146Let jobs
$891,052,149Total low bids
$906,651,026Total estimates
-1.7%Low bids vs estimates
May 2018 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 30, 2018 | 6330-51-001RMC - 633051001 | Angelina Lufkin |
INSTALLATION OF RAISED PAVEMENT MARKERSUS 59 · | $278,000 | $262,316 | BRYDL CONTRACTING, INC. | -5.6% | 3 |
| May 30, 2018 | 6331-08-001RMC - 633108001 | El Paso El Paso |
CHAINLINK FENCE REPAIRSL 375 · | $238,786 | $253,280 | E. G. L. CONSTRUCTION, INC. | +6.1% | 2 |
| May 30, 2018 | 6331-06-001RMC - 633106001 | El Paso El Paso |
CULVERT CLEANINGIH 10 · | $223,277 | $162,750 | DEL MAR CONTRACTING, INC. | -27.1% | 2 |
| May 30, 2018 | 6331-07-001RMC - 633107001 | El Paso El Paso |
TRANSMOUNTAIN PICNIC AREA MAINTENANCESL 375 · | $29,200 | $36,000 | MESA D CORP. | +23.3% | 6 |
| May 24, 2018 | 6331-64-001RMC - 633164001 | Bexar San Antonio |
NEW ROAD AND RENOVATE EXISTING PARKINGMR 681 · | $241,792 | $276,524 | LONE STAR PAVING COMPANY | +14.4% | 6 |
| May 24, 2018 | 6327-64-001RMC - 632764001 | Bexar San Antonio |
INSTALL LOOM TURNAROUNDFM 1957 · | $129,236 | $191,352 | Curran Contracting Company | +48.1% | 3 |
| May 17, 2018 | 6330-38-001RMC - 633038001 | Grayson Paris |
ON CALL TREE TRIMMING AND REMOVALUS 82 · | $267,500 | $258,500 | NATURAL COLORS PAINTING LLC. | -3.4% | 3 |
| May 15, 2018 | 6325-12-001RMC - 632512001 | Wharton Yoakum |
RAISED PAVEMENT MARKINGSUS 59 · | $277,971 | $209,229 | BRYDL CONTRACTING, INC. | -24.7% | 5 |
| May 15, 2018 | 6325-53-001RMC - 632553001 | Falls Waco |
WIDEN PAVEMENTUS 77 · | $109,152 | $164,979 | KNIFE RIVER CORPORATION - SOUTH | +51.1% | 3 |
| May 14, 2018 | 6331-25-001RMC - 633125001 | Eastland Brownwood |
ROADSIDE MOWINGIH 20 · | $298,932 | $323,712 | JASCO | +8.3% | 4 |
| May 14, 2018 | 6331-24-001RMC - 633124001 | Comanche Brownwood |
ROADSIDE MOWINGUS 67 · | $298,373 | $255,057 | SQUARE G, INC. | -14.5% | 5 |
| May 14, 2018 | 6331-52-001RMC - 633152001 | San Saba Brownwood |
ROADSIDE MOWINGUS 190 · | $222,343 | $194,895 | R&M INCORPORATED | -12.3% | 5 |
| May 14, 2018 | 6325-11-001RMC - 632511001 | Colorado Yoakum |
SPECIALTY MARKINGSIH 10 · | $82,576 | $80,403 | PAVEMENT MARKINGS INC. | -2.6% | 2 |
| May 8, 2018 | 6329-95-001RMC - 632995001 | Galveston Houston |
DITCH CLEANING AND RESHAPINGFM 517 · | $296,825 | $267,075 | DOZIERS EXCAVATING & HAULING | -10.0% | 3 |
| May 8, 2018 | 6329-03-001RMC - 632903001 | Harris Houston |
DITCH CLEANING AND RESHAPINGSL 8 · | $295,900 | $247,300 | DOZIERS EXCAVATING & HAULING | -16.4% | 3 |
| May 8, 2018 | 6330-01-001RMC - 633001001 | Galveston Houston |
FULL DEPTH CONCRETE REPAIRFM 518 · | $237,630 | $226,616 | MAIN LANE INDUSTRIES LTD. | -4.6% | 3 |
| May 8, 2018 | 6325-57-001RMC - 632557001 | Dallas Dallas |
TREE TRIMMING AND BRUSH REMOVALIH 30 · | $249,998 | $205,492 | DOZIERS EXCAVATING & HAULING | -17.8% | 5 |
| May 8, 2018 | 6326-35-001RMC - 632635001 | Montgomery Houston |
REFL PAV MRKGS (GRAPHICS)IH 45 · | $196,243 | $175,043 | REPUBLIC TRAFFIC SAFETY, INC. | -10.8% | 4 |
| May 8, 2018 | 6329-31-001RMC - 632931001 | Webb Laredo |
MAINTENANCE OF ILLUMINATION SYSTEMS ALONG IH 35, EIH 35 · | $136,000 | $128,000 | SIGNAL SERVICES GROUP INC. | -5.9% | 2 |
| May 8, 2018 | 6325-58-001RMC - 632558001 | Dallas Dallas |
TREE TRIMMING AND BRUSH REMOVALSH 78 · | $138,780 | $113,960 | DOZIERS EXCAVATING & HAULING | -17.9% | 6 |
| May 2, 2018 | 0389-05-116NH 2018(852) | Harris Houston |
WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANESSH 146 · | $191,581,736 | $201,835,273 | WEBBER, LLC | +5.4% | 5 |
| May 2, 2018 | 0200-02-039NH 2018(811) | Angelina Lufkin |
GR STRS BASE & SURFUS 69 · | $72,772,732 | $71,614,967 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | -1.6% | 6 |
| May 2, 2018 | 0102-01-088NH 2018(842) | Nueces Corpus Christi |
GR, BS, SURF, STRUCTSSH 44 · | $33,992,727 | $37,950,858 | HAAS-ANDERSON CONSTRUCTION, LTD. | +11.6% | 5 |
| May 2, 2018 | 0367-02-075NH 1802(203) | Galveston Houston |
REHABILITATION AND RAISING ROADWAYSH 87 · | $18,260,225 | $20,817,021 | OLDCASTLE MATERIALS TEXAS, INC. | +14.0% | 3 |
| May 2, 2018 | 0229-03-035NH 2018(881) | Crane Odessa |
WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAYUS 385 · | $25,971,706 | $20,285,449 | DELHUR INDUSTRIES, INC. | -21.9% | 6 |
| May 2, 2018 | 0127-02-142STP 2018(829) | Eastland Brownwood |
RECONSTRUCT URBAN ROADWAYUS 183 · | $15,659,404 | $16,887,012 | BIG CREEK CONSTRUCTION, LTD. | +7.8% | 2 |
| May 2, 2018 | 0997-03-007STP 2018(888) | Navarro Dallas |
REPAIR AND RESURFACE HIGHWAYFM 667 · | $18,999,390 | $12,773,112 | BIG CREEK CONSTRUCTION, LTD. | -32.8% | 6 |
| May 2, 2018 | 1639-01-014STP 2018(879) | Reeves Odessa |
ROADWAY REHABILITATIONFM 1450 · | $8,014,513 | $10,632,822 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +32.7% | 5 |
| May 2, 2018 | 0014-03-095NH 2018(892) | Johnson Fort Worth |
CONC PAV RPR, MILL, OVERLAY, PAVMTIH 35W · | $10,302,248 | $10,321,477 | OLDCASTLE MATERIALS TEXAS, INC. | +0.2% | 4 |
| May 2, 2018 | 0040-01-050STP 1802(176)HES | Dallam Amarillo |
OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPINGUS 87 · | $11,386,918 | $10,092,336 | KIEWIT INFRASTRUCTURE SOUTH CO. | -11.4% | 6 |
| May 2, 2018 | 0617-01-196NH 2018(843) | Nueces Corpus Christi |
NOVACHIP ROADWAYSH 358 · | $5,929,131 | $7,489,379 | BAY LTD. | +26.3% | 2 |
| May 2, 2018 | 3508-01-028C 3508-1-28 | Bexar San Antonio |
OVERLAY AND PAVEMENT MARKINGS ON FRONTAGE ROADSSH 151 · | $9,996,396 | $7,394,842 | ANGEL BROTHERS HOLDINGS CORP. | -26.0% | 7 |
| May 2, 2018 | 7107-04-001STP 2018(117) | Crockett San Angelo |
RAILROAD REHABILITATIONRL SO · | $6,070,795 | $6,591,742 | RAILWORKS TRACK SYSTEMS, INC. | +8.6% | 1 |
| May 2, 2018 | 0008-05-027C 8-5-27 | Tarrant Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKSH 180 · | $7,227,166 | $5,833,765 | OLDCASTLE MATERIALS TEXAS, INC. | -19.3% | 4 |
| May 2, 2018 | 3207-01-011STP 2018(895) | Johnson Fort Worth |
GR, BS, DR, PAVMT MARKFM 3136 · | $5,796,805 | $5,771,223 | JAY MILLS CONTRACTING, INCORPORATED | -0.4% | 4 |
| May 2, 2018 | 0613-02-063C 613-2-63 | Atascosa San Antonio |
REPLACE EXISTING BRIDGESH 16 · | $5,215,910 | $5,704,330 | HARPER BROTHERS CONSTRUCTION LLC | +9.4% | 11 |
| May 2, 2018 | 6324-43-001RMC - 632443001 | Dallas Dallas |
PERF BASED OPER & MAINT OF MANAGED LANESIH 30 · | $7,140,180 | $5,662,048 | ROY JORGENSEN ASSOCIATES, INC. | -20.7% | 4 |
| May 2, 2018 | 0138-04-046C 138-4-46 | Rusk Tyler |
PLNG, ACP OVERLAY, SEAL COAT, PFC, PV MKUS 259 · | $5,848,095 | $5,220,900 | MADDEN CONTRACTING COMPANY, LLC. | -10.7% | 4 |
| May 2, 2018 | 0008-09-036C 8-9-36 | Parker Fort Worth |
BASE RPR, OVERLAY, PAVEMENT MARKFM 5 · | $5,540,492 | $5,012,311 | NORTHEASTERN PAVERS, INC. | -9.5% | 5 |
| May 2, 2018 | 6329-01-001RMC - 632901001 | Harris Houston |
ROADWAY MAINTENANCE FOR SH 99SH 99 · | $5,618,167 | $4,083,347 | ROY JORGENSEN ASSOCIATES, INC. | -27.3% | 3 |
| May 2, 2018 | 0109-02-026STP 2018(809) | Anderson Tyler |
PLNG,ACP,OCST,PFC,PVT MRKGUS 287 · | $4,111,723 | $3,987,345 | BIG CREEK CONSTRUCTION, LTD. | -3.0% | 5 |
| May 2, 2018 | 6328-51-001RMC - 632851001 | Midland Odessa |
MILL AND INLAYIH 20 · | $4,122,774 | $3,690,711 | FNF CONSTRUCTION, INC. | -10.5% | 1 |
| May 2, 2018 | 0102-01-116STP 2018(444) | Nueces Corpus Christi |
2018 HOT RUBBER SEAL PROJECTBS 44D · | $3,374,534 | $3,210,192 | COX PAVING OF TEXAS, INC. | -4.9% | 3 |
| May 2, 2018 | 0095-13-040NH 2018(450) | Dallas Dallas |
LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANSIH 20 · | $3,371,461 | $3,191,186 | CENTRAL NORTH CONSTRUCTION, LLC | -5.3% | 3 |
| May 2, 2018 | 0605-01-064STP 2018(837) | Matagorda Yoakum |
PAVEMENT REPAIR AND RESURFACINGFM 457 · | $3,098,709 | $2,986,655 | JAMES CONSTRUCTION GROUP, L.L.C. | -3.6% | 4 |
| May 2, 2018 | 0918-47-176STP 2018(887) | Dallas Dallas |
CHANNEL WORK, GRDCS · | $3,320,629 | $2,950,293 | T KWEST GROUP LLC | -11.2% | 11 |
| May 2, 2018 | 0823-01-029STP 2018(824) | Cooke Wichita Falls |
EXTEND CULVERTS AND WIDEN PAVEMENTFM 373 · | $3,297,240 | $2,899,372 | JAGOE-PUBLIC COMPANY | -12.1% | 9 |
| May 2, 2018 | 6318-45-001RMC - 631845001 | Karnes Corpus Christi |
SEAL COATSS 190 · | $2,668,143 | $2,771,538 | NEWMAN & KENG PAVING COMPANY, INC. | +3.9% | 5 |
| May 2, 2018 | 1566-01-011C 1566-1-11 | Williamson Austin |
DEPTH REPAIR, UNDERSEAL & THIN OVFM 1660 · | $2,430,755 | $2,389,609 | OLDCASTLE MATERIALS TEXAS, INC. | -1.7% | 4 |
| May 2, 2018 | 0495-08-110BR 2018(831) | Harrison Atlanta |
CONC DECK REPAIR & CONC STR REPAIRIH 20 · | $1,955,599 | $2,087,956 | HIGHWAY 19 CONSTRUCTION LLC | +6.8% | 7 |
| May 2, 2018 | 3510-06-015STP 2018(857) | Harris Houston |
CONSTRUCT SOUNDWALLSH 99 · | $2,353,260 | $2,082,834 | J.D. ABRAMS, L.P. | -11.5% | 9 |
| May 2, 2018 | 0928-02-020STP 2018(813)HES | Polk Lufkin |
IMPROVE GUARDRAIL TO DESIGN STANDFM 350 · | $1,788,894 | $1,889,218 | L.C. JORDAN & SON | +5.6% | 8 |
| May 2, 2018 | 0914-00-398STP 2018(821) | Travis Austin |
FY 2018 SITE SPECIFIC SIGNALSVA · | $1,787,988 | $1,886,559 | CHAMPION INFRASTRUCTURE, LLC | +5.5% | 3 |
| May 2, 2018 | 1005-02-001STP 2018(854)MM | Harris Houston |
WIDEN FROM 2 TO 4-LANE DIVIDED W/CURB & GUTTERFM 525 · | $1,886,983 | $1,763,846 | TRIPLE B SERVICES LLP | -6.5% | 6 |
| May 2, 2018 | 0636-01-038STP 1802(202)HES | Coleman Brownwood |
MILLED EDGELINE/CENTERLINE RUMBLESH 153 · | $2,285,019 | $1,682,224 | L&L COMPANY | -26.4% | 6 |
| May 2, 2018 | 0090-05-095STP 2018(815)HES | Potter Amarillo |
IMPROVE TRAFFIC SIGNALSSL 279 · | $1,447,750 | $1,568,719 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +8.4% | 1 |
| May 2, 2018 | 0521-06-144C 521-6-144 | Bexar San Antonio |
HIGH MAST AND CONTINUOUS ILLUMINATIONIH 410 · | $1,424,747 | $1,310,013 | MICA CORPORATION | -8.1% | 6 |
| May 2, 2018 | 0091-03-027C 91-3-27 | Collin Dallas |
INSTALLATION OF TRAFFIC SIGNALSSH 289 · | $1,219,466 | $1,288,000 | DURABLE SPECIALTIES, INC. | +5.6% | 5 |
| May 2, 2018 | 6331-40-001RMC - 633140001 | Nueces Corpus Christi |
DEBRIS REMOVAL AND DISPOSALUS 77 · | $1,295,000 | $1,283,590 | NIXON ENGINEERING | -0.9% | 3 |
| May 2, 2018 | 0334-05-032STP 2018(595) | Lee Austin |
REPAIR, LEVEL-UP & SEAL COATFM 141 · | $1,256,805 | $1,244,148 | LONE STAR PAVING COMPANY | -1.0% | 8 |
| May 2, 2018 | 0915-00-179STP 2018(866) | Bexar San Antonio |
CONSTRUCT CURB RAMPSVA · | $1,496,265 | $1,236,777 | F. D. CONCRETE, LLC | -17.3% | 6 |
| May 2, 2018 | 6330-57-001RMC - 633057001 | Nueces Corpus Christi |
PAVEMENT REPAIR AND PLANINGFM 2444 · | $1,169,164 | $1,227,884 | CLARK CONSTRUCTION OF TEXAS, INC. | +5.0% | 3 |
| May 2, 2018 | 0320-03-099BR 2018(820) | Williamson Austin |
REPLACE DECK AND STRUCTURAL REPAIRSSH 95 · | $829,418 | $1,149,643 | DAN WILLIAMS COMPANY | +38.6% | 8 |
| May 2, 2018 | 0883-02-086SSW 883-2-86 | Orange Beaumont |
BS, ACP, MILLED RUMBLE STRIPSFM 105 · | $1,339,279 | $1,139,721 | OLDCASTLE MATERIALS TEXAS, INC. | -14.9% | 3 |
| May 2, 2018 | 0916-00-086STP 2018(844) | Nueces Corpus Christi |
DISTRICT WIDE SIGN REPLACEMENTVA · | $1,340,810 | $1,132,329 | HIGHWAY BARRICADES AND SERVICES, LLC | -15.5% | 2 |
| May 2, 2018 | 0893-01-034STP 2018(812)HES | Nacogdoches Lufkin |
IMPROVE GUARDRAIL AND SAFETY TREATFM 226 · | $1,077,944 | $1,084,003 | A R BROTHERS CONSTRUCTION SERVICES, INC. | +0.6% | 14 |
| May 2, 2018 | 6328-01-001RMC - 632801001 | Montgomery Houston |
MILL AND OVERLAYSH 105 · | $1,301,370 | $1,042,517 | SMITH & COMPANY | -19.9% | 5 |
| May 2, 2018 | 6328-56-001RMC - 632856001 | Howard Abilene |
CALL OUT MBGFIH 20 · | $988,485 | $951,385 | HJC FARMS, INC. | -3.8% | 2 |
| May 2, 2018 | 0232-05-016C 232-5-16 | Bell Waco |
SEAL/OVLYFM 2305 · | $839,513 | $888,222 | OLDCASTLE MATERIALS TEXAS, INC. | +5.8% | 5 |
| May 2, 2018 | 6330-09-001RMC - 633009001 | El Paso El Paso |
MISCELLANEOUS CONCRETEIH 10 · | $706,462 | $799,980 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +13.2% | 2 |
| May 2, 2018 | 6322-60-001RMC - 632260001 | Galveston Houston |
MILLING,OVERLAY,BASE RPR,CONC RPR,LOOPSSH 275 · | $619,747 | $717,549 | ANGEL BROTHERS HOLDINGS CORP. | +15.8% | 2 |
| May 2, 2018 | 0231-01-056C 231-1-56 | Lampasas Brownwood |
PLANING AND ACP OVERLAYUS 190 · | $1,199,065 | $667,334 | LONE STAR PAVING COMPANY | -44.3% | 4 |
| May 2, 2018 | 0626-01-007C 626-1-7 | Reeves Odessa |
REHAB PARK ROADS,PARKING LOTS AND CAMPSITEPR 30B · | $438,565 | $560,740 | FNH CONSTRUCTION, LLC | +27.9% | 4 |
| May 2, 2018 | 6329-42-001RMC - 632942001 | Donley Childress |
MOWING OF RIGHT WAYUS 287 · | $775,712 | $497,841 | ALL HANDS & DUKE, INC. | -35.8% | 5 |
| May 2, 2018 | 0017-09-104NH 2018(801) | Bexar San Antonio |
LANDSCAPE PLANTING AND IRRIGATIONIH 35 · | $386,094 | $482,084 | APEX LANDSCAPE & IRRIGATION, LLC | +24.9% | 3 |
| May 2, 2018 | 3256-01-111NH 2018(855) | Harris Houston |
LANDSCAPE ENHANCEMENTSSL 8 · | $468,750 | $407,844 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -13.0% | 5 |
| May 2, 2018 | 6328-57-001RMC - 632857001 | Jasper Beaumont |
METAL BEAM GUARD FENCE REPAIRSUS 96 · | $340,326 | $406,501 | ELITE CASTLE RESOURCES LLC | +19.4% | 3 |
| May 2, 2018 | 6329-41-001RMC - 632941001 | Childress Childress |
MOWING RIGHT OF WAYUS 287 · | $567,840 | $364,432 | ALL HANDS & DUKE, INC. | -35.8% | 6 |
| May 2, 2018 | 6324-23-001RMC - 632423001 | Tarrant Fort Worth |
ADDING TURN LANEFM 1187 · | $384,555 | $354,605 | ED BELL CONSTRUCTION COMPANY | -7.8% | 5 |
| May 2, 2018 | 0415-01-025STP 2018(878)HES | Jeff Davis El Paso |
IMPROVE GUARDRAIL TO STANDARDSSH 118 · | $221,701 | $340,160 | VIZCAINO, L.P. | +53.4% | 4 |
| May 2, 2018 | 6326-38-001RMC - 632638001 | Montgomery Houston |
CONCRETE STRUCTURE REPAIRIH 45 · | $323,475 | $318,750 | ISI CONTRACTING, INC. | -1.5% | 4 |
| May 2, 2018 | 0088-06-004STP 2018(836)HES | Victoria Yoakum |
IMPROVE TRAFFIC SIGNALSBU 59-T · | $366,368 | $316,189 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -13.7% | 3 |
| May 2, 2018 | 6328-97-001RMC - 632897001 | Jefferson Beaumont |
CABLE BARRIER REPAIRIH 10 · | $354,900 | $307,890 | ELITE CASTLE RESOURCES LLC | -13.2% | 2 |
| May 2, 2018 | 6326-66-001RMC - 632666001 | Kaufman Dallas |
MISCELLANEOUS CONCRETE REPAIRUS 80 · | $295,540 | $280,600 | HIGHWAY 19 CONSTRUCTION LLC | -5.1% | 9 |
| May 2, 2018 | 0028-07-052BR 2018(848) | Jefferson Beaumont |
UPGRADE BRIDGE AND APPROACH RAILINGUS 90 · | $271,678 | $237,658 | OLDCASTLE MATERIALS TEXAS, INC. | -12.5% | 8 |
| May 1, 2018 | 0025-02-160C 25-2-160 | Bexar San Antonio |
EXPAND FROM 4 TO 6 LANE EXPRESSWAYIH 10 · | $126,653,961 | $119,776,274 | WEBBER, LLC | -5.4% | 5 |
| May 1, 2018 | 1051-01-037STP 1802(011)MM | Ellis Dallas |
WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDEDFM 664 · | $35,322,910 | $32,207,127 | STERLING DELAWARE HOLDING COMPANY, INC. | -8.8% | 11 |
| May 1, 2018 | 0139-04-045NH 2018(882) | Reeves Odessa |
ROADWAY WIDENING TO A MODIFIED SUPER 2US 285 · | $30,686,831 | $31,638,493 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | +3.1% | 3 |
| May 1, 2018 | 0088-05-085C 88-5-85 | Victoria Yoakum |
CONSTRUCT FRONTAGE ROADSUS 59 · | $24,497,349 | $28,593,623 | SER CONSTRUCTION PARTNERS, LLC | +16.7% | 3 |
| May 1, 2018 | 0168-01-029C 168-1-29 | Parmer Lubbock |
REHABILITATION OF EXISTING ROADWAYUS 60 · | $19,335,374 | $17,450,676 | J. LEE MILLIGAN, INC. | -9.7% | 8 |
| May 1, 2018 | 0017-06-084NH 2018(910) | Frio San Antonio |
REHABILITATE EXISTING FRONTAGE ROADSIH 35 · | $15,775,305 | $13,995,985 | H. L. ZUMWALT CONSTRUCTION, INC. | -11.3% | 8 |
| May 1, 2018 | 1015-01-023STP 2018(889) | Rockwall Dallas |
WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN DIVIDEDFM 3549 · | $9,746,299 | $9,250,063 | TISEO PAVING CO. | -5.1% | 3 |
| May 1, 2018 | 0380-09-087NH 2018(880) | Midland Odessa |
ROADWAY REHABILITATIONBS 349C · | $8,300,644 | $8,191,798 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -1.3% | 4 |
| May 1, 2018 | 2350-01-057NH 2018(838) | Victoria Yoakum |
PAVEMENT REPAIR AND RESURFACINGSL 463 · | $6,881,890 | $6,854,284 | HUNTER INDUSTRIES, LTD. | -0.4% | 2 |
| May 1, 2018 | 0004-06-036STP 2018(883)HES | Ector Odessa |
INSTALL MEDIAN BARRIERIH 20 · | $7,025,447 | $6,242,607 | SCR CIVIL CONSTRUCTION, LLC | -11.1% | 3 |
| May 1, 2018 | 0006-18-058C 6-18-58 | Taylor Abilene |
MILL & FILL W/ 1-CST AND SMABI 20-R · | $6,185,482 | $5,844,818 | CONTRACT PAVING CO. | -5.5% | 4 |
| May 1, 2018 | 0100-10-015STP 2018(186) | Karnes Corpus Christi |
2018 DISTRICT WIDE SEAL COAT PROJECTBU 181F · | $5,530,328 | $5,799,224 | BRANNAN PAVING CO., LTD. | +4.9% | 5 |
| May 1, 2018 | 0248-05-064C 248-5-64 | Upshur Atlanta |
PLANE ACP, ACP SURF, & PAV MARKUS 271 · | $5,424,194 | $5,046,398 | MADDEN CONTRACTING COMPANY, LLC. | -7.0% | 4 |
| May 1, 2018 | 0017-10-280STP 2018(860)MM | Bexar San Antonio |
CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADSIH 35 · | $5,046,511 | $4,561,841 | J3 COMPANY, LLC | -9.6% | 9 |
| May 1, 2018 | 0156-06-052NH 1802(199) | Baylor Wichita Falls |
RE-ALIGN ROADWAYUS 82 · | $4,131,857 | $3,745,738 | A. L. HELMCAMP, INC. | -9.3% | 2 |
1–100 of 146Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.