126Let jobs
$347,276,492Total low bids
$360,836,325Total estimates
-3.8%Low bids vs estimates
Sep 2013 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Sep 26, 2013 | 6159-72-001RMC - 615972001 | Crockett San Angelo |
RIGHT OF WAY MOWING IN CROCKETT COUNTYSH 163 · | $120,700 | $144,840 | SQUARE G, INC. | +20.0% | 4 |
| Sep 26, 2013 | 6167-56-001RMC - 616756001 | Kimble San Angelo |
MOWING RIGHT OF WAY IN KIMBLE COUNTYUS 83 · | $118,550 | $142,165 | R&M INCORPORATED | +19.9% | 3 |
| Sep 26, 2013 | 6140-88-001RMC - 614088001 | Tom Green San Angelo |
RIGHT OF WAY MOWING IN TOM GREEN RURALUS 277 · | $105,100 | $126,120 | EGGEMEYER MOWING & CONTRACTING, INC. | +20.0% | 3 |
| Sep 26, 2013 | 6122-70-001RMC - 612270001 | Sterling San Angelo |
RIGHT OF WAY MOWING IN STERLING GLASSCOCKUS 87 · | $123,800 | $118,848 | L&L COMPANY | -4.0% | 4 |
| Sep 25, 2013 | 6138-80-001RMC - 613880001 | Sutton San Angelo |
RIGHT OF WAY MOWING SUTTON SCHLEICHER COUNTIESUS 277 · | $142,775 | $171,330 | SQUARE G, INC. | +20.0% | 4 |
| Sep 25, 2013 | 6149-37-001RMC - 614937001 | Tom Green San Angelo |
RIGHT OF WAY MOWING IN TOM GREEN URBANUS 67 · | $128,850 | $161,063 | R&M INCORPORATED | +25.0% | 4 |
| Sep 25, 2013 | 6157-65-001RMC - 615765001 | Concho San Angelo |
MOWING RIGHT OF WAY IN CONCHO AND MENARD COUNTYUS 87 · | $136,500 | $133,552 | EGGEMEYER MOWING & CONTRACTING, INC. | -2.2% | 4 |
| Sep 25, 2013 | 6152-76-001RMC - 615276001 | Coke San Angelo |
RIGHT OF WAY MOWING IN COKE COUNTYUS 277 · | $81,700 | $87,517 | BILLY BENSON | +7.1% | 3 |
| Sep 24, 2013 | 6257-22-001RMC - 625722001 | Jefferson Beaumont |
CONCRETE PAVEMENT REPAIRUS 69 · | $293,660 | $295,659 | TEXAS HIGHWAY MAINTENANCE, LLC | +0.7% | 5 |
| Sep 24, 2013 | 6261-69-001RMC - 626169001 | Tarrant Fort Worth |
FULL-DEPTH REPAIR OF EXIST. CONC. PAV.SH 360 · | $291,612 | $289,381 | OMEGA CONSTRUCTION GROUP, LLC | -0.8% | 6 |
| Sep 24, 2013 | 6259-44-001RMC - 625944001 | Fayette Yoakum |
TREE REMOVAL & BRUSH TRIMMINGUS 77 · | $263,150 | $241,735 | T.F.R. ENTERPRISES, INC. | -8.1% | 2 |
| Sep 24, 2013 | 6262-87-001RMC - 626287001 | Tarrant Fort Worth |
RAISED PAVEMENT MARKERSIH 820 · | $251,995 | $168,755 | BRYDL CONTRACTING, INC. | -33.0% | 4 |
| Sep 24, 2013 | 6088-98-001RMC - 608898001 | Real San Angelo |
RIGHT OF WAY MOWING IN REAL ETC COUNTYSH 41 · | $129,425 | $155,206 | R&M INCORPORATED | +19.9% | 4 |
| Sep 24, 2013 | 6258-94-001RMC - 625894001 | Jefferson Beaumont |
HOT POURED RUBBER CRACKSEALINGUS 69 · | $200,742 | $155,000 | TEXAS ROAD MAINTENANCE | -22.8% | 3 |
| Sep 24, 2013 | 6118-09-001RMC - 611809001 | Runnels San Angelo |
RIGHT OF WAY MOWING IN RUNNELS COUNTYSH 158 · | $108,200 | $118,977 | EGGEMEYER MOWING & CONTRACTING, INC. | +10.0% | 4 |
| Sep 24, 2013 | 6031-30-001RMC - 603130001 | Reagan San Angelo |
RIGHT OF WAY MOWING IN REAGAN IRION COUNTIESUS 67 · | $90,100 | $90,922 | G.K.C., INC. | +0.9% | 5 |
| Sep 19, 2013 | 6260-56-001RMC - 626056001 | Kerr San Antonio |
CRACK SEAL0016 · | $94,020 | $72,082 | M & M STRIPING & POWER WASHING, LLC | -23.3% | 7 |
| Sep 18, 2013 | 6261-28-001RMC - 626128001 | Bexar San Antonio |
EMERGENCY REPAIR OF TRAFFIC SIGNALSIH 10 · | $200,360 | $197,673 | SIEMENS INDUSTRY, INC. | -1.3% | 2 |
| Sep 18, 2013 | 6259-73-001RMC - 625973001 | Wilson San Antonio |
CRACK SEALUS 181 · | $229,020 | $179,410 | TRIPLE R CONTRACTING, L.L.C. | -21.7% | 7 |
| Sep 18, 2013 | 6262-70-001RMC - 626270001 | Frio San Antonio |
CRACK SEALSS 581 · | $224,136 | $167,728 | D & M CONTRACTORS, LLC | -25.2% | 6 |
| Sep 17, 2013 | 6262-96-001RMC - 626296001 | Shelby Lufkin |
TREE REMOVALSH 87 · | $254,500 | $334,250 | K & R CONTRACTORS | +31.3% | 2 |
| Sep 17, 2013 | 6262-24-001RMC - 626224001 | Freestone Bryan |
TREE REMOVALSH 75 · | $157,475 | $268,350 | DEVTEX INC. | +70.4% | 1 |
| Sep 17, 2013 | 6260-73-001RMC - 626073001 | Harris Houston |
GUARDRAIL REPAIRSL 8 · | $294,549 | $262,658 | ISI CONTRACTING, INC. | -10.8% | 3 |
| Sep 17, 2013 | 6258-48-001RMC - 625848001 | Harris Houston |
GUARDRAIL REPAIRUS 59 · | $266,078 | $259,651 | ISI CONTRACTING, INC. | -2.4% | 3 |
| Sep 17, 2013 | 6261-84-001RMC - 626184001 | McLennan Waco |
CRACK SEAL - COLD APPLICATIONBU 77L · | $248,270 | $240,011 | D & M CONTRACTORS, LLC | -3.3% | 2 |
| Sep 17, 2013 | 6262-23-001RMC - 626223001 | Robertson Bryan |
CLEANING AND SWEEPING HIGHWAYSSH 6 · | $234,444 | $216,751 | M & M STRIPING & POWER WASHING, LLC | -7.5% | 1 |
| Sep 17, 2013 | 6261-91-001RMC - 626191001 | Milam Bryan |
CLEANING AND SEALING CRACKSUS 79 · | $252,086 | $148,731 | TEXAS ROAD MAINTENANCE | -41.0% | 8 |
| Sep 17, 2013 | 6262-22-001RMC - 626222001 | Freestone Bryan |
MBGF AND CABLE BARRIER REPAIRIH 45 · | $157,731 | $135,087 | T & L CLEANING SERVICES | -14.4% | 6 |
| Sep 17, 2013 | 6262-06-001RMC - 626206001 | Freestone Bryan |
CLEANING AND SWEEPING HIGHWAYSUS 84 · | $115,450 | $103,135 | EXPERT MAINTENANCE SERVICES LLC | -10.7% | 2 |
| Sep 17, 2013 | 6261-92-001RMC - 626192001 | Washington Bryan |
CLEANING AND SEALING CRACKSUS 290 · | $158,990 | $93,486 | TEXAS ROAD MAINTENANCE | -41.2% | 8 |
| Sep 17, 2013 | 6261-86-001RMC - 626186001 | Leon Bryan |
CLEANING AND SEALING CRACKSSH 75 · | $143,191 | $91,642 | TEXAS ROAD MAINTENANCE | -36.0% | 8 |
| Sep 17, 2013 | 6261-58-001BPM - 626158001 | Callahan Abilene |
IH 20 BRIDGE REPAIR AT BRUSHY CREEKIH 20 · | $49,500 | $71,825 | SCR CONSTRUCTION CO., INC. | +45.1% | 2 |
| Sep 17, 2013 | 6261-89-001RMC - 626189001 | Walker Bryan |
CLEANING AND SEALING CRACKSSH 75 · | $59,245 | $46,211 | TEXAS ROAD MAINTENANCE | -22.0% | 8 |
| Sep 16, 2013 | 6257-66-001RMC - 625766001 | Rusk Tyler |
TREE REMOVALUS 259 · | $190,035 | $203,750 | PATTERSON'S COMPLETE TREE SERVICE LLC | +7.2% | 6 |
| Sep 16, 2013 | 6257-64-001RMC - 625764001 | Henderson Tyler |
TREE REMOVALSH 31 · | $182,387 | $175,400 | PATTERSON'S COMPLETE TREE SERVICE LLC | -3.8% | 5 |
| Sep 16, 2013 | 6257-67-001RMC - 625767001 | Cherokee Tyler |
REE REMOVALUS 69 · | $160,400 | $146,250 | SALATIEL GARCIA | -8.8% | 4 |
| Sep 16, 2013 | 6257-65-001RMC - 625765001 | Van Zandt Tyler |
TREE REMOVALSH 64 · | $141,844 | $117,200 | BRYDL CONTRACTING, INC. | -17.4% | 5 |
| Sep 12, 2013 | 6251-16-001RMC - 625116001 | Collin Dallas |
POTHOLE & EDGE REPAIRUS 75 · | $144,770 | $208,749 | BRYDL CONTRACTING, INC. | +44.2% | 1 |
| Sep 12, 2013 | 6259-05-001RMC - 625905001 | Morris Atlanta |
CRACK SEALINGSH 49 · | $200,829 | $201,050 | D & M CONTRACTORS, LLC | +0.1% | 4 |
| Sep 12, 2013 | 6256-57-001RMC - 625657001 | Collin Dallas |
VEGETATION MANAGEMENTUS 380 · | $130,286 | $141,381 | ANTHONY SERVICES | +8.5% | 1 |
| Sep 12, 2013 | 6261-85-001RMC - 626185001 | Sabine Lufkin |
GUARD FENCE, ATTENUATOR & METAL RAIL RPRSH 87 · | $150,748 | $131,851 | ACE CONTRACTORS, INC. | -12.5% | 2 |
| Sep 12, 2013 | 6259-61-001RMC - 625961001 | Grayson Paris |
CRACK SEALUS 82 · | $120,500 | $95,078 | D & M CONTRACTORS, LLC | -21.1% | 7 |
| Sep 12, 2013 | 6259-03-001RMC - 625903001 | Navarro Dallas |
JOINT AND/OR CRACK SEALINGSH 22 · | $161,553 | $83,544 | TEXAS ROAD MAINTENANCE | -48.3% | 8 |
| Sep 12, 2013 | 6254-47-001RMC - 625447001 | Shelby Lufkin |
HIGH EDGE REMOVALUS 96 · | $79,105 | $70,948 | ACE CONTRACTORS, INC. | -10.3% | 2 |
| Sep 12, 2013 | 6262-72-001RMC - 626272001 | Grayson Paris |
DEBRIS REMOVALUS 82 · | $60,632 | $59,748 | CHITWOOD, INC | -1.5% | 2 |
| Sep 12, 2013 | 6262-59-001RMC - 626259001 | Harrison Atlanta |
DEBRIS REMOVAL (S)IH 20 · | $37,000 | $35,076 | WILLIAM DUNCAN | -5.2% | 5 |
| Sep 12, 2013 | 6262-71-001RMC - 626271001 | Bowie Atlanta |
DEBRIS REMOVAL (N)IH 30 · | $40,700 | $33,226 | WILLIAM DUNCAN | -18.4% | 4 |
| Sep 11, 2013 | 0508-01-276IM 0107(442) | Harris Houston |
REPLACE BRG AND APPROACHIH 10 · | $38,437,514 | $34,623,242 | OHL USA, INC. | -9.9% | 6 |
| Sep 11, 2013 | 1315-02-009C 1315-2-9 | Denton Dallas |
WIDEN 2 LANE RURAL UNDIVIDED TO 6 LANE DIVIDED URBFM 423 · | $28,358,878 | $29,826,070 | MCM | +5.2% | 12 |
| Sep 11, 2013 | 0052-03-029NH 2014(008) | Bailey Lubbock |
MILL, CEMENT STABILIZE, TY B HOTMIX, SMAUS 84 · | $18,515,091 | $15,399,876 | DUININCK, INC. | -16.8% | 5 |
| Sep 11, 2013 | 0017-10-253BR 2013(757) | Bexar San Antonio |
STRUCTURE REPAIRIH 35 · | $9,846,650 | $10,703,165 | SCR CONSTRUCTION CO., INC. | +8.7% | 1 |
| Sep 11, 2013 | 0251-01-056STP 2014(010) | Hamilton Waco |
ADD PASSING LANESUS 281 · | $11,245,002 | $10,087,611 | BIG CREEK CONSTRUCTION, LTD. | -10.3% | 4 |
| Sep 11, 2013 | 0327-02-051NH 2014(021) | Kenedy Pharr |
MILL & OVERLAY N.B. & S.B. ROADWAYSUS 77 · | $9,488,581 | $8,073,399 | TEXAS SAI, INC. | -14.9% | 3 |
| Sep 11, 2013 | 0458-01-022STP 2013(819) | Henderson Tyler |
SBGR WDN,BS,OCST,SURF,STRS,MBGF,SGN,PV MKFM 59 · | $8,709,284 | $6,987,662 | BIG CREEK CONSTRUCTION, LTD. | -19.8% | 4 |
| Sep 11, 2013 | 0110-01-037STP 2014(027) | Walker Bryan |
SEAL COATSH 75 · | $8,362,524 | $6,858,557 | NEWMAN & KENG PAVING COMPANY, INC. | -18.0% | 5 |
| Sep 11, 2013 | 0016-05-106IM 0352(345) | Comal San Antonio |
SEAL COAT, PFC OVERLAY AND PAVEMENT MARKINGSIH 35 · | $9,060,252 | $5,847,999 | ANGEL BROTHERS ENTERPRISES, LTD. | -35.5% | 4 |
| Sep 11, 2013 | 0544-01-020STP 2013(903)HES | Wichita Wichita Falls |
WIDEN STRUCTURES AND ADD SHOULDERSSH 258 · | $6,239,044 | $5,823,532 | A. L. HELMCAMP, INC. | -6.7% | 3 |
| Sep 11, 2013 | 0047-18-068NH 2013(908) | Grayson Paris |
WIDEN NON-FREEWAYUS 75 · | $5,819,878 | $5,248,891 | RAGLE CONSTRUCTION, INC. | -9.8% | 6 |
| Sep 11, 2013 | 0030-08-033STP 2014(004) | Wheeler Childress |
SEAL COATUS 83 · | $5,351,735 | $5,038,372 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | -5.9% | 6 |
| Sep 11, 2013 | 0867-03-026STP 2014(012)HES | Coryell Waco |
PROV ADD'TL PAV SURF WIDTHFM 183 · | $4,767,602 | $4,552,211 | KNIFE RIVER CORPORATION - SOUTH | -4.5% | 4 |
| Sep 11, 2013 | 0700-04-045STP 2013(928) | Llano Austin |
UPGRADE TO SUPPER 2 & ADD LTL'SSH 71 · | $5,167,610 | $4,402,628 | ALLEN KELLER COMPANY | -14.8% | 3 |
| Sep 11, 2013 | 0034-01-124C 34-1-124 | Taylor Abilene |
CONSTRUCT FRTGS TO ONE-WAY OPERATIONUS 83 · | $3,738,778 | $4,055,813 | J. H. STRAIN & SONS, INC. | +8.5% | 2 |
| Sep 11, 2013 | 0179-05-002STP 2014(029) | Brazoria Houston |
SL ACP O/L & PV MRKSSH 35 · | $5,503,926 | $3,985,333 | DURWOOD GREENE CONSTRUCTION CO. | -27.6% | 3 |
| Sep 11, 2013 | 0534-01-019C 534-1-19 | Randall Amarillo |
REPLACE CONCRETE WATER CROSSINGSPR 5 · | $2,742,651 | $3,956,849 | DCI CONTRACTING, INC. | +44.3% | 3 |
| Sep 11, 2013 | 1016-02-017STP 2014(006)HES | Collin Dallas |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 1138 · | $3,028,254 | $3,337,173 | APAC-TEXAS, INC. | +10.2% | 3 |
| Sep 11, 2013 | 0259-05-070NH 2014(045) | Johnson Fort Worth |
HMAC OVERLAYUS 67 · | $2,725,154 | $2,820,911 | NORTHEASTERN PAVERS, INC. | +3.5% | 5 |
| Sep 11, 2013 | 0089-08-095NH 2013(917) | Wharton Yoakum |
ADDING ACCEL/DECEL & TURN LANESUS 59 · | $2,000,725 | $2,072,945 | HUNTER INDUSTRIES, LTD. | +3.6% | 4 |
| Sep 11, 2013 | 0842-02-021STP 1302(043) | Victoria Yoakum |
REPAIR AND WIDEN ROADWAYFM 447 · | $2,119,361 | $2,015,295 | REXCO CONSTRUCTION SERVICES, INC. | -4.9% | 5 |
| Sep 11, 2013 | 2419-01-010STP 2014(009) | Castro Lubbock |
WIDEN, SALVAGE BASE, BASE, 2 CSTFM 145 · | $1,650,591 | $1,987,950 | J. LEE MILLIGAN, INC. | +20.4% | 3 |
| Sep 11, 2013 | 6254-60-001RMC - 625460001 | Gregg Tyler |
HMAC OVERLAYUS 80 · | $1,710,625 | $1,649,680 | MADDEN CONTRACTING COMPANY, LLC. | -3.6% | 4 |
| Sep 11, 2013 | 6262-46-001RMC - 626246001 | McLennan Waco |
OVERLAY AND MILL AND INLAYIH 35 · | $737,278 | $1,019,908 | KNIFE RIVER CORPORATION - SOUTH | +38.3% | 3 |
| Sep 11, 2013 | 0912-73-189C 912-73-189 | Galveston Houston |
VA · | $550,000 | $975,000 | FORDE CONSTRUCTION COMPANY, INC. | +77.3% | 1 |
| Sep 11, 2013 | 0978-02-071STP 2014(035)HES | Galveston Houston |
TS IMPRVMT & LT TN LNFM 517 · | $1,034,080 | $959,633 | FORDE CONSTRUCTION COMPANY, INC. | -7.2% | 3 |
| Sep 11, 2013 | 6259-30-001RMC - 625930001 | Donley Childress |
SEAL COATFM 2362 · | $924,251 | $922,469 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | -0.2% | 6 |
| Sep 11, 2013 | 0248-01-070STP 2014(031) | Titus Atlanta |
RESTORE SECTION & RESURFACE EXISTING 4-LANE HIGHWAUS 271 · | $970,000 | $779,081 | RK HALL, LLC | -19.7% | 3 |
| Sep 11, 2013 | 0176-05-173STP 2014(028)HES | Polk Lufkin |
IMPROVE GUARDRAIL TO DESIGN STANDARDSUS 59 · | $722,346 | $738,985 | VANN/ELLI, INC. | +2.3% | 4 |
| Sep 11, 2013 | 0017-07-132IM 0352(344)G | Frio San Antonio |
INSTALL TRAFFIC SIGNALIH 35 · | $649,539 | $593,552 | SIEMENS INDUSTRY, INC. | -8.6% | 7 |
| Sep 11, 2013 | 0914-00-320NH 2014(015) | Travis Austin |
FY 2013 SIGNINGVA · | $493,641 | $452,779 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -8.3% | 6 |
| Sep 11, 2013 | 6255-14-001RMC - 625514001 | Hardin Beaumont |
TREE AND BRUSH REMOVALUS 69 · | $393,250 | $448,935 | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | +14.2% | 3 |
| Sep 11, 2013 | 0919-03-049BR 1102(471) | Harrison Atlanta |
REPLACE BRIDGE AND APPROACHESCR · | $375,935 | $375,523 | EAST TEXAS BRIDGE, INC. | -0.1% | 3 |
| Sep 11, 2013 | 6262-52-001RMC - 626252001 | Bexar San Antonio |
CLEANING AND SEALING CRACKSIH 10 · | $455,000 | $364,118 | M & M STRIPING & POWER WASHING, LLC | -20.0% | 6 |
| Sep 11, 2013 | 6260-52-001RMC - 626052001 | Tarrant Fort Worth |
GUARDRAIL INSTALLATION/REPAIRIH 820 · | $386,474 | $314,507 | LONE STAR BARRIER SERVICES, LLC | -18.6% | 4 |
| Sep 11, 2013 | 0919-22-019BR 2002(373) | Marion Atlanta |
REPLACE BRIDGE AND APPROACHESCR · | $264,518 | $304,787 | EAST TEXAS BRIDGE, INC. | +15.2% | 3 |
| Sep 11, 2013 | 6260-97-001RMC - 626097001 | Tarrant Fort Worth |
GUARDRAIL INSTALLATION/REPAIRIH 35W · | $473,539 | $256,638 | CKORP, LLC | -45.8% | 4 |
| Sep 11, 2013 | 6249-66-001RMC - 624966001 | Montgomery Houston |
REFL PAV MRKGS (LONG LINE)US 59 · | $319,244 | $239,865 | PROFESSIONAL TRAFFIC CONTROL LLC | -24.9% | 5 |
| Sep 11, 2013 | 0910-00-093STP 2014(034) | Smith Tyler |
THERMO PLASTIC PAVEMENT MARKINGSVA · | $195,491 | $98,697 | STRIPE-A-ZONE, INC. | -49.5% | 4 |
| Sep 10, 2013 | 0259-06-001NH 2013(835) | Johnson Fort Worth |
WIDEN TO 4 LANE DIVIDEDUS 67 · | $22,886,096 | $28,488,426 | LONE STAR CIVIL CONSTRUCTION, INC. | +24.5% | 10 |
| Sep 10, 2013 | 0270-09-027STP 2013(750) | Live Oak Corpus Christi |
CONSTRUCT PASSING LANESSH 72 · | $18,981,771 | $16,894,488 | ANGEL BROTHERS ENTERPRISES, LTD. | -11.0% | 4 |
| Sep 10, 2013 | 0251-02-047STP 2014(011) | Hamilton Waco |
REHAB ROADWAY AND ADD PASSING LANESUS 281 · | $10,062,027 | $9,687,837 | BIG CREEK CONSTRUCTION, LTD. | -3.7% | 5 |
| Sep 10, 2013 | 0039-01-079NH 2014(019) | Starr Pharr |
OVERLAY (ML BOTH DIRECTIONS)US 83 · | $7,867,698 | $8,089,840 | FOREMOST PAVING, INC. | +2.8% | 2 |
| Sep 10, 2013 | 0495-09-049IM 0207(072) | Harrison Atlanta |
RESURFACE EXISTING INTERSTATE FACILITYIH 20 · | $6,813,552 | $7,961,243 | MADDEN CONTRACTING COMPANY, LLC. | +16.8% | 2 |
| Sep 10, 2013 | 3621-01-009STP 2013(939) | Val Verde Laredo |
FOR THE CONSTRUCTION OF A 2 LANE UNDIVIDED HIGHWAYSL 79 · | $4,964,383 | $5,720,530 | REECE ALBERT, INC. | +15.2% | 3 |
| Sep 10, 2013 | 2329-02-015STP 2014(002) | Kent Abilene |
WIDENING & REHABFM 1081 · | $4,374,321 | $5,496,256 | GILVIN-TERRILL, LTD. | +25.6% | 2 |
| Sep 10, 2013 | 0848-01-037STP 2014(018) | Medina San Antonio |
REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSFM 462 · | $5,734,538 | $4,927,895 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -14.1% | 7 |
| Sep 10, 2013 | 0675-02-077IM 0452(143) | Freestone Bryan |
HMA OVERLAY (REHABILITATION)IH 45 · | $5,293,530 | $4,687,022 | BIG CREEK CONSTRUCTION, LTD. | -11.5% | 3 |
| Sep 10, 2013 | 0050-03-090STP 1302(048)SB | Grimes Bryan |
FRTG ROADS, U-TURNS AND PED. IMP.SH 6 · | $4,860,525 | $4,575,221 | KNIFE RIVER CORPORATION - SOUTH | -5.9% | 7 |
| Sep 10, 2013 | 6261-96-001RMC - 626196001 | Nueces Corpus Christi |
DRY DOCKINGSH 361 · | $2,098,350 | $4,358,110 | SOUTHWEST SHIPYARD, L.P. | +107.7% | 1 |
| Sep 10, 2013 | 2213-01-013STP 2014(007)HES | Johnson Fort Worth |
GRADING, BASE AND PAVEMENTFM 2331 · | $4,275,518 | $4,289,115 | JAY MILLS CONTRACTING, INCORPORATED | +0.3% | 4 |
| Sep 10, 2013 | 0002-06-051IM 0101(266) | Hudspeth El Paso |
INSTALL MEDIAN BARRIERIH 10 · | $5,698,208 | $4,277,160 | DAN WILLIAMS COMPANY | -24.9% | 11 |
| Sep 10, 2013 | 2398-01-047C 2398-1-47 | Taylor Abilene |
REL RAMPS RECONST FRONTAGE RD.LP 322 · | $4,434,129 | $4,222,065 | CONTRACT PAVING CO. | -4.8% | 2 |
1–100 of 126Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.