Bid tab 0919-03-059

Let Aug 6, 2019 · Atlanta · Harrison

‹ Aug 2019 results

BRIDGE REPLACEMENT

Let date
Tuesday, August 6, 2019
CCSJ
0919-03-059
District
Atlanta
County
Harrison
Highway
CR
Limits
ON CR 4311 AT CANEY CREEK
Classification
· Construction
Project number
BR 2019(351)
Working days
80

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$369,828
1 LONGVIEW BRIDGE AND ROAD, LTD. Low bidder $398,057 +7.6%
2 EAST TEXAS BRIDGE, INC. $413,124 +11.7% +3.8%
3 STATELINE CONSTRUCTION, LLC $430,965 +16.5% +8.3%
4 HODGES AND SON CONSTRUCTION COMPANY, INC. $437,336 +18.3% +9.9%
5 PIERCE R & B LLC $497,980 +34.7% +25.1%
6 FNH CONSTRUCTION, LLC $756,186 +104.5% +90.0%

Bid tab: unit prices 43 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 LONGVIEW BRIDGE…#2 EAST TEXAS BRID…#3 STATELINE CONST…#4 HODGES AND SON …#5 PIERCE R & B LLC#6 FNH CONSTRUCTIO…
1100-6002 PREPARING ROW6STA $2,000.00 $2,400.00 $2,000.00 $1,000.00 $2,500.00 $2,000.00 $10,000.00
2110-6001 EXCAVATION (ROADWAY)490CY $8.00 $10.00 $12.00 $25.00 $20.00 $21.00 $20.00
3110-6002 EXCAVATION (CHANNEL)377CY $31.00 $17.50 $12.00 $18.00 $20.00 $25.00 $30.00
4132-6005 EMBANKMENT (FINAL)(ORD COMP)(TY C)97CY $28.00 $17.00 $20.00 $25.00 $20.00 $60.00 $50.00
5150-6001 BLADING6STA $211.00 $215.00 $250.00 $200.00 $250.00 $300.00 $450.00
6158-6005 SPEC EXCAV WORK (ORIGINAL)56CY $10.00 $22.00 $20.00 $14.00 $40.00 $60.00 $100.00
7160-6003 FURNISHING AND PLACING TOPSOIL (4")1,955SY $1.00 $3.00 $2.00 $6.00 $4.00 $3.00 $6.00
8164-6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND)1,955SY $1.00 $1.65 $1.50 $1.50 $2.00 $1.40 $1.00
9164-6055 BONDED FBR MTRX SEED (TEMP)(WARM)978SY $1.00 $1.25 $1.30 $1.50 $2.00 $1.45 $1.00
10164-6056 BONDED FBR MTRX SEED (TEMP)(COOL)978SY $1.00 $1.25 $1.30 $1.50 $2.00 $1.45 $1.00
11168-6001 VEGETATIVE WATERING62.6MG $13.00 $1.00 $20.00 $10.00 $1.00 $20.00 $50.00
12169-6005 SOIL RETENTION BLANKETS (CL 2) (TY E)1,955SY $2.00 $2.00 $1.65 $2.00 $4.00 $1.67 $6.50
13275-6001 CEMENT21TON $154.00 $200.00 $200.00 $350.00 $200.00 $300.00 $185.00
14275-6019 CEMENT TREAT (SUBGRADE)(6")1,341SY $9.00 $3.50 $4.00 $14.00 $6.00 $7.65 $10.00
15314-6010 EMULS ASPH (EROSN CONT)(SS-1)94GAL $4.00 $6.75 $15.00 $50.00 $10.00 $28.00 $8.00
16400-6005 CEM STABIL BKFL90CY $300.00 $210.00 $200.00 $200.00 $220.00 $200.00 $350.00
17416-6002 DRILL SHAFT (24 IN)180LF $140.00 $230.00 $250.00 $140.00 $300.00 $250.00
18420-6013 CL C CONC (ABUT)18.4CY $824.00 $1,000.00 $950.00 $1,100.00 $1,000.00 $1,350.00 $1,250.00
19422-6007 REINF CONC SLAB (SLAB BEAM)1,300SF $16.00 $16.00 $17.50 $15.00 $22.00 $21.00 $20.00
20422-6015 APPROACH SLAB48.2CY $449.00 $500.00 $525.00 $650.00 $500.00 $565.00 $1,250.00
21425-6012 PRESTR CONC SLAB BEAM (5SB15)247.5LF $175.00 $225.00 $225.00 $202.50 $230.00 $250.00 $250.00
22432-6002 RIPRAP (CONC)(5 IN)1.6CY $518.00 $2,200.00 $1,500.00 $500.00 $800.00 $2,100.00 $650.00
23432-6033 RIPRAP (STONE PROTECTION)(18 IN)152CY $109.00 $165.00 $140.00 $135.00 $120.00 $165.00 $185.00
24432-6045 RIPRAP (MOW STRIP)(4 IN)3CY $481.00 $900.00 $600.00 $500.00 $600.00 $1,200.00 $500.00
25450-6006 RAIL (TY T223)124LF $98.00 $100.00 $110.00 $95.00 $120.00 $150.00 $185.00
26454-6003 ARMOR JOINT48LF $250.00 $45.00 $75.00 $100.00 $100.00 $90.00 $150.00
27454-6004 ARMOR JOINT (SEALED)44LF $130.00 $75.00 $100.00 $100.00 $100.00 $90.00 $150.00
28496-6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH)1EA $19,025.00 $5,000.00 $10,000.00 $12,000.00 $12,000.00 $8,500.00 $50,000.00
29500-6001 MOBILIZATION1LS $27,000.00 $30,000.00 $35,000.00 $40,000.00 $35,000.00 $49,600.00 $70,000.00
30502-6001 BARRICADES, SIGNS AND TRAFFIC HANDLING6MO $1,000.00 $1,100.00 $2,000.00 $1,200.00 $2,500.00 $2,000.00 $8,500.00
31506-6002 ROCK FILTER DAMS (INSTALL) (TY 2)70LF $33.00 $44.00 $45.00 $50.00 $5.00 $44.00 $30.00
32506-6011 ROCK FILTER DAMS (REMOVE)70LF $12.00 $10.00 $11.00 $15.00 $1.00 $11.00 $15.00
33506-6038 TEMP SEDMT CONT FENCE (INSTALL)225LF $3.00 $4.60 $4.00 $5.00 $2.00 $4.00 $4.00
34506-6039 TEMP SEDMT CONT FENCE (REMOVE)225LF $2.00 $1.10 $1.00 $2.00 $1.00 $1.40 $2.00
35540-6001 MTL W-BEAM GD FEN (TIM POST)225LF $22.00 $22.00 $18.00 $18.00 $25.00 $17.60 $25.00
36540-6006 MTL BEAM GD FEN TRANS (THRIE-BEAM)4EA $1,817.00 $1,550.00 $1,500.00 $1,600.00 $1,800.00 $1,500.00 $1,850.00
37544-6004 GDRAIL END TRT(INST)(WOOD POST)(TY I)4EA $3,025.00 $2,800.00 $2,750.00 $2,750.00 $2,700.00 $2,700.00 $2,850.00
38644-6068 RELOCATE SM RD SN SUP&AM TY 10BWG1EA $434.00 $740.00 $1,000.00 $300.00 $800.00 $300.00 $1,500.00
39644-6076 REMOVE SM RD SN SUP&AM3EA $90.00 $110.00 $100.00 $200.00 $100.00 $100.00 $650.00
40658-6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)4EA $30.00 $22.00 $30.00 $35.00 $50.00 $29.00 $100.00
41658-6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)6EA $40.00 $44.00 $40.00 $35.00 $60.00 $30.00 $100.00
422014-6002 ASPHALT-STABILIZED FLEXIBLE BASE465TON $60.00 $110.00 $105.00 $70.00 $120.00 $110.00 $200.00
43409-6002 PRESTR CONC PIL (18 IN SQ)208LF $121.15 $165.00