119BidsSep 10, 2013 to Oct 3, 2018
24Wins (low bidder)
20.2%Win rate
$20,198,664Total won
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Oct 3, 2018 | 6335-42-001 | BRIDGE PREVENTATIVE MAINTENANCECooke · Wichita Falls | 1 of 9 | $661,892 | $661,892 | Won |
| Oct 2, 2018 | 0586-01-067 | REMOVE AND REPLACE EXISTING DRAINAGE STRUCTUREBrazoria · Houston | 7 of 7 | $739,708 | $433,601EARTH BUILDERS, L.P. | +70.6% |
| Oct 2, 2018 | 6329-68-001 | CULVERT REPAIRClay · Wichita Falls | 8 of 8 | $891,894 | $579,763COPPELL CONSTRUCTION CO., I… | +53.8% |
| Sep 26, 2018 | 6327-79-001 | DISASTER RELIEF MAINTENANCESabine · Lufkin | 1 of 3 | $187,075 | $187,075 | Won |
| Sep 26, 2018 | 6330-12-001 | DISASTER RELIEF MAINTENANCEPolk · Lufkin | 1 of 3 | $58,124 | $58,124 | Won |
| Sep 20, 2018 | 6335-47-001 | CROSS DRAINAGE STRUCTURE REPAIRRains · Paris | 2 of 3 | $166,040 | $165,494HIGHWAY 19 CONSTRUCTION LLC | +0.3% |
| Sep 12, 2018 | 6327-80-001 | FHWASan Jacinto · Lufkin | 1 of 3 | $259,685 | $259,685 | Won |
| Sep 11, 2018 | 6328-76-001 | BRIDGE REPAIRBrazoria · Houston | 3 of 4 | $328,480 | $242,320TEXCON GENERAL CONTRACTORS | +35.6% |
| Sep 7, 2018 | 6330-81-001 | US 96 ETC., EROSION & SCOUR REPAIRJasper · Beaumont | 1 of 6 | $296,106 | $296,106 | Won |
| Sep 7, 2018 | 6327-34-001 | MISCELLANEOUS BRIDGE REPAIRSComanche · Brownwood | 2 of 7 | $571,660 | $498,038BECK-REIT & SONS, LTD. | +14.8% |
| Sep 6, 2018 | 0008-13-239 | RIPRAP SLOPE REPAIRTarrant · Fort Worth | 6 of 10 | $848,494 | $655,000ED BELL CONSTRUCTION COMPANY | +29.5% |
| Aug 22, 2018 | 6333-52-001 | BRIDGE RAIL REPAIRWichita · Wichita Falls | 3 of 6 | $142,500 | $92,400DRS CONSTRUCTION, INC. | +54.2% |
| Aug 8, 2018 | 0920-03-034 | REPLACE BRIDGEHardin · Beaumont | 4 of 4 | $1,067,017 | $586,642STATELINE CONSTRUCTION, LLC | +81.9% |
| Aug 8, 2018 | 0909-38-078 | REPL BR & APPRSFalls · Waco | 6 of 7 | $340,955 | $279,404KNIFE RIVER CORPORATION - S… | +22.0% |
| Jul 11, 2018 | 0176-03-131 | IMPROVE GUARDRAIL TO DES STANDARDSAngelina · Lufkin | 6 of 8 | $2,047,815 | $1,620,249B & E CONSTRUCTION INC | +26.4% |
| May 2, 2018 | 0893-01-034 | IMPROVE GUARDRAIL AND SAFETY TREATNacogdoches · Lufkin | 3 of 14 | $1,258,481 | $1,084,003A R BROTHERS CONSTRUCTION S… | +16.1% |
| May 2, 2018 | 0928-02-020 | IMPROVE GUARDRAIL TO DESIGN STANDPolk · Lufkin | 1 of 8 | $1,889,218 | $1,889,218 | Won |
| May 1, 2018 | 0109-06-040 | IMPROVE GUARDRAIL TO DES. STANDARDHouston · Lufkin | 3 of 7 | $965,682 | $877,760A R BROTHERS CONSTRUCTION S… | +10.0% |
| Apr 3, 2018 | 2013-01-012 | SAFETY TREAT FIXED OBJECTSBrown · Brownwood | 1 of 9 | $1,024,337 | $1,024,337 | Won |
| Apr 3, 2018 | 0675-01-070 | SAFETY TREAT FIXED OBJECTSFreestone · Bryan | 1 of 7 | $3,593,926 | $3,593,926 | Won |
| Apr 3, 2018 | 0813-01-101 | SAFETY TREAT FIXED OBJECTSLiberty · Beaumont | 1 of 8 | $539,803 | $539,803 | Won |
| Mar 22, 2018 | 6326-09-001 | BPM-ABUTMENT EROSION REPAIRGrayson · Paris | 10 of 11 | $156,880 | $95,594HARTBEAT CONSTRUCTION | +64.1% |
| Mar 7, 2018 | 0209-07-045 | SFTY TR FX OBJMcLennan · Waco | 3 of 7 | $1,178,794 | $1,033,600TTG UTILITIES, LP | +14.0% |
| Mar 7, 2018 | 0908-00-085 | BRIDGE REPAIRTaylor · Abilene | 3 of 12 | $416,795 | $258,870AW&E CONSTRUCTION LLC | +61.0% |
| Mar 7, 2018 | 6328-47-001 | BRIDGE REPAIR CALL OUTEctor · Odessa | 5 of 5 | $893,000 | $453,300SCR CIVIL CONSTRUCTION, LLC | +97.0% |
| Mar 6, 2018 | 0010-19-012 | SAFETY TREAT FIXED OBJECTSBowie · Atlanta | 6 of 11 | $1,708,445 | $1,463,551CDM HOLDINGS, LLC | +16.7% |
| Mar 6, 2018 | 0831-02-020 | SFTY TR FX OBJSLimestone · Waco | 3 of 6 | $778,181 | $698,267BEAR CREEK CONTRACTING, LLC | +11.4% |
| Feb 13, 2018 | 6326-86-001 | BRIDGE AND CULVERT REPAIRSBell · Waco | 2 of 5 | $163,730 | $162,978CROSS PLUS CONSTRUCTION, LLC | +0.5% |
| Feb 6, 2018 | 6318-12-001 | BRIDGE PREVENTIVE MAINTENANCEGregg · Tyler | 3 of 11 | $238,302 | $210,592CHAMPION INFRASTRUCTURE, LLC | +13.2% |
| Feb 6, 2018 | 6326-87-001 | BRIDGE PREVENTIVE MAINTENANCEAnderson · Tyler | 4 of 10 | $297,063 | $232,133RED BARON BUILDING COMPANY,… | +28.0% |
| Feb 6, 2018 | 6318-13-001 | BRIDGE PREVENTIVE MAINTENANCEGregg · Tyler | 3 of 12 | $177,164 | $167,860RED BARON BUILDING COMPANY,… | +5.5% |
| Feb 6, 2018 | 6318-11-001 | BRIDGE PREVENTIVE MAINTENANCEAnderson · Tyler | 1 of 9 | $129,538 | $129,538 | Won |
| Feb 2, 2018 | 0834-04-024 | SFTY TR FX OBJSMcLennan · Waco | 2 of 8 | $1,281,284 | $1,258,844CDM HOLDINGS, LLC | +1.8% |
| Feb 2, 2018 | 6324-98-001 | 2018 BPM PROJECTChildress · Childress | 5 of 10 | $823,610 | $553,766CDM HOLDINGS, LLC | +48.7% |
| Feb 1, 2018 | 6312-37-001 | MISCELLANEOUS BRIDGE REPAIRScurry · Abilene | 6 of 11 | $609,575 | $343,510SCR CIVIL CONSTRUCTION, LLC | +77.5% |
| Feb 1, 2018 | 6324-94-001 | MISCELLANEOUS CONCRETE REPAIRSMcLennan · Waco | 3 of 6 | $795,091 | $648,174DBI SERVICES, LLC | +22.7% |
| Feb 1, 2018 | 6299-32-001 | BRIDGE PREVENTIVE MAINTENANCEBowie · Atlanta | 5 of 10 | $1,084,167 | $853,995CDM HOLDINGS, LLC | +27.0% |
| Jan 24, 2018 | 6322-97-001 | CULVERT CLEANING AND REPLACEMENTTrinity · Lufkin | 1 of 2 | $134,140 | $134,140 | Won |
| Jan 10, 2018 | 6324-32-001 | BRIDGE AND SCOUR REPAIRSAngelina · Lufkin | 1 of 2 | $219,453 | $219,453 | Won |
| Jan 9, 2018 | 6325-86-001 | BRIDGE PREVENTIVE MAINTENANCEWilliamson · Austin | 4 of 6 | $198,100 | $169,160RESTEK, INC. | +17.1% |
| Dec 18, 2017 | 6319-00-001 | REHABILITAION OF VARIOUS BRIDGE FACILITIDimmit · Laredo | 1 of 1 | $222,330 | $222,330 | Won |
| Dec 18, 2017 | 6318-91-001 | REHABILITATION OF VARIOUS BRIDGE FACILITMaverick · Laredo | 2 of 2 | $531,115 | $385,594DELGADO'S CONTRACTORS, LLC | +37.7% |
| Dec 5, 2017 | 0043-05-107 | DECK AND CONCRETE STRUCTURE REPAIRWilbarger · Wichita Falls | 8 of 8 | $2,775,363 | $1,842,668GIBSON & ASSOCIATES, INC. | +50.6% |
| Dec 5, 2017 | 0055-06-033 | BRIDGE MAINTENANCECoryell · Waco | 12 of 12 | $576,196 | $277,779ELLIS-MCGINNIS CONSTRUCTION… | +107.4% |
| Dec 5, 2017 | 1202-03-014 | UPGRADE MBGF AND SAFETY TREAT FIXED OBJECTSWilliamson · Austin | 4 of 9 | $1,438,267 | $1,248,579RELMCO, INC. | +15.2% |
| Dec 5, 2017 | 0118-08-074 | IMPROVE GUARDRAIL AND SAFETY TREATNacogdoches · Lufkin | 7 of 9 | $1,777,048 | $1,578,551A R BROTHERS CONSTRUCTION S… | +12.6% |
| Nov 14, 2017 | 6318-51-001 | BRIDGE REPAIRSCaldwell · Austin | 9 of 9 | $455,750 | $251,000MAIN LANE INDUSTRIES LTD. | +81.6% |
| Nov 8, 2017 | 6315-32-001 | RIPRAP/SPALL REPAIRJasper · Beaumont | 4 of 8 | $236,106 | $193,184DEZTEX INDUSTRIAL SERVICES,… | +22.2% |
| Nov 3, 2017 | 0231-04-056 | SAFETY TREAT FIXED OBJECTSBell · Waco | 3 of 9 | $1,136,158 | $1,063,872BEAR CREEK CONTRACTING, LLC | +6.8% |
| Nov 3, 2017 | 6320-20-001 | EROSION/DRAINAGE REPAIRWichita · Wichita Falls | 3 of 9 | $654,197 | $578,952STATELINE CONSTRUCTION, LLC | +13.0% |
| Nov 2, 2017 | 0257-01-047 | DRAINAGE IMPROVEMENTSStephens · Brownwood | 3 of 12 | $246,600 | $223,074REECE CONSTRUCTION CO., INC. | +10.5% |
| Nov 2, 2017 | 0114-07-080 | BRIDGE REHABLee · Austin | 3 of 9 | $975,862 | $844,010DAN WILLIAMS COMPANY | +15.6% |
| Nov 2, 2017 | 6323-05-001 | BRIDGE PREVENTATIVE MAINTENANCECoryell · Waco | 3 of 4 | $413,600 | $318,825BECK-REIT & SONS, LTD. | +29.7% |
| Oct 11, 2017 | 6309-30-001 | DITCH AND CULVERT CLEANINGAngelina · Lufkin | 2 of 2 | $289,580 | $170,302TEXAS DRAINAGE INC. | +70.0% |
| Oct 4, 2017 | 0064-01-067 | IMPROVE GUARDRAIL AND SAFETY TREATShelby · Lufkin | 4 of 10 | $1,292,700 | $1,118,356A R BROTHERS CONSTRUCTION S… | +15.6% |
| Oct 4, 2017 | 1096-01-061 | SAFETY TREAT FIXED OBJECTSHardin · Beaumont | 2 of 5 | $253,415 | $228,356NORMAN HIGHWAY CONSTRUCTORS… | +11.0% |
| Oct 4, 2017 | 0150-02-039 | BRIDGE REHAB & EROSION REPAIRLlano · Austin | 5 of 6 | $1,203,893 | $890,245RESTEK, INC. | +35.2% |
| Oct 3, 2017 | 6298-16-001 | CULVERT REPAIRVan Zandt · Tyler | 3 of 9 | $480,910 | $430,297RED BARON BUILDING COMPANY,… | +11.8% |
| Oct 3, 2017 | 0923-22-021 | REPLACE BRIDGE AND APPROACHESStephens · Brownwood | 10 of 10 | $991,791 | $676,267HODGES AND SON CONSTRUCTION… | +46.7% |
| Sep 7, 2017 | 0035-04-035 | SAFETY TREAT FIXED OBJECTSConcho · San Angelo | 1 of 5 | $1,472,270 | $1,472,270 | Won |
| Aug 16, 2017 | 6320-23-001 | DRAINAGE STRUCTURE MAINTENANCEUpshur · Atlanta | 6 of 7 | $161,477 | $99,921CDM HOLDINGS, LLC | +61.6% |
| Aug 15, 2017 | 6319-87-001 | REP MOD EXP JTS, REP SPALLS, INS CONC RRGillespie · Austin | 3 of 5 | $161,463 | $138,3953LW CIVIL LLC | +16.7% |
| Aug 15, 2017 | 6318-66-001 | REMOVE AND REPLACE CROSS DRAINAGEFreestone · Bryan | 6 of 7 | $387,752 | $233,742BECK-REIT & SONS, LTD. | +65.9% |
| Aug 9, 2017 | 0420-01-040 | SAFETY TREAT FIXED OBJECTSJackson · Yoakum | 5 of 5 | $1,154,938 | $864,757CHAMPION INFRASTRUCTURE, LLC | +33.6% |
| Aug 9, 2017 | 0905-06-110 | BEAM REPAIRLubbock · Lubbock | 4 of 4 | $333,600 | $93,214DRS CONSTRUCTION, INC. | +257.9% |
| Aug 9, 2017 | 6319-59-001 | MISCELLANEOUS BRIDGE REPAIRBrown · Brownwood | 6 of 6 | $774,520 | $564,232FNH CONSTRUCTION, LLC | +37.3% |
| Aug 9, 2017 | 6310-01-001 | REHABILITATION OF EXISTING CULVERTSEllis · Dallas | 1 of 2 | $244,090 | $244,090 | Won |
| Aug 8, 2017 | 0937-03-016 | SAFETY TREAT FIXED OBJECTSHouston · Lufkin | 1 of 5 | $1,576,406 | $1,576,406 | Won |
| Aug 8, 2017 | 0141-20-009 | BRIDGE MAINTENANCEKimble · San Angelo | 4 of 6 | $1,561,753 | $1,146,309ALLEN KELLER COMPANY | +36.2% |
| Aug 8, 2017 | 0005-06-117 | BRIDGE REHABHoward · Abilene | 2 of 9 | $1,444,315 | $1,316,919STRUCTURAL TECHNOLOGIES, LLC | +9.7% |
| Aug 8, 2017 | 0920-30-079 | REPLACE BRIDGE AND APPROACHESOrange · Beaumont | 7 of 7 | $486,880 | $316,837WIDGEON CONSTRUCTION, INC. | +53.7% |
| Jul 13, 2017 | 6314-72-001 | REPAIR BRIDGE RAILCrockett · San Angelo | 2 of 3 | $169,270 | $161,660SCR CIVIL CONSTRUCTION, LLC | +4.7% |
| Jul 13, 2017 | 6305-76-001 | CULVERT REPAIRCherokee · Tyler | 5 of 8 | $85,951 | $60,270HIGHWAY 19 CONSTRUCTION LLC | +42.6% |
| Jul 12, 2017 | 0911-39-038 | BRIDGE REPLACEMENTShelby · Lufkin | 5 of 8 | $734,141 | $619,834DREWERY CONSTRUCTION COMPAN… | +18.4% |
| Jul 12, 2017 | 0396-02-026 | UPGRADE MBGF, SAFETY TREAT, PROFILE MARKERSMason · Austin | 1 of 6 | $1,204,214 | $1,204,214 | Won |
| Jul 11, 2017 | 0914-26-007 | REPLACE BRIDGE AND APPROACHESMason · Austin | 5 of 5 | $381,270 | $264,228ALLEN KELLER COMPANY | +44.3% |
| Jul 11, 2017 | 0011-07-051 | REHAB BRIDGEStephens · Brownwood | 3 of 4 | $4,241,830 | $3,484,145GIBSON & ASSOCIATES, INC. | +21.7% |
| Jul 11, 2017 | 0240-03-036 | SAFETY TREAT FIXED OBJECTSWharton · Yoakum | 4 of 8 | $2,382,146 | $1,947,826SB CONTRACTORS LLC | +22.3% |
| Jul 11, 2017 | 6312-67-001 | BEAM REPAIRVictoria · Yoakum | 7 of 7 | $458,500 | $268,722DRS CONSTRUCTION, INC. | +70.6% |
| Jun 7, 2017 | 0917-17-065 | REPLACE EXISTING BRIDGEGrimes · Bryan | 8 of 8 | $2,329,971 | $905,681TREVWAY, INC. | +157.3% |
| Jun 7, 2017 | 0920-06-033 | REPLACE BRIDGE AND APPROACHESNewton · Beaumont | 2 of 4 | $837,239 | $646,004OLDCASTLE MATERIALS TEXAS, … | +29.6% |
| Jun 7, 2017 | 6313-96-001 | BRIDGE AND CONCRETE WORK (WILL-CALL)Brown · Brownwood | 1 of 3 | $711,915 | $711,915 | Won |
| Jun 6, 2017 | 0010-11-069 | CONCRETE STRUCTURE REPAIRBowie · Atlanta | 3 of 10 | $1,626,743 | $1,398,422STATELINE CONSTRUCTION, LLC | +16.3% |
| Jun 6, 2017 | 0006-06-103 | REHAB EXISTING BRIDGETaylor · Abilene | 4 of 5 | $3,466,367 | $2,981,257JAY-REESE CONTRACTORS, INC. | +16.3% |
| May 9, 2017 | 6311-25-001 | REPAIR OF CORRODED STEEL PILESRobertson · Bryan | 4 of 5 | $283,900 | $226,520PBX BRIDGE COMPANY | +25.3% |
| May 9, 2017 | 6311-27-001 | RIP RAP FOR SCOUR REPAIRLeon · Bryan | 9 of 10 | $88,680 | $56,555TEXCAVATION COMPANY LLC. | +56.8% |
| Apr 20, 2017 | 6312-42-001 | EROSION REPAIRFannin · Paris | 6 of 7 | $228,390 | $168,515HARTBEAT CONSTRUCTION | +35.5% |
| Apr 20, 2017 | 6315-37-001 | BRIDGE RAIL REPAIRHunt · Paris | 3 of 4 | $211,225 | $190,925SJ&J CONSTRUCTION, LLC | +10.6% |
| Apr 19, 2017 | 6307-60-001 | DRAINAGE REPAIRSabine · Lufkin | 1 of 4 | $149,008 | $149,008 | Won |
| Apr 5, 2017 | 6314-29-001 | CULVERT REPAIRFannin · Paris | 5 of 8 | $818,845 | $620,554SAMMY GIST ENTERPRISES, INC. | +32.0% |
| Apr 4, 2017 | 0911-28-033 | REPLACE BRIDGE AND APPROACHESHouston · Lufkin | 9 of 9 | $1,231,399 | $619,444HODGES AND SON CONSTRUCTION… | +98.8% |
| Apr 4, 2017 | 6311-78-001 | CROSS DRAINAGE STRUCTURE REPAIRRed River · Paris | 5 of 9 | $608,045 | $478,008CDM HOLDINGS, LLC | +27.2% |
| Apr 4, 2017 | 6312-46-001 | BRIDGE PREVENTIVE MAINTENANCEMcLennan · Waco | 6 of 7 | $476,902 | $322,993BECK-REIT & SONS, LTD. | +47.7% |
| Mar 14, 2017 | 6311-28-001 | BRIDGE JOINT REPAIRWalker · Bryan | 7 of 7 | $183,511 | $91,577FUQUA CONSTRUCTION CO., INC. | +100.4% |
| Mar 8, 2017 | 0923-06-075 | CNSTR BIKE/ PED PATHBrown · Brownwood | 5 of 8 | $504,913 | $427,890MHB CONSTRUCTION, INC. | +18.0% |
| Mar 8, 2017 | 6312-12-001 | MISC. BRIDGE REPAIRSCarson · Amarillo | 3 of 9 | $524,533 | $430,115GILVIN-TERRILL, LTD. | +22.0% |
| Mar 7, 2017 | 6309-85-001 | MISC BRIDGE REPIARLampasas · Brownwood | 1 of 5 | $520,475 | $520,475 | Won |
| Feb 3, 2017 | 1109-01-023 | SAFETY TREAT FIXED OBJECTSJasper · Beaumont | 2 of 9 | $506,095 | $368,813NORMAN HIGHWAY CONSTRUCTORS… | +37.2% |
| Feb 3, 2017 | 2553-01-117 | IMPROVE GUARDRAIL TO DESIGN STANDARDS, ETC.Angelina · Lufkin | 2 of 4 | $2,054,353 | $1,891,195SJ&J CONSTRUCTION, LLC | +8.6% |
| Feb 3, 2017 | 6307-23-001 | MISCELLANEOUS BRIDGE REPAIRSHoward · Abilene | 7 of 9 | $590,475 | $264,432AW&E CONSTRUCTION LLC | +123.3% |
| Feb 3, 2017 | 6311-96-001 | BRIDGE AND SCOUR REPAIRSAngelina · Lufkin | 3 of 9 | $407,756 | $286,936CHAMPION INFRASTRUCTURE, LLC | +42.1% |
| Feb 2, 2017 | 6304-13-001 | BRIDGE PROTECTIVE MAINTENANCECamp · Atlanta | 8 of 8 | $993,006 | $743,841STATELINE CONSTRUCTION, LLC | +33.5% |
| Jan 5, 2017 | 1681-01-012 | SAFETY TREAT FIXED OBJECTSSan Jacinto · Lufkin | 1 of 3 | $1,585,480 | $1,585,480 | Won |
| Jan 5, 2017 | 0905-00-091 | REPAIR SETSLubbock · Lubbock | 4 of 5 | $582,350 | $431,448GILVIN-TERRILL, LTD. | +35.0% |
| Jan 4, 2017 | 0634-01-012 | SAFETY TREAT FIXED OBJECTSCherokee · Tyler | 3 of 11 | $1,207,938 | $1,037,127HIGHWAY 19 CONSTRUCTION LLC | +16.5% |
| Jan 4, 2017 | 0118-01-019 | SAFETY TREAT FIXED OBJECTSHouston · Lufkin | 1 of 6 | $2,981,767 | $2,981,767 | Won |
| Nov 3, 2016 | 6307-84-001 | EMERGENCY BRIDGE REPAIREctor · Odessa | 4 of 5 | $750,150 | $412,850SCR CIVIL CONSTRUCTION, LLC | +81.7% |
| Nov 3, 2016 | 6305-47-001 | SLOPE REPAIRBrazos · Bryan | 6 of 10 | $1,421,318 | $1,149,333ANGEL BROTHERS HOLDINGS COR… | +23.7% |
| Nov 3, 2016 | 6263-97-001 | CULVERT EXTENSION & CROSS DRAINAGEKaufman · Dallas | 6 of 8 | $359,571 | $258,874BECK-REIT & SONS, LTD. | +38.9% |
| Sep 6, 2016 | 6305-75-001 | REPAIR OF RETAINING WALLVan Zandt · Tyler | 4 of 5 | $169,280 | $65,000RED BARON BUILDING COMPANY,… | +160.4% |
| Nov 14, 2013 | 6261-59-001 | EROSION AND SCOUR REPAIRSPolk · Lufkin | 3 of 3 | $392,250 | $296,665EASTER CONSTRUCTION INC. | +32.2% |
| Nov 13, 2013 | 6259-42-001 | REPLACE WINGWALLS & REPAIR SPALLINGRockwall · Dallas | 2 of 3 | $222,500 | $130,385EASTER CONSTRUCTION INC. | +70.6% |
| Nov 13, 2013 | 6260-33-001 | BRIDGE EROSION REPAIRNavarro · Dallas | 3 of 5 | $103,230 | $83,210EASTER CONSTRUCTION INC. | +24.1% |
| Nov 5, 2013 | 0079-05-052 | EROSION CONTROLErath · Fort Worth | 4 of 13 | $105,995 | $87,935MANN ROBINSON & SON, INC. | +20.5% |
| Nov 5, 2013 | 6260-02-001 | VARIOUS CULVERT REPAIRSCollin · Dallas | 4 of 7 | $516,102 | $445,075AUSTIN FILTER SYSTEMS, INC. | +16.0% |
| Oct 16, 2013 | 6259-27-001 | MISC. BRIDGE REPAIRSPotter · Amarillo | 1 of 6 | $301,429 | $301,429 | Won |
| Oct 16, 2013 | 6260-25-001 | EROSION CONTROL (GABION MATTRESS)Dallas · Dallas | 1 of 5 | $235,985 | $235,985 | Won |
| Oct 8, 2013 | 0917-20-011 | REPLACE BRIDGE AND APPROACHESFreestone · Bryan | 9 of 9 | $625,098 | $448,407KNIFE RIVER CORPORATION - S… | +39.4% |
| Sep 10, 2013 | 6231-73-001 | DRAINAGE STRUCTURES AND EMBANKMENTSWise · Fort Worth | 6 of 6 | $642,613 | $428,558DCI CONTRACTING, INC. | +49.9% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.