| 1 | 100-6002 |
PREPARING ROW | 41 | STA |
$2,000.00 |
$915.59 |
$1,600.00 |
$2,500.00 |
|
| 2 | 100-6009 |
PREPARING ROW (TREE) (6" TO 24" DIA) | 1 | EA |
$605.00 |
$784.63 |
$3,000.00 |
$3,600.00 |
|
| 3 | 104-6014 |
REMOVING CONC (FOUNDATIONS) | 4 | CY |
$550.00 |
$185.39 |
$320.00 |
$480.00 |
|
| 4 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 18 | SY |
$55.00 |
$44.24 |
$46.00 |
$50.00 |
|
| 5 | 110-6002 |
EXCAVATION (CHANNEL) | 5 | CY |
$45.00 |
$18.74 |
$66.50 |
$148.50 |
|
| 6 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 758.64 | STA |
$340.00 |
$274.97 |
$275.00 |
$250.00 |
|
| 7 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 361.9 | CY |
$27.00 |
$25.44 |
$29.50 |
$50.00 |
|
| 8 | 134-6004 |
BACKFILL (TY A OR B) | 786.98 | STA |
$140.00 |
$152.66 |
$195.00 |
$146.50 |
|
| 9 | 150-6002 |
BLADING | 75 | HR |
$170.00 |
$124.56 |
$145.00 |
$290.00 |
|
| 10 | 164-6034 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 40 | AC |
$320.00 |
$359.00 |
$330.00 |
$380.00 |
|
| 11 | 164-6042 |
DRILL SEEDING (TEMP) (WARM) | 20 | AC |
$350.00 |
$300.00 |
$355.00 |
$315.00 |
|
| 12 | 164-6044 |
DRILL SEEDING (TEMP) (COOL) | 20 | AC |
$350.00 |
$365.00 |
$365.00 |
$385.00 |
|
| 13 | 168-6001 |
VEGETATIVE WATERING | 1,560 | MG |
$20.00 |
$24.49 |
$24.50 |
$41.00 |
|
| 14 | 314-6013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 16,843.12 | GAL |
$3.10 |
$3.50 |
$3.45 |
$3.85 |
|
| 15 | 341-6010 |
D-GR HMA TY-B PG70-22 | 21,740.75 | TON |
$95.00 |
$104.68 |
$114.00 |
$121.60 |
|
| 16 | 341-6085 |
D-GR HMA TY-D SAC-A PG 76-28 | 50,725 | TON |
$105.00 |
$115.50 |
$114.00 |
$131.65 |
|
| 17 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 5,089 | SY |
$2.90 |
$2.34 |
$3.25 |
$4.25 |
|
| 18 | 354-6045 |
PLANE ASPH CONC PAV (2") | 10,360 | SY |
$1.80 |
$1.86 |
$2.50 |
$2.90 |
|
| 19 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 211.64 | CY |
$125.00 |
$102.46 |
$215.00 |
$155.00 |
|
| 20 | 460-6007 |
CMP (GAL STL 48 IN) | 58 | LF |
$115.00 |
$179.80 |
$215.00 |
$235.00 |
|
| 21 | 467-6468 |
SET (TY II) (48 IN) (CMP) (4: 1) (C) | 14 | EA |
$4,500.00 |
$5,128.80 |
$7,000.00 |
$3,415.00 |
|
| 22 | 500-6001 |
MOBILIZATION | 1 | LS |
$688,351.00 |
$692,853.99 |
$540,000.00 |
$954,000.00 |
|
| 23 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$11,800.00 |
$14,620.15 |
$33,500.00 |
$29,950.00 |
|
| 24 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 500 | SY |
$30.00 |
$25.00 |
$27.00 |
$44.50 |
|
| 25 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 500 | SY |
$5.50 |
$5.00 |
$10.50 |
$7.00 |
|
| 26 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,000 | LF |
$4.00 |
$5.02 |
$5.35 |
$9.40 |
|
| 27 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 157,687 | LF |
$0.1500 |
$0.1000 |
$0.1300 |
$0.1300 |
|
| 28 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 78,598 | LF |
$0.3500 |
$0.1000 |
$0.1700 |
$0.3000 |
|
| 29 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 800 | LF |
$30.00 |
$30.00 |
$32.00 |
$31.60 |
|
| 30 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 800 | LF |
$4.20 |
$4.00 |
$4.30 |
$4.20 |
|
| 31 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,200.00 |
$3,100.00 |
$3,300.00 |
$3,265.00 |
|
| 32 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$330.00 |
$400.00 |
$430.00 |
$420.00 |
|
| 33 | 560-6001 |
MAILBOX INSTALL-S (TWG-POST) TY 1 | 10 | EA |
$220.00 |
$210.00 |
$225.00 |
$265.00 |
|
| 34 | 560-6002 |
MAILBOX INSTALL-D (TWG-POST) TY 1 | 2 | EA |
$280.00 |
$250.00 |
$270.00 |
$315.00 |
|
| 35 | 560-6003 |
MAILBOX INSTALL-M (TWG-POST) TY 1 | 2 | EA |
$415.00 |
$385.00 |
$410.00 |
$474.00 |
|
| 36 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 22 | EA |
$580.00 |
$520.00 |
$555.00 |
$895.00 |
|
| 37 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 5 | EA |
$1,300.00 |
$825.00 |
$885.00 |
$1,225.00 |
|
| 38 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 39 | EA |
$600.00 |
$415.00 |
$445.00 |
$795.00 |
|
| 39 | 644-6070 |
RELOCATE SM RD SN SUP&AM TY S80 | 3 | EA |
$520.00 |
$485.00 |
$520.00 |
$875.00 |
|
| 40 | 658-6002 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI) | 12 | EA |
$130.00 |
$55.00 |
$59.00 |
$142.00 |
|
| 41 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 52 | EA |
$95.00 |
$60.00 |
$64.00 |
$142.00 |
|
| 42 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 65 | EA |
$14.00 |
$25.00 |
$27.00 |
$16.00 |
|
| 43 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 4,989 | EA |
$1.10 |
$1.00 |
$1.05 |
$1.15 |
|
| 44 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 7,232 | EA |
$1.10 |
$1.00 |
$1.05 |
$1.20 |
|
| 45 | 666-6006 |
REFL PAV MRK TY I (W)4"(DOT)(100MIL) | 1,837 | LF |
$0.8000 |
$0.8000 |
$0.8600 |
$0.4500 |
|
| 46 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 2,400 | LF |
$1.00 |
$0.7500 |
$0.8000 |
$0.8800 |
|
| 47 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 30 | LF |
$7.50 |
$10.00 |
$10.50 |
$21.05 |
|
| 48 | 666-6054 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 20 | EA |
$108.00 |
$200.00 |
$215.00 |
$263.40 |
|
| 49 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 17,240 | LF |
$0.3500 |
$0.3100 |
$0.3300 |
$0.4500 |
|
| 50 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 156,230 | LF |
$0.3500 |
$0.3000 |
$0.3200 |
$0.4500 |
|
| 51 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 6,275 | LF |
$0.3500 |
$0.3500 |
$0.3700 |
$0.4500 |
|
| 52 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 165,705 | LF |
$0.3500 |
$0.3000 |
$0.3200 |
$0.4500 |
|
| 53 | 672-6007 |
REFL PAV MRKR TY I-C | 266 | EA |
$4.20 |
$3.00 |
$3.20 |
$4.20 |
|
| 54 | 672-6009 |
REFL PAV MRKR TY II-A-A | 2,300 | EA |
$4.20 |
$3.00 |
$3.20 |
$4.20 |
|
| 55 | 677-6007 |
ELIM EXT PAV MRK & MRKS (24") | 30 | LF |
$8.00 |
$20.00 |
$21.50 |
$3.65 |
|
| 56 | 677-6008 |
ELIM EXT PAV MRK & MRKS (ARROW) | 6 | EA |
$55.00 |
$30.00 |
$32.00 |
$60.75 |
|
| 57 | 685-6002 |
RELOCATE RDSD FLASH BEACON ASSEMBLY | 2 | EA |
$3,500.00 |
$4,400.00 |
$4,300.00 |
$12,115.00 |
|
| 58 | 6185-6002 |
TMA (STATIONARY) | 91 | DAY |
$300.00 |
$250.00 |
$300.00 |
$785.00 |
|
| 59 | 6185-6003 |
TMA (MOBILE OPERATION) | 104 | HR |
$50.00 |
$95.00 |
$96.50 |
$78.50 |
|