| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 61,000 | CY |
$6.00 |
$14.00 |
$14.04 |
$11.80 |
|
| 2 | 164-6033 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 497,471 | SY |
$0.2000 |
$0.0800 |
$0.1000 |
$0.1100 |
|
| 3 | 216-6001 |
PROOF ROLLING | 50 | HR |
$90.00 |
$155.00 |
$71.59 |
$150.00 |
|
| 4 | 314-6013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 64,672 | GAL |
$3.50 |
$3.30 |
$3.98 |
$3.50 |
|
| 5 | 315-6004 |
FOG SEAL (CSS-1H) | 87,960 | GAL |
$3.50 |
$3.65 |
$4.08 |
$3.50 |
|
| 6 | 347-6002 |
TOM-C (AGGREGATE) SAC-A | 54,514 | TON |
$70.00 |
$97.25 |
$91.78 |
$90.00 |
|
| 7 | 347-6005 |
TOM (ASPHALT) PG 70-28 | 3,479 | TON |
$600.00 |
$790.00 |
$1,098.26 |
$1,100.00 |
|
| 8 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 26,664 | SY |
$25.00 |
$46.00 |
$59.46 |
$70.00 |
|
| 9 | 354-6090 |
PLANE ASPH CONC PAV (3/4") | 1,333,195 | SY |
$0.5000 |
$0.6800 |
$0.6900 |
$0.8000 |
|
| 10 | 480-6001 |
CLEAN EXIST CULVERTS | 34 | EA |
$2,000.00 |
$2,200.00 |
$7,029.50 |
$1,600.00 |
|
| 11 | 500-6001 |
MOBILIZATION | 1 | LS |
$960,000.00 |
$760,000.00 |
$748,831.57 |
$1,100,000.00 |
|
| 12 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 | MO |
$8,500.00 |
$19,500.00 |
$5,423.82 |
$4,950.00 |
|
| 13 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 536 | SY |
$28.00 |
$21.00 |
$24.42 |
$25.00 |
|
| 14 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 536 | SY |
$7.00 |
$10.50 |
$7.80 |
$6.00 |
|
| 15 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 14,080 | LF |
$3.50 |
$2.90 |
$2.57 |
$3.80 |
|
| 16 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 14,080 | LF |
$1.50 |
$0.8400 |
$0.8200 |
$1.25 |
|
| 17 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,040 | LF |
$5.00 |
$6.30 |
$5.46 |
$6.40 |
|
| 18 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,040 | LF |
$1.00 |
$1.05 |
$2.70 |
$1.80 |
|
| 19 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 597,696 | LF |
$0.1000 |
$0.0800 |
$0.0800 |
$0.1000 |
|
| 20 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 1,625 | LF |
$30.00 |
$25.00 |
$28.95 |
$27.50 |
|
| 21 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$2,000.00 |
$1,000.00 |
$1,485.64 |
$1,400.00 |
|
| 22 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,625 | LF |
$6.00 |
$2.65 |
$3.28 |
$3.20 |
|
| 23 | 542-6003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 1 | EA |
$250.00 |
$210.00 |
$327.72 |
$320.00 |
|
| 24 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 1 | EA |
$4,000.00 |
$2,700.00 |
$3,277.16 |
$3,200.00 |
|
| 25 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 1 | EA |
$400.00 |
$265.00 |
$327.72 |
$320.00 |
|
| 26 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 51 | EA |
$400.00 |
$475.00 |
$824.75 |
$450.00 |
|
| 27 | 658-6041 |
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND | 116 | EA |
$95.00 |
$42.00 |
$147.47 |
$110.00 |
|
| 28 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 33 | EA |
$30.00 |
$16.00 |
$43.70 |
$45.00 |
|
| 29 | 662-6001 |
WK ZN PAV MRK NON-REMOV (W)4"(BRK) | 18,662 | LF |
$0.2500 |
$0.3500 |
$0.3600 |
$0.2000 |
|
| 30 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 74,646 | LF |
$0.2000 |
$0.3400 |
$0.3500 |
$0.1900 |
|
| 31 | 662-6012 |
WK ZN PAV MRK NON-REMOV (W)8"(SLD) | 8,162 | LF |
$0.4000 |
$0.9400 |
$0.9700 |
$0.8500 |
|
| 32 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 74,646 | LF |
$0.2000 |
$0.3400 |
$0.3500 |
$0.1900 |
|
| 33 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 48,744 | EA |
$1.00 |
$1.05 |
$1.65 |
$0.5000 |
|
| 34 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 18,680 | EA |
$1.00 |
$1.05 |
$1.69 |
$0.5000 |
|
| 35 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 32,650 | LF |
$1.00 |
$0.7900 |
$0.8200 |
$0.8000 |
|
| 36 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 298,580 | LF |
$0.4000 |
$0.3700 |
$0.3800 |
$0.3800 |
|
| 37 | 666-6306 |
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | 74,646 | LF |
$0.5000 |
$0.4400 |
$0.4600 |
$0.4500 |
|
| 38 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 298,580 | LF |
$0.4000 |
$0.3700 |
$0.3800 |
$0.3800 |
|
| 39 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 402 | LF |
$14.00 |
$17.00 |
$17.48 |
$17.00 |
|
| 40 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 234 | EA |
$280.00 |
$240.00 |
$251.25 |
$240.00 |
|
| 41 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 4 | EA |
$300.00 |
$305.00 |
$316.79 |
$300.00 |
|
| 42 | 672-6007 |
REFL PAV MRKR TY I-C | 2,850 | EA |
$3.50 |
$3.40 |
$3.55 |
$3.50 |
|
| 43 | 672-6010 |
REFL PAV MRKR TY II-C-R | 5,366 | EA |
$3.50 |
$3.40 |
$3.55 |
$3.50 |
|
| 44 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 167,952 | LF |
$0.7000 |
$0.4700 |
$0.4900 |
$0.4500 |
|
| 45 | 677-6003 |
ELIM EXT PAV MRK & MRKS (8") | 8,162 | LF |
$2.00 |
$0.7900 |
$0.8200 |
$0.7500 |
|
| 46 | 730-6107 |
FULL - WIDTH MOWING | 2 | CYC |
$3,500.00 |
$21,000.00 |
$27,663.58 |
$10,000.00 |
|
| 47 | 734-6002 |
LITTER REMOVAL | 2 | CYC |
$2,500.00 |
$10,500.00 |
$15,427.77 |
$10,000.00 |
|
| 48 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$13,000.00 |
$13,000.00 |
$23,990.99 |
$20,000.00 |
|
| 49 | 6185-6002 |
TMA (STATIONARY) | 430 | DAY |
$220.00 |
$295.00 |
$332.54 |
$150.00 |
|
| 50 | 6185-6005 |
TMA (MOBILE OPERATION) | 30 | DAY |
$400.00 |
$73.50 |
$767.25 |
$1,000.00 |
|