| 1 | 100-6002 |
PREPARING ROW | 5.5 | STA |
$5,000.00 |
$2,500.00 |
$8,800.00 |
$14,000.00 |
|
| 2 | 100-6012 |
PREP ROW (TREE) (18"-36" DIA.) | 8 | EA |
$3,000.00 |
$475.00 |
$700.00 |
$2,000.00 |
|
| 3 | 106-6002 |
OBLITERATING ABANDONED ROAD | 327 | SY |
$3.00 |
$15.00 |
$24.00 |
$10.00 |
|
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 123 | CY |
$20.00 |
$15.00 |
$25.00 |
$20.00 |
|
| 5 | 132-6001 |
EMBANKMENT (FINAL)(ORD COMP)(TY A) | 926 | CY |
$40.00 |
$17.00 |
$28.00 |
$30.00 |
|
| 6 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 2,120 | SY |
$3.00 |
$4.00 |
$4.50 |
$4.00 |
|
| 7 | 164-6015 |
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY) | 2,120 | SY |
$0.5000 |
$0.5000 |
$0.5000 |
$0.6000 |
|
| 8 | 164-6041 |
DRILL SEEDING (TEMP) (WARM) | 1,060 | SY |
$0.3000 |
$0.5000 |
$0.5000 |
$0.5000 |
|
| 9 | 164-6043 |
DRILL SEEDING (TEMP) (COOL) | 1,060 | SY |
$0.3000 |
$0.5000 |
$0.5000 |
$0.5000 |
|
| 10 | 168-6001 |
VEGETATIVE WATERING | 72 | MG |
$25.00 |
$10.00 |
$29.00 |
$50.00 |
|
| 11 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 2,120 | SY |
$1.50 |
$1.25 |
$0.8500 |
$1.00 |
|
| 12 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 277 | CY |
$100.00 |
$86.00 |
$118.00 |
$115.00 |
|
| 13 | 310-6012 |
PRIME COAT (RC-250) | 199 | GAL |
$5.00 |
$7.00 |
$9.50 |
$25.00 |
|
| 14 | 316-6016 |
ASPH (AC-20XP) | 738 | GAL |
$5.00 |
$8.00 |
$6.75 |
$12.00 |
|
| 15 | 316-6126 |
AGGR(TY-PB GR-4 SAC-A) | 20 | CY |
$120.00 |
$700.00 |
$575.00 |
$425.00 |
|
| 16 | 400-6005 |
CEM STABIL BKFL | 82.5 | CY |
$150.00 |
$260.00 |
$90.00 |
$200.00 |
|
| 17 | 409-6002 |
PRESTR CONC PIL (18 IN SQ) | 480 | LF |
$130.00 |
$116.00 |
$105.00 |
$150.00 |
|
| 18 | 420-6013 |
CL C CONC (ABUT) | 29.4 | CY |
$1,600.00 |
$990.00 |
$1,485.00 |
$1,400.00 |
|
| 19 | 422-6005 |
REINF CONC SLAB (BOX BEAM) | 1,832 | SF |
$25.00 |
$18.10 |
$33.00 |
$20.00 |
|
| 20 | 422-6015 |
APPROACH SLAB | 37.2 | CY |
$800.00 |
$675.00 |
$450.00 |
$580.00 |
|
| 21 | 422-6023 |
SHEAR KEY | 18.7 | CY |
$300.00 |
$245.00 |
$375.00 |
$425.00 |
|
| 22 | 425-6002 |
PRESTR CONC BOX BEAM (5B20) | 139 | LF |
$200.00 |
$211.00 |
$203.00 |
$355.00 |
|
| 23 | 425-6003 |
PRESTR CONC BOX BEAM (4B28) | 278 | LF |
$200.00 |
$192.00 |
$203.00 |
$355.00 |
|
| 24 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 182 | CY |
$150.00 |
$135.00 |
$180.00 |
$240.00 |
|
| 25 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 19 | CY |
$500.00 |
$435.00 |
$610.00 |
$550.00 |
|
| 26 | 450-6006 |
RAIL (TY T223) | 180 | LF |
$160.00 |
$105.00 |
$160.00 |
$125.00 |
|
| 27 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$20,000.00 |
$12,000.00 |
$38,000.00 |
$25,000.00 |
|
| 28 | 500-6001 |
MOBILIZATION | 1 | LS |
$80,000.00 |
$58,000.00 |
$43,300.00 |
$75,000.00 |
|
| 29 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$6,000.00 |
$3,000.00 |
$1,500.00 |
$1,200.00 |
|
| 30 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 312 | SY |
$35.00 |
$25.00 |
$24.00 |
$24.00 |
|
| 31 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 312 | SY |
$10.00 |
$9.00 |
$7.25 |
$7.00 |
|
| 32 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,084 | LF |
$12.00 |
$6.00 |
$5.20 |
$5.50 |
|
| 33 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,084 | LF |
$1.50 |
$2.00 |
$1.05 |
$1.10 |
|
| 34 | 508-6001 |
CONSTRUCTING DETOURS | 374 | SY |
$55.00 |
$121.00 |
$88.00 |
$65.00 |
|
| 35 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 175 | LF |
$25.00 |
$22.00 |
$26.00 |
$27.50 |
|
| 36 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 4 | EA |
$1,200.00 |
$1,500.00 |
$925.00 |
$995.50 |
|
| 37 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$1,200.00 |
$1,200.00 |
$1,025.00 |
$1,089.00 |
|
| 38 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$2,300.00 |
$2,500.00 |
$2,300.00 |
$2,475.00 |
|
| 39 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 13 | EA |
$500.00 |
$450.00 |
$570.00 |
$429.00 |
|
| 40 | 644-6076 |
REMOVE SM RD SN SUP&AM | 3 | EA |
$150.00 |
$200.00 |
$86.00 |
$93.50 |
|
| 41 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$30.00 |
$25.00 |
$26.00 |
$16.50 |
|
| 42 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 10 | EA |
$30.00 |
$45.00 |
$31.00 |
$30.25 |
|
| 43 | 1004-6001 |
TREE PROTECTION | 6 | EA |
$400.00 |
$475.00 |
$430.00 |
$270.00 |
|