBosque · Waco | 1 of 7 | $595,781 | $595,781 | Won |
| Jun 6, 2017 | 0751-03-038 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERSKaufman · Dallas | 6 of 9 | $4,888,631 | $4,087,837BIG CREEK CONSTRUCTION, LTD. | +19.6% |
| Jun 6, 2017 | 0015-13-377 | MILL, SEAL AND INLAY ON MAINLANESTravis · Austin | 2 of 4 | $6,869,964 | $5,984,426LONE STAR PAVING COMPANY | +14.8% |
| Jun 6, 2017 | 0339-04-035 | PAVEMENT REPAIR, MILL, OCST, PFCHardin · Beaumont | 2 of 4 | $2,810,148 | $2,678,097ANGEL BROTHERS HOLDINGS COR… | +4.9% |
| Jun 6, 2017 | 1973-01-014 | BASE REPAIR, LEVEL UP, OVERLAYCollin · Dallas | 4 of 7 | $3,215,119 | $2,697,083AUSTIN BRIDGE & ROAD SERVIC… | +19.2% |
| Jun 6, 2017 | 6315-73-001 | BASE FAILURE PAVEMENT REPAIRHamilton · Waco | 2 of 8 | $557,774 | $510,942BIG CREEK CONSTRUCTION, LTD. | +9.2% |
| Jun 6, 2017 | 6315-78-001 | BASE FAILURE PAVEMENT REPAIRBell · Waco | 1 of 5 | $940,401 | $940,401 | Won |
| May 2, 2017 | 0314-07-054 | MILL AND OVERLAYParker · Fort Worth | 5 of 6 | $1,962,060 | $1,697,512JOHNSON BROS. CORPORATION, … | +15.6% |
| May 2, 2017 | 1419-01-009 | REPLACE BRIDGE AND APPROACHESJasper · Beaumont | 4 of 6 | $1,769,064 | $1,409,475ALLCO, LLC | +25.5% |
| May 2, 2017 | 6315-75-001 | MILL AND INLAYFalls · Waco | 4 of 5 | $280,544 | $217,681KNIFE RIVER CORPORATION - S… | +28.9% |
| Apr 5, 2017 | 0080-06-030 | MILL AND OVERLAYParker · Fort Worth | 2 of 4 | $8,237,272 | $7,889,840NORTHEASTERN PAVERS, INC. | +4.4% |
| Apr 5, 2017 | 0197-03-075 | MILL, OVERLAY, BRIDGE JOINT REPAIR AND PVMT MRKSKaufman · Dallas | 4 of 6 | $4,654,140 | $4,046,960AUSTIN BRIDGE & ROAD SERVIC… | +15.0% |
| Apr 5, 2017 | 0121-05-050 | FOR THE CONSTRUCTION OF MILL & INLAY HMAC, FDRCPNavarro · Dallas | 2 of 5 | $2,023,616 | $1,989,594KNIFE RIVER CORPORATION - S… | +1.7% |
| Apr 5, 2017 | 0305-04-037 | OVERLAY EXISTING ROADWAYNewton · Beaumont | 1 of 2 | $2,270,329 | $2,270,329 | Won |
| Apr 5, 2017 | 0151-09-145 | REPAIR, MILL,SEAL & OVERLAY NB & SB FRONTAGE ROADSTravis · Austin | 5 of 5 | $3,178,826 | $2,711,158LONE STAR PAVING COMPANY | +17.2% |
| Apr 5, 2017 | 0306-02-069 | OVERLAY EXISTING ROADWAYOrange · Beaumont | 1 of 1 | $5,658,758 | $5,658,758 | Won |
| Apr 5, 2017 | 1068-02-142 | MILL AND OVERLAYTarrant · Fort Worth | 4 of 6 | $5,425,419 | $4,616,650AUSTIN BRIDGE & ROAD SERVIC… | +17.5% |
| Apr 5, 2017 | 0581-02-145 | MILL,FULL DEPTH REPAIR & OVERLAY ON FR RDS.Dallas · Dallas | 5 of 7 | $1,609,153 | $1,463,103O. TREVINO CONSTRUCTION, LLC | +10.0% |
| Apr 5, 2017 | 0044-04-059 | FULL DEPTH REPAIR AND OVERLAYMontague · Wichita Falls | 5 of 9 | $6,041,218 | $4,894,838JAGOE-PUBLIC COMPANY | +23.4% |
| Apr 5, 2017 | 6313-71-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRTyler · Beaumont | 1 of 5 | $532,283 | $532,283 | Won |
| Apr 5, 2017 | 6311-44-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAYNavarro · Dallas | 5 of 5 | $954,500 | $401,955KNIFE RIVER CORPORATION - S… | +137.5% |
| Apr 4, 2017 | 3123-01-014 | GR, BS, STRUC, AND PAVEMENTHood · Fort Worth | 6 of 8 | $4,067,922 | $3,211,242JAY MILLS CONTRACTING, INCO… | +26.7% |
| Apr 4, 2017 | 0173-07-055 | OVERLAYHunt · Paris | 3 of 5 | $1,863,516 | $1,683,588AUSTIN BRIDGE & ROAD SERVIC… | +10.7% |
| Apr 4, 2017 | 0710-01-049 | OVERLAY EXISTING ROADWAYJasper · Beaumont | 1 of 4 | $1,012,112 | $1,012,112 | Won |
| Apr 4, 2017 | 0882-01-013 | PROVIDE ADDITIONAL PAVED SURFACEOrange · Beaumont | 1 of 2 | $328,093 | $328,093 | Won |
| Apr 4, 2017 | 0114-02-103 | OVERLAY, CLEANING & SEALING JOINTSTravis · Austin | 1 of 5 | $3,108,528 | $3,108,528 | Won |
| Mar 8, 2017 | 0245-05-047 | PLANING, BS RPR, OCST, PFC SURF, PV MKSmith · Tyler | 3 of 6 | $1,945,172 | $1,789,205IOC COMPANY LLC | +8.7% |
| Mar 8, 2017 | 2686-01-012 | FULL DEPTH, LEVEL UP & SEAL COATBastrop · Austin | 4 of 7 | $1,851,157 | $1,637,668LONE STAR PAVING COMPANY | +13.0% |
| Mar 8, 2017 | 1330-01-062 | HMAC OVERLAYTarrant · Fort Worth | 1 of 4 | $5,144,733 | $5,144,733 | Won |
| Mar 8, 2017 | 0049-01-092 | MILL/PFC OVLYMcLennan · Waco | 3 of 3 | $4,583,670 | $3,877,223BIG CREEK CONSTRUCTION, LTD. | +18.2% |
| Mar 8, 2017 | 0094-02-123 | MILL AND OVERLAYTarrant · Fort Worth | 1 of 5 | $2,966,572 | $2,966,572 | Won |
| Mar 7, 2017 | 6310-74-001 | REHABILITATE EXISTING ROADWAYJasper · Beaumont | 2 of 4 | $698,620 | $538,723A. L. HELMCAMP, INC. | +29.7% |
| Mar 7, 2017 | 3417-01-024 | PAVEMENT REPAIR, UNDERSEAL & OVERLAYTravis · Austin | 3 of 5 | $1,597,233 | $1,497,762LONE STAR PAVING COMPANY | +6.6% |
| Mar 7, 2017 | 0273-02-026 | LEVEL-UP AND FULL DEPTH REPAIRBurnet · Austin | 2 of 6 | $2,566,666 | $2,446,346LONE STAR PAVING COMPANY | +4.9% |
| Mar 7, 2017 | 3192-02-009 | FULL DEPTH REPAIR AND OVERLAYCooke · Wichita Falls | 9 of 9 | $1,262,615 | $793,931THE LANE CONSTRUCTION CORPO… | +59.0% |
| Mar 7, 2017 | 0079-05-054 | MILL, OVERLAY AND SIGNAL WORKErath · Fort Worth | 3 of 5 | $4,994,060 | $4,655,724IOC COMPANY LLC | +7.3% |
| Mar 7, 2017 | 1378-04-050 | CONVERT 4-LN UNDIVIDED RDWY TO SUPER 2 W/SHOULDERSBurnet · Austin | 4 of 5 | $1,108,498 | $790,289LONE STAR PAVING COMPANY | +40.3% |
| Mar 7, 2017 | 0910-16-121 | BASE REPAIR, CRAC SEAL, HMAC OVERLAYSmith · Tyler | 5 of 5 | $1,838,939 | $1,269,696A. L. HELMCAMP, INC. | +44.8% |
| Mar 7, 2017 | 0724-01-050 | ADD LEFT TURN LANECoryell · Waco | 3 of 4 | $5,284,854 | $4,345,841BIG CREEK CONSTRUCTION, LTD. | +21.6% |
| Mar 7, 2017 | 1237-01-032 | INCREASE SUPERELEVATIONTyler · Beaumont | 2 of 2 | $529,429 | $458,347A. L. HELMCAMP, INC. | +15.5% |
| Mar 7, 2017 | 0265-05-079 | LEVEL UP & THIN OVERLAY MIXTUREBastrop · Austin | 6 of 6 | $7,113,583 | $5,983,022HUNTER INDUSTRIES, LTD. | +18.9% |
| Mar 7, 2017 | 0909-22-173 | INCR SUPRELVMcLennan · Waco | 3 of 3 | $544,033 | $372,721BIG CREEK CONSTRUCTION, LTD. | +46.0% |
| Feb 3, 2017 | 2103-01-031 | MILL, SEAL & THIN OVERLAYWilliamson · Austin | 3 of 4 | $754,765 | $677,721AUSTIN MATERIALS, LLC | +11.4% |
| Feb 3, 2017 | 0320-03-097 | MILL, SEAL & TYPE D INLAYWilliamson · Austin | 4 of 6 | $1,149,444 | $893,754ANGEL BROTHERS HOLDINGS COR… | +28.6% |
| Feb 3, 2017 | 0251-07-025 | CONVERT 4 LN UNDIVIDED TO SUPER 2 WITH PAV SHOULDBurnet · Austin | 5 of 6 | $3,854,982 | $3,585,893ANGEL BROTHERS HOLDINGS COR… | +7.5% |
| Feb 3, 2017 | 1831-01-019 | WDN, GR, BS, SURF, ADD SHLDRSHill · Waco | 5 of 6 | $3,521,094 | $2,487,232BIG CREEK CONSTRUCTION, LTD. | +41.6% |
| Feb 3, 2017 | 2981-01-007 | BASE REPAIR,LEVEL UP,OVERLAYKaufman · Dallas | 1 of 5 | $4,016,437 | $4,016,437 | Won |
| Feb 3, 2017 | 6307-41-001 | OVERLAY ROADWAYJefferson · Beaumont | 2 of 3 | $633,729 | $624,886FORDE CONSTRUCTION COMPANY,… | +1.4% |
| Feb 2, 2017 | 0495-04-067 | TBPFC&ACP SURF,PLG,BRG JNTS,SHDR TXT,PV MKSmith · Tyler | 2 of 3 | $2,876,911 | $2,876,797CLARK CONSTRUCTION OF TEXAS… | +0.0% |
| Feb 2, 2017 | 0337-02-040 | OVERLAYWilliamson · Austin | 3 of 4 | $1,515,968 | $1,319,539LONE STAR PAVING COMPANY | +14.9% |
| Feb 2, 2017 | 0197-02-118 | MILL,CONC,REPAIR,OVERLAYDallas · Dallas | 3 of 9 | $1,643,097 | $1,511,373AUSTIN BRIDGE & ROAD SERVIC… | +8.7% |
| Feb 2, 2017 | 0113-07-065 | REPAIR AND OVERLAYHays · Austin | 7 of 7 | $2,900,089 | $2,315,707DEAN WORD COMPANY, LTD. | +25.2% |
| Feb 2, 2017 | 0205-05-048 | OVERLAYLeon · Bryan | 3 of 3 | $4,037,507 | $2,951,400BIG CREEK CONSTRUCTION, LTD. | +36.8% |
| Jan 5, 2017 | 0290-03-029 | LEVEL-UP AND SEAL COATGillespie · Austin | 4 of 6 | $2,935,616 | $2,194,473LONE STAR PAVING COMPANY | +33.8% |
| Jan 5, 2017 | 0113-13-155 | SEAL AND THIN OVERLAYTravis · Austin | 5 of 6 | $1,581,257 | $1,306,470LONE STAR PAVING COMPANY | +21.0% |
| Jan 5, 2017 | 0015-09-188 | MILL, SEAL & INLAYWilliamson · Austin | 2 of 5 | $4,653,309 | $4,091,045AUSTIN MATERIALS, LLC | +13.7% |
| Jan 5, 2017 | 0015-21-012 | MILL/SEAL/INLAYMcLennan · Waco | 3 of 3 | $808,330 | $673,249KNIFE RIVER CORPORATION - S… | +20.1% |
| Jan 5, 2017 | 1181-04-044 | MICROSURFACINGJohnson · Fort Worth | 1 of 4 | $470,738 | $470,738 | Won |
| Jan 5, 2017 | 2506-01-036 | MILL/SEAL/INLAYMcLennan · Waco | 1 of 3 | $717,979 | $717,979 | Won |
| Jan 5, 2017 | 0113-08-083 | REPAIR AND OVERLAYTravis · Austin | 3 of 6 | $397,915 | $352,287CLARK CONSTRUCTION OF TEXAS… | +13.0% |
| Jan 5, 2017 | 6301-96-001 | FLEXIBLE PAVEMENT REPAIRSHardin · Beaumont | 3 of 8 | $1,362,469 | $1,166,410CORNERSTONE PAVING AND CONS… | +16.8% |
| Jan 5, 2017 | 6302-17-001 | MILL & INLAY/OVERLAYJefferson · Beaumont | 1 of 1 | $2,081,958 | $2,081,958 | Won |
| Jan 5, 2017 | 6308-39-001 | FULL DEPTH CONCRETE PAVEMENT REPAIRHardin · Beaumont | 3 of 7 | $384,575 | $344,550ISI CONTRACTING, INC. | +11.6% |
| Jan 5, 2017 | 6310-16-001 | MILL & INLAY/OVERLAYNewton · Beaumont | 2 of 2 | $1,000,900 | $970,890A. L. HELMCAMP, INC. | +3.1% |
| Jan 4, 2017 | 0080-04-096 | THIN OVERLAY MIXTURE (TOM)Hood · Fort Worth | 2 of 3 | $3,222,086 | $3,213,559NORTHEASTERN PAVERS, INC. | +0.3% |
| Jan 4, 2017 | 0306-03-126 | MILL AND OVERLAY EXISTING ROADWAYJefferson · Beaumont | 2 of 2 | $9,499,028 | $8,246,675ANGEL BROTHERS HOLDINGS COR… | +15.2% |
| Jan 4, 2017 | 1539-03-001 | REPAIR AND OVERLAYHays · Austin | 7 of 7 | $1,499,774 | $1,037,968LONE STAR PAVING COMPANY | +44.5% |
| Jan 4, 2017 | 0008-13-233 | GR, BS, ASPHALT PAV, PAV MK, SIGNTarrant · Fort Worth | 5 of 6 | $1,405,067 | $1,173,740RAGLE CONSTRUCTION, INC. | +19.7% |
| Jan 4, 2017 | 6307-43-001 | MILL AND INLAYMilam · Bryan | 5 of 5 | $1,564,147 | $1,068,368KNIFE RIVER CORPORATION - S… | +46.4% |
| Dec 1, 2016 | 0920-39-023 | CONSTRUCTION OF SIDEWALKSChambers · Beaumont | 8 of 8 | $1,315,190 | $964,954DEZTEX INDUSTRIAL SERVICES,… | +36.3% |
| Dec 1, 2016 | 3534-01-011 | MILL/SEAL/INLYBell · Waco | 1 of 5 | $3,489,226 | $3,489,226 | Won |
| Dec 1, 2016 | 0056-03-061 | MILL/SEAL/INLAYLimestone · Waco | 3 of 4 | $1,261,100 | $1,218,683BIG CREEK CONSTRUCTION, LTD. | +3.5% |
| Dec 1, 2016 | 0675-01-066 | REHABILITATE EXISTING ROADFreestone · Bryan | 4 of 4 | $3,391,868 | $2,450,488BIG CREEK CONSTRUCTION, LTD. | +38.4% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.