185Let jobs
$930,125,230Total low bids
$819,112,082Total estimates
+13.6%Low bids vs estimates
Jun 2022 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jun 30, 2022 | 0195-02-076C 195-2-76 | Denton Dallas |
WIDEN ROAD - ADD LANESIH 35 · | $103,131,751 | $119,332,000 | WEBBER, LLC | +15.7% | 5 |
| Jun 30, 2022 | 0215-01-044F 2022(901) | Comal San Antonio |
WIDEN ROAD - ADD LANESSH 46 · | $60,014,958 | $59,488,630 | WEBBER, LLC | -0.9% | 3 |
| Jun 30, 2022 | 0198-03-026C 198-3-26 | Anderson Tyler |
WIDEN ROAD - ADD LANESUS 175 · | $48,036,549 | $55,487,305 | BIG CREEK CONSTRUCTION, LTD. | +15.5% | 4 |
| Jun 30, 2022 | 2679-03-015C 2679-3-15 | Collin Dallas |
RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDEDFM 2514 · | $43,170,226 | $50,385,911 | WEBBER, LLC | +16.7% | 3 |
| Jun 30, 2022 | 0292-01-034F 2022(583) | Winkler Odessa |
HIGHWAY IMPROVEMENTSH 18 · | $30,502,877 | $37,268,536 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +22.2% | 3 |
| Jun 30, 2022 | 0912-73-220F 2021(384) | Galveston Houston |
FERRY OPERATION PROJECTSVA · | $15,249,270 | $22,468,330 | SOUTHWEST SHIPYARD, L.P. | +47.3% | 1 |
| Jun 30, 2022 | 0639-02-034F 2022(716) | Madison Bryan |
REHABILITATE RD AND WIDEN SHOULDERSFM 39 · | $11,983,467 | $14,087,278 | BIG CREEK CONSTRUCTION, LTD. | +17.6% | 2 |
| Jun 30, 2022 | 0905-06-118STP 2021(423)MM | Lubbock Lubbock |
CONSTRUCT NEW ROADWAY LANESCS · | $10,587,826 | $12,797,068 | ALLEN BUTLER CONSTRUCTION, INC. | +20.9% | 3 |
| Jun 30, 2022 | 0308-01-013BR 2022(681) | Hansford Amarillo |
BRIDGE REPLACEMENTSH 207 · | $5,536,580 | $7,907,130 | J. LEE MILLIGAN, INC. | +42.8% | 3 |
| Jun 30, 2022 | 0017-13-012F 2022(688) | Atascosa San Antonio |
WIDEN ROAD - ADD LANESSH 132 · | $5,479,624 | $6,628,642 | HUNTER INDUSTRIES, LTD. | +21.0% | 7 |
| Jun 30, 2022 | 1392-01-050C 1392-1-50 | Collin Dallas |
REHABILITATE EXISTING ROADWAYFM 1378 · | $5,236,362 | $6,227,271 | FOUTSCO PAVING COMPANY, LLC | +18.9% | 4 |
| Jun 30, 2022 | 0162-04-057BR 2022(763) | Navarro Dallas |
BRIDGE REPLACEMENTSH 31 · | $5,721,272 | $5,998,923 | MP HEAVY CONSTRUCTION INC | +4.9% | 6 |
| Jun 30, 2022 | 0034-06-014STP 2022(701)HES | Runnels San Angelo |
HAZARD ELIMINATION & SAFETYFM 2887 · | $3,624,249 | $4,777,670 | RELMCO, INC. | +31.8% | 3 |
| Jun 30, 2022 | 1986-01-067F 2022(725) | Montgomery Houston |
SURFACING/ROADWAY RESTORATIONFM 1314 · | $5,001,869 | $4,740,081 | TEXAS MATERIALS GROUP, INC. | -5.2% | 4 |
| Jun 30, 2022 | 0346-06-052BR 2022(719) | Lavaca Yoakum |
BRIDGE REPLACEMENTSH 111 · | $4,336,406 | $4,643,081 | SB CONTRACTORS LLC | +7.1% | 6 |
| Jun 30, 2022 | 6401-93-001RMC - 640193001 | Lamar Paris |
MILL AND INLAYBU 271B · | $3,743,683 | $3,805,754 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +1.7% | 2 |
| Jun 30, 2022 | 0912-31-307BR 2019(421) | Brazoria Houston |
BRIDGE REPLACEMENTCR · | $2,751,922 | $3,440,533 | R CONSTRUCTION CIVIL, LLC | +25.0% | 3 |
| Jun 30, 2022 | 2570-01-011STP 2022(708)HES | Brown Brownwood |
HAZARD ELIMINATION & SAFETYFM 2632 · | $2,849,472 | $3,196,924 | JAY MILLS CONTRACTING, INCORPORATED | +12.2% | 2 |
| Jun 30, 2022 | 6399-86-001RMC - 639986001 | Dallas Dallas |
SWEEPING AND DEBRIS REMOVALUS 175 · | $2,660,611 | $3,040,803 | SWEEPING CORPORATION OF AMERICA, LLC | +14.3% | 1 |
| Jun 30, 2022 | 0902-00-288C 902-00-288 | Tarrant Fort Worth |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $1,995,181 | $2,520,015 | DURABLE SPECIALTIES, INC. | +26.3% | 1 |
| Jun 30, 2022 | 6400-10-001RMC - 640010001 | Dallas Dallas |
SWEEPING AND DEBRIS REMOVALSL 12 · | $1,975,364 | $2,364,578 | SWEEPING CORPORATION OF AMERICA, LLC | +19.7% | 1 |
| Jun 30, 2022 | 6400-67-001RMC - 640067001 | Harris Houston |
ILLUMINATION MAINTENANCEIH 610 · | $2,914,622 | $2,230,105 | LINDSEY ELECTRIC, L.P. | -23.5% | 4 |
| Jun 30, 2022 | 0382-01-047STP 2022(695)HES | Falls Waco |
HAZARD ELIMINATION & SAFETYSH 7 · | $1,840,743 | $2,042,766 | TALBRAN ENTERPRISES LLC | +11.0% | 3 |
| Jun 30, 2022 | 0915-17-072STP 2022(692)HES | Comal San Antonio |
HAZARD ELIMINATION & SAFETYCS · | $1,730,027 | $1,934,817 | E-Z BEL CONSTRUCTION, LLC | +11.8% | 6 |
| Jun 30, 2022 | 2121-06-054C 2121-6-54 | Hudspeth El Paso |
PREVENTIVE MAINTENANCEIH 10 · | $1,519,273 | $1,895,555 | PENHALL COMPANY | +24.8% | 3 |
| Jun 30, 2022 | 0016-08-043STP 2022(685)HES | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYSL 368 · | $1,606,167 | $1,884,493 | E-Z BEL CONSTRUCTION, LLC | +17.3% | 1 |
| Jun 30, 2022 | 2446-01-030STP 2022(717)HES | Brazos Bryan |
HAZARD ELIMINATION & SAFETYSH 30 · | $1,149,545 | $1,790,661 | KNIFE RIVER CORPORATION - SOUTH | +55.8% | 2 |
| Jun 30, 2022 | 0915-12-693STP 2022(691)HESG | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYCR · | $2,005,549 | $1,705,803 | E-Z BEL CONSTRUCTION, LLC | -14.9% | 3 |
| Jun 30, 2022 | 0918-47-398F 2022(766) | Dallas Dallas |
PREVENTIVE MAINTENANCEVA · | $2,472,754 | $1,681,430 | STRIPE-A-ZONE, LLC | -32.0% | 3 |
| Jun 30, 2022 | 6393-42-001RMC - 639342001 | Hopkins Paris |
TRAFFIC CONTROL SERVICESSH 19 · | $915,000 | $1,360,000 | AREA WIDE PROTECTIVE, INC. | +48.6% | 3 |
| Jun 30, 2022 | 0016-01-133STP 2022(640)HES | Travis Austin |
INSTALL TRAFFIC SIGNALSL 275 · | $969,753 | $1,318,917 | LONE STAR SITEWORK, LLC | +36.0% | 3 |
| Jun 30, 2022 | 0508-02-131STP 2022(778)HES | Chambers Beaumont |
HAZARD ELIMINATION & SAFETYIH 10 · | $1,374,196 | $1,285,257 | THIRD COAST SERVICES LLC | -6.5% | 6 |
| Jun 30, 2022 | 6401-97-001BPM - 640197001 | Clay Wichita Falls |
BRIDGE PREVENTATIVE MAINTENANCEUS 82 · | $1,368,967 | $1,243,840 | TALBRAN ENTERPRISES LLC | -9.1% | 6 |
| Jun 30, 2022 | 6393-40-001RMC - 639340001 | Lamar Paris |
TRAFFIC CONTROL SERVICESUS 82 · | $1,095,500 | $1,236,500 | AREA WIDE PROTECTIVE, INC. | +12.9% | 3 |
| Jun 30, 2022 | 0003-08-064F 2022(736) | Reeves Odessa |
INSTALL FLASHING BEACONBI 20-B · | $973,535 | $1,033,762 | APOLLO CONSTRUCTORS, INC. | +6.2% | 3 |
| Jun 30, 2022 | 0901-19-214BR 2021(966) | Grayson Paris |
BRIDGE REPLACEMENTCR · | $1,092,706 | $999,796 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -8.5% | 4 |
| Jun 30, 2022 | 0924-06-663C 924-6-663 | El Paso El Paso |
LANDSCAPE DEVELOPMENTVA · | $849,610 | $995,591 | Horizone Construction I, Ltd | +17.2% | 4 |
| Jun 30, 2022 | 0913-27-078BR 2B20(083) | Victoria Yoakum |
BRIDGE REPLACEMENTCR · | $785,144 | $988,832 | TEXAS STEEL INDUSTRIAL PLACING, LLC | +25.9% | 4 |
| Jun 30, 2022 | 6405-12-001RMC - 640512001 | Culberson El Paso |
METAL BEAM GUARD FENCE REPAIRIH 10 · | $862,630 | $921,772 | APACHE BARRICADE & SIGN | +6.9% | 3 |
| Jun 30, 2022 | 0786-01-090F 2022(733) | Jefferson Beaumont |
HAZARD ELIMINATION & SAFETYFM 364 · | $1,118,741 | $871,505 | NORMAN HIGHWAY CONSTRUCTORS, INC. | -22.1% | 3 |
| Jun 30, 2022 | 0920-13-037BR 2022(103) | Tyler Beaumont |
BRIDGE REPLACEMENTCR · | $613,986 | $746,700 | TEXAS MATERIALS GROUP, INC. | +21.6% | 2 |
| Jun 30, 2022 | 6399-17-001RMC - 639917001 | Throckmorton Wichita Falls |
ASPHALT PAVEMENT REPAIRFM 2651 · | $574,610 | $714,092 | BLACKSMITH VENTURES LLC | +24.3% | 1 |
| Jun 30, 2022 | 6407-21-001RMC - 640721001 | Midland Odessa |
TRAFFIC CONTROL SERVICESIH 20 · | $684,750 | $631,975 | FC TRAFFIC CONTROL, INC. | -7.7% | 2 |
| Jun 30, 2022 | 6400-23-001RMC - 640023001 | Harris Houston |
PAVEMENT MARKINGSIH 69 · | $864,256 | $612,059 | STRIPE LINES, INC. | -29.2% | 5 |
| Jun 30, 2022 | 6402-05-001RMC - 640205001 | Ector Odessa |
BRIDGE REPAIRIH 20 · | $508,250 | $549,625 | SCR CIVIL CONSTRUCTION, LLC | +8.1% | 1 |
| Jun 30, 2022 | 0747-05-047STP 2022(700)HES | Johnson Fort Worth |
INSTALL/REPLACE SIGNSFM 157 · | $644,845 | $473,255 | SYNERGY SIGNS & SERVICES LLC | -26.6% | 10 |
| Jun 30, 2022 | 3256-03-096C 3256-3-96 | Harris Houston |
RESTRIPING FROM 6 TO 8 LANESSL 8 · | $308,729 | $459,159 | BATTERSON, LLP | +48.7% | 1 |
| Jun 30, 2022 | 6404-10-001RMC - 640410001 | Jasper Beaumont |
TREE TRIMMING AND BRUSH REMOVALUS 96 · | $524,190 | $449,100 | ACE CONTRACTORS, INC. | -14.3% | 4 |
| Jun 30, 2022 | 6405-10-001RMC - 640510001 | El Paso El Paso |
CULVERT CLEANINGIH 10 · | $369,630 | $435,554 | SYNERGY PROJECT CONTRACTORS, INC. | +17.8% | 3 |
| Jun 30, 2022 | 6408-18-001RMC - 640818001 | El Paso El Paso |
SWEEPING AND DEBRIS REMOVALIH 10 · | $341,000 | $402,262 | SYNERGY PROJECT CONTRACTORS, INC. | +18.0% | 3 |
| Jun 30, 2022 | 6386-80-001RMC - 638680001 | Williamson Austin |
TREE TRIMMING AND BRUSH REMOVALFM 487 · | $347,585 | $335,690 | BOEN LANDSCAPING & IRRIGATION, LLC | -3.4% | 5 |
| Jun 30, 2022 | 6409-65-001MMC - 640965001 | El Paso El Paso |
DE-ICING SALTIH 10 · | $313,495 | $312,266 | NSG LOGISTICS, LLC | -0.4% | 2 |
| Jun 30, 2022 | 6404-12-001MMC - 640412001 | Hopkins Paris |
CUTBACK ASPHALTSH 11 · | $302,250 | $272,350 | MARTIN RESOURCE MANAGEMENT CORPORATION | -9.9% | 2 |
| Jun 30, 2022 | 0910-34-037F 2022(757) | Henderson Tyler |
LANDSCAPE DEVELOPMENTVA · | $157,492 | $173,162 | TIGHT LINE CONSTRUCTION, LLC | +9.9% | 2 |
| Jun 30, 2022 | 6406-83-001RMC - 640683001 | San Jacinto Lufkin |
CRACK SEALUS 59 · | $237,946 | $122,337 | SCOUT 5 CONSTRUCTION LLC | -48.6% | 7 |
| Jun 29, 2022 | 0095-03-080F 2022(793) | Kaufman Dallas |
RECONSTRUCT EXISTING ROADWAY & BRIDGE REPLACEMENTUS 80 · | $120,016,150 | $128,902,801 | WEBBER, LLC | +7.4% | 3 |
| Jun 29, 2022 | 0139-03-048BR 2022(580) | Reeves Odessa |
BRIDGE REPLACEMENT & SUPER 2US 285 · | $37,501,580 | $46,043,243 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +22.8% | 3 |
| Jun 29, 2022 | 0598-02-112C 598-2-112 | Brazoria Houston |
CONSTRUCT BRIDGESH 288 · | $28,379,847 | $38,504,600 | GRANITE CONSTRUCTION COMPANY | +35.7% | 8 |
| Jun 29, 2022 | 0451-03-013C 451-3-13 | Collin Dallas |
GR,PVMT,STR,SIGNSSH 205 · | $28,357,498 | $31,480,213 | STERLING DELAWARE HOLDING COMPANY, INC. | +11.0% | 5 |
| Jun 29, 2022 | 0389-13-039C 389-13-39 | Harris Houston |
CONSTRUCT BRIDGESH 146 · | $26,302,732 | $24,851,806 | ISI CONTRACTING, INC. | -5.5% | 5 |
| Jun 29, 2022 | 0374-06-022F 2022(758) | Hudspeth El Paso |
HIGHWAY IMPROVEMENTUS 62 · | $23,168,432 | $21,060,676 | DAN WILLIAMS COMPANY | -9.1% | 3 |
| Jun 29, 2022 | 0196-02-132F 2022(043) | Denton Dallas |
HIGHWAY OPERATIONS PROGRAMIH 35E · | $11,761,703 | $19,987,979 | RAGLE CONSTRUCTION, INC. | +69.9% | 1 |
| Jun 29, 2022 | 0005-03-068STP 2021(748)FRS | Midland Odessa |
RAILROAD CROSSING IMPROVEMENTSBI 20-E · | $8,828,725 | $11,943,374 | ALTUS CONSTRUCTION LLC | +35.3% | 3 |
| Jun 29, 2022 | 0218-04-119C 218-4-119 | Cass Atlanta |
RESURFACE EXISTING 4-LANE ROADWAYUS 59 · | $8,971,075 | $11,842,462 | EAST TEXAS BRIDGE, INC. | +32.0% | 2 |
| Jun 29, 2022 | 0675-08-114CC 675-8-114 | Montgomery Houston |
CONSTRUCT FRONTAGE ROADSIH 45 · | $7,368,740 | $7,473,853 | JAMES CONSTRUCTION GROUP, LLC | +1.4% | 8 |
| Jun 29, 2022 | 0003-07-064C 3-7-64 | Reeves Odessa |
TRAFFIC SIGNAL PROGRAM (2022)IH 20 · | $4,267,432 | $5,899,356 | DAN WILLIAMS COMPANY | +38.2% | 1 |
| Jun 29, 2022 | 3325-01-014C 3325-1-14 | Navarro Dallas |
REHABILITATE EXISTING ROADWAYFM 3243 · | $6,524,789 | $5,724,414 | A. L. HELMCAMP, INC. | -12.3% | 5 |
| Jun 29, 2022 | 0240-02-032BR 2022(718) | Wharton Yoakum |
BRIDGE REPLACEMENTSH 60 · | $5,322,493 | $5,657,395 | JOHN REED AND COMPANY, LLC | +6.3% | 5 |
| Jun 29, 2022 | 0140-10-034STP 2022(702)HES | Crockett San Angelo |
HAZARD ELIMINATION & SAFETYIH 10 · | $4,212,424 | $5,283,752 | VECTOR UTILITIES LLC | +25.4% | 5 |
| Jun 29, 2022 | 0902-00-312C 902-00-312 | Tarrant Fort Worth |
REHABILITATE EXISTING ROADWAYVA · | $3,433,330 | $4,103,210 | NEW WORLD CONTRACTING, LLC | +19.5% | 3 |
| Jun 29, 2022 | 0179-14-010C 179-14-10 | Matagorda Yoakum |
DRAINAGE IMPROVEMENTSBS 35-H · | $1,573,925 | $4,002,343 | EARTH BUILDERS, L.P. | +154.3% | 1 |
| Jun 29, 2022 | 0263-05-024BR 2B20(044) | Fisher Abilene |
BRIDGE REPLACEMENTSH 70 · | $3,124,040 | $3,716,744 | STATELINE CONSTRUCTION, LLC | +19.0% | 5 |
| Jun 29, 2022 | 0861-01-068STP 2022(723)HES | Hidalgo Pharr |
HAZARD ELIMINATION & SAFETYFM 491 · | $3,910,867 | $3,701,236 | ASAGO, LLC | -5.4% | 4 |
| Jun 29, 2022 | 0915-00-241C 915-00-241 | Bexar San Antonio |
HIGHWAY IMPROVEMENTVA · | $3,994,522 | $3,546,574 | STRIPE-A-ZONE, LLC | -11.2% | 4 |
| Jun 29, 2022 | 6401-92-001RMC - 640192001 | Grayson Paris |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 69 · | $3,835,552 | $2,968,020 | D. L. LENNON INCORPORATED - CONTRACTOR | -22.6% | 3 |
| Jun 29, 2022 | 6399-88-001RMC - 639988001 | Dallas Dallas |
SWEEPING AND DEBRIS REMOVALSH 78 · | $2,726,698 | $2,900,071 | SWEEPING CORPORATION OF AMERICA, LLC | +6.4% | 1 |
| Jun 29, 2022 | 0196-02-131F 2022(771) | Denton Dallas |
CONSTRUCT RAMPSIH 35E · | $2,318,636 | $2,796,047 | TEXAS MATERIALS GROUP, INC. | +20.6% | 3 |
| Jun 29, 2022 | 6399-84-001RMC - 639984001 | Dallas Dallas |
SWEEPING AND DEBRIS REMOVALUS 67 · | $2,194,815 | $2,603,188 | SWEEPING CORPORATION OF AMERICA, LLC | +18.6% | 1 |
| Jun 29, 2022 | 6401-72-001RMC - 640172001 | Harris Houston |
CONCRETE SPALL REPAIRIH 610 · | $2,224,594 | $2,439,368 | ISI CONTRACTING, INC. | +9.7% | 3 |
| Jun 29, 2022 | 0016-10-025STP 2022(687)HES | Comal San Antonio |
HAZARD ELIMINATION & SAFETYBS 46-C · | $2,113,035 | $2,079,347 | E-Z BEL CONSTRUCTION, LLC | -1.6% | 2 |
| Jun 29, 2022 | 0915-12-624STP 2022(690)HES | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYCS · | $2,030,607 | $2,074,272 | D&G ENERGY CORPORATION | +2.2% | 3 |
| Jun 29, 2022 | 6399-85-001RMC - 639985001 | Johnson Fort Worth |
METAL BEAM GUARD FENCE REPAIRIH 35W · | $2,027,287 | $1,798,404 | SHORT-LINE CORPORATION | -11.3% | 4 |
| Jun 29, 2022 | 6375-83-001RMC - 637583001 | Grimes Bryan |
ASPHALT PAVEMENT REPAIRBS 6S · | $1,633,101 | $1,743,869 | KNIFE RIVER CORPORATION - SOUTH | +6.8% | 4 |
| Jun 29, 2022 | 6399-81-001RMC - 639981001 | Hopkins Paris |
FULL DEPTH CONCRETE REPAIRIH 30 · | $1,797,870 | $1,648,115 | WINDING ROAD CONSTRUCTION, INC. | -8.3% | 3 |
| Jun 29, 2022 | 0922-33-206C 922-33-206 | Webb Laredo |
STATE PARK IMPROVEMENTSVA · | $954,753 | $1,621,824 | LCR TOTAL TRANSPORT LLC | +69.9% | 5 |
| Jun 29, 2022 | 0281-02-075STP 2022(764)HES | Collin Dallas |
HAZARD ELIMINATION & SAFETYSH 78 · | $1,120,668 | $1,531,622 | DURABLE SPECIALTIES, INC. | +36.7% | 4 |
| Jun 29, 2022 | 0265-05-088C 265-5-88 | Bastrop Austin |
LANDSCAPE DEVELOPMENTSH 71 · | $1,616,660 | $1,511,895 | APEX LANDSCAPE & IRRIGATION, LLC | -6.5% | 5 |
| Jun 29, 2022 | 6393-38-001RMC - 639338001 | Hunt Paris |
TRAFFIC CONTROL SERVICESIH 30 · | $1,566,432 | $1,511,218 | AREA WIDE PROTECTIVE, INC. | -3.5% | 3 |
| Jun 29, 2022 | 6400-04-001RMC - 640004001 | Dallas Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRSS 408 · | $1,300,800 | $1,419,060 | FOUTSCO PAVING COMPANY, LLC | +9.1% | 2 |
| Jun 29, 2022 | 6408-34-001MMC - 640834001 | Tarrant Fort Worth |
DENSE GRADED HOT MIXIH 35W · | $1,292,000 | $1,355,000 | FNH CONSTRUCTION, LLC | +4.9% | 3 |
| Jun 29, 2022 | 6402-13-001RMC - 640213001 | Brazos Bryan |
MILL AND INLAYFM 1179 · | $1,358,849 | $1,289,908 | KNIFE RIVER CORPORATION - SOUTH | -5.1% | 3 |
| Jun 29, 2022 | 6402-17-001RMC - 640217001 | Jefferson Beaumont |
TRAFFIC SIGNAL MAINTENANCEUS 69 · | $1,103,234 | $1,126,764 | THIRD COAST SERVICES LLC | +2.1% | 2 |
| Jun 29, 2022 | 0901-27-046BR 1902(390) | Red River Paris |
BRIDGE REPLACEMENTCS · | $966,029 | $1,091,166 | HIGHWAY 19 CONSTRUCTION LLC | +13.0% | 5 |
| Jun 29, 2022 | 6402-01-001RMC - 640201001 | Jeff Davis El Paso |
TREE REMOVALSH 118 · | $764,020 | $1,089,455 | CROSS PLUS CONSTRUCTION, LLC | +42.6% | 3 |
| Jun 29, 2022 | 0073-07-068STP 2022(831)TP | Live Oak Corpus Christi |
TRANSPORTATION NON-ROADWAYIH 37 · | $893,116 | $1,030,452 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | +15.4% | 5 |
| Jun 29, 2022 | 0918-47-341STP 2022(765)HES | Dallas Dallas |
HAZARD ELIMINATION & SAFETYCS · | $812,204 | $985,989 | ALTUS CONSTRUCTION LLC | +21.4% | 5 |
| Jun 29, 2022 | 0920-03-081BR 2021(530) | Hardin Beaumont |
BRIDGE REPLACEMENTCR · | $871,936 | $937,939 | PROJECT ALLIED RESOURCES, LLC | +7.6% | 3 |
| Jun 29, 2022 | 0911-28-048BR 2B20(123) | Houston Lufkin |
BRIDGE REPLACEMENTCR · | $830,999 | $876,155 | THK CONSTRUCTION LLC | +5.4% | 4 |
| Jun 29, 2022 | 1437-02-016STP 2022(693)HES | Wilson San Antonio |
HAZARD ELIMINATION & SAFETYFM 1346 · | $730,518 | $853,370 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | +16.8% | 5 |
| Jun 29, 2022 | 6407-53-001MMC - 640753001 | Bowie Atlanta |
LIMESTONE ROCK ASPHALTIH 30 · | $685,000 | $780,475 | VULCAN CONSTRUCTION MATERIALS, LLC | +13.9% | 1 |
1–100 of 185Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.