Contact information
- Phone
- (512) 440-1717
- Address
- 2967 BUSINESS PARK DR, BUDA, TX 78610
- TxDOT prequalification
- Construction qualified
155BidsOct 8, 2013 to Aug 6, 2026
17Wins (low bidder)
11.0%Win rate
$143,798,620Total won
Competitor scorecard
Last 5 years in Texas5.4%Win rate2 of 37 bids
+11.1%Average bid vs estimate
-11.4%Winning bids vs estimate
+14.1%Over the low bid when they loseAverage field: 5.7 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| DAN WILLIAMS COMPANY | 14 | 4 | 10 | 29% |
| HUNTER INDUSTRIES, LTD. | 12 | 6 | 6 | 50% |
| J3 COMPANY, LLC | 10 | 4 | 6 | 40% |
| ACME BRIDGE COMPANY, INC. | 10 | 5 | 5 | 50% |
| JORDAN FOSTER CONSTRUCTION, LLC | 8 | 4 | 4 | 50% |
| RELMCO, INC. | 7 | 1 | 6 | 14% |
| E-Z BEL CONSTRUCTION, LLC | 7 | 5 | 2 | 71% |
| TEXAS MATERIALS GROUP, INC. | 7 | 3 | 4 | 43% |
| HARPER BROTHERS CONSTRUCTION LLC | 7 | 5 | 2 | 71% |
| AUSTIN ENGINEERING CO., INC. | 5 | 4 | 1 | 80% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Aug 6, 2026 | 0535-02-050 | IH 10: 0535-02-050; BRGuadalupe · San Antonio | 4 of 8 | $6,596,524 | $5,753,739HUNTER INDUSTRIES, LTD. | +14.6% |
| Jul 1, 2026 | 0016-05-128 | SAT_IH0035Comal · San Antonio | 2 of 7 | $13,440,747 | $12,034,296J3 COMPANY, LLC | +11.7% |
| May 6, 2026 | 0073-08-183 | IH 37: 0073-08-183; FOIBexar · San Antonio | 3 of 5 | $34,315,676 | $33,122,615HUNTER INDUSTRIES, LTD. | +3.6% |
| May 6, 2026 | 0151-02-026 | SH 29 from RM 1174 to WILLIAMSON CO LINEBurnet · Austin | 6 of 8 | $12,858,021 | $10,910,072TEXAS MATERIALS GROUP, INC. | +17.9% |
| Aug 2, 2024 | 0015-07-087 | INFRASTRUCTURE IMPROVEMENTSBell · Waco | 5 of 6 | $13,798,156 | $12,103,561TEXAS MATERIALS GROUP, INC. | +14.0% |
| Aug 2, 2024 | 2452-04-017 | WIDEN ROAD - ADD LANESBexar · San Antonio | 3 of 8 | $16,429,016 | $16,250,383STERLING DELAWARE HOLDING C… | +1.1% |
| Jun 6, 2024 | 0915-00-270 | BRIDGE MAINTENANCEBexar · San Antonio | 4 of 5 | $13,738,067 | $9,168,264RELMCO, INC. | +49.8% |
| Jun 5, 2024 | 0915-12-695 | HAZARD ELIMINATION & SAFETYBexar · San Antonio | 2 of 3 | $3,144,394 | $2,683,102ELECNOR BELCO ELECTRIC, INC. | +17.2% |
| May 2, 2024 | 1308-01-025 | REPLACE BRIDGE AND APPROACHESBell · Waco | 2 of 6 | $5,185,346 | $5,183,802C. E. BARKER, LTD. | +0.0% |
| Apr 5, 2024 | 1728-02-065 | BICYCLE AND PEDESTRIAN IMPROVEMENTSComal · San Antonio | 2 of 6 | $7,932,389 | $7,171,216ENCINO LANDSCAPE, INC. | +10.6% |
| Apr 5, 2024 | 1133-02-030 | SURFACING/ROADWAY RESTORATIONGonzales · Yoakum | 7 of 11 | $5,412,733 | $4,879,726BIG CREEK CONSTRUCTION, LTD. | +10.9% |
| Mar 5, 2024 | 0805-04-033 | HAZARD ELIMINATION & SAFETYHays · Austin | 5 of 8 | $5,604,770 | $5,105,188LONE STAR SITEWORK, LLC | +9.8% |
| Mar 5, 2024 | 0024-07-069 | HAZARD ELIMINATION & SAFETYBexar · San Antonio | 3 of 6 | $8,214,804 | $6,869,482J3 COMPANY, LLC | +19.6% |
| Feb 2, 2024 | 3212-05-013 | BRIDGE REPLACEMENTComal · San Antonio | 4 of 9 | $14,230,378 | $12,558,078DAN WILLIAMS COMPANY | +13.3% |
| Nov 2, 2023 | 0521-06-153 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TBexar · San Antonio | 3 of 3 | $9,148,652 | $8,150,777J3 COMPANY, LLC | +12.2% |
| Oct 5, 2023 | 3136-01-200 | DRAINAGE IMPROVEMENTSTravis · Austin | 3 of 5 | $6,407,743 | $4,337,215AUSTIN UNDERGROUND INCORPOR… | +47.7% |
| Sep 7, 2023 | 1200-04-016 | BRIDGE REPLACEMENTWilliamson · Austin | 3 of 4 | $6,563,207 | $5,546,235JOE BLAND CONSTRUCTION, L.P. | +18.3% |
| Aug 3, 2023 | 0535-06-049 | CONSTRUCT REST AREAFayette · Yoakum | 2 of 4 | $9,962,549 | $9,282,087HUNTER INDUSTRIES, LTD. | +7.3% |
| Aug 2, 2023 | 0914-18-120 | CONSTRUCT PEDESTRIAN INFRASTRUCTUREBastrop · Austin | 6 of 7 | $5,198,188 | $4,210,9823LW CIVIL LLC | +23.4% |
| Jun 28, 2023 | 0715-01-025 | BRIDGE REPLACEMENTGonzales · Yoakum | 2 of 2 | $6,940,513 | $6,351,465E-Z BEL CONSTRUCTION, LLC | +9.3% |
| Jun 28, 2023 | 0915-00-264 | WIDEN ROAD - ADD SHOULDERSBexar · San Antonio | 1 of 4 | $2,147,580 | $2,147,580 | Won |
| Jun 27, 2023 | 0914-05-204 | CONSTRUCT NEW ROADWilliamson · Austin | 2 of 4 | $2,675,623 | $2,578,219RELMCO, INC. | +3.8% |
| Jun 27, 2023 | 3277-01-025 | WIDEN ROAD - ADD LANESTravis · Austin | 3 of 4 | $2,688,863 | $2,361,951LONE STAR SITEWORK, LLC | +13.8% |
| May 4, 2023 | 1433-02-044 | WIDEN ROAD - ADD LANESComal · San Antonio | 2 of 6 | $48,807,137 | $48,503,887HARPER BROTHERS CONSTRUCTIO… | +0.6% |
| May 4, 2023 | 0291-06-053 | WIDEN ROAD - ADD LANESBandera · San Antonio | 4 of 5 | $16,195,149 | $14,840,092STERLING DELAWARE HOLDING C… | +9.1% |
| Apr 5, 2023 | 0026-03-046 | BRIDGE REPLACEMENTFayette · Yoakum | 2 of 5 | $7,881,129 | $7,055,348ACME BRIDGE COMPANY, INC. | +11.7% |
| Apr 5, 2023 | 0914-18-107 | BRIDGE MAINTENANCEBastrop · Austin | 3 of 4 | $1,577,697 | $1,478,746RELMCO, INC. | +6.7% |
| Feb 2, 2023 | 0320-02-039 | BRIDGE REPLACEMENTBell · Waco | 3 of 5 | $13,171,747 | $11,989,344JAMES CONSTRUCTION GROUP, L… | +9.9% |
| Feb 2, 2023 | 2690-01-038 | ADDING SHOULDERS WITH NO ADDED CAPACITYWilliamson · Austin | 3 of 7 | $4,509,644 | $4,469,902JORDAN FOSTER CONSTRUCTION,… | +0.9% |
| Feb 2, 2023 | 1060-01-012 | BRIDGE REPLACEMENTCaldwell · Austin | 2 of 8 | $2,470,850 | $2,089,053CROSS PLUS CONSTRUCTION, LLC | +18.3% |
| Sep 7, 2022 | 1741-02-036 | REHABILITATE EXISTING ROADWAYBexar · San Antonio | 1 of 8 | $7,692,727 | $7,692,727 | Won |
| Aug 4, 2022 | 0987-03-014 | WIDEN ROAD - ADD LANES AND SHOULDERSHays · Austin | 5 of 8 | $3,648,143 | $3,199,567JOE BLAND CONSTRUCTION, L.P. | +14.0% |
| Aug 4, 2022 | 1186-02-025 | WIDEN ROAD - ADD SHOULDERSBastrop · Austin | 5 of 5 | $3,074,141 | $2,496,797DAN WILLIAMS COMPANY | +23.1% |
| Aug 4, 2022 | 6384-75-001 | BRIDGE REPAIRTravis · Austin | 6 of 6 | $986,759 | $668,791BUILT RIGHT CONSTRUCTION OF… | +47.5% |
| Mar 3, 2022 | 6378-07-001 | REPAIR OF AN MSE RETAINING WALLTravis · Austin | 2 of 6 | $4,589,998 | $4,532,814AUSTIN BRIDGE & ROAD SERVIC… | +1.3% |
| Jan 6, 2022 | 0700-03-145 | HIGHWAY IMPROVEMENTTravis · Austin | 2 of 3 | $14,984,693 | $13,908,751HUNTER INDUSTRIES, LTD. | +7.7% |
| Dec 2, 2021 | 0849-01-055 | WIDEN ROAD - ADD LANESBexar · San Antonio | 3 of 3 | $55,556,262 | $49,119,270HARPER BROTHERS CONSTRUCTIO… | +13.1% |
| Nov 4, 2021 | 0700-01-045 | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDEBurnet · Austin | 2 of 7 | $9,225,750 | $8,763,189PRODIRT SERVICES, LLC | +5.3% |
| Sep 2, 2021 | 1186-01-091 | WIDEN ROAD - ADD LANESTravis · Austin | 2 of 6 | $9,676,247 | $8,953,610DAN WILLIAMS COMPANY | +8.1% |
| Aug 5, 2021 | 0024-07-063 | INTERSECTION IMPROVEMENTBexar · San Antonio | 2 of 11 | $2,907,080 | $2,885,971DAN WILLIAMS COMPANY | +0.7% |
| Aug 4, 2021 | 0273-04-048 | REHABILITATION OF EXISTING ROADWilliamson · Austin | 2 of 8 | $5,897,313 | $5,760,579TEXAS MATERIALS GROUP, INC. | +2.4% |
| Aug 4, 2021 | 1113-01-028 | BRIDGE REPLACEMENTDe Witt · Yoakum | 2 of 4 | $12,338,459 | $12,073,106TEXAS MATERIALS GROUP, INC. | +2.2% |
| Jul 1, 2021 | 0113-07-075 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT THays · Austin | 2 of 9 | $1,437,208 | $1,353,925RELMCO, INC. | +6.2% |
| Jun 4, 2021 | 0914-33-068 | CONSTRUCT NEW ROADHays · Austin | 3 of 10 | $18,860,514 | $17,724,256J3 COMPANY, LLC | +6.4% |
| Jun 4, 2021 | 0073-02-080 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TBexar · San Antonio | 6 of 9 | $4,782,082 | $4,316,413SALINAS CONSTRUCTION TECHNO… | +10.8% |
| Jun 3, 2021 | 2211-01-026 | CONSTRUCT BRIDGEWilliamson · Austin | 5 of 8 | $8,397,390 | $7,570,068J.D. ABRAMS, L.P. | +10.9% |
| May 6, 2021 | 0511-02-026 | BRIDGE REPLACEMENTComal · San Antonio | 4 of 11 | $1,218,309 | $1,044,625SB CONTRACTORS LLC | +16.6% |
| Apr 8, 2021 | 0408-01-043 | BRIDGE REPLACEMENTFayette · Yoakum | 3 of 9 | $5,868,320 | $5,331,594ACME BRIDGE COMPANY, INC. | +10.1% |
| Apr 7, 2021 | 0016-08-039 | BRIDGE REPLACEMENTBexar · San Antonio | 3 of 8 | $7,533,879 | $6,974,797RELMCO, INC. | +8.0% |
| Mar 5, 2021 | 1776-02-019 | CONSTRUCT NEW ROADWAY LANESHays · Austin | 4 of 12 | $6,225,408 | $5,959,526HUNTER INDUSTRIES, LTD. | +4.5% |
| Nov 5, 2020 | 0143-07-039 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 2 of 8 | $8,613,682 | $8,424,542ANGEL BROTHERS HOLDINGS COR… | +2.2% |
| Sep 3, 2020 | 0265-14-008 | CONSTRUCT BRIDGE AND APPROACHESFayette · Yoakum | 2 of 11 | $13,800,972 | $13,635,356ANGEL BROTHERS HOLDINGS COR… | +1.2% |
| Aug 6, 2020 | 0337-01-043 | HIGHWAY IMPROVEMENTWilliamson · Austin | 2 of 6 | $6,329,302 | $5,548,288DAN WILLIAMS COMPANY | +14.1% |
| Aug 6, 2020 | 0252-02-060 | HIGHWAY IMPROVEMENTBurnet · Austin | 9 of 9 | $6,195,250 | $4,562,497BIG CREEK CONSTRUCTION, LTD. | +35.8% |
| Aug 6, 2020 | 0269-06-059 | ADD 3 LANES FOR A 4-LANE UNDIVIDED HIGHWAYDe Witt · Yoakum | 5 of 5 | $4,684,542 | $3,564,628HUNTER INDUSTRIES, LTD. | +31.4% |
| Aug 5, 2020 | 0915-12-657 | CONSTRUCT INTERCHANGEBexar · San Antonio | 3 of 8 | $4,409,010 | $4,289,597DAN WILLIAMS COMPANY | +2.8% |
| Jul 9, 2020 | 0216-01-057 | CONSTRUCT GRADE SEPARATIONComal · San Antonio | 4 of 8 | $14,651,435 | $14,284,639HUNTER INDUSTRIES, LTD. | +2.6% |
| Jul 9, 2020 | 0231-03-147 | CONSTRUCT WEST TO EAST TURNAROUND @ FM 2410Bell · Waco | 3 of 3 | $3,748,941 | $3,098,000J.D. ABRAMS, L.P. | +21.0% |
| Jul 8, 2020 | 1539-02-026 | RECONSTRUCT EXST 2-LN RDWY TO A 4-LN RDWY W/CLTLTravis · Austin | 3 of 5 | $10,844,846 | $10,089,973ANGEL BROTHERS HOLDINGS COR… | +7.5% |
| Jun 5, 2020 | 0683-03-039 | HIGHWAY IMPROVEMENTHays · Austin | 4 of 7 | $3,905,536 | $3,603,618LONE STAR SITEWORK, LLC | +8.4% |
| May 8, 2020 | 7774-01-001 | EXPAND 4 TO 6 LNS DIVIDED & INTERSECT OPERATIONSBexar · San Antonio | 4 of 6 | $8,898,937 | $7,947,752AUSTIN BRIDGE & ROAD SERVIC… | +12.0% |
| May 8, 2020 | 1433-01-029 | INTERSECT OPER IMPROV & INCL WIDEN CIBOLO CRK BRDGBexar · San Antonio | 2 of 10 | $7,040,839 | $6,580,023HARPER BROTHERS CONSTRUCTIO… | +7.0% |
| May 7, 2020 | 0915-00-230 | INTERSECTION OPERATIONAL IMPROVEMENTSBexar · San Antonio | 5 of 6 | $3,813,399 | $3,053,201ACME BRIDGE COMPANY, INC. | +24.9% |
| Mar 5, 2020 | 0914-18-114 | BRIDGE REPLACEMENTBastrop · Austin | 2 of 4 | $1,640,817 | $1,454,554CHASCO CONSTRUCTORS | +12.8% |
| Mar 4, 2020 | 0143-08-088 | CONSTRUCT ONE WAY BRIDGE AND APPROACHESDe Witt · Yoakum | 1 of 5 | $15,556,721 | $15,556,721 | Won |
| Feb 7, 2020 | 0658-01-044 | EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SWBexar · San Antonio | 2 of 7 | $5,817,018 | $5,683,754J3 COMPANY, LLC | +2.3% |
| Aug 6, 2019 | 0683-01-056 | INTERSECTION & OPERATIONAL IMPROVEMENTSWilliamson · Austin | 4 of 5 | $31,108,250 | $27,468,704BRIDGES AND ROADS, LLC | +13.2% |
| Aug 6, 2019 | 0287-03-032 | BRIDGE REPLACEMENTGonzales · Yoakum | 4 of 5 | $9,994,010 | $8,087,779AUSTIN BRIDGE & ROAD SERVIC… | +23.6% |
| Jun 4, 2019 | 0715-01-019 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 7 of 7 | $3,296,337 | $2,235,432HILL COUNTRY BRIDGE, INC. | +47.5% |
| May 8, 2019 | 0265-04-062 | STR, GR, BASE, HMACP & PVMT MRKSBastrop · Austin | 1 of 9 | $50,359,853 | $50,359,853 | Won |
| May 8, 2019 | 1899-01-018 | GRD, BSE, SURF, PAV'T MRKINGSKendall · San Antonio | 4 of 4 | $13,128,051 | $10,189,263Curran Contracting Company | +28.8% |
| May 8, 2019 | 8408-15-006 | REHABILITATE BRIDGE & APPROACHESComal · San Antonio | 1 of 5 | $4,518,896 | $4,518,896 | Won |
| May 8, 2019 | 0914-04-271 | REPLACE BRIDGE & APPROACHESTravis · Austin | 4 of 6 | $1,243,248 | $1,078,645SB CONTRACTORS LLC | +15.3% |
| May 8, 2019 | 0913-22-046 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 9 of 9 | $617,395 | $399,752TMES LLC | +54.4% |
| May 7, 2019 | 0915-00-223 | INTERSECTION OPERATIONAL IMPROVEMENTS-SOUTHBexar · San Antonio | 1 of 6 | $3,461,235 | $3,461,235 | Won |
| May 7, 2019 | 0915-17-067 | REPLACE BRIDGE AND APPROACHESComal · San Antonio | 6 of 11 | $2,032,909 | $1,589,567SB CONTRACTORS LLC | +27.9% |
| May 7, 2019 | 0915-00-209 | INTERSECTION OPERATIONAL IMPROVEMENTS-NORTHBexar · San Antonio | 3 of 5 | $1,754,652 | $1,371,713Curran Contracting Company | +27.9% |
| May 7, 2019 | 6332-26-001 | RETAINING WALL REPAIRBexar · San Antonio | 3 of 5 | $459,730 | $389,024HAYWARD BAKER, INC. | +18.2% |
| Apr 3, 2019 | 0072-06-074 | RECONFG RAMPS & WIDEN FR TO CONVERT TO ONE WAY OPKendall · San Antonio | 4 of 6 | $19,460,979 | $18,335,085AUSTIN BRIDGE & ROAD SERVIC… | +6.1% |
| Apr 2, 2019 | 0015-13-396 | GR, BASE, STRUCT, HMACP & PVMT MKSTravis · Austin | 2 of 4 | $26,010,380 | $24,590,929JAMES CONSTRUCTION GROUP, L… | +5.8% |
| Apr 2, 2019 | 0015-09-193 | GR,BASE,HMACP,SIGNS & PVMT MRKSWilliamson · Austin | 2 of 5 | $11,021,212 | $10,705,999JORDAN FOSTER CONSTRUCTION,… | +2.9% |
| Mar 6, 2019 | 0015-08-141 | REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHESWilliamson · Austin | 2 of 7 | $15,293,897 | $15,048,230DAN WILLIAMS COMPANY | +1.6% |
| Mar 6, 2019 | 0150-04-047 | GR, BASE, HMACP & PVMT MRKSLlano · Austin | 4 of 6 | $4,165,857 | $3,884,999ACME BRIDGE COMPANY, INC. | +7.2% |
| Feb 6, 2019 | 0016-05-119 | GRADING, STRUCTURES, BASE & SURFACEComal · San Antonio | 5 of 7 | $27,240,629 | $25,398,551BRIDGES AND ROADS, LLC | +7.3% |
| Feb 6, 2019 | 0291-10-110 | RECONSTRUCT EXISTING CULVERTBexar · San Antonio | 5 of 6 | $2,709,129 | $2,107,962DAN WILLIAMS COMPANY | +28.5% |
| Feb 6, 2019 | 2136-01-015 | REPL BR & APPRSBell · Waco | 1 of 3 | $5,238,854 | $5,238,854 | Won |
| Feb 5, 2019 | 2452-04-016 | EXPAND FROM 2 LANES TO 4 LANE DIVIDEDBexar · San Antonio | 5 of 14 | $20,936,952 | $20,172,902MARIO SINACOLA & SONS EXCAV… | +3.8% |
| Jan 9, 2019 | 0015-08-142 | GRADING, BASE, HMACP, PVMRK & SIGNSWilliamson · Austin | 4 of 6 | $15,980,846 | $13,145,763DAN WILLIAMS COMPANY | +21.6% |
| Dec 5, 2018 | 0073-02-071 | INTERSECTION OPERATIONAL IMPROVEMENTSBexar · San Antonio | 6 of 10 | $2,273,575 | $1,936,000ALL IN CONSTRUCTION, L.L.C. | +17.4% |
| Nov 7, 2018 | 0715-01-014 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 8 of 8 | $2,633,524 | $1,963,663HILL COUNTRY BRIDGE, INC. | +34.1% |
| Nov 6, 2018 | 0914-18-110 | REPLACE BRIDGE AND APPROACHESBastrop · Austin | 8 of 12 | $493,674 | $399,604TREVWAY, INC. | +23.5% |
| Oct 3, 2018 | 1890-01-046 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSBexar · San Antonio | 5 of 7 | $19,448,874 | $16,483,393Curran Contracting Company | +18.0% |
| Oct 2, 2018 | 0073-08-195 | REPAIR SLOPE FAILUREBexar · San Antonio | 2 of 8 | $3,656,202 | $2,967,147RELMCO, INC. | +23.2% |
| Sep 7, 2018 | 0143-01-055 | RESTORE EXISTING ROADWAYBexar · San Antonio | 4 of 8 | $3,612,793 | $3,451,000JORDAN FOSTER CONSTRUCTION,… | +4.7% |
| Sep 6, 2018 | 0839-01-014 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 1 of 6 | $2,535,860 | $2,535,860 | Won |
| Aug 8, 2018 | 2230-01-013 | GRAD, STR, BASE, SURFBexar · San Antonio | 4 of 8 | $18,260,857 | $17,810,211DAN WILLIAMS COMPANY | +2.5% |
| Aug 8, 2018 | 1349-03-013 | PROVIDE ADDITIONAL PAVED SURFACEBurnet · Austin | 2 of 6 | $6,325,619 | $6,179,469CORNERSTONE PAVING AND CONS… | +2.4% |
| Aug 8, 2018 | 0270-10-013 | REPLACE BRIDGE AND APPROACHESDe Witt · Yoakum | 2 of 3 | $13,587,699 | $12,717,082SB CONTRACTORS LLC | +6.8% |
| Aug 7, 2018 | 1566-02-019 | REHAB RDWYWilliamson · Austin | 5 of 7 | $10,238,900 | $8,947,810JORDAN FOSTER CONSTRUCTION,… | +14.4% |
| Aug 7, 2018 | 0016-08-036 | INTERSECTION OPERATIONAL IMPROVEMENTSBexar · San Antonio | 2 of 3 | $1,718,860 | $1,345,680E-Z BEL CONSTRUCTION, LLC | +27.7% |
| Aug 7, 2018 | 0252-02-054 | ADD CENTER LEFT TURN LANE AND SHOULDERSBurnet · Austin | 3 of 4 | $8,646,950 | $7,365,015JORDAN FOSTER CONSTRUCTION,… | +17.4% |
| Jul 11, 2018 | 2100-01-054 | RECONSTRUCT 4-LN ROADWAY TO 6-LN DIVIDED_ROADWAYTravis · Austin | 1 of 3 | $23,618,553 | $23,618,553 | Won |
| Jul 11, 2018 | 0215-06-039 | EXPAND 2 LANES TO 4 LANES WITH MEDIAN OR CLTLKendall · San Antonio | 3 of 6 | $12,278,030 | $11,999,322HUNTER INDUSTRIES, LTD. | +2.3% |
| Jul 11, 2018 | 0015-08-140 | STRCT, GRADING, HMACPWilliamson · Austin | 1 of 7 | $6,748,949 | $6,748,949 | Won |
| Jul 11, 2018 | 0914-04-229 | REPLACE BRIDGE AND APPROACHESTravis · Austin | 3 of 9 | $585,159 | $571,595TREVWAY, INC. | +2.4% |
| Jul 11, 2018 | 0909-39-127 | REPL BR & APPRSCoryell · Waco | 1 of 7 | $1,020,198 | $1,020,198 | Won |
| Jul 10, 2018 | 0072-10-006 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHKendall · San Antonio | 3 of 8 | $841,541 | $783,135Curran Contracting Company | +7.5% |
| Jul 10, 2018 | 3417-03-024 | ADDING 2ND LEFT TURN LANE TO 2 INTERESECTIONSTravis · Austin | 4 of 5 | $488,863 | $388,447AARON CONCRETE CONTRACTORS,… | +25.9% |
| Jul 10, 2018 | 0691-01-035 | WIDEN OR REPLACE STRUCTUREKarnes · Corpus Christi | 2 of 10 | $4,313,417 | $4,236,891LISKA CONSTRUCTION COMPANY,… | +1.8% |
| Jun 6, 2018 | 1202-01-020 | REHAB ADD SHOULDER AND SAFETY TREATWilliamson · Austin | 4 of 5 | $10,439,555 | $8,984,216DAN WILLIAMS COMPANY | +16.2% |
| Jun 6, 2018 | 0100-05-184 | RECONSTRUCT INTERSECTIONKarnes · Corpus Christi | 2 of 8 | $7,037,495 | $6,543,323RELMCO, INC. | +7.6% |
| Jun 6, 2018 | 0913-29-037 | REPLACE BRIDGE AND APPROACHESLavaca · Yoakum | 2 of 5 | $1,494,021 | $1,395,464HILL COUNTRY BRIDGE, INC. | +7.1% |
| Jun 6, 2018 | 2452-02-118 | INTERSEC OPERATION IMPROVE-EB TO WB TURNAROUNDBexar · San Antonio | 1 of 5 | $806,297 | $806,297 | Won |
| Jun 5, 2018 | 2452-03-112 | EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAYBexar · San Antonio | 5 of 6 | $49,471,649 | $45,888,889FLATIRON CONSTRUCTORS, INC. | +7.8% |
| Jun 5, 2018 | 0328-04-044 | GRADING, BASE, SURFACE, PAVEMENT MARKINGSAtascosa · San Antonio | 2 of 4 | $4,629,669 | $4,231,472HUNTER INDUSTRIES, LTD. | +9.4% |
| Jun 5, 2018 | 0270-04-006 | REHAB ROADWAYKarnes · Corpus Christi | 4 of 6 | $1,903,280 | $1,573,310HUNTER INDUSTRIES, LTD. | +21.0% |
| Jun 5, 2018 | 0515-06-024 | UPGRADE GRD RAIL,WIDEN RDWAYLavaca · Yoakum | 6 of 6 | $2,076,835 | $1,599,662GLENN FUQUA, INC. | +29.8% |
| Jun 5, 2018 | 0231-03-146 | RDWY RECONFIGBell · Waco | 1 of 3 | $4,549,398 | $4,549,398 | Won |
| Jun 5, 2018 | 1198-01-022 | PROVIDE ADDITIONAL PAVED SURFACEBurnet · Austin | 2 of 4 | $8,508,335 | $7,444,233DENBOW COMPANY INC. | +14.3% |
| Jun 5, 2018 | 2452-02-119 | INTERSECTION OP IMPROV - CONST 4 TURNAROUNDSBexar · San Antonio | 1 of 9 | $6,253,995 | $6,253,995 | Won |
| Jun 5, 2018 | 2452-03-118 | RECONFIG RAMPS, CONSTR TA AT BULVERDE RD & OP IMPRBexar · San Antonio | 2 of 7 | $10,860,465 | $10,847,613Curran Contracting Company | +0.1% |
| May 2, 2018 | 0613-02-063 | REPLACE EXISTING BRIDGEAtascosa · San Antonio | 4 of 11 | $5,772,536 | $5,704,330HARPER BROTHERS CONSTRUCTIO… | +1.2% |
| May 2, 2018 | 0320-03-099 | REPLACE DECK AND STRUCTURAL REPAIRSWilliamson · Austin | 3 of 8 | $1,355,097 | $1,149,643DAN WILLIAMS COMPANY | +17.9% |
| May 1, 2018 | 1378-02-053 | INSTALLATION OF A SOUND WALL ALONG THE N ROW LINEWilliamson · Austin | 2 of 8 | $920,765 | $829,476SB CONTRACTORS LLC | +11.0% |
| May 1, 2018 | 0017-10-280 | CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADSBexar · San Antonio | 2 of 9 | $4,571,422 | $4,561,841J3 COMPANY, LLC | +0.2% |
| May 1, 2018 | 0072-12-198 | INTERSECTION AND OPERATIONAL IMPROVEMENTSBexar · San Antonio | 4 of 6 | $1,776,877 | $1,598,613DAN WILLIAMS COMPANY | +11.2% |
| May 1, 2018 | 0320-03-092 | BRIDGE WIDENING & REPLACE APPROACHESWilliamson · Austin | 2 of 9 | $352,347 | $330,318DAN WILLIAMS COMPANY | +6.7% |
| Apr 4, 2018 | 0914-04-305 | REPLACE BRIDGE AND APPROACHESTravis · Austin | 8 of 11 | $444,993 | $329,781SB CONTRACTORS LLC | +34.9% |
| Apr 4, 2018 | 0253-03-072 | EXPAND 2 LANES TO 4 LANES DIVIDED RURALComal · San Antonio | 7 of 10 | $861,642 | $726,396HUNTER INDUSTRIES, LTD. | +18.6% |
| Mar 6, 2018 | 0072-06-075 | GRAD, BS, STR, SURF, PVMT MRKGKendall · San Antonio | 8 of 9 | $75,925,175 | $64,660,757STERLING DELAWARE HOLDING C… | +17.4% |
| Mar 6, 2018 | 0848-04-046 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSMedina · San Antonio | 8 of 10 | $2,563,079 | $1,968,967DEAN WORD COMPANY, LTD. | +30.2% |
| Dec 6, 2017 | 0440-06-017 | ADD ONE LANE IN EACH DIRECTIONTravis · Austin | 9 of 12 | $45,955,165 | $36,726,431OHL USA, INC. | +25.1% |
| Dec 5, 2017 | 0153-01-013 | INTERSECTION IMPROVEMENTSCaldwell · Austin | 8 of 10 | $2,155,434 | $1,769,284DEAN WORD COMPANY, LTD. | +21.8% |
| Dec 5, 2017 | 3417-03-023 | CONSTURCTION OF MEDIAN AND LEFT TURN LANETravis · Austin | 5 of 5 | $356,906 | $248,444AARON CONCRETE CONTRACTORS,… | +43.7% |
| Oct 4, 2017 | 0915-11-028 | REPLACE BRIDGE AND APPROACHESKendall · San Antonio | 6 of 11 | $557,085 | $514,523Curran Contracting Company | +8.3% |
| Aug 9, 2017 | 0913-29-050 | REPLACE BRIDGE AND APPROACHESLavaca · Yoakum | 4 of 7 | $485,607 | $451,306CONSTAR CONSTRUCTION | +7.6% |
| Aug 8, 2017 | 3136-01-015 | GRADE SEPARATION OF MAIN LANESTravis · Austin | 8 of 9 | $57,815,738 | $53,513,432WEBBER, LLC | +8.0% |
| Jul 12, 2017 | 0914-04-227 | REPLACE BRIDGE AND APPROACHESTravis · Austin | 1 of 8 | $377,671 | $377,671 | Won |
| Jul 11, 2017 | 0216-01-036 | GRADING, STRUCTURES, BASE AND SURFACEComal · San Antonio | 5 of 8 | $46,274,893 | $42,308,391HUNTER INDUSTRIES, LTD. | +9.4% |
| Jun 7, 2017 | 2452-01-064 | INTERSECTION OPERATIONAL IMPROVEMENTSBexar · San Antonio | 7 of 7 | $9,769,699 | $8,000,083HARPER BROTHERS CONSTRUCTIO… | +22.1% |
| Jun 6, 2017 | 1042-01-032 | WIDEN EXISTING ROADWAY TO ADD SHOULDERSKendall · San Antonio | 7 of 7 | $6,216,820 | $4,456,843RAY FARIS, INC. | +39.5% |
| Apr 5, 2017 | 2230-01-018 | CONSTRUCT 2 LANE ROADWAY ON NEW LOCATIONBexar · San Antonio | 2 of 10 | $3,868,832 | $3,419,685DAN WILLIAMS COMPANY | +13.1% |
| Apr 5, 2017 | 1200-01-023 | REHAB RDWYWilliamson · Austin | 4 of 12 | $4,804,090 | $4,076,992HUNTER INDUSTRIES, LTD. | +17.8% |
| Mar 8, 2017 | 1477-01-040 | EXPAND 2 TO 4 LNS W/ LTL, SW, BK LN & EXTEND RDWYBexar · San Antonio | 1 of 9 | $7,388,906 | $7,388,906 | Won |
| Mar 7, 2017 | 0016-05-115 | REPLACE EXIST BRIDGE, CONSTRUCT NEW TURNAROUNDSComal · San Antonio | 3 of 12 | $7,337,306 | $7,256,065ANDERSON COLUMBIA CO., INC. | +1.1% |
| Jan 5, 2017 | 0915-11-031 | REPLACE BRIDGE AND APPROACHESKendall · San Antonio | 1 of 5 | $1,522,928 | $1,522,928 | Won |
| Jan 5, 2017 | 2230-01-016 | REPLACE EXISTING CULVERT WITH BRIDGEBexar · San Antonio | 4 of 10 | $1,552,750 | $1,447,520DAN WILLIAMS COMPANY | +7.3% |
| Jan 4, 2017 | 0024-08-128 | CONSTRUCT PEDESTRIAN BRIDGE OVER US 90Bexar · San Antonio | 2 of 8 | $2,394,959 | $2,331,043RELMCO, INC. | +2.7% |
| Jan 4, 2017 | 1186-01-090 | REHAB ROADWAY & ADD TWLTL & SHOULDERSTravis · Austin | 4 of 9 | $7,941,131 | $6,648,304AARON CONCRETE CONTRACTORS,… | +19.4% |
| Nov 5, 2013 | 0152-02-070 | RECONSTRUCT TO 5-LN URBAN SECTIONCaldwell · Austin | 2 of 3 | $12,175,882 | $11,698,919DEAN WORD COMPANY, LTD. | +4.1% |
| Nov 5, 2013 | 0700-03-125 | ADD LEFT TURN LANE & SHOULDERSTravis · Austin | 2 of 4 | $16,405,528 | $15,965,613JOE BLAND CONSTRUCTION, L.P. | +2.8% |
| Oct 9, 2013 | 0016-02-135 | REPLACE BRIDGEHays · Austin | 5 of 9 | $13,988,384 | $12,215,171OHL USA, INC. | +14.5% |
| Oct 9, 2013 | 0253-03-068 | CONSTRUCT TURNAROUNDSComal · San Antonio | 7 of 7 | $4,835,273 | $3,132,254CRG | +54.4% |
| Oct 8, 2013 | 2293-01-024 | ADD CENTER TURN LANEHays · Austin | 4 of 5 | $7,899,683 | $6,950,845DAN WILLIAMS COMPANY | +13.7% |
| Oct 8, 2013 | 3136-01-172 | ADD BICYCLE BRIDGETravis · Austin | 2 of 6 | $7,937,746 | $7,773,017AUSTIN BRIDGE & ROAD, LP | +2.1% |
Subcontracts on active jobs 1
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0016-05-120Let Jun 4, 2021 | TEXAS MATERIALS GROUP, INC. | ComalSan Antonio | MISCELLANEOUS CONSTRUCTION | 4.53% | $308,056 |