| 1 | 100-6002 |
PREPARING ROW | 12 | STA |
$2,500.00 |
$1,500.00 |
$2,000.00 |
$5,000.00 |
$3,000.00 |
$7,500.00 |
| 2 | 110-6004 |
EXCAVATION (ROADWAY AND CHANNEL) | 1,055 | CY |
$20.00 |
$15.00 |
$20.00 |
$20.00 |
$13.00 |
$30.00 |
| 3 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 938 | CY |
$25.00 |
$41.00 |
$23.00 |
$20.00 |
$13.00 |
$40.00 |
| 4 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 1,950 | SY |
$8.30 |
$2.40 |
$2.25 |
$2.00 |
$3.00 |
$5.00 |
| 5 | 168-6001 |
VEGETATIVE WATERING | 18 | MG |
$500.00 |
$60.00 |
$40.00 |
$30.00 |
$75.00 |
$1.00 |
| 6 | 169-6003 |
SOIL RETENTION BLANKETS (CL 1) (TY C) | 270 | SY |
$1.75 |
$4.25 |
$2.75 |
$10.00 |
$3.00 |
$6.00 |
| 7 | 216-6001 |
PROOF ROLLING | 9 | HR |
$200.00 |
$100.00 |
$115.00 |
$100.00 |
$175.00 |
$1.00 |
| 8 | 247-6061 |
FL BS (CMP IN PLC)(TYA GR1-2) (6") | 2,208 | SY |
$35.00 |
$31.00 |
$21.00 |
$30.00 |
$24.00 |
$40.00 |
| 9 | 416-6004 |
DRILL SHAFT (36 IN) | 906 | LF |
$250.00 |
$295.00 |
$320.00 |
$350.00 |
$375.00 |
$260.00 |
| 10 | 420-6013 |
CL C CONC (ABUT) | 111.6 | CY |
$1,000.00 |
$1,000.00 |
$1,250.00 |
$1,250.00 |
$1,500.00 |
$1,200.00 |
| 11 | 420-6074 |
CL C CONC (MISC) | 23.05 | CY |
$760.00 |
$700.00 |
$1,045.00 |
$1,000.00 |
$1,400.00 |
$1,200.00 |
| 12 | 422-6002 |
REINF CONC SLAB (HPC) | 6,240 | SF |
$25.00 |
$25.00 |
$31.00 |
$25.00 |
$28.00 |
$30.00 |
| 13 | 425-6035 |
PRESTR CONC GIRDER (TX28) | 576 | LF |
$175.00 |
$170.00 |
$251.00 |
$200.00 |
$200.00 |
$225.00 |
| 14 | 425-6037 |
PRESTR CONC GIRDER (TX40) | 358 | LF |
$175.00 |
$175.00 |
$250.00 |
$225.00 |
$205.00 |
$250.00 |
| 15 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 2,430.5 | CY |
$120.00 |
$105.00 |
$114.00 |
$125.00 |
$120.00 |
$150.00 |
| 16 | 450-6006 |
RAIL (TY T223) | 582 | LF |
$110.00 |
$120.00 |
$170.75 |
$150.00 |
$150.00 |
$125.00 |
| 17 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 3 | EA |
$27,500.00 |
$15,000.00 |
$24,500.00 |
$20,000.00 |
$25,000.00 |
$22,000.00 |
| 18 | 500-6001 |
MOBILIZATION | 1 | LS |
$126,000.00 |
$125,000.00 |
$153,000.00 |
$150,000.00 |
$178,000.00 |
$160,000.00 |
| 19 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$7,500.00 |
$1,750.00 |
$911.00 |
$5,000.00 |
$2,500.00 |
$3,000.00 |
| 20 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 180 | LF |
$30.00 |
$40.00 |
$40.00 |
$40.00 |
$44.00 |
$1.00 |
| 21 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 990 | LF |
$2.25 |
$3.10 |
$3.00 |
$4.00 |
$5.00 |
$1.00 |
| 22 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 990 | LF |
$0.6500 |
$1.00 |
$1.00 |
$1.00 |
$2.00 |
$1.00 |
| 23 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 240 | LF |
$3.50 |
$3.50 |
$3.00 |
$4.00 |
$5.00 |
$10.00 |
| 24 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 240 | LF |
$1.25 |
$1.25 |
$1.00 |
$1.00 |
$2.00 |
$5.00 |
| 25 | 530-6016 |
DRIVEWAYS (BASE) | 24 | SY |
$50.00 |
$100.00 |
$250.00 |
$100.00 |
$100.00 |
$30.00 |
| 26 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 350 | LF |
$25.00 |
$26.50 |
$25.00 |
$30.00 |
$28.00 |
$28.00 |
| 27 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 12 | EA |
$1,400.00 |
$1,150.00 |
$1,175.00 |
$1,500.00 |
$1,400.00 |
$1,800.00 |
| 28 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 6 | EA |
$1,100.00 |
$1,225.00 |
$1,350.00 |
$1,500.00 |
$1,500.00 |
$2,000.00 |
| 29 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 6 | EA |
$2,850.00 |
$3,175.00 |
$3,025.00 |
$3,500.00 |
$3,400.00 |
$3,000.00 |
| 30 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$25.00 |
$31.00 |
$15.00 |
$25.00 |
$20.00 |
$60.00 |
| 31 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 22 | EA |
$46.50 |
$31.00 |
$35.00 |
$50.00 |
$40.00 |
$40.00 |
| 32 | 5132-6001 |
LEAD CONTAINING COATING MANAGEMENT | 600 | SF |
$75.00 |
$42.00 |
$40.00 |
$45.00 |
$44.00 |
$2.00 |