| 1 | 100-6002 |
PREPARING ROW | 4 | STA |
$3,600.00 |
$3,700.00 |
$2,000.00 |
$2,500.00 |
$1,639.75 |
$12,500.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 160 | CY |
$20.00 |
$15.00 |
$20.00 |
$30.00 |
$57.82 |
$20.00 |
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 450 | CY |
$20.00 |
$15.00 |
$18.00 |
$36.00 |
$28.05 |
$30.00 |
| 4 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 380 | CY |
$16.00 |
$15.00 |
$22.00 |
$31.50 |
$51.47 |
$35.00 |
| 5 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 600 | SY |
$3.00 |
$4.00 |
$1.50 |
$2.25 |
$3.76 |
$2.00 |
| 6 | 168-6001 |
VEGETATIVE WATERING | 6 | MG |
$36.00 |
$1.00 |
$50.00 |
$50.00 |
$688.86 |
$100.00 |
| 7 | 169-6003 |
SOIL RETENTION BLANKETS (CL 1) (TY C) | 90 | SY |
$1.20 |
$5.00 |
$3.50 |
$4.00 |
$14.72 |
$6.50 |
| 8 | 247-6061 |
FL BS (CMP IN PLC)(TYA GR1-2) (6") | 772 | SY |
$19.00 |
$35.00 |
$32.00 |
$28.00 |
$20.39 |
$25.00 |
| 9 | 416-6004 |
DRILL SHAFT (36 IN) | 444 | LF |
$200.00 |
$185.00 |
$235.00 |
$265.00 |
$252.42 |
$275.00 |
| 10 | 420-6013 |
CL C CONC (ABUT) | 32.8 | CY |
$900.00 |
$1,000.00 |
$1,200.00 |
$1,400.00 |
$1,046.77 |
$1,000.00 |
| 11 | 420-6074 |
CL C CONC (MISC) | 6.9 | CY |
$2,500.00 |
$900.00 |
$1,050.00 |
$1,200.00 |
$2,311.13 |
$1,000.00 |
| 12 | 422-6002 |
REINF CONC SLAB (HPC) | 1,950 | SF |
$26.00 |
$25.00 |
$26.00 |
$26.00 |
$26.49 |
$20.00 |
| 13 | 425-6035 |
PRESTR CONC GIRDER (TX28) | 298 | LF |
$195.00 |
$180.00 |
$215.00 |
$221.00 |
$197.02 |
$185.00 |
| 14 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 401 | CY |
$125.00 |
$130.00 |
$125.00 |
$118.00 |
$113.65 |
$185.00 |
| 15 | 450-6006 |
RAIL (TY T223) | 182 | LF |
$110.00 |
$130.00 |
$105.00 |
$120.00 |
$161.43 |
$185.00 |
| 16 | 496-6005 |
REMOV STR (WINGWALL) | 2 | EA |
$2,000.00 |
$4,000.00 |
$3,250.00 |
$2,300.00 |
$4,417.39 |
$2,500.00 |
| 17 | 496-6007 |
REMOV STR (PIPE) | 60 | LF |
$20.00 |
$50.00 |
$22.25 |
$20.00 |
$147.25 |
$50.00 |
| 18 | 496-6018 |
REMOVE STR (CONC) | 1 | EA |
$4,000.00 |
$5,000.00 |
$5,000.00 |
$4,000.00 |
$10,897.49 |
$5,000.00 |
| 19 | 500-6001 |
MOBILIZATION | 1 | LS |
$39,553.00 |
$40,000.00 |
$40,000.00 |
$50,900.00 |
$53,775.00 |
$60,000.00 |
| 20 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$6,000.00 |
$1,500.00 |
$1,750.00 |
$2,500.00 |
$1,424.60 |
$8,500.00 |
| 21 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 60 | LF |
$40.00 |
$1.00 |
$45.00 |
$28.00 |
$42.57 |
$30.00 |
| 22 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 335 | LF |
$3.50 |
$1.00 |
$7.50 |
$5.00 |
$5.77 |
$4.00 |
| 23 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 335 | LF |
$1.00 |
$1.00 |
$3.50 |
$1.00 |
$2.57 |
$2.00 |
| 24 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 80 | LF |
$3.00 |
$8.00 |
$18.00 |
$6.00 |
$11.59 |
$18.00 |
| 25 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 80 | LF |
$1.00 |
$1.00 |
$6.50 |
$1.00 |
$7.59 |
$9.00 |
| 26 | 530-6016 |
DRIVEWAYS (BASE) | 28 | SY |
$30.00 |
$40.00 |
$100.00 |
$45.00 |
$163.42 |
$40.00 |
| 27 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 87.5 | LF |
$35.00 |
$30.00 |
$29.50 |
$40.00 |
$37.55 |
$25.00 |
| 28 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 4 | EA |
$1,200.00 |
$1,600.00 |
$1,600.00 |
$1,299.50 |
$1,363.60 |
$1,850.00 |
| 29 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$1,500.00 |
$1,600.00 |
$1,500.00 |
$1,475.00 |
$2,429.42 |
$1,850.00 |
| 30 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$2,500.00 |
$3,000.00 |
$3,225.00 |
$2,995.00 |
$2,961.47 |
$2,850.00 |
| 31 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$30.00 |
$40.00 |
$25.00 |
$30.00 |
$71.93 |
$100.00 |
| 32 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 7 | EA |
$32.00 |
$40.00 |
$42.50 |
$40.00 |
$82.66 |
$100.00 |