| 1 | 100-2002 |
PREPARING ROW | 33.84 | STA |
$1,350.00 |
$4,000.00 |
$2,600.00 |
$8,000.00 |
| 2 | 104-2001 |
REMOVING CONC (PAV) | 1,724 | SY |
$25.00 |
$15.00 |
$36.75 |
$20.00 |
| 3 | 104-2009 |
REMOVING CONC (RIPRAP) | 1,074 | SY |
$11.00 |
$15.00 |
$30.50 |
$20.00 |
| 4 | 105-2091 |
REMOVING STAB BASE & ASPH PAV (8"-12") | 3,807 | SY |
$8.25 |
$15.00 |
$6.25 |
$17.50 |
| 5 | 110-2001 |
EXCAVATION (ROADWAY) | 3,025 | CY |
$15.00 |
$10.00 |
$30.20 |
$25.00 |
| 6 | 110-2002 |
EXCAVATION (CHANNEL) | 1,668 | CY |
$25.00 |
$12.00 |
$28.15 |
$11.45 |
| 7 | 132-2004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 16,251 | CY |
$13.00 |
$20.00 |
$30.00 |
$12.75 |
| 8 | 150-2002 |
BLADING | 4 | HR |
$106.00 |
$100.00 |
$125.00 |
$175.00 |
| 9 | 161-2008 |
EROSION CONTROL COMPOST (2") | 9,174 | SY |
$2.00 |
$3.00 |
$7.50 |
$10.50 |
| 10 | 164-2022 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 3.18 | AC |
$1,600.00 |
$2,000.00 |
$4,350.00 |
$2,185.00 |
| 11 | 168-2001 |
VEGETATIVE WATERING | 279 | MG |
$17.00 |
$25.00 |
$37.00 |
$150.00 |
| 12 | 169-2002 |
SOIL RETENTION BLANKETS (CL 1) (TY B) | 354 | SY |
$3.25 |
$5.00 |
$10.75 |
$3.10 |
| 13 | 169-2004 |
SOIL RETENTION BLANKETS (CL 1) (TY D) | 407 | SY |
$3.50 |
$5.00 |
$11.90 |
$3.10 |
| 14 | 169-2006 |
SOIL RETENTION BLANKETS (CL 2) (TY F) | 761 | SY |
$3.00 |
$6.00 |
$12.00 |
$4.50 |
| 15 | 216-2001 |
PROOF ROLLING | 4 | HR |
$70.00 |
$100.00 |
$105.00 |
$125.00 |
| 16 | 247-2419 |
FL BS(CMP IN PLC)(TY A,B OR D GR4)(10") | 7,064 | SY |
$12.00 |
$15.00 |
$25.25 |
$20.65 |
| 17 | 247-2421 |
FL BS(CMP IN PLC)(TY A,B, OR D GR4)(6") | 376 | SY |
$9.00 |
$12.00 |
$30.35 |
$16.10 |
| 18 | 310-2001 |
PRIME COAT (MC-30) | 1,823 | GAL |
$4.50 |
$15.00 |
$7.40 |
$5.85 |
| 19 | 316-2707 |
ASPH (TIER III) | 4,161 | GAL |
$4.50 |
$16.00 |
$5.00 |
$6.55 |
| 20 | 316-2719 |
AGGR (TIER III) | 110.8 | CY |
$100.00 |
$100.00 |
$310.00 |
$122.00 |
| 21 | 400-2005 |
CEM STABIL BKFL | 98.8 | CY |
$135.00 |
$300.00 |
$264.25 |
$250.00 |
| 22 | 400-2008 |
CUT & RESTORING PAV (ASPH) | 105 | SY |
$100.00 |
$50.00 |
$107.00 |
$255.00 |
| 23 | 402-2001 |
TRENCH EXCAVATION PROTECTION | 20 | LF |
$5.00 |
$100.00 |
$15.75 |
$100.00 |
| 24 | 403-2001 |
TEMPORARY SPL SHORING | 580 | SF |
$8.00 |
$33.00 |
$25.00 |
$80.00 |
| 25 | 416-2002 |
DRILL SHAFT (24 IN) | 1,380 | LF |
$140.00 |
$180.00 |
$188.00 |
$200.00 |
| 26 | 420-2041 |
CL C CONC (ABUT)(HPC) | 62.8 | CY |
$850.00 |
$960.00 |
$1,765.00 |
$1,900.00 |
| 27 | 420-2042 |
CL C CONC (BENT)(HPC) | 46.2 | CY |
$900.00 |
$960.00 |
$1,505.00 |
$1,900.00 |
| 28 | 420-2068 |
CL S CONC (HPC)(SLAB) | 185.2 | CY |
$500.00 |
$800.00 |
$1,500.00 |
$1,900.00 |
| 29 | 420-2223 |
CL C CONC (COLUMN)(HPC) | 28 | CY |
$650.00 |
$2,000.00 |
$1,925.00 |
$1,900.00 |
| 30 | 420-2256 |
CL S CONC(APPR SLAB)(HPC) | 128.4 | CY |
$600.00 |
$540.00 |
$590.00 |
$1,900.00 |
| 31 | 423-2005 |
RETAINING WALL (TEMP WALL) | 7,200 | SF |
$13.00 |
$30.00 |
$15.75 |
$15.00 |
| 32 | 423-2012 |
RETAINING WALL (CAST-IN-PLACE) | 86 | SF |
$50.00 |
$50.00 |
$188.00 |
$200.00 |
| 33 | 425-2017 |
PRESTR CONC SLAB BEAM (5SB15) | 2,132.7 | LF |
$171.00 |
$250.00 |
$218.80 |
$190.00 |
| 34 | 432-2002 |
RIPRAP (CONC)(5 IN) | 35.8 | CY |
$450.00 |
$500.00 |
$430.00 |
$900.00 |
| 35 | 432-2040 |
RIPRAP (MOW STRIP)(5 IN) | 42 | CY |
$435.00 |
$500.00 |
$680.00 |
$425.00 |
| 36 | 450-2154 |
RAIL (TY T1W) | 792 | LF |
$175.00 |
$150.00 |
$143.00 |
$250.00 |
| 37 | 454-2008 |
JOINT SEALANT | 176 | LF |
$70.00 |
$28.00 |
$55.00 |
$100.00 |
| 38 | 459-2002 |
GABIONS (GALV) | 155.5 | CY |
$250.00 |
$220.00 |
$226.00 |
$200.00 |
| 39 | 459-2011 |
GABION MATTRESSES (GALV)(12 IN) | 27 | SY |
$100.00 |
$150.00 |
$245.00 |
$150.00 |
| 40 | 459-2012 |
GABION MATTRESSES (GALV)(18 IN) | 1,487 | SY |
$115.00 |
$170.00 |
$96.00 |
$175.00 |
| 41 | 459-2014 |
GABIONS (3' X 3')(GALV) | 387 | CY |
$250.00 |
$225.00 |
$230.00 |
$200.00 |
| 42 | 460-2007 |
CMP (GAL STL 36 IN) | 32 | LF |
$120.00 |
$100.00 |
$170.00 |
$160.00 |
| 43 | 462-2019 |
CONC BOX CULV (8 FT X 4 FT) | 60 | LF |
$570.00 |
$550.00 |
$750.00 |
$450.00 |
| 44 | 464-2005 |
RC PIPE (CL III)(24 IN) | 28 | LF |
$65.00 |
$100.00 |
$110.00 |
$150.00 |
| 45 | 466-2021 |
WINGWALL (FW-0)(HW=5 FT) | 2 | EA |
$8,000.00 |
$4,500.00 |
$16,475.00 |
$9,000.00 |
| 46 | 466-2084 |
HEADWALL (CH-FW-15)(DIA= 36 IN) | 2 | EA |
$5,000.00 |
$6,000.00 |
$10,615.00 |
$9,000.00 |
| 47 | 467-2211 |
SET (TY II)(24 IN)(RCP)(3:1)(C) | 2 | EA |
$1,000.00 |
$2,000.00 |
$2,020.00 |
$2,500.00 |
| 48 | 496-2007 |
REMOV STR (PIPE) | 408 | LF |
$13.00 |
$20.00 |
$30.50 |
$35.00 |
| 49 | 496-2018 |
REMOVE STR (CONC) | 1 | EA |
$10,000.00 |
$18,000.00 |
$1,250.00 |
$1,600.00 |
| 50 | 496-2042 |
REMOV STR (SMALL) | 1 | EA |
$15,000.00 |
$5,000.00 |
$6,750.00 |
$1,600.00 |
| 51 | 500-2001 |
MOBILIZATION | 1 | LS |
$250,000.00 |
$380,000.00 |
$353,400.00 |
$440,000.00 |
| 52 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$3,500.00 |
$3,000.00 |
$8,400.00 |
$1,500.00 |
| 53 | 508-2002 |
CONSTRUCTING DETOURS | 163 | SY |
$140.00 |
$100.00 |
$220.00 |
$205.00 |
| 54 | 512-2017 |
PORT CTB (DES SOURCE)(LOW PROF)(TY 1) | 1,320 | LF |
$20.00 |
$60.00 |
$15.70 |
$10.00 |
| 55 | 512-2018 |
PORT CTB (DES SOURCE)(LOW PROF)(TY 2) | 80 | LF |
$20.00 |
$60.00 |
$63.50 |
$10.00 |
| 56 | 512-2035 |
PORT CTB (STKPL)(LOW PROF)(TY 1) | 1,320 | LF |
$8.00 |
$60.00 |
$7.35 |
$10.00 |
| 57 | 512-2036 |
PORT CTB (STKPL)(LOW PROF)(TY 2) | 80 | LF |
$8.00 |
$60.00 |
$56.75 |
$10.00 |
| 58 | 540-2033 |
MTL BM GD FN TRANS(TL2)(RND TIM POST) | 12 | EA |
$1,200.00 |
$2,000.00 |
$1,760.00 |
$1,200.00 |
| 59 | 540-2044 |
DOWNSTREAM ANCHOR TERMINAL(DAT)SECTION | 1 | EA |
$1,500.00 |
$200.00 |
$2,225.00 |
$1,600.00 |
| 60 | 540-2045 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 50 | LF |
$25.00 |
$300.00 |
$32.60 |
$52.00 |
| 61 | 542-2001 |
REMOVING METAL BEAM GUARD FENCE | 144 | LF |
$6.00 |
$10.00 |
$5.25 |
$2.00 |
| 62 | 544-2001 |
GUARDRAIL END TREATMENT (INSTALL) | 13 | EA |
$2,250.00 |
$3,000.00 |
$3,950.00 |
$4,200.00 |
| 63 | 636-2001 |
ALUMINUM SIGNS (TY A) | 30 | SF |
$45.00 |
$200.00 |
$70.00 |
$26.00 |
| 64 | 644-2001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 19 | EA |
$400.00 |
$600.00 |
$650.00 |
$450.00 |
| 65 | 644-2060 |
REMOVE SM RD SN SUP & AM | 8 | EA |
$150.00 |
$200.00 |
$80.00 |
$75.00 |
| 66 | 658-2261 |
INSTL DEL ASSM (D-SW)SZ (TYC)GF1(BI) | 24 | EA |
$20.00 |
$50.00 |
$22.50 |
$20.00 |
| 67 | 658-2337 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 2 | EA |
$85.00 |
$300.00 |
$190.00 |
$75.00 |
| 68 | 662-2067 |
WK ZN PAV MRK REMOV (W) 4" (SLD) | 120 | LF |
$1.25 |
$2.00 |
$1.40 |
$1.32 |
| 69 | 662-2079 |
WK ZN PAV MRK REMOV (W) 24" (SLD) | 48 | LF |
$12.00 |
$10.00 |
$8.40 |
$8.00 |
| 70 | 666-2012 |
REFL PAV MRK TY I (W) 4" (SLD)(100MIL) | 3,805 | LF |
$0.5000 |
$2.00 |
$1.40 |
$1.32 |
| 71 | 666-2042 |
REFL PAV MRK TY I (W) 12"(SLD)(100MIL) | 113 | LF |
$1.00 |
$5.00 |
$3.80 |
$3.60 |
| 72 | 666-2048 |
REFL PAV MRK TY I (W) 24"(SLD)(100MIL) | 60 | LF |
$5.50 |
$10.00 |
$8.40 |
$8.00 |
| 73 | 666-2111 |
REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) | 3,955 | LF |
$0.5000 |
$2.00 |
$1.40 |
$1.32 |
| 74 | 681-2001 |
TEMP TRAF SIGNALS | 2 | EA |
$15,100.00 |
$30,000.00 |
$31,500.00 |
$35,000.00 |
| 75 | 1122-2002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 355 | LF |
$50.00 |
$40.00 |
$28.00 |
$30.00 |
| 76 | 1122-2003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 14 | LF |
$50.00 |
$50.00 |
$67.00 |
$60.00 |
| 77 | 1122-2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 4 | SY |
$17.00 |
$100.00 |
$160.00 |
$35.00 |
| 78 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 4 | SY |
$3.00 |
$1.00 |
$30.00 |
$15.00 |
| 79 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 3,004 | LF |
$3.75 |
$5.00 |
$4.25 |
$1.95 |
| 80 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 3,004 | LF |
$1.20 |
$1.00 |
$1.75 |
$0.7500 |
| 81 | 3268-2045 |
D-GR HMA TY-D SAC-B PG70-28 | 961 | TON |
$110.00 |
$200.00 |
$135.00 |
$200.00 |
| 82 | 5910-2001 |
REMOVE AND RELOCATE GATE | 3 | EA |
$2,000.00 |
$2,000.00 |
$2,200.00 |
$3,000.00 |