| 1 | 100-6002 |
PREPARING ROW | 52 | STA |
$2,500.00 |
$1,230.00 |
$1,575.00 |
$1,000.00 |
$600.00 |
$1,250.00 |
$6,500.00 |
| 2 | 105-6105 |
REMOVING STAB BASE AND ASPH PAV(15") | 3,280 | SY |
$6.75 |
$10.25 |
$11.00 |
$10.00 |
$12.00 |
$7.00 |
$20.00 |
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 10,000 | CY |
$7.20 |
$12.50 |
$10.00 |
$10.00 |
$11.00 |
$15.00 |
$17.50 |
| 4 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 10,000 | CY |
$11.55 |
$16.00 |
$10.00 |
$10.00 |
$18.00 |
$18.00 |
$25.00 |
| 5 | 134-6004 |
BACKFILL (TY A OR B) | 320 | STA |
$140.00 |
$183.00 |
$150.00 |
$300.00 |
$180.00 |
$210.00 |
$250.00 |
| 6 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 19,360 | SY |
$0.7000 |
$0.9500 |
$0.8000 |
$2.00 |
$1.15 |
$3.00 |
$2.50 |
| 7 | 162-6002 |
BLOCK SODDING | 19,360 | SY |
$3.00 |
$3.30 |
$3.15 |
$4.00 |
$4.00 |
$4.25 |
$4.00 |
| 8 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 6,446 | SY |
$0.7000 |
$0.4200 |
$0.1000 |
$0.4000 |
$0.6000 |
$0.2800 |
$1.00 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 1,969 | MG |
$5.00 |
$0.0100 |
$1.05 |
$8.00 |
$10.00 |
$11.50 |
$25.00 |
| 10 | 247-6053 |
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) | 1,185 | CY |
$72.00 |
$66.00 |
$57.50 |
$45.00 |
$65.00 |
$90.00 |
$90.00 |
| 11 | 344-6032 |
SUPERPAVE MIXTURES SP-C SAC-B PG64-22 | 18,267 | TON |
$80.00 |
$85.00 |
$87.50 |
$95.00 |
$95.00 |
$100.00 |
$98.00 |
| 12 | 344-6172 |
SUPERPAVE MIXTURES SP-C PG64-22(LEV-UP) | 1,030 | TON |
$78.00 |
$93.30 |
$101.00 |
$115.00 |
$113.00 |
$116.00 |
$140.00 |
| 13 | 351-6021 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") | 7,000 | SY |
$120.00 |
$75.00 |
$84.00 |
$105.00 |
$85.00 |
$120.00 |
$75.00 |
| 14 | 354-6045 |
PLANE ASPH CONC PAV (2") | 165,942 | SY |
$1.25 |
$1.34 |
$1.42 |
$1.50 |
$1.60 |
$2.15 |
$2.50 |
| 15 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 74 | CY |
$450.00 |
$600.00 |
$630.00 |
$475.00 |
$700.00 |
$480.00 |
$500.00 |
| 16 | 500-6001 |
MOBILIZATION | 1 | LS |
$280,000.00 |
$298,000.00 |
$380,000.00 |
$200,000.00 |
$400,000.00 |
$365,000.00 |
$500,000.00 |
| 17 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$8,500.00 |
$15,745.00 |
$21,000.00 |
$6,000.00 |
$18,000.00 |
$4,500.00 |
$8,500.00 |
| 18 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 126 | LF |
$24.00 |
$29.00 |
$22.84 |
$33.00 |
$40.00 |
$23.00 |
$30.00 |
| 19 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 126 | LF |
$5.00 |
$10.00 |
$10.50 |
$10.00 |
$7.50 |
$7.70 |
$15.00 |
| 20 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 250 | SY |
$20.00 |
$16.00 |
$22.05 |
$26.00 |
$10.00 |
$22.25 |
$40.00 |
| 21 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 250 | SY |
$5.00 |
$8.00 |
$11.55 |
$10.00 |
$2.00 |
$9.00 |
$20.00 |
| 22 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 6,085 | LF |
$1.70 |
$1.50 |
$1.47 |
$3.50 |
$2.50 |
$1.85 |
$4.00 |
| 23 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 6,085 | LF |
$0.4000 |
$0.4400 |
$0.1100 |
$1.00 |
$1.00 |
$0.5500 |
$2.00 |
| 24 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 49,826 | LF |
$0.1000 |
$0.1300 |
$0.0900 |
$0.3000 |
$0.2000 |
$0.1700 |
$0.2500 |
| 25 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 24,913 | LF |
$0.1600 |
$0.1800 |
$0.0900 |
$0.3000 |
$0.2000 |
$0.1700 |
$0.2500 |
| 26 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 2,339 | LF |
$19.00 |
$20.00 |
$19.34 |
$23.00 |
$18.25 |
$22.00 |
$20.00 |
| 27 | 540-6005 |
TERMINAL ANCHOR SECTION | 16 | EA |
$1,800.00 |
$2,650.00 |
$2,651.25 |
$3,000.00 |
$960.00 |
$2,750.00 |
$1,500.00 |
| 28 | 540-6021 |
MTL THRIE-BEAM GD FEN (TIM POST) | 4 | EA |
$1,929.00 |
$1,395.00 |
$1,401.75 |
$1,800.00 |
$1,710.00 |
$1,500.00 |
$1,500.00 |
| 29 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 2,339 | LF |
$2.70 |
$3.05 |
$3.15 |
$3.00 |
$2.10 |
$2.50 |
$3.00 |
| 30 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 16 | EA |
$215.00 |
$235.00 |
$236.25 |
$250.00 |
$270.00 |
$220.00 |
$850.00 |
| 31 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 11 | EA |
$400.00 |
$525.00 |
$472.50 |
$700.00 |
$375.00 |
$825.00 |
$550.00 |
| 32 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 63,056 | LF |
$0.1800 |
$0.3500 |
$0.3700 |
$0.3800 |
$0.3700 |
$0.3800 |
$0.4000 |
| 33 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 63,056 | LF |
$0.1800 |
$0.3500 |
$0.3700 |
$0.3800 |
$0.3700 |
$0.3800 |
$0.4000 |
| 34 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 655 | EA |
$0.9500 |
$1.02 |
$2.10 |
$2.00 |
$0.5100 |
$1.20 |
$5.00 |
| 35 | 662-6110 |
WK ZN PAV MRK SHT TERM (TAB)TY Y | 2,526 | EA |
$0.9500 |
$1.02 |
$2.10 |
$2.00 |
$0.5100 |
$1.20 |
$5.00 |
| 36 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 1,265 | LF |
$0.7500 |
$1.05 |
$1.05 |
$1.10 |
$1.05 |
$1.10 |
$6.00 |
| 37 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 180 | LF |
$4.70 |
$5.75 |
$5.78 |
$6.00 |
$5.78 |
$6.00 |
$20.00 |
| 38 | 666-6054 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 11 | EA |
$106.00 |
$145.00 |
$147.00 |
$150.00 |
$147.00 |
$155.00 |
$250.00 |
| 39 | 666-6078 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 11 | EA |
$130.00 |
$185.00 |
$189.00 |
$200.00 |
$189.00 |
$200.00 |
$250.00 |
| 40 | 666-6224 |
PAVEMENT SEALER 4" | 3,760 | LF |
$0.8000 |
$0.5200 |
$0.5300 |
$0.5500 |
$0.5300 |
$0.5500 |
$1.00 |
| 41 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 21,016 | LF |
$0.1500 |
$0.5000 |
$0.5000 |
$0.5400 |
$0.5000 |
$0.5200 |
$0.5000 |
| 42 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 64,936 | LF |
$0.1200 |
$0.4200 |
$0.4200 |
$0.4500 |
$0.4200 |
$0.4400 |
$0.5000 |
| 43 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 64,936 | LF |
$0.3000 |
$0.4200 |
$0.4200 |
$0.4500 |
$0.4200 |
$0.4400 |
$0.5000 |
| 44 | 672-6007 |
REFL PAV MRKR TY I-C | 724 | EA |
$3.45 |
$3.45 |
$3.47 |
$4.00 |
$3.50 |
$3.65 |
$15.00 |
| 45 | 672-6009 |
REFL PAV MRKR TY II-A-A | 449 | EA |
$2.70 |
$3.45 |
$3.47 |
$4.00 |
$3.50 |
$3.65 |
$15.00 |
| 46 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 3,760 | LF |
$0.4500 |
$1.05 |
$1.05 |
$1.10 |
$1.10 |
$1.10 |
$0.5000 |
| 47 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 3,760 | LF |
$0.3500 |
$0.2600 |
$0.2600 |
$0.3000 |
$0.2500 |
$0.2800 |
$0.5000 |
| 48 | 6185-6001 |
TMA (STATIONARY) | 3 | EA |
$5,000.00 |
$14,000.00 |
$7,350.00 |
$30,000.00 |
$15,000.00 |
$15,000.00 |
$15,000.00 |
| 49 | 6185-6003 |
TMA (MOBILE OPERATION) | 264 | HR |
$80.00 |
$57.00 |
$10.50 |
$30.00 |
$40.00 |
$11.00 |
$85.00 |