| 1 | 161-6022 |
GENERAL USE COMPOST (4") | 8,887 | SY |
$4.50 |
$5.50 |
$3.00 |
$4.94 |
| 2 | 170-6006 |
IRRIGATION SYSTEM LOCATION A | 1 | LS |
$80,000.00 |
$91,074.88 |
$100,000.00 |
$70,558.63 |
| 3 | 170-6007 |
IRRIGATION SYSTEM LOCATION B | 1 | LS |
$55,000.00 |
$33,000.00 |
$50,000.00 |
$21,362.52 |
| 4 | 180-6001 |
WILDFLOWER SEEDING | 6.4 | AC |
$2,000.00 |
$1,500.00 |
$2,000.00 |
$2,449.05 |
| 5 | 192-6002 |
PLANT MATERIAL (1-GAL) | 2,101 | EA |
$10.00 |
$8.00 |
$10.00 |
$5.85 |
| 6 | 192-6013 |
MULCH | 9,938 | SY |
$3.50 |
$5.50 |
$3.00 |
$3.72 |
| 7 | 192-6015 |
LANDSCAPE EDGE | 1,494 | LF |
$10.00 |
$15.00 |
$15.00 |
$17.99 |
| 8 | 192-6016 |
PLANT BED PREPARATION | 8,887 | SY |
$3.00 |
$2.00 |
$3.00 |
$0.4940 |
| 9 | 192-6021 |
PLANT MATERIAL (5 GAL) (TREE) | 1,199 | EA |
$26.00 |
$26.00 |
$30.00 |
$14.63 |
| 10 | 192-6023 |
PLANT MATERIAL (15 GAL) (TREE) | 197 | EA |
$130.00 |
$120.00 |
$100.00 |
$80.15 |
| 11 | 192-6024 |
PLANT MATERIAL (30 GAL) (TREE) | 30 | EA |
$275.00 |
$240.00 |
$225.00 |
$105.26 |
| 12 | 192-6026 |
PLANT MATERIAL (65 GAL) (TREE) | 45 | EA |
$550.00 |
$500.00 |
$400.00 |
$311.89 |
| 13 | 192-6028 |
PLANT MATERIAL (1 GAL) (SHRUB) | 2,444 | EA |
$10.00 |
$8.00 |
$10.00 |
$3.23 |
| 14 | 192-6031 |
PLANT MATERIAL (5 GAL) (SHRUB) | 269 | EA |
$30.00 |
$26.00 |
$30.00 |
$14.35 |
| 15 | 193-6021 |
PLANT MAINTENANCE LOCATION A | 24 | MO |
$1,200.00 |
$1,500.00 |
$1,000.00 |
$7,175.17 |
| 16 | 193-6022 |
PLANT MAINTENANCE LOCATION B | 24 | MO |
$1,200.00 |
$750.00 |
$500.00 |
$5,004.57 |
| 17 | 193-6023 |
IRRIG SYS OPER AND MAINT LOCATION A | 24 | MO |
$600.00 |
$700.00 |
$500.00 |
$909.12 |
| 18 | 193-6024 |
IRRIG SYS OPER AND MAINT LOCATION B | 24 | MO |
$500.00 |
$500.00 |
$500.00 |
$909.12 |
| 19 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 100 | LF |
$10.00 |
$0.0100 |
$0.0100 |
$18.01 |
| 20 | 403-6001 |
TEMPORARY SPL SHORING | 150 | SF |
$10.00 |
$0.0100 |
$0.0100 |
$97.08 |
| 21 | 432-6002 |
RIPRAP (CONC)(5 IN) | 2 | CY |
$550.00 |
$0.0100 |
$1,000.00 |
$1,190.29 |
| 22 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 52.5 | CY |
$500.00 |
$600.00 |
$800.00 |
$989.98 |
| 23 | 500-6001 |
MOBILIZATION | 1 | LS |
$51,700.00 |
$61,000.00 |
$60,000.00 |
$80,701.75 |
| 24 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$3,000.00 |
$3,000.00 |
$2,000.00 |
$3,197.22 |
| 25 | 506-6035 |
SANDBAGS FOR EROSION CONTROL | 70 | EA |
$5.00 |
$0.0100 |
$0.0100 |
$2.59 |
| 26 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,550 | LF |
$2.50 |
$0.0100 |
$3.00 |
$1.93 |
| 27 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,550 | LF |
$0.5000 |
$0.0100 |
$1.00 |
$0.2230 |
| 28 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 2,040 | LF |
$5.00 |
$0.0100 |
$8.00 |
$4.87 |
| 29 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 100 | LF |
$1.00 |
$0.0100 |
$1.00 |
$0.2230 |
| 30 | 1004-6001 |
TREE PROTECTION | 73 | EA |
$225.00 |
$60.00 |
$500.00 |
$19.41 |