| 1 | 100-7002 |
PREPARING ROW | 28 | STA |
$8,000.00 |
$14,000.00 |
$2,000.00 |
$5,000.00 |
$4,000.00 |
$250.00 |
$3,300.00 |
$35,000.00 |
$10,000.00 |
| 2 | 104-7006 |
REMOV CONC (RIPRAP) | 871 | SY |
$32.00 |
$15.00 |
$10.00 |
$25.00 |
$14.00 |
$60.00 |
$33.00 |
$50.00 |
$20.00 |
| 3 | 110-7001 |
EXCAV (ROADWAY) | 5,740 | CY |
$25.00 |
$18.00 |
$18.00 |
$20.00 |
$10.00 |
$11.00 |
$22.00 |
$20.00 |
$25.00 |
| 4 | 132-7008 |
EMBANK (FNL)(DC)(TY C1) | 13,045 | CY |
$25.00 |
$26.00 |
$27.00 |
$30.00 |
$25.00 |
$35.00 |
$33.00 |
$30.00 |
$35.00 |
| 5 | 132-7010 |
EMBANK (FNL)(DC)(TY C2) | 801 | CY |
$75.00 |
$327.00 |
$40.00 |
$50.00 |
$25.00 |
$110.00 |
$33.00 |
$40.00 |
$35.00 |
| 6 | 161-7002 |
COMPOST MANUF TOPSOIL (4") | 22,220 | SY |
$3.00 |
$2.20 |
$4.00 |
$2.00 |
$2.00 |
$2.00 |
$1.08 |
$3.00 |
$1.72 |
| 7 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 5,323 | SY |
$0.5000 |
$0.4000 |
$0.7500 |
$0.4500 |
$0.5000 |
$0.9000 |
$0.4180 |
$0.5000 |
$0.4600 |
| 8 | 164-7015 |
DRILL SEED (TEMP_WARM_COOL) | 5,323 | SY |
$0.5000 |
$0.4000 |
$0.7500 |
$0.4500 |
$0.5000 |
$0.8000 |
$0.3960 |
$0.5000 |
$0.4500 |
| 9 | 168-7001 |
VEGETATIVE WATERING | 1,583.7 | TGL |
$20.00 |
$1.00 |
$0.2500 |
$10.00 |
$1.00 |
$3.00 |
$17.60 |
$10.00 |
$35.00 |
| 10 | 247-7102 |
FL BS (CMP IN PLC)(TY D GR 1-2) (10") | 2,102 | SY |
|
$35.00 |
$55.00 |
$35.00 |
$60.00 |
$31.00 |
$38.50 |
$28.00 |
$55.00 |
| 11 | 247-7125 |
FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 2,218 | SY |
$30.00 |
$36.00 |
$45.00 |
$36.00 |
$60.00 |
$37.00 |
$38.50 |
$32.00 |
$60.00 |
| 12 | 247-7271 |
FL BS (RDWY DEL)(TY D GR 1-2)(FNAL POS) | 1,110 | CY |
$100.00 |
$96.00 |
$100.00 |
$85.00 |
$85.00 |
$120.00 |
$289.30 |
$80.00 |
$125.00 |
| 13 | 251-7049 |
REWORK BS MTL (TY C)(6")(ORD COMP) | 2,218 | SY |
$3.00 |
$6.00 |
$14.00 |
$10.00 |
$25.00 |
$9.00 |
$22.00 |
$6.00 |
$20.00 |
| 14 | 251-7051 |
REWORK BS MTL (TY C)(8")(ORD COMP) | 5,433 | SY |
|
$7.00 |
$10.00 |
$5.00 |
$25.00 |
$4.00 |
$33.00 |
$8.00 |
$20.00 |
| 15 | 260-7001 |
LIME (COM OR QK)(SLURRY) OR QK(DRY) | 57.22 | TON |
|
$360.00 |
$400.00 |
$350.00 |
$350.00 |
$450.00 |
$375.22 |
$400.00 |
$375.00 |
| 16 | 260-7007 |
LIME TRT (EXIST MATL)(8") | 2,102 | SY |
|
$10.00 |
$30.00 |
$10.00 |
$15.00 |
$15.00 |
$22.00 |
$12.00 |
$15.00 |
| 17 | 275-7001 |
CEMENT | 15 | TON |
$250.00 |
$260.00 |
$350.00 |
$320.00 |
$400.00 |
$290.00 |
$254.84 |
$300.00 |
$275.00 |
| 18 | 275-7006 |
CEMENT TRT (EXIST MATL & NEW BASE)(6") | 2,218 | SY |
$2.50 |
$5.00 |
$24.00 |
$10.00 |
$15.00 |
$18.00 |
$22.00 |
$10.00 |
$7.50 |
| 19 | 275-7007 |
CEMENT TRT (EXIST MATL & NEW BASE)(8") | 5,433 | SY |
|
$5.50 |
$22.00 |
$7.00 |
$15.00 |
$18.00 |
$27.50 |
$12.00 |
$7.50 |
| 20 | 305-7016 |
SALV, HAUL & STKPL RCL APH PV (3") | 1,724 | SY |
|
$6.50 |
$15.00 |
$15.00 |
$25.00 |
$8.00 |
$4.40 |
$10.00 |
$10.00 |
| 21 | 310-7015 |
PRIME COAT (MULTI OPTION) | 411 | GAL |
|
$24.00 |
$29.00 |
$22.00 |
$20.00 |
$16.00 |
$24.20 |
$5.00 |
$22.00 |
| 22 | 314-7017 |
EMULS ASPH (PRIME)(AE-P) | 1,531 | GAL |
$7.00 |
$28.00 |
$31.00 |
$25.00 |
$15.00 |
$14.00 |
$27.50 |
$5.00 |
$25.00 |
| 23 | 316-7012 |
ASPH (CRS-2P) | 4,642 | GAL |
$6.50 |
$30.00 |
$29.50 |
$27.00 |
$10.00 |
$6.00 |
$30.25 |
$5.00 |
$27.50 |
| 24 | 316-7016 |
ASPH (RC-250) | 714 | GAL |
$4.50 |
$56.00 |
$55.00 |
$51.00 |
$15.00 |
$13.00 |
$56.10 |
$5.00 |
$51.00 |
| 25 | 316-7071 |
ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 3,826 | GAL |
$5.50 |
$28.00 |
$30.00 |
$25.00 |
$15.00 |
$7.00 |
$27.50 |
$5.00 |
$25.00 |
| 26 | 316-7171 |
AGGR (TY-B, GR-3)(SAC-B) | 48 | CY |
$150.00 |
$1,200.00 |
$1,400.00 |
$1,100.00 |
$1,500.00 |
$555.00 |
$1,210.00 |
$250.00 |
$1,100.00 |
| 27 | 316-7175 |
AGGR (TY-B, GR-5)(SAC-B) | 21 | CY |
$120.00 |
$1,400.00 |
$1,500.00 |
$1,220.00 |
$1,500.00 |
$1,100.00 |
$1,342.00 |
$250.00 |
$1,220.00 |
| 28 | 316-7211 |
AGGR (TY-PB, GR-4)(SAC-B) | 65 | CY |
$150.00 |
$1,490.00 |
$1,600.00 |
$1,325.00 |
$1,000.00 |
$1,200.00 |
$1,457.50 |
$250.00 |
$1,325.00 |
| 29 | 344-7011 |
SP MIXES SP-C SAC-B PG64-22 | 339 | TON |
|
$266.00 |
$325.00 |
$244.00 |
$250.00 |
$270.00 |
$268.40 |
$200.00 |
$244.00 |
| 30 | 344-7077 |
TACK COAT | 123 | GAL |
|
$1.70 |
$5.00 |
$2.00 |
$10.00 |
$12.00 |
$1.65 |
$6.00 |
$1.50 |
| 31 | 400-7010 |
CEM STABIL BKFL | 151 | CY |
$250.00 |
$273.00 |
$325.00 |
$350.00 |
$300.00 |
$350.00 |
$330.00 |
$250.00 |
$400.00 |
| 32 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 1,871 | LF |
$10.00 |
$9.00 |
$8.00 |
$10.00 |
$5.00 |
$13.00 |
$9.90 |
$5.00 |
$15.00 |
| 33 | 403-7001 |
TEMPORARY SPL SHORING | 8,106 | SF |
$40.00 |
$33.00 |
$12.50 |
$55.00 |
$25.00 |
$75.00 |
$49.50 |
$55.00 |
$35.00 |
| 34 | 416-7004 |
DRILL SHAFT (24 IN) | 2,235 | LF |
$225.00 |
$184.00 |
$275.00 |
$300.00 |
$155.00 |
$300.00 |
$108.94 |
$225.00 |
$275.00 |
| 35 | 416-7005 |
DRILL SHAFT (30 IN) | 320 | LF |
|
$216.00 |
$300.00 |
$350.00 |
$175.00 |
$420.00 |
$117.02 |
$275.00 |
$325.00 |
| 36 | 420-7013 |
CL C CONC (ABUT)(HPC) | 115.2 | CY |
$1,500.00 |
$1,220.00 |
$1,400.00 |
$1,300.00 |
$2,000.00 |
$4,000.00 |
$1,705.00 |
$1,350.00 |
$3,000.00 |
| 37 | 420-7023 |
CL C CONC (CAP)(HPC) | 101.7 | CY |
$1,500.00 |
$1,430.00 |
$1,800.00 |
$1,550.00 |
$2,200.00 |
$4,200.00 |
$1,925.00 |
$2,000.00 |
$3,025.00 |
| 38 | 420-7039 |
CL C CONC (COLUMN)(HPC) | 10.5 | CY |
$2,000.00 |
$1,700.00 |
$2,000.00 |
$1,200.00 |
$2,200.00 |
$3,200.00 |
$1,925.00 |
$1,350.00 |
$4,000.00 |
| 39 | 422-7002 |
REINF CONC SLAB (HPC) | 16,770 | SF |
$26.00 |
$31.00 |
$28.00 |
$25.00 |
$24.00 |
$48.00 |
$29.70 |
$22.00 |
$50.00 |
| 40 | 422-7013 |
APPROACH SLAB | 71 | CY |
$800.00 |
$922.00 |
$800.00 |
$800.00 |
$1,000.00 |
$1,200.00 |
$935.00 |
$1,250.00 |
$1,100.00 |
| 41 | 423-7001 |
RETAINING WALL (MSE) | 3,537 | SF |
|
$70.00 |
$125.00 |
$85.00 |
$120.00 |
$150.00 |
$141.90 |
$55.00 |
$200.00 |
| 42 | 425-7016 |
PRESTR CONC SLAB BEAM (4SB12) | 1,726.02 | LF |
$250.00 |
$214.00 |
$240.00 |
$250.00 |
$290.00 |
$240.00 |
$190.07 |
$210.00 |
$300.00 |
| 43 | 425-7017 |
PRESTR CONC SLAB BEAM (5SB12) | 1,844.52 | LF |
$270.00 |
$221.00 |
$240.00 |
$250.00 |
$290.00 |
$240.00 |
$190.07 |
$210.00 |
$300.00 |
| 44 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 26.2 | CY |
$750.00 |
$630.00 |
$750.05 |
$500.00 |
$700.00 |
$750.00 |
$880.00 |
$550.00 |
$750.00 |
| 45 | 432-7033 |
RIPRAP (STONE COMMON)(DRY)(18 IN) | 322 | CY |
|
$132.00 |
$130.00 |
$130.00 |
$160.00 |
$130.00 |
$220.00 |
$185.00 |
$175.00 |
| 46 | 432-7045 |
RIPRAP (STONE PROTECTION)(24 IN) | 2,146 | CY |
|
$127.00 |
$130.00 |
$130.00 |
$180.00 |
$120.00 |
$231.00 |
$190.00 |
$175.00 |
| 47 | 432-7047 |
RIPRAP (STONE PROTECTION)(30 IN) | 2,234 | CY |
$220.00 |
$127.00 |
$141.00 |
$135.00 |
$242.00 |
$120.00 |
$231.00 |
$200.00 |
$175.00 |
| 48 | 432-7048 |
RIPRAP (STONE PROTECTION)(36 IN) | 2,761 | CY |
|
$127.00 |
$150.00 |
$140.00 |
$300.00 |
$120.00 |
$231.00 |
$250.00 |
$180.00 |
| 49 | 450-7004 |
RAIL (TY T221) | 332 | LF |
|
$120.00 |
$165.00 |
$180.00 |
$170.00 |
$180.00 |
$209.00 |
$250.00 |
$250.00 |
| 50 | 450-7009 |
RAIL (TY T223)(HPC) | 850 | LF |
$150.00 |
$125.00 |
$175.00 |
$220.00 |
$170.00 |
$240.00 |
$220.00 |
$250.00 |
$250.00 |
| 51 | 454-7001 |
TYPE A JOINT | 413 | LF |
$165.00 |
$55.00 |
$95.00 |
$180.00 |
$100.00 |
$52.00 |
$132.00 |
$100.00 |
$10.00 |
| 52 | 464-7005 |
RC PIPE (CL III)(24 IN) | 80 | LF |
$115.00 |
$135.00 |
$100.00 |
$110.00 |
$120.00 |
$110.00 |
$143.00 |
$105.00 |
$175.00 |
| 53 | 464-7007 |
RC PIPE (CL III)(30 IN) | 30 | LF |
|
$175.00 |
$150.00 |
$170.00 |
$125.00 |
$225.00 |
$176.00 |
$150.00 |
$275.00 |
| 54 | 467-7328 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 4 | EA |
$1,700.00 |
$2,600.00 |
$3,500.00 |
$2,690.00 |
$3,500.00 |
$1,300.00 |
$2,420.00 |
$2,500.00 |
$4,000.00 |
| 55 | 467-7348 |
SET (TY II) (30 IN) (RCP) (6: 1) (P) | 1 | EA |
|
$5,000.00 |
$6,000.00 |
$5,870.00 |
$3,500.00 |
$2,900.00 |
$6,050.00 |
$3,000.00 |
$5,225.00 |
| 56 | 496-7004 |
REMOV STR (SET) | 2 | EA |
|
$1,000.00 |
$500.00 |
$500.00 |
$500.00 |
$1,600.00 |
$660.00 |
$50.00 |
$675.00 |
| 57 | 496-7007 |
REMOV STR (PIPE) | 65 | LF |
$25.00 |
$30.00 |
$20.00 |
$50.00 |
$10.00 |
$95.00 |
$30.80 |
$30.00 |
$50.00 |
| 58 | 496-7009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 3 | EA |
$35,000.00 |
$23,000.00 |
$30,000.00 |
$50,000.00 |
$36,000.00 |
$95,000.00 |
$44,000.00 |
$50,000.00 |
$60,000.00 |
| 59 | 496-7010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
|
$40,000.00 |
$50,000.00 |
$50,000.00 |
$50,000.00 |
$150,000.00 |
$55,000.00 |
$250,000.00 |
$100,000.00 |
| 60 | 500-7001 |
MOBILIZATION | 1 | LS |
$930,000.00 |
$961,038.96 |
$800,000.00 |
$400,000.00 |
$1,015,000.00 |
$1,100,000.00 |
$1,171,733.33 |
$1,000,000.00 |
$599,000.00 |
| 61 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 35 | MO |
$6,500.00 |
$7,700.00 |
$2,000.00 |
$5,000.00 |
$2,500.00 |
$5,050.00 |
$5,500.00 |
$10,000.00 |
$6,675.00 |
| 62 | 505-7001 |
TMA (STATIONARY) | 4 | DAY |
$215.00 |
$400.00 |
$400.00 |
$1,000.00 |
$350.00 |
$450.00 |
$300.06 |
$250.00 |
$200.00 |
| 63 | 505-7003 |
TMA (MOBILE OPERATION) | 4 | DAY |
$200.00 |
$800.00 |
$150.00 |
$1,000.00 |
$350.00 |
$780.00 |
$434.13 |
$550.00 |
$895.00 |
| 64 | 506-7002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 709 | LF |
$45.00 |
$40.00 |
$40.00 |
$45.00 |
$1.00 |
$41.00 |
$47.94 |
$30.00 |
$55.00 |
| 65 | 506-7003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 260 | LF |
$80.00 |
$90.00 |
$55.00 |
$65.00 |
$1.00 |
$80.00 |
$94.90 |
$50.00 |
$143.75 |
| 66 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 969 | LF |
$15.00 |
$12.00 |
$5.00 |
$15.00 |
$1.00 |
$13.00 |
$22.65 |
$20.00 |
$38.00 |
| 67 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 489 | SY |
$35.00 |
$40.00 |
$15.00 |
$25.00 |
$1.00 |
$35.00 |
$39.37 |
$50.00 |
$45.10 |
| 68 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 489 | SY |
$12.00 |
$12.00 |
$5.00 |
$15.00 |
$1.00 |
$10.00 |
$15.31 |
$20.00 |
$30.00 |
| 69 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 7,230 | LF |
$4.00 |
$4.00 |
$3.50 |
$4.00 |
$1.00 |
$4.30 |
$5.49 |
$4.00 |
$3.90 |
| 70 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 7,230 | LF |
$1.00 |
$1.20 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1.76 |
$2.00 |
$2.00 |
| 71 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 440 | LF |
$6.00 |
$7.00 |
$12.00 |
$10.00 |
$5.00 |
$6.50 |
$8.11 |
$10.00 |
$21.60 |
| 72 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 440 | LF |
$1.50 |
$1.40 |
$6.00 |
$1.00 |
$1.00 |
$2.20 |
$2.43 |
$5.00 |
$10.00 |
| 73 | 508-7001 |
CONSTRUCTING DETOURS | 679 | SY |
$125.00 |
$115.00 |
$135.00 |
$180.00 |
$100.00 |
$110.00 |
$110.00 |
$50.00 |
$185.00 |
| 74 | 510-7003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 35 | MO |
$5,500.00 |
$3,300.00 |
$3,000.00 |
$7,500.00 |
$4,000.00 |
$5,500.00 |
$6,285.72 |
$6,500.00 |
$3,700.00 |
| 75 | 512-7005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 4,560 | LF |
$45.00 |
$40.00 |
$49.00 |
$75.00 |
$80.00 |
$62.00 |
$59.16 |
$100.00 |
$10.00 |
| 76 | 512-7029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 2,250 | LF |
$15.00 |
$8.00 |
$50.00 |
$25.00 |
$20.00 |
$22.00 |
$18.46 |
$20.00 |
$10.00 |
| 77 | 512-7053 |
PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 4,560 | LF |
$15.00 |
$14.00 |
$11.00 |
$25.00 |
$35.00 |
$25.00 |
$25.45 |
$20.00 |
$5.00 |
| 78 | 530-7010 |
DRIVEWAYS (ACP) | 170 | SY |
$60.00 |
$156.00 |
$150.00 |
$70.00 |
$50.00 |
$125.00 |
$104.50 |
$50.00 |
$135.00 |
| 79 | 533-7002 |
MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 450 | LF |
|
$14.00 |
$10.00 |
$6.00 |
$30.00 |
$9.00 |
$9.35 |
$0.5000 |
$17.50 |
| 80 | 538-7001 |
RIGHT OF WAY MARKERS | 25 | EA |
$400.00 |
$230.00 |
$500.00 |
$100.00 |
$80.00 |
$900.00 |
$476.15 |
$500.00 |
$500.00 |
| 81 | 540-7002 |
MTL W-BEAM GD FEN (STEEL POST) | 1,525 | LF |
$26.00 |
$32.00 |
$34.00 |
$27.00 |
$30.00 |
$30.00 |
$31.35 |
$30.00 |
$31.50 |
| 82 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 13 | EA |
$2,300.00 |
$2,500.00 |
$2,000.00 |
$1,850.00 |
$2,000.00 |
$2,300.00 |
$2,420.00 |
$1,850.00 |
$2,175.00 |
| 83 | 540-7013 |
SHORT RADIUS (28") | 42 | LF |
$50.00 |
$34.00 |
$150.00 |
$55.00 |
$35.00 |
$32.00 |
$33.00 |
$100.00 |
$54.00 |
| 84 | 540-7015 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 2 | EA |
$1,500.00 |
$1,300.00 |
$2,000.00 |
$2,100.00 |
$1,500.00 |
$1,300.00 |
$1,320.00 |
$1,850.00 |
$1,550.00 |
| 85 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 1,600 | LF |
$3.50 |
$4.50 |
$5.00 |
$3.00 |
$2.00 |
$4.00 |
$4.40 |
$3.00 |
$4.25 |
| 86 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 16 | EA |
$350.00 |
$255.00 |
$250.00 |
$2,750.00 |
$100.00 |
$270.00 |
$275.00 |
$500.00 |
$300.00 |
| 87 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 13 | EA |
$3,200.00 |
$3,000.00 |
$3,400.00 |
$3,200.00 |
$3,000.00 |
$3,100.00 |
$3,245.00 |
$3,850.00 |
$2,975.00 |
| 88 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 16 | EA |
$350.00 |
$255.00 |
$500.00 |
$350.00 |
$500.00 |
$260.00 |
$275.00 |
$1,500.00 |
$350.00 |
| 89 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 8 | EA |
$1,700.00 |
$1,250.00 |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,300.00 |
$1,320.00 |
$6,500.00 |
$2,500.00 |
| 90 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 10 | EA |
$900.00 |
$900.00 |
$1,000.00 |
$2,500.00 |
$1,000.00 |
$900.00 |
$935.00 |
$2,500.00 |
$1,250.00 |
| 91 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 11 | EA |
$9,000.00 |
$9,000.00 |
$9,250.00 |
$7,500.00 |
$9,000.00 |
$8,000.00 |
$8,250.00 |
$21,000.00 |
$4,500.00 |
| 92 | 556-7007 |
PIPE UNDERDRAINS (TY 7) (6") | 358 | LF |
|
$42.00 |
$100.00 |
$35.00 |
$40.00 |
$42.00 |
$66.00 |
$60.00 |
$75.00 |
| 93 | 560-7008 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 1 | EA |
|
$312.00 |
$750.00 |
$350.00 |
$2,500.00 |
$980.00 |
$341.00 |
$850.00 |
$320.00 |
| 94 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 8 | EA |
$725.00 |
$660.00 |
$1,200.00 |
$850.00 |
$2,000.00 |
$1,300.00 |
$825.00 |
$1,150.00 |
$720.00 |
| 95 | 658-7013 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 33 | EA |
$25.00 |
$42.00 |
$30.00 |
$35.00 |
$45.00 |
$45.00 |
$44.00 |
$100.00 |
$45.00 |
| 96 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 37 | EA |
$30.00 |
$46.00 |
$30.00 |
$35.00 |
$45.00 |
$48.00 |
$44.00 |
$100.00 |
$65.00 |
| 97 | 662-7051 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 217 | EA |
$5.50 |
$7.00 |
$6.00 |
$8.00 |
$10.00 |
$5.50 |
$4.79 |
$6.00 |
$8.00 |
| 98 | 662-7064 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 17,739 | LF |
$1.50 |
$1.50 |
$1.50 |
$2.50 |
$2.50 |
$1.10 |
$0.9240 |
$1.00 |
$2.50 |
| 99 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 120 | LF |
$12.00 |
$10.00 |
$15.00 |
$10.00 |
$15.00 |
$8.00 |
$6.99 |
$20.00 |
$10.00 |
| 100 | 662-7097 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 16,500 | LF |
$1.00 |
$1.40 |
$1.50 |
$2.50 |
$2.50 |
$1.10 |
$0.9240 |
$1.00 |
$2.50 |
| 101 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 4,644 | EA |
$1.50 |
$1.40 |
$1.50 |
$1.00 |
$2.00 |
$4.00 |
$4.40 |
$6.00 |
$2.38 |
| 102 | 666-7346 |
PAVEMENT SLER 4" | 10,776 | LF |
$0.5000 |
$0.5000 |
$0.7500 |
$0.5000 |
$0.6000 |
$0.4000 |
$0.3300 |
$1.00 |
$0.5000 |
| 103 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 5,388 | LF |
$1.00 |
$1.30 |
$1.50 |
$3.00 |
$3.00 |
$1.00 |
$0.8690 |
$2.00 |
$3.00 |
| 104 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 5,388 | LF |
$1.00 |
$1.30 |
$1.50 |
$3.00 |
$3.00 |
$1.00 |
$0.8690 |
$2.00 |
$3.00 |
| 105 | 672-7004 |
REFL PAV MRKR TY II-A-A | 73 | EA |
$5.50 |
$17.00 |
$20.00 |
$10.00 |
$15.00 |
$13.00 |
$11.00 |
$6.00 |
$10.00 |
| 106 | 677-7001 |
ELIM EXT PM & MRKS (4") | 23,966 | LF |
$0.5000 |
$1.10 |
$0.9000 |
$0.7000 |
$1.00 |
$0.7000 |
$0.6600 |
$1.00 |
$0.7000 |
| 107 | 730-7022 |
FULL - WIDTH MOWING | 1.53 | AC |
$35.00 |
$4,000.00 |
$1,000.00 |
$5,000.00 |
$100.00 |
$6,000.00 |
$4,400.00 |
$1,000.00 |
$5,000.00 |
| 1 | 100-7002 |
PREPARING ROW | 6 | STA |
$8,000.00 |
|
|
|
|
|
|
|
|
| 2 | 104-7006 |
REMOV CONC (RIPRAP) | 14 | SY |
$32.00 |
|
|
|
|
|
|
|
|
| 3 | 110-7001 |
EXCAV (ROADWAY) | 2,522 | CY |
$25.00 |
|
|
|
|
|
|
|
|
| 4 | 132-7008 |
EMBANK (FNL)(DC)(TY C1) | 2,099 | CY |
$25.00 |
|
|
|
|
|
|
|
|
| 5 | 132-7010 |
EMBANK (FNL)(DC)(TY C2) | 50 | CY |
$75.00 |
|
|
|
|
|
|
|
|
| 6 | 161-7002 |
COMPOST MANUF TOPSOIL (4") | 4,612 | SY |
$3.00 |
|
|
|
|
|
|
|
|
| 7 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 4,612 | SY |
$0.5000 |
|
|
|
|
|
|
|
|
| 8 | 164-7015 |
DRILL SEED (TEMP_WARM_COOL) | 4,612 | SY |
$0.5000 |
|
|
|
|
|
|
|
|
| 9 | 168-7001 |
VEGETATIVE WATERING | 1,372.2 | TGL |
$20.00 |
|
|
|
|
|
|
|
|
| 10 | 247-7102 |
FL BS (CMP IN PLC)(TY D GR 1-2) (10") | 2,102 | SY |
$30.00 |
|
|
|
|
|
|
|
|
| 15 | 260-7001 |
LIME (COM OR QK)(SLURRY) OR QK(DRY) | 57.22 | TON |
$350.00 |
|
|
|
|
|
|
|
|
| 16 | 260-7007 |
LIME TRT (EXIST MATL)(8") | 2,102 | SY |
$10.00 |
|
|
|
|
|
|
|
|
| 20 | 305-7016 |
SALV, HAUL & STKPL RCL APH PV (3") | 1,724 | SY |
$1.00 |
|
|
|
|
|
|
|
|
| 21 | 310-7015 |
PRIME COAT (MULTI OPTION) | 411 | GAL |
$5.00 |
|
|
|
|
|
|
|
|
| 29 | 344-7011 |
SP MIXES SP-C SAC-B PG64-22 | 339 | TON |
$150.00 |
|
|
|
|
|
|
|
|
| 30 | 344-7077 |
TACK COAT | 123 | GAL |
$5.00 |
|
|
|
|
|
|
|
|
| 31 | 400-7010 |
CEM STABIL BKFL | 44 | CY |
$250.00 |
|
|
|
|
|
|
|
|
| 32 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 476 | LF |
$10.00 |
|
|
|
|
|
|
|
|
| 33 | 403-7001 |
TEMPORARY SPL SHORING | 453 | SF |
$40.00 |
|
|
|
|
|
|
|
|
| 34 | 416-7004 |
DRILL SHAFT (24 IN) | 400 | LF |
$225.00 |
|
|
|
|
|
|
|
|
| 36 | 420-7013 |
CL C CONC (ABUT)(HPC) | 32.3 | CY |
$1,500.00 |
|
|
|
|
|
|
|
|
| 37 | 420-7023 |
CL C CONC (CAP)(HPC) | 26 | CY |
$1,500.00 |
|
|
|
|
|
|
|
|
| 38 | 420-7039 |
CL C CONC (COLUMN)(HPC) | 11.6 | CY |
$2,000.00 |
|
|
|
|
|
|
|
|
| 39 | 422-7002 |
REINF CONC SLAB (HPC) | 4,600 | SF |
$26.00 |
|
|
|
|
|
|
|
|
| 40 | 422-7013 |
APPROACH SLAB | 71 | CY |
$800.00 |
|
|
|
|
|
|
|
|
| 42 | 425-7016 |
PRESTR CONC SLAB BEAM (4SB12) | 492.11 | LF |
$250.00 |
|
|
|
|
|
|
|
|
| 43 | 425-7017 |
PRESTR CONC SLAB BEAM (5SB12) | 492.11 | LF |
$270.00 |
|
|
|
|
|
|
|
|
| 44 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 26.3 | CY |
$750.00 |
|
|
|
|
|
|
|
|
| 48 | 432-7048 |
RIPRAP (STONE PROTECTION)(36 IN) | 2,761 | CY |
$240.00 |
|
|
|
|
|
|
|
|
| 50 | 450-7009 |
RAIL (TY T223)(HPC) | 228 | LF |
$150.00 |
|
|
|
|
|
|
|
|
| 51 | 454-7001 |
TYPE A JOINT | 107 | LF |
$165.00 |
|
|
|
|
|
|
|
|
| 52 | 464-7005 |
RC PIPE (CL III)(24 IN) | 24 | LF |
$115.00 |
|
|
|
|
|
|
|
|
| 54 | 467-7328 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 2 | EA |
$1,700.00 |
|
|
|
|
|
|
|
|
| 56 | 496-7004 |
REMOV STR (SET) | 2 | EA |
$550.00 |
|
|
|
|
|
|
|
|
| 57 | 496-7007 |
REMOV STR (PIPE) | 28 | LF |
$25.00 |
|
|
|
|
|
|
|
|
| 58 | 496-7009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$35,000.00 |
|
|
|
|
|
|
|
|
| 60 | 500-7001 |
MOBILIZATION | 0.24 | LS |
$930,000.00 |
|
|
|
|
|
|
|
|
| 61 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$6,500.00 |
|
|
|
|
|
|
|
|
| 62 | 505-7001 |
TMA (STATIONARY) | 1 | DAY |
$215.00 |
|
|
|
|
|
|
|
|
| 63 | 505-7003 |
TMA (MOBILE OPERATION) | 1 | DAY |
$200.00 |
|
|
|
|
|
|
|
|
| 64 | 506-7002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 180 | LF |
$45.00 |
|
|
|
|
|
|
|
|
| 65 | 506-7003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 80 | LF |
$80.00 |
|
|
|
|
|
|
|
|
| 66 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 260 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 67 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 489 | SY |
$35.00 |
|
|
|
|
|
|
|
|
| 68 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 489 | SY |
$12.00 |
|
|
|
|
|
|
|
|
| 69 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,629 | LF |
$4.00 |
|
|
|
|
|
|
|
|
| 70 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,629 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 71 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 110 | LF |
$6.00 |
|
|
|
|
|
|
|
|
| 72 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 110 | LF |
$1.50 |
|
|
|
|
|
|
|
|
| 73 | 508-7001 |
CONSTRUCTING DETOURS | 324 | SY |
$125.00 |
|
|
|
|
|
|
|
|
| 74 | 510-7003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 9 | MO |
$5,500.00 |
|
|
|
|
|
|
|
|
| 75 | 512-7005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 780 | LF |
$45.00 |
|
|
|
|
|
|
|
|
| 76 | 512-7029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 690 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 77 | 512-7053 |
PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 780 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 78 | 530-7010 |
DRIVEWAYS (ACP) | 70 | SY |
$60.00 |
|
|
|
|
|
|
|
|
| 79 | 533-7002 |
MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 450 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 80 | 538-7001 |
RIGHT OF WAY MARKERS | 8 | EA |
$400.00 |
|
|
|
|
|
|
|
|
| 81 | 540-7002 |
MTL W-BEAM GD FEN (STEEL POST) | 325 | LF |
$26.00 |
|
|
|
|
|
|
|
|
| 82 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 3 | EA |
$2,300.00 |
|
|
|
|
|
|
|
|
| 83 | 540-7013 |
SHORT RADIUS (28") | 16 | LF |
$50.00 |
|
|
|
|
|
|
|
|
| 84 | 540-7015 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$1,500.00 |
|
|
|
|
|
|
|
|
| 85 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 450 | LF |
$3.50 |
|
|
|
|
|
|
|
|
| 86 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 4 | EA |
$350.00 |
|
|
|
|
|
|
|
|
| 87 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$3,200.00 |
|
|
|
|
|
|
|
|
| 88 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$350.00 |
|
|
|
|
|
|
|
|
| 89 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$1,700.00 |
|
|
|
|
|
|
|
|
| 90 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$900.00 |
|
|
|
|
|
|
|
|
| 91 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$9,000.00 |
|
|
|
|
|
|
|
|
| 93 | 560-7008 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 1 | EA |
$290.00 |
|
|
|
|
|
|
|
|
| 94 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$725.00 |
|
|
|
|
|
|
|
|
| 95 | 658-7013 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 6 | EA |
$25.00 |
|
|
|
|
|
|
|
|
| 96 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 9 | EA |
$30.00 |
|
|
|
|
|
|
|
|
| 97 | 662-7051 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 50 | EA |
$5.50 |
|
|
|
|
|
|
|
|
| 98 | 662-7064 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 3,954 | LF |
$1.50 |
|
|
|
|
|
|
|
|
| 99 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 24 | LF |
$12.00 |
|
|
|
|
|
|
|
|
| 100 | 662-7097 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 3,840 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 101 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 984 | EA |
$1.50 |
|
|
|
|
|
|
|
|
| 102 | 666-7346 |
PAVEMENT SLER 4" | 2,360 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 103 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 1,180 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 104 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 1,180 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 105 | 672-7004 |
REFL PAV MRKR TY II-A-A | 16 | EA |
$5.50 |
|
|
|
|
|
|
|
|
| 106 | 677-7001 |
ELIM EXT PM & MRKS (4") | 5,531 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 107 | 730-7022 |
FULL - WIDTH MOWING | 0.33 | AC |
$35.00 |
|
|
|
|
|
|
|
|
| 1 | 100-7002 |
PREPARING ROW | 9 | STA |
$8,000.00 |
|
|
|
|
|
|
|
|
| 2 | 104-7006 |
REMOV CONC (RIPRAP) | 196 | SY |
$32.00 |
|
|
|
|
|
|
|
|
| 3 | 110-7001 |
EXCAV (ROADWAY) | 2,263 | CY |
$25.00 |
|
|
|
|
|
|
|
|
| 4 | 132-7008 |
EMBANK (FNL)(DC)(TY C1) | 6,398 | CY |
$25.00 |
|
|
|
|
|
|
|
|
| 5 | 132-7010 |
EMBANK (FNL)(DC)(TY C2) | 672 | CY |
$75.00 |
|
|
|
|
|
|
|
|
| 6 | 161-7002 |
COMPOST MANUF TOPSOIL (4") | 6,481 | SY |
$3.00 |
|
|
|
|
|
|
|
|
| 7 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 6,481 | SY |
$0.5000 |
|
|
|
|
|
|
|
|
| 8 | 164-7015 |
DRILL SEED (TEMP_WARM_COOL) | 6,481 | SY |
$0.5000 |
|
|
|
|
|
|
|
|
| 9 | 168-7001 |
VEGETATIVE WATERING | 1,928.2 | TGL |
$20.00 |
|
|
|
|
|
|
|
|
| 11 | 247-7125 |
FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 3,367 | SY |
$30.00 |
|
|
|
|
|
|
|
|
| 12 | 247-7271 |
FL BS (RDWY DEL)(TY D GR 1-2)(FNAL POS) | 526 | CY |
$100.00 |
|
|
|
|
|
|
|
|
| 14 | 251-7051 |
REWORK BS MTL (TY C)(8")(ORD COMP) | 3,367 | SY |
$3.00 |
|
|
|
|
|
|
|
|
| 17 | 275-7001 |
CEMENT | 30.3 | TON |
$250.00 |
|
|
|
|
|
|
|
|
| 19 | 275-7007 |
CEMENT TRT (EXIST MATL & NEW BASE)(8") | 3,367 | SY |
$3.50 |
|
|
|
|
|
|
|
|
| 22 | 314-7017 |
EMULS ASPH (PRIME)(AE-P) | 674 | GAL |
$7.00 |
|
|
|
|
|
|
|
|
| 23 | 316-7012 |
ASPH (CRS-2P) | 2,043 | GAL |
$6.50 |
|
|
|
|
|
|
|
|
| 24 | 316-7016 |
ASPH (RC-250) | 314 | GAL |
$4.50 |
|
|
|
|
|
|
|
|
| 25 | 316-7071 |
ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 1,684 | GAL |
$5.50 |
|
|
|
|
|
|
|
|
| 26 | 316-7171 |
AGGR (TY-B, GR-3)(SAC-B) | 21 | CY |
$150.00 |
|
|
|
|
|
|
|
|
| 27 | 316-7175 |
AGGR (TY-B, GR-5)(SAC-B) | 9 | CY |
$120.00 |
|
|
|
|
|
|
|
|
| 28 | 316-7211 |
AGGR (TY-PB, GR-4)(SAC-B) | 28 | CY |
$150.00 |
|
|
|
|
|
|
|
|
| 31 | 400-7010 |
CEM STABIL BKFL | 31 | CY |
$250.00 |
|
|
|
|
|
|
|
|
| 32 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 458 | LF |
$10.00 |
|
|
|
|
|
|
|
|
| 33 | 403-7001 |
TEMPORARY SPL SHORING | 2,527 | SF |
$40.00 |
|
|
|
|
|
|
|
|
| 34 | 416-7004 |
DRILL SHAFT (24 IN) | 500 | LF |
$225.00 |
|
|
|
|
|
|
|
|
| 36 | 420-7013 |
CL C CONC (ABUT)(HPC) | 27.9 | CY |
$1,500.00 |
|
|
|
|
|
|
|
|
| 37 | 420-7023 |
CL C CONC (CAP)(HPC) | 22.6 | CY |
$1,500.00 |
|
|
|
|
|
|
|
|
| 38 | 420-7039 |
CL C CONC (COLUMN)(HPC) | 15.1 | CY |
$2,000.00 |
|
|
|
|
|
|
|
|
| 39 | 422-7002 |
REINF CONC SLAB (HPC) | 3,450 | SF |
$26.00 |
|
|
|
|
|
|
|
|
| 40 | 422-7013 |
APPROACH SLAB | 71 | CY |
$800.00 |
|
|
|
|
|
|
|
|
| 41 | 423-7001 |
RETAINING WALL (MSE) | 3,537 | SF |
$127.00 |
|
|
|
|
|
|
|
|
| 42 | 425-7016 |
PRESTR CONC SLAB BEAM (4SB12) | 367.5 | LF |
$250.00 |
|
|
|
|
|
|
|
|
| 43 | 425-7017 |
PRESTR CONC SLAB BEAM (5SB12) | 367.5 | LF |
$270.00 |
|
|
|
|
|
|
|
|
| 44 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 24 | CY |
$750.00 |
|
|
|
|
|
|
|
|
| 45 | 432-7033 |
RIPRAP (STONE COMMON)(DRY)(18 IN) | 322 | CY |
$200.00 |
|
|
|
|
|
|
|
|
| 46 | 432-7045 |
RIPRAP (STONE PROTECTION)(24 IN) | 2,146 | CY |
$185.00 |
|
|
|
|
|
|
|
|
| 49 | 450-7004 |
RAIL (TY T221) | 332 | LF |
$200.00 |
|
|
|
|
|
|
|
|
| 50 | 450-7009 |
RAIL (TY T223)(HPC) | 174 | LF |
$150.00 |
|
|
|
|
|
|
|
|
| 51 | 454-7001 |
TYPE A JOINT | 92 | LF |
$165.00 |
|
|
|
|
|
|
|
|
| 53 | 464-7007 |
RC PIPE (CL III)(30 IN) | 30 | LF |
$140.00 |
|
|
|
|
|
|
|
|
| 55 | 467-7348 |
SET (TY II) (30 IN) (RCP) (6: 1) (P) | 1 | EA |
$3,200.00 |
|
|
|
|
|
|
|
|
| 58 | 496-7009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$35,000.00 |
|
|
|
|
|
|
|
|
| 60 | 500-7001 |
MOBILIZATION | 0.28 | LS |
$930,000.00 |
|
|
|
|
|
|
|
|
| 61 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$6,500.00 |
|
|
|
|
|
|
|
|
| 62 | 505-7001 |
TMA (STATIONARY) | 1 | DAY |
$215.00 |
|
|
|
|
|
|
|
|
| 63 | 505-7003 |
TMA (MOBILE OPERATION) | 1 | DAY |
$200.00 |
|
|
|
|
|
|
|
|
| 64 | 506-7002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 165 | LF |
$45.00 |
|
|
|
|
|
|
|
|
| 65 | 506-7003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 50 | LF |
$80.00 |
|
|
|
|
|
|
|
|
| 66 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 215 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 67 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 489 | SY |
$35.00 |
|
|
|
|
|
|
|
|
| 68 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 489 | SY |
$12.00 |
|
|
|
|
|
|
|
|
| 69 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,212 | LF |
$4.00 |
|
|
|
|
|
|
|
|
| 70 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,212 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 71 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 110 | LF |
$6.00 |
|
|
|
|
|
|
|
|
| 72 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 110 | LF |
$1.50 |
|
|
|
|
|
|
|
|
| 73 | 508-7001 |
CONSTRUCTING DETOURS | 324 | SY |
$125.00 |
|
|
|
|
|
|
|
|
| 74 | 510-7003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 8 | MO |
$5,500.00 |
|
|
|
|
|
|
|
|
| 75 | 512-7005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 1,710 | LF |
$45.00 |
|
|
|
|
|
|
|
|
| 77 | 512-7053 |
PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 1,710 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 80 | 538-7001 |
RIGHT OF WAY MARKERS | 11 | EA |
$400.00 |
|
|
|
|
|
|
|
|
| 81 | 540-7002 |
MTL W-BEAM GD FEN (STEEL POST) | 337.5 | LF |
$26.00 |
|
|
|
|
|
|
|
|
| 82 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 3 | EA |
$2,300.00 |
|
|
|
|
|
|
|
|
| 85 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 850 | LF |
$3.50 |
|
|
|
|
|
|
|
|
| 86 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 4 | EA |
$350.00 |
|
|
|
|
|
|
|
|
| 87 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$3,200.00 |
|
|
|
|
|
|
|
|
| 88 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$350.00 |
|
|
|
|
|
|
|
|
| 89 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$1,700.00 |
|
|
|
|
|
|
|
|
| 90 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$900.00 |
|
|
|
|
|
|
|
|
| 91 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$9,000.00 |
|
|
|
|
|
|
|
|
| 92 | 556-7007 |
PIPE UNDERDRAINS (TY 7) (6") | 358 | LF |
$40.00 |
|
|
|
|
|
|
|
|
| 94 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$725.00 |
|
|
|
|
|
|
|
|
| 95 | 658-7013 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 13 | EA |
$25.00 |
|
|
|
|
|
|
|
|
| 96 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
$30.00 |
|
|
|
|
|
|
|
|
| 97 | 662-7051 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 50 | EA |
$5.50 |
|
|
|
|
|
|
|
|
| 98 | 662-7064 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 5,006 | LF |
$1.50 |
|
|
|
|
|
|
|
|
| 99 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 24 | LF |
$12.00 |
|
|
|
|
|
|
|
|
| 100 | 662-7097 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 3,840 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 101 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,188 | EA |
$1.50 |
|
|
|
|
|
|
|
|
| 102 | 666-7346 |
PAVEMENT SLER 4" | 3,360 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 103 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 1,680 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 104 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 1,680 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 105 | 672-7004 |
REFL PAV MRKR TY II-A-A | 22 | EA |
$5.50 |
|
|
|
|
|
|
|
|
| 106 | 677-7001 |
ELIM EXT PM & MRKS (4") | 5,700 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 107 | 730-7022 |
FULL - WIDTH MOWING | 0.45 | AC |
$35.00 |
|
|
|
|
|
|
|
|
| 1 | 100-7002 |
PREPARING ROW | 7 | STA |
$8,000.00 |
|
|
|
|
|
|
|
|
| 2 | 104-7006 |
REMOV CONC (RIPRAP) | 374 | SY |
$32.00 |
|
|
|
|
|
|
|
|
| 3 | 110-7001 |
EXCAV (ROADWAY) | 290 | CY |
$25.00 |
|
|
|
|
|
|
|
|
| 4 | 132-7008 |
EMBANK (FNL)(DC)(TY C1) | 1,511 | CY |
$25.00 |
|
|
|
|
|
|
|
|
| 5 | 132-7010 |
EMBANK (FNL)(DC)(TY C2) | 42 | CY |
$75.00 |
|
|
|
|
|
|
|
|
| 6 | 161-7002 |
COMPOST MANUF TOPSOIL (4") | 5,804 | SY |
$3.00 |
|
|
|
|
|
|
|
|
| 7 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 5,804 | SY |
$0.5000 |
|
|
|
|
|
|
|
|
| 8 | 164-7015 |
DRILL SEED (TEMP_WARM_COOL) | 5,804 | SY |
$0.5000 |
|
|
|
|
|
|
|
|
| 9 | 168-7001 |
VEGETATIVE WATERING | 1,726.8 | TGL |
$20.00 |
|
|
|
|
|
|
|
|
| 11 | 247-7125 |
FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 2,066 | SY |
$30.00 |
|
|
|
|
|
|
|
|
| 12 | 247-7271 |
FL BS (RDWY DEL)(TY D GR 1-2)(FNAL POS) | 323 | CY |
$100.00 |
|
|
|
|
|
|
|
|
| 14 | 251-7051 |
REWORK BS MTL (TY C)(8")(ORD COMP) | 2,066 | SY |
$3.00 |
|
|
|
|
|
|
|
|
| 17 | 275-7001 |
CEMENT | 18.5 | TON |
$250.00 |
|
|
|
|
|
|
|
|
| 19 | 275-7007 |
CEMENT TRT (EXIST MATL & NEW BASE)(8") | 2,066 | SY |
$3.50 |
|
|
|
|
|
|
|
|
| 22 | 314-7017 |
EMULS ASPH (PRIME)(AE-P) | 413 | GAL |
$7.00 |
|
|
|
|
|
|
|
|
| 23 | 316-7012 |
ASPH (CRS-2P) | 1,253 | GAL |
$6.50 |
|
|
|
|
|
|
|
|
| 24 | 316-7016 |
ASPH (RC-250) | 193 | GAL |
$4.50 |
|
|
|
|
|
|
|
|
| 25 | 316-7071 |
ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 1,033 | GAL |
$5.50 |
|
|
|
|
|
|
|
|
| 26 | 316-7171 |
AGGR (TY-B, GR-3)(SAC-B) | 13 | CY |
$150.00 |
|
|
|
|
|
|
|
|
| 27 | 316-7175 |
AGGR (TY-B, GR-5)(SAC-B) | 6 | CY |
$120.00 |
|
|
|
|
|
|
|
|
| 28 | 316-7211 |
AGGR (TY-PB, GR-4)(SAC-B) | 18 | CY |
$150.00 |
|
|
|
|
|
|
|
|
| 31 | 400-7010 |
CEM STABIL BKFL | 37 | CY |
$250.00 |
|
|
|
|
|
|
|
|
| 32 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 510 | LF |
$10.00 |
|
|
|
|
|
|
|
|
| 33 | 403-7001 |
TEMPORARY SPL SHORING | 1,048 | SF |
$40.00 |
|
|
|
|
|
|
|
|
| 34 | 416-7004 |
DRILL SHAFT (24 IN) | 360 | LF |
$225.00 |
|
|
|
|
|
|
|
|
| 35 | 416-7005 |
DRILL SHAFT (30 IN) | 320 | LF |
$280.00 |
|
|
|
|
|
|
|
|
| 36 | 420-7013 |
CL C CONC (ABUT)(HPC) | 26.2 | CY |
$1,500.00 |
|
|
|
|
|
|
|
|
| 37 | 420-7023 |
CL C CONC (CAP)(HPC) | 29.7 | CY |
$1,500.00 |
|
|
|
|
|
|
|
|
| 38 | 420-7039 |
CL C CONC (COLUMN)(HPC) | 20.4 | CY |
$2,000.00 |
|
|
|
|
|
|
|
|
| 39 | 422-7002 |
REINF CONC SLAB (HPC) | 5,040 | SF |
$26.00 |
|
|
|
|
|
|
|
|
| 40 | 422-7013 |
APPROACH SLAB | 64 | CY |
$800.00 |
|
|
|
|
|
|
|
|
| 42 | 425-7016 |
PRESTR CONC SLAB BEAM (4SB12) | 474 | LF |
$250.00 |
|
|
|
|
|
|
|
|
| 43 | 425-7017 |
PRESTR CONC SLAB BEAM (5SB12) | 592.5 | LF |
$270.00 |
|
|
|
|
|
|
|
|
| 44 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 34.7 | CY |
$750.00 |
|
|
|
|
|
|
|
|
| 47 | 432-7047 |
RIPRAP (STONE PROTECTION)(30 IN) | 3,695 | CY |
$220.00 |
|
|
|
|
|
|
|
|
| 50 | 450-7009 |
RAIL (TY T223)(HPC) | 264 | LF |
$150.00 |
|
|
|
|
|
|
|
|
| 51 | 454-7001 |
TYPE A JOINT | 119 | LF |
$165.00 |
|
|
|
|
|
|
|
|
| 59 | 496-7010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$45,000.00 |
|
|
|
|
|
|
|
|
| 60 | 500-7001 |
MOBILIZATION | 0.27 | LS |
$930,000.00 |
|
|
|
|
|
|
|
|
| 61 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$6,500.00 |
|
|
|
|
|
|
|
|
| 62 | 505-7001 |
TMA (STATIONARY) | 1 | DAY |
$215.00 |
|
|
|
|
|
|
|
|
| 63 | 505-7003 |
TMA (MOBILE OPERATION) | 1 | DAY |
$200.00 |
|
|
|
|
|
|
|
|
| 64 | 506-7002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 184 | LF |
$45.00 |
|
|
|
|
|
|
|
|
| 65 | 506-7003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 70 | LF |
$80.00 |
|
|
|
|
|
|
|
|
| 66 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 254 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 67 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 489 | SY |
$35.00 |
|
|
|
|
|
|
|
|
| 68 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 489 | SY |
$12.00 |
|
|
|
|
|
|
|
|
| 69 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,682 | LF |
$4.00 |
|
|
|
|
|
|
|
|
| 70 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,682 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 71 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 110 | LF |
$6.00 |
|
|
|
|
|
|
|
|
| 72 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 110 | LF |
$1.50 |
|
|
|
|
|
|
|
|
| 73 | 508-7001 |
CONSTRUCTING DETOURS | 238 | SY |
$125.00 |
|
|
|
|
|
|
|
|
| 74 | 510-7003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 9 | MO |
$5,500.00 |
|
|
|
|
|
|
|
|
| 75 | 512-7005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 840 | LF |
$45.00 |
|
|
|
|
|
|
|
|
| 76 | 512-7029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 810 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 77 | 512-7053 |
PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 840 | LF |
$15.00 |
|
|
|
|
|
|
|
|
| 81 | 540-7002 |
MTL W-BEAM GD FEN (STEEL POST) | 450 | LF |
$26.00 |
|
|
|
|
|
|
|
|
| 82 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,300.00 |
|
|
|
|
|
|
|
|
| 85 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 150 | LF |
$3.50 |
|
|
|
|
|
|
|
|
| 86 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 4 | EA |
$350.00 |
|
|
|
|
|
|
|
|
| 87 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,200.00 |
|
|
|
|
|
|
|
|
| 88 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$350.00 |
|
|
|
|
|
|
|
|
| 89 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$1,700.00 |
|
|
|
|
|
|
|
|
| 90 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$900.00 |
|
|
|
|
|
|
|
|
| 91 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$9,000.00 |
|
|
|
|
|
|
|
|
| 94 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$725.00 |
|
|
|
|
|
|
|
|
| 95 | 658-7013 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 8 | EA |
$25.00 |
|
|
|
|
|
|
|
|
| 96 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 10 | EA |
$30.00 |
|
|
|
|
|
|
|
|
| 97 | 662-7051 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 50 | EA |
$5.50 |
|
|
|
|
|
|
|
|
| 98 | 662-7064 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 4,175 | LF |
$1.50 |
|
|
|
|
|
|
|
|
| 99 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 24 | LF |
$12.00 |
|
|
|
|
|
|
|
|
| 100 | 662-7097 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 3,840 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 101 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,104 | EA |
$1.50 |
|
|
|
|
|
|
|
|
| 102 | 666-7346 |
PAVEMENT SLER 4" | 2,616 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 103 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 1,308 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 104 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 1,308 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 105 | 672-7004 |
REFL PAV MRKR TY II-A-A | 18 | EA |
$5.50 |
|
|
|
|
|
|
|
|
| 106 | 677-7001 |
ELIM EXT PM & MRKS (4") | 6,440 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 107 | 730-7022 |
FULL - WIDTH MOWING | 0.39 | AC |
$35.00 |
|
|
|
|
|
|
|
|