| 1 | 110-2001 |
EXCAVATION (ROADWAY) | 2,235 | CY |
$10.00 |
$13.00 |
$18.00 |
$14.73 |
| 2 | 132-2006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 12,622 | CY |
$20.00 |
$17.00 |
$10.30 |
$19.98 |
| 3 | 150-2001 |
BLADING | 222.39 | STA |
$53.00 |
$107.00 |
$240.00 |
$56.99 |
| 4 | 162-2002 |
BLOCK SODDING | 5,405 | SY |
$3.50 |
$2.65 |
$5.00 |
$5.15 |
| 5 | 164-2015 |
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY) | 67,356 | SY |
$0.2500 |
$0.2150 |
$0.4000 |
$0.3900 |
| 6 | 164-2041 |
DRILL SEEDING (TEMP) (WARM) | 33,678 | SY |
$0.1000 |
$0.1100 |
$0.1500 |
$0.1500 |
| 7 | 164-2043 |
DRILL SEEDING (TEMP) (COOL) | 33,678 | SY |
$0.1000 |
$0.1100 |
$0.1500 |
$0.1500 |
| 8 | 168-2001 |
VEGETATIVE WATERING | 3,727 | MG |
$14.00 |
$22.00 |
$17.00 |
$12.60 |
| 9 | 247-2076 |
FL BS (CMP IN PLC)(TY D GR 4) (6") | 4,758 | SY |
$12.00 |
$11.00 |
$11.00 |
$19.31 |
| 10 | 351-2008 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 11,450 | SY |
$47.00 |
$56.19 |
$60.00 |
$67.12 |
| 11 | 400-2008 |
CUT & RESTORING PAV (ASPH) | 24 | SY |
$75.00 |
$102.00 |
$60.00 |
$105.00 |
| 12 | 401-2001 |
FLOWABLE BACKFILL | 27.1 | CY |
$150.00 |
$230.00 |
$150.00 |
$236.25 |
| 13 | 420-2013 |
CL C CONC (MISC) | 2.4 | CY |
$450.00 |
$1,225.00 |
$1,100.00 |
$1,260.00 |
| 14 | 430-2047 |
CL C CONC FOR EXT STRU (CULV)(2-7'X4') | 20 | LF |
$1,200.00 |
$685.00 |
$900.00 |
$708.75 |
| 15 | 432-2001 |
RIPRAP (CONC)(4 IN) | 71 | CY |
$375.00 |
$405.00 |
$400.00 |
$420.00 |
| 16 | 432-2021 |
RIPRAP (STONE PROTECTION)(18 IN) | 22.2 | CY |
$100.00 |
$30.50 |
$150.00 |
$157.50 |
| 17 | 432-2039 |
RIPRAP (MOW STRIP)(4 IN) | 15 | CY |
$375.00 |
$405.00 |
$400.00 |
$420.00 |
| 18 | 464-2003 |
RC PIPE (CL III)(18 IN) | 2,412 | LF |
$35.00 |
$38.50 |
$40.00 |
$39.90 |
| 19 | 464-2005 |
RC PIPE (CL III)(24 IN) | 566 | LF |
$50.00 |
$57.00 |
$50.00 |
$58.80 |
| 20 | 464-2007 |
RC PIPE (CL III)(30 IN) | 37 | LF |
$65.00 |
$81.00 |
$80.00 |
$84.00 |
| 21 | 464-2009 |
RC PIPE (CL III)(36 IN) | 72 | LF |
$75.00 |
$111.00 |
$84.00 |
$115.50 |
| 22 | 466-2049 |
WINGWALL (PW)(HW=5 FT) | 1 | EA |
$6,500.00 |
$5,050.00 |
$8,000.00 |
$5,250.00 |
| 23 | 466-2050 |
WINGWALL (PW)(HW=6 FT) | 1 | EA |
$6,750.00 |
$6,550.00 |
$11,000.00 |
$6,825.00 |
| 24 | 466-2142 |
HEADWALL (CH-PW-S)(DIA= 30 IN) | 1 | EA |
$3,500.00 |
$3,550.00 |
$6,000.00 |
$3,675.00 |
| 25 | 467-2211 |
SET (TY II)(24 IN)(RCP)(3:1)(C) | 3 | EA |
$1,050.00 |
$655.00 |
$800.00 |
$682.50 |
| 26 | 467-2213 |
SET (TY II)(30 IN)(RCP)(3:1)(C) | 1 | EA |
$1,500.00 |
$925.00 |
$1,300.00 |
$945.00 |
| 27 | 467-2215 |
SET (TY II)(36 IN)(RCP)(3:1)(C) | 10 | EA |
$1,750.00 |
$2,550.00 |
$1,650.00 |
$2,625.00 |
| 28 | 467-2222 |
SET (TY II)(18 IN)(RCP)(4:1)(C) | 2 | EA |
$1,200.00 |
$605.00 |
$700.00 |
$630.00 |
| 29 | 467-2224 |
SET (TY II)(24 IN)(RCP)(4:1)(C) | 13 | EA |
$1,500.00 |
$755.00 |
$900.00 |
$787.50 |
| 30 | 467-2286 |
SET (TY II)(18 IN)(RCP)(6:1)(P) | 196 | EA |
$500.00 |
$755.00 |
$750.00 |
$787.50 |
| 31 | 467-2288 |
SET (TY II)(24 IN)(RCP)(6:1)(P) | 32 | EA |
$1,000.00 |
$852.00 |
$1,000.00 |
$892.50 |
| 32 | 467-2290 |
SET (TY II)(30 IN)(RCP)(6:1)(P) | 2 | EA |
$2,000.00 |
$1,255.00 |
$2,300.00 |
$1,312.50 |
| 33 | 467-2292 |
SET (TY II)(36 IN)(RCP)(6:1)(P) | 4 | EA |
$2,500.00 |
$3,050.00 |
$3,300.00 |
$3,150.00 |
| 34 | 496-2007 |
REMOV STR (PIPE) | 3,548 | LF |
$10.00 |
$12.20 |
$17.00 |
$16.80 |
| 35 | 496-2042 |
REMOV STR (SMALL) | 2 | EA |
$400.00 |
$555.00 |
$900.00 |
$577.50 |
| 36 | 500-2001 |
MOBILIZATION | 1 | LS |
$275,296.00 |
$274,300.00 |
$349,000.00 |
$299,569.74 |
| 37 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$4,000.00 |
$12,800.00 |
$4,000.00 |
$1,517.40 |
| 38 | 530-2005 |
INTERSECTIONS (ACP) | 1,833 | SY |
$16.00 |
$20.30 |
$28.00 |
$23.34 |
| 39 | 530-2010 |
DRIVEWAYS (CONC) | 1,751 | SY |
$50.00 |
$66.00 |
$70.00 |
$73.50 |
| 40 | 530-2011 |
DRIVEWAYS (ACP) | 1,154 | SY |
$25.00 |
$20.00 |
$38.00 |
$23.34 |
| 41 | 540-2001 |
MTL W-BEAM GD FEN (TIM POST) | 225 | LF |
$20.00 |
$15.25 |
$16.50 |
$21.00 |
| 42 | 540-2044 |
DOWNSTREAM ANCHOR TERMINAL(DAT)SECTION | 1 | EA |
$1,100.00 |
$760.00 |
$800.00 |
$1,076.25 |
| 43 | 544-2004 |
GDRAIL END TRT(INST)(WOOD POST)(TY I) | 1 | EA |
$2,200.00 |
$1,825.00 |
$2,000.00 |
$2,205.00 |
| 44 | 560-2007 |
MAILBOX INSTALL-D (TWW-POST)TY 4 FND-TB | 4 | EA |
$150.00 |
$205.00 |
$220.00 |
$183.75 |
| 45 | 560-2008 |
MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB | 3 | EA |
$200.00 |
$490.00 |
$530.00 |
$409.50 |
| 46 | 560-2015 |
MAILBOX INSTALL-S(TWW-POST)TY 4 FND-TB | 70 | EA |
$350.00 |
$215.00 |
$230.00 |
$173.25 |
| 47 | 644-2001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 33 | EA |
$400.00 |
$432.00 |
$450.00 |
$404.25 |
| 48 | 644-2004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 9 | EA |
$525.00 |
$458.00 |
$500.00 |
$414.75 |
| 49 | 644-2025 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 1 | EA |
$800.00 |
$805.00 |
$880.00 |
$929.25 |
| 50 | 644-2027 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 3 | EA |
$700.00 |
$755.00 |
$820.00 |
$834.75 |
| 51 | 644-2042 |
IN SM RD SN SUP&AM TYS80(2)SA(P) | 2 | EA |
$900.00 |
$1,080.00 |
$1,100.00 |
$1,218.00 |
| 52 | 644-2060 |
REMOVE SM RD SN SUP & AM | 46 | EA |
$75.00 |
$71.00 |
$75.00 |
$99.75 |
| 53 | 658-2316 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 30 | EA |
$150.00 |
$67.00 |
$70.00 |
$89.25 |
| 54 | 662-2115 |
WK ZN PAV MRK SHT TERM (TAB) TY Y-2 | 2,224 | EA |
$1.00 |
$1.00 |
$1.00 |
$1.06 |
| 55 | 666-2036 |
REFL PAV MRK TY I (W) 8" (SLD)(100MIL) | 6,422 | LF |
$0.7500 |
$0.8860 |
$0.9500 |
$0.9900 |
| 56 | 666-2048 |
REFL PAV MRK TY I (W) 24"(SLD)(100MIL) | 16 | LF |
$5.50 |
$12.50 |
$13.00 |
$6.30 |
| 57 | 672-2015 |
REFL PAV MRKR TY II-A-A | 488 | EA |
$3.00 |
$3.65 |
$3.90 |
$4.10 |
| 58 | 730-2002 |
FULL-WIDTH MOWING | 63.31 | AC |
$100.00 |
$109.39 |
$50.00 |
$29.55 |
| 59 | 1122-2001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 160 | LF |
$18.00 |
$16.59 |
$25.00 |
$23.63 |
| 60 | 1122-2009 |
ROCK FILTER DAMS (REMOVE) | 160 | LF |
$8.00 |
$5.95 |
$9.00 |
$8.93 |
| 61 | 1122-2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 1,104 | SY |
$12.00 |
$19.97 |
$13.00 |
$13.13 |
| 62 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 1,104 | SY |
$5.00 |
$6.98 |
$6.00 |
$5.78 |
| 63 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 2,005 | LF |
$2.00 |
$2.48 |
$3.00 |
$2.84 |
| 64 | 1122-2047 |
BIOGRD EROSN CONT LOGS (8" DIA) INSTALL | 160 | LF |
$5.00 |
$4.17 |
$6.00 |
$6.14 |
| 65 | 1122-2056 |
BIODEGRADBLE EROSION CONTROL LOGS REMOV | 160 | LF |
$1.00 |
$3.13 |
$2.00 |
$2.10 |
| 66 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 2,005 | LF |
$0.5000 |
$0.4270 |
$0.5000 |
$0.4500 |
| 67 | 3268-2008 |
D-GR HMA TY-B PG64-22 | 7,176 | TON |
$60.00 |
$66.00 |
$73.00 |
$77.73 |
| 68 | 3268-2021 |
D-GR HMA TY-C SAC-B PG64-22 | 8,752 | TON |
$70.00 |
$70.00 |
$73.00 |
$77.18 |
| 69 | 8251-2006 |
RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) | 28,078 | LF |
$0.3500 |
$0.3700 |
$0.4000 |
$0.4200 |
| 70 | 8251-2015 |
RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) | 2,860 | LF |
$0.4000 |
$0.3900 |
$0.4000 |
$0.4600 |
| 71 | 8251-2018 |
RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) | 27,563 | LF |
$0.3500 |
$0.3700 |
$0.4000 |
$0.4400 |