| 1 | 100-6002 |
PREPARING ROW | 93 | STA |
$250.00 |
$200.00 |
$20.00 |
$975.00 |
|
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 9,882.9 | CY |
$8.25 |
$20.00 |
$10.00 |
$19.75 |
|
| 3 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 702.6 | CY |
$5.50 |
$22.00 |
$20.00 |
$7.00 |
|
| 4 | 150-6002 |
BLADING | 340 | HR |
$260.00 |
$190.00 |
$100.00 |
$420.00 |
|
| 5 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 914,382 | SY |
$0.1100 |
$0.1100 |
$0.0500 |
$0.1500 |
|
| 6 | 432-6001 |
RIPRAP (CONC)(4 IN) | 12,032 | CY |
$510.00 |
$379.00 |
$455.00 |
$525.00 |
|
| 7 | 500-6001 |
MOBILIZATION | 1 | LS |
$554,506.12 |
$1,012,000.00 |
$700,000.00 |
$1,000,000.00 |
|
| 8 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 16 | MO |
$10,500.00 |
$18,000.00 |
$15,000.00 |
$9,375.00 |
|
| 9 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 2,680 | LF |
$8.00 |
$9.35 |
$1.00 |
$10.00 |
|
| 10 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,680 | LF |
$2.80 |
$1.95 |
$1.00 |
$2.00 |
|
| 11 | 543-6002 |
CABLE BARRIER SYSTEM (TL-4) | 315,361 | LF |
$9.68 |
$6.90 |
$8.50 |
$10.75 |
|
| 12 | 543-6006 |
CABLE BARRIER SYSTEM (TL-4) (10'-0") | 4,940 | LF |
$11.50 |
$8.30 |
$10.00 |
$15.00 |
|
| 13 | 543-6020 |
CABLE BARRIER TERMINAL SECTION (TL-4) | 218 | EA |
$4,300.00 |
$3,500.00 |
$2,300.00 |
$2,900.00 |
|
| 14 | 636-6007 |
REPLACE EXISTING ALUMINUM SIGNS(TY A) | 26 | SF |
$27.55 |
$60.00 |
$30.00 |
$35.00 |
|
| 15 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 10 | EA |
$924.49 |
$1,300.00 |
$500.00 |
$750.00 |
|
| 16 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 12 | EA |
$17,900.00 |
$8,000.00 |
$1,000.00 |
$10,000.00 |
|
| 17 | 6185-6002 |
TMA (STATIONARY) | 779 | DAY |
$210.00 |
$280.00 |
$20.00 |
$375.00 |
|