| 1 | 100-6002 |
PREPARING ROW | 3.9 | STA |
$1,000.00 |
$500.00 |
$3,800.00 |
$2,500.00 |
$2,000.00 |
$3,265.00 |
$10,000.00 |
|
| 2 | 105-6011 |
REMOVING STAB BASE AND ASPH PAV (2"-6") | 581 | SY |
$5.00 |
$12.00 |
$8.00 |
$15.00 |
$12.00 |
$4.00 |
$8.00 |
|
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 10 | CY |
$11.00 |
$100.00 |
$100.00 |
$30.00 |
$120.00 |
$25.00 |
$50.00 |
|
| 4 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 279 | CY |
$25.00 |
$22.00 |
$20.00 |
$30.00 |
$35.00 |
$25.00 |
$30.00 |
|
| 5 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 831 | SY |
$3.00 |
$6.75 |
$4.00 |
$2.00 |
$4.00 |
$6.40 |
$3.00 |
|
| 6 | 164-6054 |
BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 831 | SY |
$1.00 |
$2.00 |
$3.00 |
$1.00 |
$2.00 |
$2.45 |
$2.05 |
|
| 7 | 164-6055 |
BONDED FBR MTRX SEED (TEMP)(WARM) | 416 | SY |
$1.00 |
$1.30 |
$4.00 |
$1.00 |
$1.40 |
$1.50 |
$1.30 |
|
| 8 | 164-6056 |
BONDED FBR MTRX SEED (TEMP)(COOL) | 416 | SY |
$1.00 |
$0.1000 |
$4.00 |
$1.00 |
$1.80 |
$1.50 |
$1.30 |
|
| 9 | 168-6001 |
VEGETATIVE WATERING | 18.3 | MG |
$16.00 |
$25.00 |
$1.00 |
$10.00 |
$50.00 |
$90.00 |
$20.00 |
|
| 10 | 340-6034 |
D-GR HMA(SQ) TY-C PG64-22 | 253 | TON |
$105.00 |
$152.00 |
$180.00 |
$200.00 |
$167.00 |
$140.00 |
$185.00 |
|
| 11 | 407-6004 |
SHEET PILING (PZ - 35) | 11,287 | SF |
$60.00 |
$51.02 |
$58.00 |
$63.24 |
$62.00 |
$65.00 |
$75.00 |
|
| 12 | 416-6003 |
DRILL SHAFT (30 IN) | 255 | LF |
$125.00 |
$225.00 |
$180.00 |
$200.00 |
$260.00 |
$325.00 |
$320.00 |
|
| 13 | 420-6013 |
CL C CONC (ABUT) | 34.4 | CY |
$915.00 |
$925.00 |
$1,000.00 |
$1,000.00 |
$1,200.00 |
$1,000.00 |
$1,200.00 |
|
| 14 | 420-6064 |
CL C CONC (COPING) | 67 | CY |
$800.00 |
$660.00 |
$1,200.00 |
$1,000.00 |
$825.00 |
$810.00 |
$1,200.00 |
|
| 15 | 422-6005 |
REINF CONC SLAB (BOX BEAM) | 2,355 | SF |
$12.00 |
$19.00 |
$24.00 |
$17.00 |
$22.00 |
$18.00 |
$18.00 |
|
| 16 | 422-6023 |
SHEAR KEY | 24.1 | CY |
$300.00 |
$325.00 |
$600.00 |
$250.00 |
$400.00 |
$425.00 |
$500.00 |
|
| 17 | 425-6005 |
PRESTR CONC BOX BEAM (4B34) | 358 | LF |
$215.00 |
$259.00 |
$260.00 |
$259.69 |
$249.00 |
$400.00 |
$300.00 |
|
| 18 | 425-6006 |
PRESTR CONC BOX BEAM (5B34) | 179 | LF |
$225.00 |
$259.00 |
$260.00 |
$259.69 |
$259.00 |
$400.00 |
$300.00 |
|
| 19 | 432-6024 |
RIPRAP (STONE COMMON)(DRY)(12 IN) | 174 | CY |
$130.00 |
$95.00 |
$190.00 |
$180.00 |
$165.00 |
$220.00 |
$150.00 |
|
| 20 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 19 | CY |
$500.00 |
$465.00 |
$550.00 |
$400.00 |
$500.00 |
$675.00 |
$500.00 |
|
| 21 | 442-6007 |
STR STEEL (MISC NON - BRIDGE) | 14,500 | LB |
$4.00 |
$5.95 |
$2.00 |
$7.00 |
$10.00 |
$3.00 |
$7.00 |
|
| 22 | 450-6006 |
RAIL (TY T223) | 224 | LF |
$105.00 |
$127.00 |
$150.00 |
$110.00 |
$110.00 |
$85.00 |
$100.00 |
|
| 23 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$20,000.00 |
$18,000.00 |
$40,000.00 |
$10,000.00 |
$18,000.00 |
$85,000.00 |
$40,000.00 |
|
| 24 | 500-6001 |
MOBILIZATION | 1 | LS |
$116,581.78 |
$120,000.00 |
$135,000.00 |
$115,000.00 |
$145,000.00 |
$100,000.00 |
$180,000.00 |
|
| 25 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$4,300.00 |
$2,200.00 |
$6,000.00 |
$1,000.00 |
$2,000.00 |
$1,500.00 |
$5,000.00 |
|
| 26 | 506-6027 |
EXCAV (EROSN & SEDMT CONT, IN VEH) | 50 | CY |
$30.00 |
$50.00 |
$10.00 |
$1.00 |
$50.00 |
$28.00 |
$40.00 |
|
| 27 | 506-6030 |
BACKHOE WORK (EROSION & SEDMT CONT) | 20 | HR |
$80.00 |
$50.00 |
$10.00 |
$1.00 |
$50.00 |
$140.00 |
$80.00 |
|
| 28 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 605 | LF |
$3.00 |
$3.00 |
$1.00 |
$3.00 |
$3.00 |
$3.40 |
$3.00 |
|
| 29 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 605 | LF |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1.50 |
$1.60 |
$1.50 |
|
| 30 | 506-6046 |
TRACKHOE WORK (EROSION & SEDMT CONT) | 20 | HR |
$100.00 |
$85.00 |
$10.00 |
$1.00 |
$110.00 |
$140.00 |
$100.00 |
|
| 31 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 75 | LF |
$20.00 |
$24.00 |
$26.00 |
$22.00 |
$21.50 |
$30.00 |
$25.00 |
|
| 32 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 4 | EA |
$1,120.00 |
$1,195.00 |
$1,500.00 |
$1,050.00 |
$880.00 |
$1,400.00 |
$1,200.00 |
|
| 33 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,260.00 |
$2,900.00 |
$2,600.00 |
$2,675.00 |
$2,800.00 |
$3,530.00 |
$3,000.00 |
|
| 34 | 618-6011 |
CONDT (HDPE) (4") | 231 | LF |
$40.00 |
$10.00 |
$8.00 |
$35.00 |
$45.00 |
$15.00 |
$50.00 |
|
| 35 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 2 | EA |
$25.00 |
$25.00 |
$50.00 |
$35.00 |
$50.00 |
$26.00 |
$25.00 |
|
| 36 | 658-6016 |
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | 4 | EA |
$22.00 |
$30.00 |
$50.00 |
$25.00 |
$50.00 |
$33.00 |
$30.00 |
|
| 37 | 5048-6002 |
FLOATING TURBIDITY BARRIER(FUR & INST) | 880 | LF |
$30.00 |
$42.00 |
$40.00 |
$48.08 |
$38.00 |
$55.00 |
$55.00 |
|
| 38 | 5048-6003 |
FLOATING TURBIDITY BARRIER (REMOVE) | 880 | LF |
$15.00 |
$12.00 |
$10.00 |
$14.44 |
$15.00 |
$20.00 |
$16.00 |
|
| 39 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 14 | DAY |
$75.00 |
$250.00 |
$120.00 |
$100.00 |
$150.00 |
$132.00 |
$200.00 |
|