| 1 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 106 | SY |
$15.00 |
$20.00 |
$52.50 |
$40.00 |
|
| 2 | 105-6002 |
REMOVING STAB BASE AND ASPH PAV (2") | 1,063 | SY |
$4.00 |
$6.00 |
$7.23 |
$9.00 |
|
| 3 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 82 | CY |
$22.00 |
$60.25 |
$105.00 |
$25.00 |
|
| 4 | 134-6004 |
BACKFILL (TY A OR B) | 107 | STA |
$155.00 |
$300.00 |
$315.00 |
$100.00 |
|
| 5 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 1,292 | SY |
$2.00 |
$2.30 |
$9.54 |
$2.00 |
|
| 6 | 162-6002 |
BLOCK SODDING | 1,292 | SY |
$4.00 |
$6.00 |
$6.00 |
$7.00 |
|
| 7 | 168-6001 |
VEGETATIVE WATERING | 195 | MG |
$10.00 |
$25.00 |
$80.00 |
$25.00 |
|
| 8 | 344-6032 |
SUPERPAVE MIXTURES SP-C SAC-B PG64-22 | 4,312 | TON |
$93.00 |
$84.00 |
$87.00 |
$86.00 |
|
| 9 | 351-6008 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 9,738 | SY |
$58.00 |
$22.00 |
$40.00 |
$60.00 |
|
| 10 | 354-6045 |
PLANE ASPH CONC PAV (2") | 39,196 | SY |
$2.25 |
$1.80 |
$1.85 |
$1.00 |
|
| 11 | 464-6003 |
RC PIPE (CL III)(18 IN) | 472 | LF |
$48.00 |
$65.00 |
$105.00 |
$80.00 |
|
| 12 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 34 | EA |
$650.00 |
$950.00 |
$945.00 |
$950.00 |
|
| 13 | 496-6007 |
REMOV STR (PIPE) | 472 | LF |
$15.00 |
$32.00 |
$21.00 |
$20.00 |
|
| 14 | 500-6001 |
MOBILIZATION | 1 | LS |
$127,814.00 |
$100,000.00 |
$127,500.00 |
$100,000.00 |
|
| 15 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$10,500.00 |
$35,055.00 |
$25,000.00 |
$2,000.00 |
|
| 16 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 78 | SY |
$20.00 |
$0.0100 |
$23.00 |
$10.00 |
|
| 17 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 78 | SY |
$10.00 |
$0.0100 |
$12.00 |
$5.00 |
|
| 18 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 600 | LF |
$2.00 |
$2.50 |
$2.75 |
$2.00 |
|
| 19 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 600 | LF |
$1.00 |
$0.6000 |
$0.7000 |
$1.00 |
|
| 20 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 600 | LF |
$4.00 |
$5.75 |
$6.00 |
$4.00 |
|
| 21 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 600 | LF |
$1.00 |
$0.9000 |
$0.9500 |
$1.00 |
|
| 22 | 530-6005 |
DRIVEWAYS (ACP) | 1,414 | SY |
$28.00 |
$23.00 |
$27.50 |
$85.00 |
|
| 23 | 530-6017 |
DRIVEWAYS (CONC) (HES) | 106 | SY |
$100.00 |
$143.00 |
$175.00 |
$130.00 |
|
| 24 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 25 | LF |
$6.00 |
$25.00 |
$10.50 |
$10.00 |
|
| 25 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 2 | EA |
$260.00 |
$240.00 |
$265.00 |
$300.00 |
|
| 26 | 560-6013 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 1 | EA |
$570.00 |
$595.00 |
$525.00 |
$700.00 |
|
| 27 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 13 | EA |
$63.00 |
$47.00 |
$100.00 |
$75.00 |
|
| 28 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 20 | EA |
$20.00 |
$27.00 |
$50.00 |
$30.00 |
|
| 29 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 25,772 | LF |
$0.3500 |
$0.5500 |
$0.7500 |
$0.5500 |
|
| 30 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,289 | EA |
$0.7500 |
$1.15 |
$4.00 |
$1.00 |
|
| 31 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 284 | LF |
$6.00 |
$6.45 |
$6.50 |
$7.00 |
|
| 32 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 25,772 | LF |
$0.4000 |
$0.5500 |
$0.6000 |
$0.4500 |
|
| 33 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 25,772 | LF |
$0.4000 |
$0.5500 |
$0.6000 |
$0.4500 |
|
| 34 | 672-6009 |
REFL PAV MRKR TY II-A-A | 322 | EA |
$3.00 |
$5.55 |
$5.50 |
$7.00 |
|
| 35 | 734-6002 |
LITTER REMOVAL | 1 | CYC |
$3,000.00 |
$1,700.00 |
$1,300.00 |
$1,000.00 |
|
| 36 | 760-6001 |
DITCH CLEANING AND RESHAPING (FOOT) | 830 | LF |
$13.00 |
$9.50 |
$11.00 |
$3.00 |
|
| 37 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$9,000.00 |
$3,825.00 |
$17,850.00 |
$10,000.00 |
|
| 38 | 6185-6001 |
TMA (STATIONARY) | 1 | EA |
$11,000.00 |
$7,150.00 |
$9,000.00 |
$6,000.00 |
|
| 39 | 6185-6005 |
TMA (MOBILE OPERATION) | 10 | DAY |
$250.00 |
$100.00 |
$105.00 |
$250.00 |
|