| 1 | 100-6002 |
PREPARING ROW | 6.5 | STA |
$3,303.00 |
$4,600.00 |
$1,944.00 |
$10,000.00 |
| 2 | 110-6004 |
EXCAVATION (ROADWAY AND CHANNEL) | 333 | CY |
$28.00 |
$30.00 |
$43.64 |
$30.00 |
| 3 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 684 | CY |
$12.00 |
$25.00 |
$30.49 |
$40.00 |
| 4 | 169-6004 |
SOIL RETENTION BLANKETS (CL 1) (TY D) | 2,210 | SY |
$2.00 |
$3.00 |
$2.00 |
$6.50 |
| 5 | 400-6005 |
CEM STABIL BKFL | 52 | CY |
$185.00 |
$250.00 |
$162.42 |
$350.00 |
| 6 | 416-6002 |
DRILL SHAFT (24 IN) | 354 | LF |
$207.00 |
$250.00 |
$421.83 |
$185.00 |
| 7 | 420-6013 |
CL C CONC (ABUT) | 41.4 | CY |
$1,150.00 |
$1,500.00 |
$1,474.34 |
$1,500.00 |
| 8 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 2,210 | SF |
$18.00 |
$28.00 |
$35.21 |
$20.00 |
| 9 | 425-6010 |
PRESTR CONC SLAB BEAM (5SB12) | 172.5 | LF |
$213.00 |
$260.00 |
$235.50 |
$280.00 |
| 10 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 247.41 | LF |
$191.00 |
$260.00 |
$246.75 |
$290.00 |
| 11 | 432-6002 |
RIPRAP (CONC)(5 IN) | 60 | CY |
$542.00 |
$600.00 |
$764.59 |
$650.00 |
| 12 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 320 | CY |
$141.00 |
$180.00 |
$227.08 |
$185.00 |
| 13 | 450-6006 |
RAIL (TY T223) | 218 | LF |
$225.00 |
$150.00 |
$205.22 |
$165.00 |
| 14 | 454-6004 |
ARMOR JOINT (SEALED) | 90 | LF |
$110.00 |
$75.00 |
$195.02 |
$500.00 |
| 15 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 2 | EA |
$19,025.00 |
$15,000.00 |
$16,841.42 |
$50,000.00 |
| 16 | 496-6099 |
REMOVE STR (RAIL) | 182 | LF |
$25.00 |
$20.00 |
$38.55 |
$85.00 |
| 17 | 500-6001 |
MOBILIZATION | 1 | LS |
$56,871.38 |
$75,000.00 |
$138,331.46 |
$125,000.00 |
| 18 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$13,500.00 |
$2,500.00 |
$1,339.40 |
$5,000.00 |
| 19 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 80 | LF |
$61.00 |
$5.00 |
$51.00 |
$30.00 |
| 20 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 80 | LF |
$15.00 |
$5.00 |
$10.30 |
$15.00 |
| 21 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 1,404 | LF |
$11.00 |
$5.00 |
$11.64 |
$18.00 |
| 22 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,404 | LF |
$5.00 |
$1.00 |
$2.29 |
$9.00 |
| 23 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 200 | LF |
$32.00 |
$26.00 |
$33.60 |
$35.00 |
| 24 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 8 | EA |
$1,200.00 |
$2,000.00 |
$1,664.96 |
$1,850.00 |
| 25 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$3,116.00 |
$2,800.00 |
$3,314.96 |
$3,000.00 |
| 26 | 552-6003 |
WIRE FENCE (TY C) | 273 | LF |
$18.00 |
$20.00 |
$16.94 |
$10.00 |
| 27 | 644-6078 |
REMOVE SM RD SN SUP&AM (SIGN ONLY) | 11 | EA |
$140.00 |
$200.00 |
$120.88 |
$50.00 |
| 28 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 24 | EA |
$46.00 |
$50.00 |
$43.49 |
$100.00 |
| 29 | 3077-6001 |
SP MIXES SP-B PG64-22 | 570 | TON |
$150.00 |
$200.00 |
$176.97 |
$200.00 |