| 1 | 100-2002 |
PREPARING ROW | 3.8 | STA |
$2,500.00 |
$3,225.00 |
$1,500.00 |
$3,000.00 |
| 2 | 110-2001 |
EXCAVATION (ROADWAY) | 269 | CY |
$7.00 |
$12.00 |
$12.00 |
$25.00 |
| 3 | 132-2006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 28 | CY |
$7.00 |
$35.00 |
$12.00 |
$50.00 |
| 4 | 160-2003 |
FURNISHING AND PLACING TOPSOIL (4") | 544 | SY |
$2.00 |
$3.00 |
$6.00 |
$5.50 |
| 5 | 164-2009 |
BROADCAST SEED (TEMP) (WARM) | 136 | SY |
$0.1600 |
$1.00 |
$0.6000 |
$1.30 |
| 6 | 164-2011 |
BROADCAST SEED (TEMP) (COOL) | 136 | SY |
$0.1600 |
$1.00 |
$0.6000 |
$3.10 |
| 7 | 164-2054 |
BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 544 | SY |
$0.2300 |
$1.00 |
$3.00 |
$3.00 |
| 8 | 168-2001 |
VEGETATIVE WATERING | 9 | MG |
$11.00 |
$10.00 |
$1.00 |
$8.00 |
| 9 | 169-2003 |
SOIL RETENTION BLANKETS (CL 1) (TY C) | 16 | SY |
$2.00 |
$10.00 |
$5.00 |
$8.00 |
| 10 | 400-2005 |
CEM STABIL BKFL | 35.4 | CY |
$45.00 |
$150.00 |
$150.00 |
$245.00 |
| 11 | 416-2004 |
DRILL SHAFT (36 IN) | 210 | LF |
$160.00 |
$195.00 |
$140.00 |
|
| 12 | 420-2041 |
CL C CONC (ABUT)(HPC) | 27.4 | CY |
$680.00 |
$805.00 |
$800.00 |
$825.00 |
| 13 | 420-2256 |
CL S CONC(APPR SLAB)(HPC) | 48.3 | CY |
$385.00 |
$485.00 |
$500.00 |
$485.00 |
| 14 | 422-2003 |
REINF CONC SLAB (HPC)(CL S) | 1,560 | SF |
$15.00 |
$18.00 |
$20.00 |
$16.00 |
| 15 | 425-2100 |
PRESTR CONC BOX BEAM (5XB20) | 178.5 | LF |
$260.00 |
$245.00 |
$320.00 |
$350.00 |
| 16 | 432-2021 |
RIPRAP (STONE PROTECTION)(18 IN) | 108 | CY |
$120.00 |
$110.00 |
$110.00 |
$124.00 |
| 17 | 432-2028 |
BEDDING MATERIAL (6 IN) | 36 | CY |
$89.00 |
$100.00 |
$110.00 |
$124.00 |
| 18 | 450-2161 |
RAIL (TY T223) | 148 | LF |
$53.00 |
$83.00 |
$80.00 |
$90.00 |
| 19 | 454-2004 |
ARMOR JOINT | 48 | LF |
$60.00 |
$42.00 |
$60.00 |
$80.00 |
| 20 | 500-2001 |
MOBILIZATION | 1 | LS |
$25,000.00 |
$30,000.00 |
$30,000.00 |
$20,000.00 |
| 21 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$1,500.00 |
$815.00 |
$1,200.00 |
$700.00 |
| 22 | 540-2001 |
MTL W-BEAM GD FEN (TIM POST) | 25 | LF |
$18.50 |
$30.00 |
$30.00 |
$28.00 |
| 23 | 540-2012 |
MTL BEAM GD FEN TRANS (TL2) | 2 | EA |
$725.00 |
$910.00 |
$1,200.00 |
$1,200.00 |
| 24 | 540-2025 |
TERMINAL ANCHOR SECTION (DRWY) (SPCL) | 1 | EA |
$1,000.00 |
$800.00 |
$900.00 |
$800.00 |
| 25 | 540-2037 |
MTL W - BEAM GD FEN(CRT POST)(SHRT RAD) | 12.5 | LF |
$33.00 |
$50.00 |
$45.00 |
$55.00 |
| 26 | 540-2044 |
DOWNSTREAM ANCHOR TERMINAL(DAT)SECTION | 2 | EA |
$1,420.00 |
$1,400.00 |
$1,200.00 |
$1,760.00 |
| 27 | 544-2004 |
GDRAIL END TRT(INST)(WOOD POST)(TY I) | 1 | EA |
$2,000.00 |
$2,400.00 |
$2,600.00 |
$2,500.00 |
| 28 | 658-2241 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) | 6 | EA |
$31.00 |
$38.00 |
$50.00 |
$42.00 |
| 29 | 658-2259 |
INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) | 6 | EA |
$17.00 |
$27.00 |
$50.00 |
$24.00 |
| 30 | 1122-2002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 80 | LF |
$22.50 |
$26.00 |
$40.00 |
$27.00 |
| 31 | 1122-2009 |
ROCK FILTER DAMS (REMOVE) | 80 | LF |
$7.50 |
$7.00 |
$20.00 |
$6.65 |
| 32 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 810 | LF |
$2.75 |
$2.80 |
$4.00 |
$2.80 |
| 33 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 810 | LF |
$1.00 |
$0.7500 |
$1.00 |
$0.6100 |
| 34 | 3120-2001 |
ASPHALT-STABILIZED FLEXIBLE BASE | 258 | TON |
$99.00 |
$145.00 |
$110.00 |
$115.00 |
| 35 | 409-2031 |
PRESTR CONC PIL (16 IN SQ)(ALT BID) | 420 | LF |
$80.00 |
|
|
$80.00 |