149Let jobs
$540,245,317Total low bids
$575,574,925Total estimates
-6.1%Low bids vs estimates
Jul 2017 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jul 27, 2017 | 6320-09-001RMC - 632009001 | Presidio El Paso |
PICNIC AREA LITTER BARRELUS 67 · | $50,820 | $46,979 | MESA D CORP. | -7.6% | 2 |
| Jul 25, 2017 | 6301-71-001RMC - 630171001 | La Salle Laredo |
CLEANING AND SWEEPING OF HIGHWAYS/LITTERIH 35 · | $123,483 | $389,615 | M & M STRIPING & POWER WASHING, LLC | +215.5% | 1 |
| Jul 25, 2017 | 6319-25-001RMC - 631925001 | Duval Laredo |
MOWING OF HIGHWAYS RIGHT-OF-WAYUS 59 · | $179,922 | $214,060 | R&M INCORPORATED | +19.0% | 1 |
| Jul 20, 2017 | 6317-69-001RMC - 631769001 | Grayson Paris |
CLEANING AND SWEEPING HIGHWAYSUS 75 · | $206,715 | $287,638 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | +39.1% | 1 |
| Jul 20, 2017 | 6318-96-001RMC - 631896001 | Hopkins Paris |
CRACK SEALIH 30 · | $135,250 | $94,682 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -30.0% | 7 |
| Jul 20, 2017 | 6319-69-001RMC - 631969001 | Hudspeth El Paso |
MOWING HIGHWAY RIGHT OF WAYUS 62 · | $64,860 | $54,651 | CM COMPANY | -15.7% | 2 |
| Jul 20, 2017 | 6319-98-001RMC - 631998001 | Culberson El Paso |
MAINTENANCE PICNIC AREASUS 62 · | $33,760 | $29,407 | A CUT ABOVE LAWN MAINTENANCE & SPRINKLER CO. | -12.9% | 1 |
| Jul 18, 2017 | 6316-03-001RMC - 631603001 | Parker Fort Worth |
SWEEPING AND DEBRISIH 20 · | $294,845 | $286,745 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -2.7% | 2 |
| Jul 18, 2017 | 6318-38-001RMC - 631838001 | Brazoria Houston |
PUMP STA & DRAINAGE SYS CLNSH 288 · | $277,655 | $277,655 | CLEAN SERVE, LLC | 0.0% | 1 |
| Jul 18, 2017 | 6312-88-001RMC - 631288001 | Tarrant Fort Worth |
CALLOUT REFLECTORIZED PAVEMENT MARKINGSIH 35W · | $275,157 | $273,473 | TOTAL HIGHWAY MAINTENANCE, LLC | -0.6% | 4 |
| Jul 18, 2017 | 6316-52-001RMC - 631652001 | Brazoria Houston |
REPAIR OF FLEXIBLE PAVEMENTSH 288 · | $273,170 | $246,750 | MAIN LANE INDUSTRIES LTD. | -9.7% | 2 |
| Jul 18, 2017 | 6311-71-001RMC - 631171001 | Tarrant Fort Worth |
FULL DEPTH REPAIR OF EXISTING CONCRETEUS 287 · | $205,385 | $243,481 | IIPL USA LLC | +18.5% | 5 |
| Jul 18, 2017 | 6313-83-001RMC - 631383001 | Harris Houston |
REMOVE AND RESET CULVERTSSH 35 · | $251,160 | $242,184 | MAIN LANE INDUSTRIES LTD. | -3.6% | 6 |
| Jul 18, 2017 | 6320-26-001RMC - 632026001 | Taylor Abilene |
HIGH PERFORMANCE STRIPINGIH 20 · | $296,133 | $230,803 | FLAT LINE, INC. | -22.1% | 5 |
| Jul 18, 2017 | 6316-02-001RMC - 631602001 | Johnson Fort Worth |
CLEANING AND SEALING JOINTS & CRACKSIH 35W · | $226,799 | $205,978 | CHAMPION INFRASTRUCTURE, LLC | -9.2% | 5 |
| Jul 18, 2017 | 6319-10-001RMC - 631910001 | Pecos Odessa |
SPECIALTY MARKINGSIH 10 · | $187,889 | $190,972 | DOUBLE A CONTRACTING, L.P. | +1.6% | 6 |
| Jul 18, 2017 | 6306-32-001RMC - 630632001 | Coryell Waco |
TREE TRIMMIMG AND TREE REMOVALUS 84 · | $264,880 | $190,139 | KASPARIAN UNDERGROUND, LLC | -28.2% | 3 |
| Jul 18, 2017 | 6306-33-001RMC - 630633001 | Hill Waco |
TREE TRIMMING AND TREE REMOVALUS 77 · | $224,483 | $173,013 | KASPARIAN UNDERGROUND, LLC | -22.9% | 4 |
| Jul 18, 2017 | 6316-94-001RMC - 631694001 | Montgomery Houston |
BRIDGE JOINT CLEANING AND SEALINGIH 69 · | $218,528 | $161,506 | CHAMPION INFRASTRUCTURE, LLC | -26.1% | 5 |
| Jul 18, 2017 | 6315-55-001RMC - 631555001 | Collin Dallas |
MISCELLANEOUS CONCRETE REPAIRUS 380 · | $115,982 | $138,438 | IIPL USA LLC | +19.4% | 2 |
| Jul 18, 2017 | 6319-40-001RMC - 631940001 | Bell Waco |
TREE TRIMMIMG AND TREE REMOVALFM 817 · | $146,795 | $136,909 | BEAVER BOYS SERVICES | -6.7% | 5 |
| Jul 18, 2017 | 6306-31-001RMC - 630631001 | McLennan Waco |
TREE TRIMMING AND REMOVALSH 6 · | $117,480 | $105,038 | RAFTER JK CONSTRUCTION, LLC | -10.6% | 8 |
| Jul 18, 2017 | 6316-44-001RMC - 631644001 | Galveston Houston |
CRACK SEALINGSH 146 · | $76,092 | $62,643 | CHAMPION INFRASTRUCTURE, LLC | -17.7% | 3 |
| Jul 18, 2017 | 6313-40-001RMC - 631340001 | Liberty Beaumont |
SH 105 ETC., CRACK SEALSH 105 · | $59,242 | $34,854 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -41.2% | 4 |
| Jul 13, 2017 | 6316-77-001RMC - 631677001 | Tom Green San Angelo |
METAL BEAM GUARD FENCE REPAIRSH 208 · | $286,160 | $319,359 | ELITE CASTLE RESOURCES LLC | +11.6% | 2 |
| Jul 13, 2017 | 6318-64-001RMC - 631864001 | Webb Laredo |
INSTALLATION OF PVT MRKGS AND PVT MRKRSIH 35 · | $298,983 | $266,387 | PAVEMENT MARKINGS INC. | -10.9% | 5 |
| Jul 13, 2017 | 6318-14-001RMC - 631814001 | Bastrop Austin |
CLEANING AND SEALING JOINTS AND CRACKSUS 290 · | $243,429 | $170,931 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -29.8% | 4 |
| Jul 13, 2017 | 6314-72-001RMC - 631472001 | Crockett San Angelo |
REPAIR BRIDGE RAILIH 10 · | $170,130 | $161,660 | SCR CIVIL CONSTRUCTION, LLC | -5.0% | 3 |
| Jul 13, 2017 | 6305-76-001RMC - 630576001 | Cherokee Tyler |
CULVERT REPAIRUS 69 · | $68,192 | $60,270 | HIGHWAY 19 CONSTRUCTION LLC | -11.6% | 8 |
| Jul 13, 2017 | 6317-67-001RMC - 631767001 | Williamson Austin |
CRACK SEALINGUS 79 · | $86,200 | $60,016 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -30.4% | 6 |
| Jul 12, 2017 | 2635-03-018NH 1702(473) | Randall Amarillo |
CONSTRUCT INTERCHANGE,MAINLANES AND FRT ROADSSL 335 · | $46,556,724 | $42,375,492 | ALLEN BUTLER CONSTRUCTION, INC. | -9.0% | 4 |
| Jul 12, 2017 | 0605-01-060BR 2017(973) | Matagorda Yoakum |
REPLACE SWING BRIDGEFM 457 · | $39,234,368 | $41,231,131 | AUSTIN BRIDGE & ROAD SERVICES, LP | +5.1% | 9 |
| Jul 12, 2017 | 2121-02-150NH 1702(501) | El Paso El Paso |
INTERCHANGE IMPROVEMENTSIH 10 · | $27,267,381 | $25,376,264 | DAN WILLIAMS COMPANY | -6.9% | 4 |
| Jul 12, 2017 | 0128-04-035STP 2017(458) | McCulloch Brownwood |
RECONSTRUCT URBAN ROADUS 190 · | $11,675,760 | $17,475,202 | ALLEN KELLER COMPANY | +49.7% | 1 |
| Jul 12, 2017 | 1091-04-022STP 1702(454) | Rockwall Dallas |
PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAYFM 549 · | $12,935,231 | $11,599,739 | ED BELL CONSTRUCTION COMPANY | -10.3% | 7 |
| Jul 12, 2017 | 0266-08-011BR 1702(488) | Colorado Yoakum |
CONSTRUCT NEW BRIDGE AND APPROACHESBS 71-F · | $9,384,798 | $10,459,589 | ISI CONTRACTING, INC. | +11.5% | 3 |
| Jul 12, 2017 | 0237-07-013STP 1702(496) | Dimmit Laredo |
BASE,GRADE,ACP, PAV MARKFM 133 · | $10,511,417 | $9,690,620 | ANDERSON COLUMBIA CO., INC. | -7.8% | 7 |
| Jul 12, 2017 | 0495-01-074NH 1702(759) | Kaufman Dallas |
MILL AND OVERLAY EXISTING FREEWAYIH 20 · | $10,384,459 | $9,178,945 | OLDCASTLE MATERIALS TEXAS, INC. | -11.6% | 6 |
| Jul 12, 2017 | 0089-06-088NH 1702(485) | Wharton Yoakum |
ACP OVERLAYUS 59 · | $8,011,301 | $8,161,720 | JAMES CONSTRUCTION GROUP, L.L.C. | +1.9% | 5 |
| Jul 12, 2017 | 0271-14-231NH 1702(513) | Harris Houston |
RECONSTRUCT FRTG RDSIH 610 · | $8,902,557 | $7,781,945 | MAIN LANE INDUSTRIES LTD. | -12.6% | 9 |
| Jul 12, 2017 | 0005-05-112BR 1702(476) | Howard Abilene |
INSTALL CRASHWALLSIH 20 · | $6,107,331 | $7,767,028 | SCR CIVIL CONSTRUCTION, LLC | +27.2% | 4 |
| Jul 12, 2017 | 0140-11-044NH 1702(546) | Crockett San Angelo |
PLANE, EMULSION TREAT, SURFACE TREATMENT & OVERLAYIH 10 · | $5,474,290 | $4,567,929 | REECE ALBERT, INC. | -16.6% | 6 |
| Jul 12, 2017 | 6316-22-001RMC - 631622001 | Harris Houston |
GENERL MAINTENANCE_IH 610IH 610 · | $4,535,407 | $4,111,633 | ISI CONTRACTING, INC. | -9.3% | 3 |
| Jul 12, 2017 | 1673-01-008SSW 1673-1-8 | Van Zandt Tyler |
GR, FLX BS, TCST, STRS, PV MKFM 1653 · | $3,920,876 | $3,972,777 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +1.3% | 7 |
| Jul 12, 2017 | 0005-13-056BR 1702(495) | Ector Odessa |
UPGRADE BRIDGE AND APPROACH RAILINGIH 20 · | $3,632,750 | $3,958,979 | SCR CIVIL CONSTRUCTION, LLC | +9.0% | 3 |
| Jul 12, 2017 | 0245-06-081STP 1702(585) | Smith Tyler |
PLNING,BASE REPAIR,MEMB UNDRSL,SUPER PAV,PV MKSH 64 · | $4,092,402 | $3,624,096 | MADDEN CONTRACTING COMPANY, LLC. | -11.4% | 6 |
| Jul 12, 2017 | 2374-01-187STP 1702(455)HES | Dallas Dallas |
INSTALL PROTECTIONIH 635 · | $3,358,413 | $3,522,311 | SJ&J CONSTRUCTION, LLC | +4.9% | 4 |
| Jul 12, 2017 | 0915-00-178STP 1702(555) | Bexar San Antonio |
CONSTRUCT CURB RAMPS_(VARIOUS LOC IN BEXAR CO)VA · | $3,928,875 | $3,495,290 | F. D. CONCRETE, LLC | -11.0% | 10 |
| Jul 12, 2017 | 0043-06-084BR 1702(470) | Wilbarger Wichita Falls |
BRIDGE MAINTENANCEUS 70 · | $2,821,267 | $3,149,694 | SCR CIVIL CONSTRUCTION, LLC | +11.6% | 3 |
| Jul 12, 2017 | 0047-14-082NH 1702(450) | Collin Dallas |
LANDSCAPE TREATMENT OF RIGHTS OF WAY AND MEDIANSUS 75 · | $2,311,464 | $2,750,000 | AALC, INC. | +19.0% | 4 |
| Jul 12, 2017 | 6317-22-001RMC - 631722001 | Kaufman Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAYUS 80 · | $3,045,693 | $2,604,374 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | -14.5% | 5 |
| Jul 12, 2017 | 0043-09-130BR 1702(594) | Wichita Wichita Falls |
REPLACE BRIDGE AND APPROACHESUS 287 · | $2,641,548 | $2,398,060 | COPPELL CONSTRUCTION CO., INC. | -9.2% | 6 |
| Jul 12, 2017 | 6318-15-001RMC - 631815001 | Bosque Waco |
FLAGGING AND TRAFFIC CONTROLSH 6 · | $2,263,657 | $2,234,850 | NIXON ENGINEERING | -1.3% | 4 |
| Jul 12, 2017 | 0914-00-407NH 1702(583) | Travis Austin |
ASPHALTIC PAVEMENT REPAIRSVA · | $2,103,934 | $2,168,168 | AUSTIN MATERIALS, LLC | +3.1% | 4 |
| Jul 12, 2017 | 0364-03-099NH 1702(578) | Denton Dallas |
LANDSCAPE TREATMENT OF MEDIANS AND RIGHT OF WAYBS 121H · | $1,993,865 | $1,895,000 | APEX LANDSCAPE & IRRIGATION, LLC | -5.0% | 4 |
| Jul 12, 2017 | 0918-00-267STP 1702(453) | Dallas Dallas |
TRAFFIC SIGNAL AND DMS INSTALLATIONVA · | $1,919,491 | $1,699,468 | AMERICAN LIGHTING AND SIGNALIZATION, INC. | -11.5% | 2 |
| Jul 12, 2017 | 0914-00-396STP 1702(554) | Travis Austin |
FY 2017 SITE SPECIFIC SIGNALSVA · | $1,489,195 | $1,663,381 | AMERICAN LIGHTING AND SIGNALIZATION, INC. | +11.7% | 3 |
| Jul 12, 2017 | 6318-80-001RMC - 631880001 | Nueces Corpus Christi |
CLEANING, SWEEPING & DEBRIS REMOVALIH 37 · | $1,873,415 | $1,603,287 | ROY JORGENSEN ASSOCIATES, INC. | -14.4% | 3 |
| Jul 12, 2017 | 0232-02-021BR 1702(471) | Falls Waco |
REPL BR & APPRSSH 53 · | $2,158,175 | $1,598,159 | KNIFE RIVER CORPORATION - SOUTH | -25.9% | 7 |
| Jul 12, 2017 | 0095-02-118CM 2017(726) | Dallas Dallas |
WIRELESS ITSUS 80 · | $1,575,376 | $1,497,829 | AMERICAN LIGHTING AND SIGNALIZATION, INC. | -4.9% | 3 |
| Jul 12, 2017 | 6317-54-001RMC - 631754001 | Brazos Bryan |
SEAL COAT AND HMA OVERLAYFM 60 · | $2,037,904 | $1,487,658 | BIG CREEK CONSTRUCTION, LTD. | -27.0% | 3 |
| Jul 12, 2017 | 0924-06-533NH 1702(500) | El Paso El Paso |
VEGETATION LANDSCAPEVA · | $1,454,157 | $1,330,984 | ALLIED PAVING CO. | -8.5% | 3 |
| Jul 12, 2017 | 3092-01-009STP 1702(511)HES | Tyler Beaumont |
SAFETY TREAT FIXED OBJECTSFM 3065 · | $1,167,518 | $1,224,578 | OLDCASTLE MATERIALS TEXAS, INC. | +4.9% | 5 |
| Jul 12, 2017 | 0396-02-026STP 1702(551)HES | Mason Austin |
UPGRADE MBGF, SAFETY TREAT, PROFILE MARKERSSH 29 · | $1,239,894 | $1,204,214 | L.C. JORDAN & SON | -2.9% | 6 |
| Jul 12, 2017 | 6308-12-001RMC - 630812001 | Tarrant Fort Worth |
REFLEC. PAV. MRKINGS & MRKSSH 114 · | $1,530,558 | $1,148,264 | BATTERSON, LLP | -25.0% | 3 |
| Jul 12, 2017 | 0028-06-078STP 1702(502)HES | Jefferson Beaumont |
GR, BS,STR,PVMTUS 90 · | $1,337,569 | $1,139,171 | OLDCASTLE MATERIALS TEXAS, INC. | -14.8% | 4 |
| Jul 12, 2017 | 0914-00-406NH 1702(582) | Travis Austin |
CONCRETE PAVEMENT REPAIRSVA · | $1,189,262 | $1,116,909 | ROY JORGENSEN ASSOCIATES, INC. | -6.1% | 5 |
| Jul 12, 2017 | 0200-12-014STP 1702(504)HES | Hardin Beaumont |
SFTY TREAT FXD OBJFM 418 · | $1,021,815 | $1,011,481 | AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC | -1.0% | 4 |
| Jul 12, 2017 | 0502-01-220NH 1702(514) | Harris Houston |
LANDSCAPE ENHANCEMENTSH 225 · | $954,196 | $988,675 | TEXAS WALL & LANDSCAPE | +3.6% | 4 |
| Jul 12, 2017 | 0003-01-057STP 1702(499)HESG | Culberson El Paso |
INSTALL MEDIAN BARRIERIH 10 · | $1,183,336 | $957,145 | DAN WILLIAMS COMPANY | -19.1% | 5 |
| Jul 12, 2017 | 0200-02-042NH 1702(519) | Angelina Lufkin |
CLEARING AND GRUBBINGUS 69 · | $1,113,176 | $890,456 | R&M INCORPORATED | -20.0% | 12 |
| Jul 12, 2017 | 6317-39-001RMC - 631739001 | Washington Bryan |
SPOT BASE REPAIRUS 290 · | $1,020,068 | $850,911 | KNIFE RIVER CORPORATION - SOUTH | -16.6% | 5 |
| Jul 12, 2017 | 0610-06-088NH 1702(448) | Bowie Atlanta |
CMT TRT BASE, ACP & PVMT MARKINGSIH 30 · | $633,257 | $798,693 | LONGVIEW BRIDGE AND ROAD, LTD. | +26.1% | 5 |
| Jul 12, 2017 | 0913-29-033BR 2007(372) | Lavaca Yoakum |
REHABILITATE EXISTING BRIDGECR · | $779,060 | $733,626 | SB CONTRACTORS LLC | -5.8% | 4 |
| Jul 12, 2017 | 6315-29-001RMC - 631529001 | Brazos Bryan |
HMA MILL AND INLAYBS 6R · | $895,855 | $687,930 | BIG CREEK CONSTRUCTION, LTD. | -23.2% | 5 |
| Jul 12, 2017 | 6315-30-001RMC - 631530001 | Walker Bryan |
HMA MILL AND INLAYSH 30 · | $895,855 | $672,700 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -24.9% | 5 |
| Jul 12, 2017 | 0911-39-038BR 1602(393) | Shelby Lufkin |
BRIDGE REPLACEMENTCR · | $752,719 | $619,834 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -17.7% | 8 |
| Jul 12, 2017 | 0265-05-081NH 1702(548) | Bastrop Austin |
LANDSCAPE AND IRRIGATIONSH 71 · | $625,755 | $606,000 | APEX LANDSCAPE & IRRIGATION, LLC | -3.2% | 3 |
| Jul 12, 2017 | 0002-05-045NH 1702(307) | Hudspeth El Paso |
CHANNEL IMPROVEMENTSIH 10 · | $677,614 | $603,661 | LESNA CONSTRUCTION, INC. | -10.9% | 9 |
| Jul 12, 2017 | 6317-53-001RMC - 631753001 | Grayson Paris |
FULL DEPTH CONCRETE REPAIRUS 75 · | $711,975 | $598,650 | WINDING ROAD CONSTRUCTION, INC. | -15.9% | 6 |
| Jul 12, 2017 | 6307-51-001BPM - 630751001 | Tarrant Fort Worth |
STRUCTURAL BRIDGE REPAIRIH 20 · | $614,163 | $547,186 | GIBSON & ASSOCIATES, INC. | -10.9% | 5 |
| Jul 12, 2017 | 0783-02-096C 783-2-96 | Lubbock Lubbock |
BRIDGE REPAIRSL 289 · | $439,840 | $491,471 | SCR CIVIL CONSTRUCTION, LLC | +11.7% | 2 |
| Jul 12, 2017 | 6316-20-001RMC - 631620001 | Henderson Tyler |
RAISED PAVEMENT MARKERSSH 31 · | $814,000 | $485,004 | BRYDL CONTRACTING, INC. | -40.4% | 7 |
| Jul 12, 2017 | 0919-03-057BR 2017(296) | Harrison Atlanta |
REPLACE BRIDGE AND APPROACHESCR · | $461,936 | $444,411 | STATELINE CONSTRUCTION, LLC | -3.8% | 7 |
| Jul 12, 2017 | 6313-24-001RMC - 631324001 | Harris Houston |
ROADSIDE MOWINGSH 249 · | $368,982 | $433,156 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | +17.4% | 1 |
| Jul 12, 2017 | 0915-45-052BR 1502(643) | Medina San Antonio |
REPLACE BRIDGE & APPROACHESCR · | $421,298 | $422,407 | RELMCO, INC. | +0.3% | 10 |
| Jul 12, 2017 | 6316-45-001RMC - 631645001 | Jefferson Beaumont |
SIGN INSTALLATION_AND MAINTENANCEUS 69 · | $345,800 | $388,000 | VACA UNDERGROUND UTILITIES INC | +12.2% | 2 |
| Jul 12, 2017 | 6318-68-001RMC - 631868001 | Wichita Wichita Falls |
TRUCK MOUNTED ATTENUATORS (TMA)US 287 · | $467,500 | $384,890 | NIXON ENGINEERING | -17.7% | 6 |
| Jul 12, 2017 | 6315-53-001RMC - 631553001 | Collin Dallas |
REPAIR/REPLACE CONCRETE BARRIERUS 75 · | $395,688 | $382,036 | GHB EQUIPMENT COMPANY, L.L.C. | -3.5% | 4 |
| Jul 12, 2017 | 0914-04-227BR 2008(234) | Travis Austin |
REPLACE BRIDGE AND APPROACHESCR · | $424,523 | $377,671 | CAPITAL EXCAVATION COMPANY | -11.0% | 8 |
| Jul 12, 2017 | 6317-27-001RMC - 631727001 | Henderson Tyler |
SPECIALTY PAVEMENT MARKERSSH 31 · | $364,975 | $314,295 | STRIPING TECHNOLOGY, L.P. | -13.9% | 7 |
| Jul 12, 2017 | 0134-07-073STP 1702(462)HES | Wise Fort Worth |
SAFETY LIGHTINGUS 380 · | $352,941 | $241,383 | INDEPENDENT UTILITY CONSTRUCTION INCORPORATED | -31.6% | 5 |
| Jul 12, 2017 | 0920-38-256BR 2017(503) | Jefferson Beaumont |
REPLACE BRIDGE AND APPROACHESCS · | $260,072 | $225,289 | NORMAN HIGHWAY CONSTRUCTORS, INC. | -13.4% | 4 |
| Jul 12, 2017 | 1352-04-014STP 1702(464)HES | Wise Fort Worth |
INSTALL INT FLASHING BEACONFM 455 · | $81,682 | $83,369 | AMERICAN LIGHTING AND SIGNALIZATION, INC. | +2.1% | 3 |
| Jul 11, 2017 | 0162-02-031STP 2009(661) | Hill Waco |
GR, STRS & SURFSH 31 · | $76,294,194 | $63,963,885 | SUNDT CONSTRUCTION, INC. | -16.2% | 9 |
| Jul 11, 2017 | 0216-01-036STP 1702(434) | Comal San Antonio |
GRADING, STRUCTURES, BASE AND SURFACESL 337 · | $46,964,621 | $42,308,391 | HUNTER INDUSTRIES, LTD. | -9.9% | 8 |
| Jul 11, 2017 | 2054-02-015STP 1702(730) | Denton Dallas |
WIDEN 2 LANE RURAL ROADWAY TO 6 LANES DIVIDED URBAFM 2181 · | $39,559,470 | $37,641,150 | MCM | -4.8% | 7 |
| Jul 11, 2017 | 0086-14-065CBI 1602(504) | Webb Laredo |
FLEX BASE,SURF,BRIDGE AND PAV MRKSL 20 · | $26,744,985 | $25,596,044 | SER CONSTRUCTION PARTNERS, LLC | -4.3% | 5 |
| Jul 11, 2017 | 1310-03-026C 1310-3-26 | Wise Fort Worth |
GRADING,BASE,DRAINAGE,STRUCTURE,PAVFM 2264 · | $8,023,286 | $7,015,562 | JAGOE-PUBLIC COMPANY | -12.6% | 7 |
| Jul 11, 2017 | 6310-98-001RMC - 631098001 | Cass Atlanta |
TRAFFIC CONTROL SERVICESUS 59 · | $6,160,500 | $5,646,100 | TOTAL HIGHWAY MAINTENANCE, LLC | -8.4% | 4 |
1–100 of 149Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.