| 1 | 104-6009 |
REMOVING CONC (RIPRAP) | 360 | SY |
$20.00 |
$14.66 |
$42.00 |
$50.00 |
| 2 | 110-6002 |
EXCAVATION (CHANNEL) | 1,650 | CY |
$7.50 |
$18.32 |
$21.00 |
$97.00 |
| 3 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 100 | CY |
$100.00 |
$26.76 |
$52.50 |
$97.00 |
| 4 | 164-6035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 2,500 | SY |
$0.1000 |
$0.3900 |
$7.35 |
$97.00 |
| 5 | 354-6029 |
PLANE ASPH CONC PAV(0" TO 6") | 1,520 | SY |
$10.00 |
$24.52 |
$25.20 |
$31.00 |
| 6 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 180 | LF |
$20.00 |
$6.11 |
$21.00 |
$30.00 |
| 7 | 416-6029 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) | 16 | LF |
$200.00 |
$433.21 |
$210.00 |
$296.00 |
| 8 | 432-6002 |
RIPRAP (CONC)(5 IN) | 50 | CY |
$500.00 |
$536.54 |
$735.00 |
$675.00 |
| 9 | 464-6003 |
RC PIPE (CL III)(18 IN) | 56 | LF |
$80.00 |
$73.81 |
$210.00 |
$341.00 |
| 10 | 464-6005 |
RC PIPE (CL III)(24 IN) | 16 | LF |
$100.00 |
$109.86 |
$315.00 |
$341.00 |
| 11 | 465-6187 |
INLET(COMPL)(DROP)(TY 1)(1 GRATE) | 3 | EA |
$5,000.00 |
$7,707.93 |
$6,300.00 |
$6,500.00 |
| 12 | 465-6188 |
INLET(COMPL)(DROP)(TY 1 )(2 GRATE) | 3 | EA |
$6,000.00 |
$11,688.59 |
$6,825.00 |
$8,500.00 |
| 13 | 465-6189 |
INLET(COMPL)(DROP)(TY 1)(3 GRATE) | 3 | EA |
$7,000.00 |
$14,794.65 |
$7,350.00 |
$12,000.00 |
| 14 | 465-6222 |
INLET (COMPL)(MEDIAN) | 9 | EA |
$8,000.00 |
$8,282.14 |
$11,550.00 |
$14,800.00 |
| 15 | 500-6001 |
MOBILIZATION | 1 | LS |
$210,000.00 |
$200,831.20 |
$275,000.00 |
$210,000.00 |
| 16 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$7,500.00 |
$8,450.66 |
$33,333.33 |
$41,000.00 |
| 17 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 300 | SY |
$25.00 |
$25.42 |
$21.00 |
$15.55 |
| 18 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 300 | SY |
$10.00 |
$12.87 |
$10.50 |
$11.20 |
| 19 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 600 | LF |
$5.00 |
$3.92 |
$1.52 |
$1.55 |
| 20 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 600 | LF |
$1.00 |
$0.9300 |
$0.1100 |
$0.8500 |
| 21 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 600 | LF |
$8.00 |
$7.86 |
$3.78 |
$4.50 |
| 22 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 600 | LF |
$2.00 |
$2.19 |
$1.05 |
$0.6000 |
| 23 | 512-6013 |
PORT CTB (DES SOURCE)(SGL SLP)(TY 1) | 11,730 | LF |
$16.00 |
$7.36 |
$10.50 |
$17.00 |
| 24 | 512-6037 |
PORT CTB (STKPL)(SGL SLP)(TY 1) | 11,730 | LF |
$16.00 |
$7.36 |
$10.50 |
$17.00 |
| 25 | 514-6009 |
PERM CTB (SGL SLOPE) (TY 1) (54 ) | 2,845 | LF |
$100.00 |
$101.45 |
$168.00 |
$158.00 |
| 26 | 514-6011 |
PERM CTB (SGL SLOPE) (TY 3) (54 ) | 80 | LF |
$400.00 |
$346.57 |
$420.00 |
$411.00 |
| 27 | 514-6012 |
PERM CTB (SGL SLOPE) (TY 4) (54 ) | 70 | LF |
$200.00 |
$346.57 |
$630.00 |
$426.00 |
| 28 | 514-6035 |
PERM CTB (TRAN SSCB TO CTB) (MOD) | 20 | LF |
$250.00 |
$249.53 |
$630.00 |
$426.00 |
| 29 | 514-6037 |
PERM CTB (SGL SLOPE) (RETAINING WALL) | 20 | LF |
$500.00 |
$623.83 |
$630.00 |
$899.00 |
| 30 | 514-6042 |
PERM CTB (TRAN SSCB TO PARAPET) | 20 | LF |
$300.00 |
$256.46 |
$630.00 |
$899.00 |
| 31 | 514-6044 |
PERM CTB (SGL SLOPE) (TY 1) SPECIAL | 1,432 | LF |
$200.00 |
$120.78 |
$168.00 |
$298.00 |
| 32 | 514-6045 |
PERM CTB (SGL SLOPE) (TY 3) SPECIAL | 50 | LF |
$400.00 |
$222.83 |
$420.00 |
$411.00 |
| 33 | 514-6046 |
PERM CTB (SGL SLOPE) (TY 4) SPECIAL | 70 | LF |
$200.00 |
$257.11 |
$630.00 |
$426.00 |
| 34 | 514-6047 |
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION) | 275 | LF |
$250.00 |
$188.55 |
$630.00 |
$513.50 |
| 35 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 6,875 | LF |
$5.00 |
$4.07 |
$6.30 |
$3.35 |
| 36 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 2 | EA |
$1,000.00 |
$289.83 |
$630.00 |
$280.00 |
| 37 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 6 | EA |
$500.00 |
$281.46 |
$630.00 |
$280.00 |
| 38 | 545-6001 |
CRASH CUSH ATTEN (INSTL) | 3 | EA |
$12,000.00 |
$12,789.44 |
$15,750.00 |
$14,000.00 |
| 39 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 20 | EA |
$2,500.00 |
$1,698.29 |
$4,200.00 |
$7,500.00 |
| 40 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 3 | EA |
$2,000.00 |
$2,247.45 |
$1,155.00 |
$2,000.00 |
| 41 | 545-6007 |
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 1 | EA |
$40,000.00 |
$28,289.69 |
$21,000.00 |
$36,300.00 |
| 42 | 610-6007 |
REMOVE RD IL ASM (SHOE-BASE) | 7 | EA |
$600.00 |
$1,062.60 |
$575.00 |
$310.00 |
| 43 | 610-6009 |
REMOVE RD IL ASM (TRANS-BASE) | 9 | EA |
$1,100.00 |
$1,381.38 |
$915.00 |
$310.00 |
| 44 | 610-6263 |
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED | 7 | EA |
$5,000.00 |
$8,072.48 |
$7,350.00 |
$5,000.00 |
| 45 | 610-6264 |
IN RD IL (TY SP) 48S-10 (400W EQ) LED | 8 | EA |
$4,000.00 |
$5,747.84 |
$7,350.00 |
$4,100.00 |
| 46 | 610-6287 |
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED | 2 | EA |
$4,200.00 |
$7,307.41 |
$7,350.00 |
$4,500.00 |
| 47 | 618-6023 |
CONDT (PVC) (SCH 40) (2") | 3,710 | LF |
$15.00 |
$14.60 |
$15.75 |
$12.15 |
| 48 | 620-6007 |
ELEC CONDR (NO.8) BARE | 3,865 | LF |
$2.00 |
$2.40 |
$1.57 |
$1.35 |
| 49 | 620-6008 |
ELEC CONDR (NO.8) INSULATED | 7,730 | LF |
$3.00 |
$2.60 |
$1.57 |
$1.45 |
| 50 | 624-6008 |
GROUND BOX TY C (162911)W/APRON | 2 | EA |
$1,500.00 |
$1,873.64 |
$1,365.00 |
$1,900.00 |
| 51 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 119 | EA |
$30.00 |
$23.98 |
$18.58 |
$16.00 |
| 52 | 752-6004 |
TREE TRIMMING / BRUSH REMOVAL(CHANNELS) | 0.3 | AC |
$3,000.00 |
$15,530.29 |
$84,000.00 |
$8,000.00 |
| 53 | 764-6025 |
STORM SEWER CLEANING (ALL SIZES) | 1,359 | LF |
$50.00 |
$30.65 |
$63.00 |
$12.00 |
| 54 | 764-6026 |
STORM SEWER CLEAN (BOX CULV)(ALL SIZES) | 172 | LF |
$50.00 |
$61.30 |
$126.00 |
$12.00 |
| 55 | 764-6027 |
DRAIN INLET CLEANING (BY LOCATION) | 11 | EA |
$500.00 |
$674.34 |
$1,155.00 |
$600.00 |
| 56 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 236 | DAY |
$100.00 |
$147.30 |
$157.50 |
$170.00 |
| 57 | 6185-6001 |
TMA (STATIONARY) | 8 | EA |
$10,000.00 |
$34,525.38 |
$7,500.00 |
$22,000.00 |