239Let jobs
$1,225,369,730Total low bids
$1,237,773,799Total estimates
-1.0%Low bids vs estimates
Aug 2024 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 29, 2024 | 6471-50-001MMC - 647150001 | Jefferson Beaumont |
HYDRAULIC CEMENTUS 69 · | $67,340 | $84,000 | TOUCHSTONE RESOURCES, LLC | +24.7% | 1 |
| Aug 29, 2024 | 6472-34-001MMC - 647234001 | Orange Beaumont |
FLOWABLE BACKFILLSH 62 · | $47,000 | $49,720 | SOUTHERN SOURCING SOLUTIONS, LLC | +5.8% | 2 |
| Aug 28, 2024 | 6471-80-001BPM - 647180001 | San Jacinto Lufkin |
BRIDGE PREVENTATIVE MAINTENANCESH 150 · | $893,903 | $737,340 | GARRET SHIELDS INFRASTRUCTURE | -17.5% | 2 |
| Aug 28, 2024 | 6401-50-001RMC - 640150001 | Colorado Yoakum |
CULVERT REPAIRSUS 90 · | $409,810 | $473,375 | GARRET SHIELDS INFRASTRUCTURE | +15.5% | 2 |
| Aug 28, 2024 | 6471-22-001MMC - 647122001 | Hidalgo Pharr |
ASPHALTIC PATCHING MATERIALSH 495 · | $132,000 | $159,950 | WALLER COUNTY ASPHALT INC. | +21.2% | 1 |
| Aug 27, 2024 | 6405-90-001RMC - 640590001 | Travis Austin |
SWEEPING AND DEBRIS REMOVALUS 183 · | $685,378 | $534,570 | CEN-TEX IRRIGATION SYSTEMS, INC. | -22.0% | 3 |
| Aug 27, 2024 | 6467-13-001BPM - 646713001 | Jasper Beaumont |
BRIDGE PREVENTATIVE MAINTENANCEUS 96 · | $200,219 | $300,000 | AAD CONTRACTING INC. | +49.8% | 2 |
| Aug 27, 2024 | 6468-71-001RMC - 646871001 | Chambers Beaumont |
FULL DEPTH CONCRETE REPAIRIH 10 · | $102,656 | $153,850 | RHINO EQUITY, LLC | +49.9% | 2 |
| Aug 22, 2024 | 6469-51-001RMC - 646951001 | Brown Brownwood |
CRACK SEALUS 377 · | $948,450 | $767,379 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -19.1% | 2 |
| Aug 22, 2024 | 6471-54-001RMC - 647154001 | Eastland Brownwood |
MOWING HIGHWAY RIGHT OF WAYIH 20 · | $760,594 | $676,574 | CROSS PLUS CONSTRUCTION, LLC | -11.0% | 2 |
| Aug 22, 2024 | 6470-24-001RMC - 647024001 | Brown Brownwood |
RAISED PAVEMENT MARKERSUS 377 · | $564,505 | $428,951 | TRP INFRASTRUCTURE SERVICES, LLC | -24.0% | 3 |
| Aug 22, 2024 | 6471-55-001RMC - 647155001 | Stephens Brownwood |
MOWING HIGHWAY RIGHT OF WAYUS 183 · | $414,036 | $349,762 | TRIPLE T MAINTENANCE INC. | -15.5% | 4 |
| Aug 22, 2024 | 6470-67-001MMC - 647067001 | Dimmit Laredo |
LIMESTONE ROCK ASPHALTUS 277 · | $346,140 | $343,585 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.7% | 2 |
| Aug 22, 2024 | 6471-52-001RMC - 647152001 | Maverick Laredo |
CLEANING AND SWEEPING HIGHWAYSUS 277 · | $341,683 | $297,141 | VIZCAINO, L.P. | -13.0% | 2 |
| Aug 22, 2024 | 6471-56-001MMC - 647156001 | Brown Brownwood |
TRAFFIC PAINT AND GLASS BEADS (MATERIALS ONLY)US 183 · | $630,000 | $253,740 | DIGG COMMERCIAL, LLC | -59.7% | 3 |
| Aug 22, 2024 | 6462-06-001RMC - 646206001 | Bexar San Antonio |
LARGE SIGN REPLACEMENTIH 35 · | $247,292 | $212,600 | GARRET SHIELDS INFRASTRUCTURE | -14.0% | 3 |
| Aug 21, 2024 | 6471-89-001RMC - 647189001 | Potter Amarillo |
SWEEPING AND DEBRIS REMOVALUS 87 · | $288,532 | $276,499 | PANHANDLE SWEEPING & MAINTENANCE, LLC | -4.2% | 2 |
| Aug 20, 2024 | 6464-61-001RMC - 646461001 | San Patricio Corpus Christi |
REHABILITATION OF EXISTING ROADWAYUS 181 · | $498,638 | $548,370 | CK NEWBERRY, LLC | +10.0% | 1 |
| Aug 20, 2024 | 6471-88-001MMC - 647188001 | Nueces Corpus Christi |
HOT MIXSH 358 · | $575,000 | $523,000 | COLORADO MATERIALS, LTD. | -9.0% | 3 |
| Aug 20, 2024 | 6461-00-001RMC - 646100001 | Scurry Abilene |
TRAFFIC CONTROL SERVICESUS 84 · | $434,825 | $336,613 | AWP SAFETY | -22.6% | 3 |
| Aug 20, 2024 | 6471-87-001MMC - 647187001 | Live Oak Corpus Christi |
HOT-MIX COLD-LAIDUS 281 · | $333,000 | $293,250 | TEXAS MATERIALS GROUP, INC. | -11.9% | 3 |
| Aug 20, 2024 | 6464-49-001MMC - 646449001 | Karnes Corpus Christi |
HYDRAULIC CEMENTUS 181 · | $275,800 | $266,400 | TOUCHSTONE RESOURCES, LLC | -3.4% | 2 |
| Aug 20, 2024 | 6464-19-001RMC - 646419001 | Karnes Corpus Christi |
CRACK SEALBU 181F · | $235,875 | $252,597 | D & M CONTRACTORS, LLC | +7.1% | 2 |
| Aug 20, 2024 | 6464-17-001RMC - 646417001 | Kleberg Corpus Christi |
CRACK SEALBU 77V · | $170,388 | $199,640 | CRACKSEAL OF TEXAS, LLC | +17.2% | 3 |
| Aug 20, 2024 | 6464-20-001RMC - 646420001 | San Patricio Corpus Christi |
CRACK SEALIH 37 · | $205,325 | $198,732 | D & M CONTRACTORS, LLC | -3.2% | 3 |
| Aug 20, 2024 | 6464-18-001RMC - 646418001 | Nueces Corpus Christi |
CRACK SEALIH 37 · | $105,400 | $140,026 | D & M CONTRACTORS, LLC | +32.9% | 3 |
| Aug 15, 2024 | 6467-98-001MMC - 646798001 | Tarrant Fort Worth |
WINTER WEATHER MATERIALIH 820 · | $601,500 | $737,100 | SOUTHWEST ENVIROTX PARTNERS, LLC | +22.5% | 2 |
| Aug 15, 2024 | 6469-75-001RMC - 646975001 | Hunt Paris |
METAL BEAM GUARD FENCE REPAIRIH 30 · | $935,500 | $607,777 | CATOCON, INC. | -35.0% | 3 |
| Aug 15, 2024 | 6471-07-001RMC - 647107001 | Hopkins Paris |
ON CALL TREE TRIMMING & REMOVALIH 30 · | $520,750 | $520,380 | CATOCON, INC. | -0.1% | 3 |
| Aug 15, 2024 | 6467-86-001MMC - 646786001 | Hunt Paris |
DENSE GRADED HOT MIXUS 69 · | $459,000 | $463,500 | RK HALL, LLC | +1.0% | 3 |
| Aug 15, 2024 | 6468-79-001MMC - 646879001 | Hunt Paris |
LIMESTONE ROCK ASPHALTIH 30 · | $412,500 | $414,850 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.6% | 2 |
| Aug 15, 2024 | 6467-40-001MMC - 646740001 | Fannin Paris |
AGGREGATE (LITE WEIGHT)US 69 · | $301,250 | $291,750 | ARCOSA LWS, LLC | -3.2% | 1 |
| Aug 15, 2024 | 6467-77-001BPM - 646777001 | Grayson Paris |
BRIDGE PREVENTATIVE MAINTENANCEUS 82 · | $267,092 | $241,327 | RHINO EQUITY, LLC | -9.6% | 6 |
| Aug 15, 2024 | 6467-75-001BPM - 646775001 | Grayson Paris |
BRIDGE PREVENTATIVE MAINTENANCEFM 84 · | $252,887 | $237,915 | ROAD DOCTORS LLC | -5.9% | 4 |
| Aug 15, 2024 | 6467-41-001RMC - 646741001 | Hunt Paris |
TREE TRIMMINGIH 30 · | $253,300 | $202,561 | EASTGATE SERVICES | -20.0% | 4 |
| Aug 15, 2024 | 6467-78-001BPM - 646778001 | Hopkins Paris |
BRIDGE PREVENTATIVE MAINTENANCEIH 30 · | $220,540 | $197,281 | CATOCON, INC. | -10.5% | 5 |
| Aug 15, 2024 | 6467-60-001MMC - 646760001 | Palo Pinto Fort Worth |
WINTER WEATHER MATERIALIH 20 · | $185,652 | $167,088 | NSG LOGISTICS, LLC | -10.0% | 3 |
| Aug 15, 2024 | 6467-61-001MMC - 646761001 | Palo Pinto Fort Worth |
WINTER WEATHER MATERIALIH 20 · | $68,310 | $156,640 | SOUTHWEST ENVIROTX PARTNERS, LLC | +129.3% | 3 |
| Aug 15, 2024 | 6471-43-001MMC - 647143001 | Howard Abilene |
FLEXIBLE BASEIH 20 · | $125,422 | $123,295 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.7% | 2 |
| Aug 15, 2024 | 6470-01-001RMC - 647001001 | Lamar Paris |
PICNIC AREA MAINTENANCEUS 271 · | $114,525 | $91,843 | KJRM GENERAL CONTRACTORS, LLC | -19.8% | 5 |
| Aug 15, 2024 | 6471-09-001RMC - 647109001 | Fannin Paris |
PICNIC AREA MAINTENANCESH 78 · | $41,480 | $32,382 | KJRM GENERAL CONTRACTORS, LLC | -21.9% | 5 |
| Aug 14, 2024 | 6460-55-001BPM - 646055001 | Freestone Bryan |
BRIDGE PREVENTATIVE MAINTENANCEIH 45 · | $883,540 | $833,890 | GARRET SHIELDS INFRASTRUCTURE | -5.6% | 4 |
| Aug 14, 2024 | 6471-02-001MMC - 647102001 | Walker Bryan |
WINTER WEATHER MATERIALIH 45 · | $285,200 | $245,488 | NSG LOGISTICS, LLC | -13.9% | 3 |
| Aug 14, 2024 | 6467-25-001RMC - 646725001 | Angelina Lufkin |
METAL BEAM GUARD FENCE REPAIRUS 59 · | $181,425 | $191,034 | ABOVE ALL CONTRACTING LLC | +5.3% | 5 |
| Aug 14, 2024 | 6470-37-001MMC - 647037001 | Brazos Bryan |
WINTER WEATHER MATERIALSH 6 · | $168,480 | $155,851 | NSG LOGISTICS, LLC | -7.5% | 2 |
| Aug 14, 2024 | 6432-68-001RMC - 643268001 | Jefferson Beaumont |
DEBRIS REMOVALIH 10 · | $228,003 | $127,999 | 12TWELVE ROAD AND BRIDGE LLC | -43.9% | 4 |
| Aug 14, 2024 | 6467-26-001RMC - 646726001 | Shelby Lufkin |
METAL BEAM GUARD FENCE REPAIRUS 96 · | $130,524 | $116,037 | ACE CONTRACTORS, INC. | -11.1% | 5 |
| Aug 14, 2024 | 6461-54-001RMC - 646154001 | Bastrop Austin |
SWEEPING AND DEBRIS REMOVALSH 71 · | $71,730 | $68,358 | SWEEPING CORPORATION OF AMERICA, LLC | -4.7% | 1 |
| Aug 13, 2024 | 6468-86-001RMC - 646886001 | Ector Odessa |
CRACK SEALIH 20 · | $324,266 | $565,230 | D & M CONTRACTORS, LLC | +74.3% | 2 |
| Aug 13, 2024 | 6466-81-001RMC - 646681001 | Henderson Tyler |
CRACK SEALSH 31 · | $329,985 | $506,411 | D & M CONTRACTORS, LLC | +53.5% | 1 |
| Aug 13, 2024 | 6468-85-001RMC - 646885001 | Midland Odessa |
CRACK SEALIH 20 · | $211,100 | $370,359 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | +75.4% | 2 |
| Aug 13, 2024 | 6460-58-001BPM - 646058001 | Freestone Bryan |
BRIDGE PREVENTATIVE MAINTENANCEIH 45 · | $277,640 | $282,875 | GARRET SHIELDS INFRASTRUCTURE | +1.9% | 3 |
| Aug 13, 2024 | 6468-92-001RMC - 646892001 | Pecos Odessa |
CRACK SEALBI 10G · | $313,900 | $259,484 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -17.3% | 2 |
| Aug 13, 2024 | 6470-38-001MMC - 647038001 | Walker Bryan |
WINTER WEATHER MATERIALIH 45 · | $224,640 | $202,387 | NSG LOGISTICS, LLC | -9.9% | 2 |
| Aug 13, 2024 | 6447-48-001BPM - 644748001 | Walker Bryan |
BRIDGE PREVENTATIVE MAINTENANCESH 19 · | $140,357 | $163,498 | CROSS PLUS CONSTRUCTION, LLC | +16.5% | 3 |
| Aug 13, 2024 | 6470-36-001MMC - 647036001 | Washington Bryan |
WINTER WEATHER MATERIALSH 36 · | $168,480 | $149,182 | NSG LOGISTICS, LLC | -11.5% | 2 |
| Aug 13, 2024 | 6470-75-001MMC - 647075001 | Ector Odessa |
PAINT AND BEADSBI 20E · | $130,800 | $133,272 | DIGG COMMERCIAL, LLC | +1.9% | 4 |
| Aug 13, 2024 | 6471-30-001MMC - 647130001 | Angelina Lufkin |
WINTER WEATHER MATERIAL/DISTRICTWIDEBU 69J · | $62,160 | $52,723 | CLEMENTS FLUIDS HENDERSON, LTD. | -15.2% | 3 |
| Aug 13, 2024 | 6465-23-001RMC - 646523001 | Cooke Wichita Falls |
TREE TRIMMING AND BRUSH REMOVALUS 82 · | $63,207 | $46,042 | AZA CONSTRUCTION INC | -27.2% | 11 |
| Aug 13, 2024 | 6469-58-001MMC - 646958001 | Ector Odessa |
AGGREGATESL 338 · | $35,000 | $28,750 | DIGG COMMERCIAL, LLC | -17.9% | 2 |
| Aug 9, 2024 | 6465-62-001BPM - 646562001 | Jefferson Beaumont |
BRIDGE PREVENTATIVE MAINTENANCESH 73 · | $614,994 | $508,346 | SCR CIVIL CONSTRUCTION, LLC | -17.3% | 6 |
| Aug 8, 2024 | 6469-23-001RMC - 646923001 | Maverick Laredo |
MOWING HIGHWAY RIGHT OF WAYUS 277 · | $228,403 | $271,786 | R&M INCORPORATED | +19.0% | 1 |
| Aug 7, 2024 | 6468-63-001RMC - 646863001 | Dallas Dallas |
ILLUMINATION MAINTENANCEIH 45 · | $987,585 | $823,336 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -16.6% | 2 |
| Aug 7, 2024 | 6408-04-001RMC - 640804001 | Denton Dallas |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 35W · | $681,635 | $364,567 | TRP INFRASTRUCTURE SERVICES, LLC | -46.5% | 2 |
| Aug 7, 2024 | 6460-39-001RMC - 646039001 | Collin Dallas |
POTHOLE REPAIRUS 75 · | $249,250 | $309,500 | GARRET SHIELDS INFRASTRUCTURE | +24.2% | 2 |
| Aug 7, 2024 | 6462-80-001RMC - 646280001 | Denton Dallas |
REPAIR/REPLACE CONCRETE BARRIERIH 35E · | $259,500 | $256,900 | IBCTX, LLC | -1.0% | 4 |
| Aug 7, 2024 | 6466-77-001RMC - 646677001 | Houston Lufkin |
CABLE BARRIER REPAIRUS 287 · | $322,969 | $239,834 | AUSTIN BARRICADE COMPANY, L.L.C. | -25.7% | 3 |
| Aug 7, 2024 | 6465-89-001RMC - 646589001 | Dallas Dallas |
CRACK SEALSL 12 · | $230,480 | $232,474 | ICOS MANAGEMENT, LLC | +0.9% | 3 |
| Aug 7, 2024 | 6465-96-001RMC - 646596001 | Navarro Dallas |
CRACK SEALSH 31 · | $234,788 | $222,133 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -5.4% | 3 |
| Aug 7, 2024 | 6470-13-001MMC - 647013001 | Kaufman Dallas |
EMULSIONFM 2728 · | $187,560 | $168,288 | ERGON ASPHALT & EMULSIONS, INC. | -10.3% | 3 |
| Aug 7, 2024 | 6466-50-001RMC - 646650001 | Collin Dallas |
CRACK SEALFM 1461 · | $240,743 | $152,014 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -36.9% | 4 |
| Aug 7, 2024 | 6465-88-001RMC - 646588001 | Dallas Dallas |
CRACK SEALSL 12 · | $131,400 | $128,183 | ICOS MANAGEMENT, LLC | -2.4% | 4 |
| Aug 7, 2024 | 6466-76-001RMC - 646676001 | Ellis Dallas |
CRACK SEALIH 35E · | $104,610 | $104,642 | ICOS MANAGEMENT, LLC | +0.0% | 3 |
| Aug 7, 2024 | 6470-11-001MMC - 647011001 | Kaufman Dallas |
HYDRAULIC CEMENTFM 2728 · | $89,180 | $85,064 | TOUCHSTONE RESOURCES, LLC | -4.6% | 2 |
| Aug 7, 2024 | 6466-23-001RMC - 646623001 | Kaufman Dallas |
CRACK SEALFM 2728 · | $88,869 | $78,113 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -12.1% | 3 |
| Aug 7, 2024 | 6467-21-001MMC - 646721001 | Collin Dallas |
EMULSIONSH 5 · | $48,500 | $46,109 | MARTIN RESOURCE MANAGEMENT CORPORATION | -4.9% | 2 |
| Aug 7, 2024 | 6465-35-001RMC - 646535001 | Denton Dallas |
CRACK SEALFM 455 · | $73,076 | $31,755 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -56.5% | 3 |
| Aug 6, 2024 | 6466-56-001RMC - 646656001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)IH 69 · | $906,111 | $858,824 | PROFESSIONAL TRAFFIC CONTROL LLC | -5.2% | 3 |
| Aug 6, 2024 | 6466-27-001RMC - 646627001 | Brazoria Houston |
CRACK SEALBS 288B · | $879,729 | $440,383 | ISI CONTRACTING, INC. | -49.9% | 4 |
| Aug 6, 2024 | 6467-31-001RMC - 646731001 | Harris Houston |
STORM SEWER SYSTEM CLEANINGSH 249 · | $327,838 | $322,138 | AIMS COMPANIES | -1.7% | 2 |
| Aug 6, 2024 | 6467-33-001RMC - 646733001 | Galveston Houston |
MOWING HIGHWAY RIGHT OF WAYFM 1764 · | $263,368 | $269,911 | GREEN SAGE SERVICES LLC | +2.5% | 3 |
| Aug 6, 2024 | 6470-74-001MMC - 647074001 | Trinity Lufkin |
FLEXIBLE BASE/TY E/TRINITY (POLK & SAN JAC)US 287 · | $210,000 | $203,500 | TEXAS MATERIALS GROUP, INC. | -3.1% | 2 |
| Aug 6, 2024 | 6466-82-001RMC - 646682001 | Wood Tyler |
CRACK SEALSH 154 · | $161,165 | $199,088 | D & M CONTRACTORS, LLC | +23.5% | 2 |
| Aug 6, 2024 | 6466-17-001RMC - 646617001 | Waller Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)US 290 · | $215,820 | $177,114 | TRP INFRASTRUCTURE SERVICES, LLC | -17.9% | 5 |
| Aug 5, 2024 | 6464-03-001RMC - 646403001 | Real San Angelo |
MOWING HIGHWAY RIGHT OF WAYUS 83 · | $202,845 | $309,139 | R&M INCORPORATED | +52.4% | 1 |
| Aug 5, 2024 | 6469-82-001RMC - 646982001 | Kimble San Angelo |
MOWING HIGHWAY RIGHT OF WAYUS 377 · | $194,992 | $232,019 | R&M INCORPORATED | +19.0% | 1 |
| Aug 5, 2024 | 6466-90-001RMC - 646690001 | Concho San Angelo |
MOWING HIGHWAY RIGHT OF WAYUS 87 · | $257,856 | $231,229 | TRIPLE T MAINTENANCE INC. | -10.3% | 1 |
| Aug 5, 2024 | 6469-84-001RMC - 646984001 | Runnels San Angelo |
MOWING HIGHWAY RIGHT OF WAYFM 2887 · | $189,614 | $225,577 | R&M INCORPORATED | +19.0% | 2 |
| Aug 5, 2024 | 6464-04-001RMC - 646404001 | Sterling San Angelo |
MOWING HIGHWAY RIGHT OF WAYUS 87 · | $167,826 | $181,296 | DESERT LUXURY TRANSPORTATION, LLC | +8.0% | 1 |
| Aug 5, 2024 | 6469-83-001RMC - 646983001 | Tom Green San Angelo |
MOWING HIGHWAY RIGHT OF WAYSH 208 · | $176,380 | $141,715 | DESERT LUXURY TRANSPORTATION, LLC | -19.7% | 1 |
| Aug 5, 2024 | 6464-02-001RMC - 646402001 | Reagan San Angelo |
MOWING HIGHWAY RIGHT OF WAYUS 67 · | $127,830 | $137,682 | DESERT LUXURY TRANSPORTATION, LLC | +7.7% | 1 |
| Aug 5, 2024 | 6464-01-001RMC - 646401001 | Coke San Angelo |
MOWING HIGHWAY RIGHT OF WAYSH 158 · | $123,517 | $129,688 | DESERT LUXURY TRANSPORTATION, LLC | +5.0% | 2 |
| Aug 2, 2024 | 0327-04-039F 2B24(314) | Kenedy Pharr |
INTERSTATE DESIGNATIONUS 77 · | $106,176,094 | $93,082,027 | FOREMOST PAVING, INC. | -12.3% | 3 |
| Aug 2, 2024 | 0521-06-155BR 2B24(547) | Bexar San Antonio |
INFRASTRUCTURE IMPROVEMENTSIH 410 · | $100,496,656 | $84,474,579 | ZACHRY CONSTRUCTION CORPORATION | -15.9% | 3 |
| Aug 2, 2024 | 0077-05-031F 2B24(013) | Irion San Angelo |
PREVENTIVE MAINTENANCEUS 67 · | $57,311,002 | $52,231,941 | RK HALL, LLC | -8.9% | 5 |
| Aug 2, 2024 | 0110-04-202STP 2023(491)MM | Montgomery Houston |
DRAINAGE IMPROVEMENTSIH 45 · | $44,825,425 | $42,630,751 | JAMES CONSTRUCTION GROUP, LLC | -4.9% | 4 |
| Aug 2, 2024 | 0508-01-391C 508-1-391 | Harris Houston |
SURFACING/ROADWAY RESTORATIONIH 10 · | $18,228,318 | $18,279,582 | TEXAS MATERIALS GROUP, INC. | +0.3% | 3 |
| Aug 2, 2024 | 2452-04-017F 2025(070) | Bexar San Antonio |
WIDEN ROAD - ADD LANESSL 1604 · | $19,927,581 | $16,250,383 | STERLING DELAWARE HOLDING COMPANY | -18.5% | 8 |
| Aug 2, 2024 | 2745-01-009STP 2B24(292)HES | Collin Dallas |
HAZARD ELIMINATION & SAFETYFM 2755 · | $13,064,642 | $15,084,321 | STERLING DELAWARE HOLDING COMPANY | +15.5% | 5 |
| Aug 2, 2024 | 6467-71-001RMC - 646771001 | Harris Houston |
BUNDLED BIDSH 99 · | $27,205,771 | $14,959,423 | ROY JORGENSEN ASSOCIATES, INC. | -45.0% | 2 |
1–100 of 239Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.