| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 16,445 | CY |
$6.00 |
$20.30 |
$15.00 |
$19.99 |
| 2 | 132-6001 |
EMBANKMENT (FINAL)(ORD COMP)(TY A) | 9,925 | CY |
$20.00 |
$19.60 |
$25.00 |
$35.51 |
| 3 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 12,022 | CY |
$14.00 |
$16.00 |
$25.00 |
$26.90 |
| 4 | 150-6002 |
BLADING | 109 | HR |
$115.00 |
$300.00 |
$100.00 |
$216.50 |
| 5 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 652,087 | SY |
$1.00 |
$0.1000 |
$0.1500 |
$0.1100 |
| 6 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 7,990 | CY |
$400.00 |
$346.00 |
$325.00 |
$418.23 |
| 7 | 500-6001 |
MOBILIZATION | 1 | LS |
$566,427.00 |
$624,000.00 |
$45,000.00 |
$859,402.50 |
| 8 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$10,000.00 |
$13,000.00 |
$3,500.00 |
$25,941.30 |
| 9 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,180 | LF |
$5.00 |
$6.00 |
$15.00 |
$11.80 |
| 10 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,180 | LF |
$1.00 |
$3.15 |
$2.00 |
$2.78 |
| 11 | 543-6002 |
CABLE BARRIER SYSTEM (TL-4) | 140,808 | LF |
$10.00 |
$8.80 |
$13.00 |
$12.33 |
| 12 | 543-6006 |
CABLE BARRIER SYSTEM (TL-4) (10'-0") | 17,918 | LF |
$20.00 |
$11.50 |
$13.00 |
$18.20 |
| 13 | 543-6020 |
CABLE BARRIER TERMINAL SECTION (TL-4) | 60 | EA |
$2,600.00 |
$2,300.00 |
$2,800.00 |
$2,982.65 |
| 14 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 26 | EA |
$600.00 |
$950.00 |
$600.00 |
$662.26 |
| 15 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 114 | EA |
$65.00 |
$77.00 |
$75.00 |
$59.86 |
| 16 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 6 | EA |
$5,340.00 |
$12,000.00 |
$24,000.00 |
$16,940.00 |
| 17 | 6185-6001 |
TMA (STATIONARY) | 18 | EA |
$1,575.00 |
$10,000.00 |
$26,400.00 |
$8,671.69 |