| 1 | 100-6002 |
PREPARING ROW | 7 | STA |
$2,000.00 |
$5,000.00 |
$5,500.00 |
$5,200.00 |
|
| 2 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 400 | CY |
$15.00 |
$30.00 |
$48.95 |
$55.00 |
|
| 3 | 158-6006 |
SPEC EXCAV WORK (VEHICLE) | 600 | CY |
$15.00 |
$17.50 |
$48.30 |
$27.00 |
|
| 4 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 1,345 | SY |
$2.50 |
$2.00 |
$11.00 |
$5.40 |
|
| 5 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 673 | SY |
$0.3500 |
$1.50 |
$1.25 |
$1.35 |
|
| 6 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 1,345 | SY |
$1.00 |
$1.20 |
$0.7000 |
$0.8000 |
|
| 7 | 168-6001 |
VEGETATIVE WATERING | 20 | MG |
$25.00 |
$40.00 |
$24.70 |
$200.00 |
|
| 8 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 1,345 | SY |
$2.00 |
$2.00 |
$1.80 |
$2.00 |
|
| 9 | 340-6011 |
D-GR HMA(SQ) TY-B PG64-22 | 580 | TON |
$95.00 |
$88.00 |
$90.00 |
$142.00 |
|
| 10 | 340-6136 |
D-GR HMA(SQ) TY-D SAC-B PG76-22 | 56 | TON |
$125.00 |
$244.00 |
$240.00 |
$450.00 |
|
| 11 | 340-6272 |
TACK COAT | 55 | GAL |
$4.00 |
$17.00 |
$16.15 |
$25.00 |
|
| 12 | 354-6031 |
PLANE ASPH CONC PAV(0" TO 12") | 496 | SY |
$15.00 |
$22.00 |
$29.85 |
$31.45 |
|
| 13 | 400-6005 |
CEM STABIL BKFL | 220 | CY |
$140.00 |
$120.00 |
$205.00 |
$155.00 |
|
| 14 | 403-6001 |
TEMPORARY SPL SHORING | 400 | SF |
$20.00 |
$10.00 |
$34.20 |
$60.00 |
|
| 15 | 416-6001 |
DRILL SHAFT (18 IN) | 180 | LF |
$150.00 |
$120.00 |
$231.00 |
$210.00 |
|
| 16 | 416-6005 |
DRILL SHAFT (42 IN) | 360 | LF |
$290.00 |
$585.00 |
$450.00 |
$462.00 |
|
| 17 | 420-6011 |
CL B CONC (FLUME) | 4 | CY |
$450.00 |
$675.00 |
$1,110.00 |
$760.00 |
|
| 18 | 420-6013 |
CL C CONC (ABUT) | 73 | CY |
$750.00 |
$750.00 |
$1,150.00 |
$1,025.00 |
|
| 19 | 422-6001 |
REINF CONC SLAB | 4,590 | SF |
$15.00 |
$18.00 |
$22.20 |
$26.65 |
|
| 20 | 422-6015 |
APPROACH SLAB | 51.4 | CY |
$450.00 |
$430.00 |
$830.00 |
$620.00 |
|
| 21 | 425-6040 |
PRESTR CONC GIRDER (TX62) | 672.5 | LF |
$150.00 |
$300.00 |
$233.00 |
$389.75 |
|
| 22 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 650 | CY |
$125.00 |
$180.00 |
$227.00 |
$200.00 |
|
| 23 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 27.5 | CY |
$450.00 |
$550.00 |
$700.00 |
$700.00 |
|
| 24 | 450-6032 |
RAIL (TY C223) | 350 | LF |
$115.00 |
$160.00 |
$173.00 |
$179.25 |
|
| 25 | 454-6004 |
ARMOR JOINT (SEALED) | 60 | LF |
$80.00 |
$80.00 |
$107.00 |
$105.00 |
|
| 26 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$40,000.00 |
$103,410.00 |
$22,700.00 |
$121,000.00 |
|
| 27 | 500-6001 |
MOBILIZATION | 1 | LS |
$78,928.81 |
$140,000.00 |
$140,000.00 |
$160,000.00 |
|
| 28 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$3,000.00 |
$3,500.00 |
$5,000.00 |
$3,345.00 |
|
| 29 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 160 | LF |
$35.00 |
$47.00 |
$50.00 |
$52.25 |
|
| 30 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 160 | LF |
$15.00 |
$10.00 |
$31.00 |
$32.65 |
|
| 31 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 915 | LF |
$2.50 |
$3.00 |
$4.25 |
$4.35 |
|
| 32 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 915 | LF |
$1.00 |
$1.00 |
$1.25 |
$1.10 |
|
| 33 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 400 | LF |
$20.00 |
$22.00 |
$22.00 |
$23.55 |
|
| 34 | 540-6003 |
MTL THRIE-BEAM GD FEN (TIM POST) | 25 | LF |
$35.00 |
$40.00 |
$65.80 |
$80.20 |
|
| 35 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 3 | EA |
$1,000.00 |
$1,000.00 |
$745.00 |
$914.00 |
|
| 36 | 540-6017 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 25 | LF |
$20.00 |
$23.00 |
$20.65 |
$23.55 |
|
| 37 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$2,500.00 |
$2,500.00 |
$3,000.00 |
$3,100.00 |
|
| 38 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$450.00 |
$1,100.00 |
$590.00 |
$820.00 |
|
| 39 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 12 | EA |
$20.00 |
$55.00 |
$15.00 |
$20.00 |
|
| 40 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 22 | EA |
$25.00 |
$55.00 |
$19.95 |
$35.00 |
|
| 41 | 666-6170 |
REFL PAV MRK TY II (W) 4" (SLD) | 1,350 | LF |
$0.1500 |
$0.3500 |
$0.5000 |
$0.5500 |
|
| 42 | 666-6207 |
REFL PAV MRK TY II (Y) 4" (SLD) | 1,350 | LF |
$0.1500 |
$0.4000 |
$0.5000 |
$0.5500 |
|
| 43 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 1,350 | LF |
$0.3500 |
$0.7500 |
$1.50 |
$1.60 |
|
| 44 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 1,350 | LF |
$0.3500 |
$0.7500 |
$1.50 |
$1.60 |
|
| 45 | 672-6009 |
REFL PAV MRKR TY II-A-A | 10 | EA |
$5.00 |
$8.00 |
$7.00 |
$7.60 |
|
| 46 | 4027-6001 |
TEMP CONSTRUCTION ACCESS | 1 | LS |
$50,000.00 |
$50,000.00 |
$185,000.00 |
$64,000.00 |
|
| 47 | 800-6001 |
NO. OF WORKING DAYS | 2,000 | $/D |
$76.00 |
$72.00 |
$76.00 |
$76.00 |
|