| 1 | 100-6002 |
PREPARING ROW | 6 | STA |
$3,000.00 |
$4,000.00 |
$13,657.54 |
$16,650.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 837 | CY |
$15.00 |
$8.00 |
$16.76 |
$73.26 |
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 5,375 | CY |
$10.00 |
$15.00 |
$17.25 |
$73.26 |
| 4 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 1,035 | CY |
$20.00 |
$8.00 |
$50.19 |
$36.63 |
| 5 | 150-6002 |
BLADING | 20 | HR |
$100.00 |
$65.00 |
$108.74 |
$102.60 |
| 6 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 7,106 | SY |
$1.50 |
$2.00 |
$3.05 |
$2.19 |
| 7 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 7,106 | SY |
$2.00 |
$0.5000 |
$0.3500 |
$0.4200 |
| 8 | 164-6029 |
CELL FBR MLCH SEED(TEMP)(WARM) | 1,777 | SY |
$1.00 |
$0.7500 |
$0.5000 |
$0.3000 |
| 9 | 164-6031 |
CELL FBR MLCH SEED(TEMP)(COOL) | 1,777 | SY |
$1.00 |
$0.7500 |
$0.5000 |
$0.3400 |
| 10 | 168-6001 |
VEGETATIVE WATERING | 60 | MG |
$100.00 |
$45.00 |
$37.62 |
$73.26 |
| 11 | 247-6057 |
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) | 598 | CY |
$75.00 |
$95.00 |
$89.37 |
$79.39 |
| 12 | 247-6137 |
FL BS (RDWY DEL) (TY E GR 1-2) | 254 | TON |
$50.00 |
$32.00 |
$54.08 |
$41.70 |
| 13 | 251-6033 |
REWORK BS MTL (TY C) (6") (ORD COMP) | 605 | SY |
$5.00 |
$9.00 |
$16.84 |
$3.99 |
| 14 | 260-6012 |
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) | 33 | TON |
$165.00 |
$165.00 |
$186.95 |
$210.00 |
| 15 | 260-6079 |
LIME TRT (SUBGRADE)(6") | 2,862 | SY |
$2.00 |
$3.50 |
$16.76 |
$5.70 |
| 16 | 310-6009 |
PRIME COAT (MC-30) | 620 | GAL |
$5.00 |
$5.00 |
$5.00 |
$8.76 |
| 17 | 316-6224 |
AGGR(TY-PB GR-4 SAC-B) | 88 | CY |
$100.00 |
$125.00 |
$135.00 |
$193.77 |
| 18 | 316-6400 |
ASPH (AC-15P OR AC-10-2TR OR CRS-2P) | 3,528 | GAL |
$4.00 |
$4.00 |
$4.25 |
$6.48 |
| 19 | 341-6010 |
D-GR HMA TY-B PG70-22 | 326 | TON |
$100.00 |
$96.00 |
$107.00 |
$118.41 |
| 20 | 341-6042 |
D-GR HMA TY-D SAC-B PG70-22 | 682 | TON |
$90.00 |
$96.00 |
$107.00 |
$118.41 |
| 21 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 250 | SY |
$75.00 |
$100.00 |
$110.00 |
$161.34 |
| 22 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 1,911 | SY |
$3.00 |
$4.00 |
$3.20 |
$3.33 |
| 23 | 400-6005 |
CEM STABIL BKFL | 576 | CY |
$175.00 |
$135.00 |
$166.00 |
$137.77 |
| 24 | 403-6001 |
TEMPORARY SPL SHORING | 2,643 | SF |
$15.00 |
$40.00 |
$14.30 |
$29.03 |
| 25 | 416-6001 |
DRILL SHAFT (18 IN) | 152 | LF |
$75.00 |
$45.00 |
$45.52 |
$73.08 |
| 26 | 416-6005 |
DRILL SHAFT (42 IN) | 959 | LF |
$200.00 |
$210.00 |
$213.09 |
$229.59 |
| 27 | 416-6008 |
DRILL SHAFT (60 IN) | 560 | LF |
$400.00 |
$550.00 |
$596.25 |
$688.02 |
| 28 | 420-6013 |
CL C CONC (ABUT) | 134.4 | CY |
$750.00 |
$700.00 |
$814.46 |
$1,010.83 |
| 29 | 420-6029 |
CL C CONC (CAP) | 115.2 | CY |
$800.00 |
$950.00 |
$777.18 |
$1,127.44 |
| 30 | 420-6037 |
CL C CONC (COLUMN) | 90.7 | CY |
$900.00 |
$850.00 |
$957.48 |
$1,078.68 |
| 31 | 420-6166 |
CL C CONC (TIE BEAM) | 94.8 | CY |
$2,500.00 |
$550.00 |
$689.47 |
$880.40 |
| 32 | 422-6001 |
REINF CONC SLAB | 36,400 | SF |
$15.00 |
$14.00 |
$17.00 |
$23.94 |
| 33 | 432-6002 |
RIPRAP (CONC)(5 IN) | 147 | CY |
$500.00 |
$375.00 |
$513.61 |
$532.54 |
| 34 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 1,500 | CY |
$150.00 |
$125.00 |
$140.50 |
$110.00 |
| 35 | 434-6024 |
ELASTOMERIC BEARING (E5) | 8 | EA |
$2,000.00 |
$1,600.00 |
$3,477.19 |
$2,652.96 |
| 36 | 434-6033 |
ELASTOMERIC BEARING (F5) | 8 | EA |
$2,000.00 |
$1,600.00 |
$3,477.19 |
$2,523.21 |
| 37 | 434-6041 |
SLIDING ELASTOMERIC BEARING (ES 4) | 16 | EA |
$1,900.00 |
$1,700.00 |
$2,846.30 |
$2,204.47 |
| 38 | 442-6001 |
STR STEEL (PLATE GIRDER) | 1,546,000 | LB |
$1.85 |
$1.60 |
$1.36 |
$1.82 |
| 39 | 450-6006 |
RAIL (TY T223) | 1,116 | LF |
$90.00 |
$95.00 |
$94.04 |
$132.20 |
| 40 | 454-6002 |
SEALED EXPANSION JOINT (5 IN) (SEJ - A) | 139 | LF |
$120.00 |
$90.00 |
$113.89 |
$113.62 |
| 41 | 464-6003 |
RC PIPE (CL III)(18 IN) | 132 | LF |
$85.00 |
$65.00 |
$142.77 |
$92.07 |
| 42 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 4 | EA |
$1,200.00 |
$1,000.00 |
$1,379.71 |
$1,688.49 |
| 43 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$100,000.00 |
$220,000.00 |
$400,000.00 |
$171,041.86 |
| 44 | 496-6042 |
REMOV STR (SMALL) | 3 | EA |
$500.00 |
$1,000.00 |
$1,966.83 |
$1,142.95 |
| 45 | 500-6001 |
MOBILIZATION | 1 | LS |
$500,000.00 |
$610,000.00 |
$722,000.00 |
$1,538,326.69 |
| 46 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 | MO |
$3,500.00 |
$3,000.00 |
$1,000.00 |
$1,419.92 |
| 47 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 50 | LF |
$50.00 |
$60.00 |
$56.41 |
$30.00 |
| 48 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 50 | LF |
$10.00 |
$35.00 |
$35.90 |
$10.00 |
| 49 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,320 | LF |
$3.00 |
$4.00 |
$3.59 |
$2.00 |
| 50 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,320 | LF |
$1.00 |
$1.20 |
$1.23 |
$0.6000 |
| 51 | 530-6005 |
DRIVEWAYS (ACP) | 130 | SY |
$60.00 |
$55.00 |
$47.93 |
$35.04 |
| 52 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 1,660 | LF |
$1.00 |
$3.60 |
$10.65 |
$0.9700 |
| 53 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 830 | LF |
$2.00 |
$4.00 |
$10.65 |
$0.9700 |
| 54 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 275 | LF |
$30.00 |
$27.85 |
$25.49 |
$22.00 |
| 55 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$1,500.00 |
$1,860.00 |
$1,600.00 |
$1,800.00 |
| 56 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 325 | LF |
$5.00 |
$5.00 |
$1.54 |
$1.50 |
| 57 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 4 | EA |
$250.00 |
$200.00 |
$128.21 |
$200.00 |
| 58 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 4 | EA |
$200.00 |
$250.00 |
$153.85 |
$250.00 |
| 59 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,400.00 |
$2,940.00 |
$2,805.13 |
$2,300.00 |
| 60 | 560-6007 |
MAILBOX INSTALL-S (WC-POST) TY 3 | 1 | EA |
$350.00 |
$200.00 |
$194.36 |
$200.00 |
| 61 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 4 | EA |
$450.00 |
$450.00 |
$371.90 |
$300.00 |
| 62 | 644-6061 |
IN SM RD SN SUP&AM TYTWT(1)WS(T) | 2 | EA |
$500.00 |
$525.00 |
$489.39 |
$300.00 |
| 63 | 644-6071 |
RELOCATE SM RD SN SUP&AM TY TWT | 5 | EA |
$450.00 |
$450.00 |
$348.21 |
$200.00 |
| 64 | 644-6076 |
REMOVE SM RD SN SUP&AM | 3 | EA |
$250.00 |
$250.00 |
$102.56 |
$75.00 |
| 65 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 22 | EA |
$15.00 |
$17.00 |
$10.26 |
$5.00 |
| 66 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 12 | EA |
$50.00 |
$21.00 |
$14.10 |
$10.00 |
| 67 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 2,700 | LF |
$0.5000 |
$1.50 |
$2.32 |
$0.7500 |
| 68 | 666-6311 |
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) | 100 | LF |
$2.00 |
$2.50 |
$3.87 |
$0.7500 |
| 69 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 2,308 | LF |
$0.5000 |
$1.50 |
$2.32 |
$0.7500 |
| 70 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 18 | LF |
$24.00 |
$50.00 |
$77.31 |
$15.00 |
| 71 | 672-6009 |
REFL PAV MRKR TY II-A-A | 34 | EA |
$25.00 |
$50.00 |
$77.31 |
$10.00 |
| 72 | 4027-6001 |
TEMP CONSTRUCTION ACCESS | 1 | LS |
$400,000.00 |
$235,000.00 |
$50,000.00 |
$1,260,517.30 |
| 73 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 5 | EA |
$8,000.00 |
$18,000.00 |
$8,602.17 |
$6,500.00 |
| 74 | 800-6001 |
NO. OF WORKING DAYS | 20,000 | $/D |
$430.00 |
$330.00 |
$370.00 |
$350.00 |