Bid tab 0919-19-083

Let Oct 7, 2022 · Atlanta · Bowie Sign up free

‹ Oct 2022 results

CONSTRUCT SIDEWALKS AND PEDESTRIAN CURB RAMPS

Let date
Friday, October 7, 2022
CCSJ
0919-19-083
District
Atlanta
County
Bowie
Highway
VA
Limits
ALONG N AND S ELM ST TO FRONT ST, to W LION DR AND ELLIS STREET
Classification
Construction
Project number
STP 2021(276)TAPS
Working days
64

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$754,383
1 BLACKSTONE CONCRETE VENTURES, LLC Low bidder $760,142 +0.8%
2 BELT CONSTRUCTION OF TEXAS LLC $838,883 +11.2% +10.4%
3 HODGES AND SON CONSTRUCTION COMPANY, INC. $917,668 +21.6% +20.7%
4 EAST TEXAS BRIDGE, INC. $1,043,676 +38.3% +37.3%
5 LONGVIEW BRIDGE AND ROAD, LTD. $1,057,655 +40.2% +39.1%

Bid tab: unit prices 77 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BLACKSTONE CONC…#2 BELT CONSTRUCTI…#3 HODGES AND SON …#4 EAST TEXAS BRID…#5 LONGVIEW BRIDGE…
1100-6005 PREP ROW (TREE)(24"-30"DIA)1EA $2,000.00 $480.00 $2,500.00 $2,000.00 $5,000.00 $4,000.00
2104-6009 REMOVING CONC (RIPRAP)3SY $20.00 $57.50 $100.00 $175.00 $50.00 $250.00
3104-6017 REMOVING CONC (DRIVEWAYS)95SY $14.00 $17.75 $25.00 $50.00 $50.00 $30.00
4104-6029 REMOVING CONC (CURB OR CURB & GUTTER)54LF $18.00 $21.00 $15.00 $90.00 $15.00 $25.00
5104-6036 REMOVING CONC (SIDEWALK OR RAMP)244SY $18.00 $22.00 $25.00 $50.00 $40.00 $20.00
6105-6011 REMOVING STAB BASE AND ASPH PAV (2"-6")8SY $8.00 $41.00 $50.00 $75.00 $40.00 $150.00
7105-6091 REMOVING STAB BASE & ASPH PAV (8"-12")163SY $10.00 $37.50 $20.00 $50.00 $40.00 $30.00
8110-6001 EXCAVATION (ROADWAY)733CY $8.50 $38.00 $45.00 $30.00 $30.00 $20.00
9110-6002 EXCAVATION (CHANNEL)44CY $10.00 $62.00 $45.00 $30.00 $30.00 $60.00
10132-6003 EMBANKMENT (FINAL)(ORD COMP)(TY B)346CY $18.00 $60.00 $45.00 $50.00 $50.00 $35.00
11160-6003 FURNISHING AND PLACING TOPSOIL (4")3,964SY $2.00 $7.00 $5.00 $2.00 $5.00 $5.00
12162-6002 BLOCK SODDING1,612SY $5.50 $8.50 $6.16 $6.00 $6.00 $6.00
13164-6055 BONDED FBR MTRX SEED (TEMP)(WARM)1,176SY $1.00 $2.00 $0.8500 $1.00 $1.00 $0.8200
14164-6056 BONDED FBR MTRX SEED (TEMP)(COOL)1,176SY $1.00 $2.00 $0.8400 $1.00 $1.00 $0.8000
15164-6070 BOND FBR MTRX SEED (PERM) (URBAN)(SAND)2,352SY $1.00 $2.00 $0.7500 $1.00 $1.00 $0.8200
16168-6001 VEGETATIVE WATERING83MG $15.00 $30.00 $100.00 $1.00 $30.00 $35.00
17400-6005 CEM STABIL BKFL10CY $165.00 $410.00 $200.00 $250.00 $350.00 $300.00
18400-6008 CUT & RESTORE ASPH PAVING27SY $100.00 $95.00 $250.00 $150.00 $200.00 $150.00
19416-6003 DRILL SHAFT (30 IN)108LF $200.00 $405.00 $520.00 $265.00 $450.00 $550.00
20420-6013 CL C CONC (ABUT)12.4CY $1,100.00 $2,100.00 $2,000.00 $1,500.00 $1,600.00 $2,000.00
21422-6001 REINF CONC SLAB320SF $18.00 $43.00 $35.00 $40.00 $50.00 $50.00
22432-6001 RIPRAP (CONC)(4 IN)40CY $480.00 $441.00 $572.00 $500.00 $750.00 $625.00
23432-6031 RIPRAP (STONE PROTECTION)(12 IN)81CY $200.00 $105.00 $100.00 $160.00 $200.00 $250.00
24442-6007 STR STEEL (MISC NON - BRIDGE)224LB $30.00 $26.00 $2.50 $30.00 $40.00 $40.00
25450-6051 RAIL (HANDRAIL)(TY E)65LF $150.00 $195.00 $192.00 $210.00 $225.00 $220.00
26454-6004 ARMOR JOINT (SEALED)16LF $100.00 $150.00 $250.00 $100.00 $260.00 $300.00
27462-6010 CONC BOX CULV (6 FT X 3 FT)104LF $600.00 $700.00 $515.00 $675.00 $820.00 $800.00
28464-6003 RC PIPE (CL III)(18 IN)14LF $80.00 $240.00 $140.00 $60.00 $100.00 $160.00
29465-6233 INLET (COMP) (TY SIDEWALK BRIDGE)1EA $17,000.00 $7,500.00 $17,000.00 $6,000.00 $10,000.00 $18,000.00
30467-6215 SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)3EA $15,000.00 $4,150.00 $4,720.00 $10,000.00 $14,500.00 $19,000.00
31467-6363 SET (TY II) (18 IN) (RCP) (6: 1) (P)1EA $1,000.00 $1,500.00 $2,450.00 $5,500.00 $1,500.00 $1,600.00
32479-6004 ADJUSTING MANHOLES (SANITARY)1EA $1,800.00 $1,200.00 $1,500.00 $1,500.00 $1,000.00 $2,000.00
33496-6006 REMOV STR (HEADWALL)2EA $2,000.00 $850.00 $500.00 $2,500.00 $1,000.00 $1,500.00
34496-6016 REMOV STR (PIPE)1EA $358.00 $1,500.00 $500.00 $3,000.00 $500.00 $1,500.00
35500-6001 MOBILIZATION1LS $66,400.00 $27,100.00 $85,000.00 $75,000.00 $90,000.00 $100,000.00
36502-6001 BARRICADES, SIGNS AND TRAFFIC HANDLING7MO $8,000.00 $2,900.00 $2,000.00 $10,000.00 $10,000.00 $5,000.00
37506-6002 ROCK FILTER DAMS (INSTALL) (TY 2)185LF $35.00 $30.00 $43.00 $1.00 $40.00 $36.50
38506-6003 ROCK FILTER DAMS (INSTALL) (TY 3)60LF $50.00 $72.00 $58.00 $1.00 $55.00 $50.00
39506-6011 ROCK FILTER DAMS (REMOVE)245LF $9.00 $24.00 $14.00 $1.00 $13.00 $11.00
40506-6020 CONSTRUCTION EXITS (INSTALL) (TY 1)78SY $25.00 $30.00 $35.00 $1.00 $35.00 $33.00
41506-6024 CONSTRUCTION EXITS (REMOVE)78SY $9.50 $16.00 $12.00 $1.00 $11.00 $11.00
42506-6034 CONSTRUCTION PERIMETER FENCE260LF $6.00 $5.00 $6.00 $2.00 $7.00 $6.60
43506-6035 SANDBAGS FOR EROSION CONTROL3EA $10.50 $95.00 $58.00 $50.00 $110.00 $110.00
44506-6040 BIODEG EROSN CONT LOGS (INSTL) (8")28LF $5.50 $12.00 $7.00 $15.00 $7.00 $22.00
45506-6043 BIODEG EROSN CONT LOGS (REMOVE)28LF $1.50 $5.00 $3.00 $1.00 $2.50 $11.00
46529-6008 CONC CURB & GUTTER (TY II)89LF $32.00 $43.00 $40.00 $60.00 $50.00 $80.00
47529-6015 CONC CURB (TY C1)300LF $100.00 $48.00 $35.00 $80.00 $75.00 $90.00
48530-6004 DRIVEWAYS (CONC)181SY $90.00 $114.00 $117.00 $80.00 $145.00 $120.00
49531-6001 CONC SIDEWALKS (4")1,869SY $60.00 $67.00 $70.00 $90.00 $82.00 $80.00
50531-6003 CONC SIDEWALKS (6")200SY $80.00 $86.00 $80.00 $100.00 $100.00 $90.00
51531-6004 CURB RAMPS (TY 1)1EA $2,500.00 $2,060.00 $1,500.00 $3,000.00 $3,000.00 $3,000.00
52531-6006 CURB RAMPS (TY 3)1EA $3,500.00 $2,200.00 $1,800.00 $3,000.00 $3,500.00 $3,000.00
53531-6010 CURB RAMPS (TY 7)7EA $3,600.00 $2,850.00 $1,800.00 $3,000.00 $3,000.00 $3,000.00
54550-6001 CHAIN LINK FENCE (INSTALL) (6')73LF $40.00 $5.00 $50.00 $20.00 $85.00 $60.00
55550-6003 CHAIN LINK FENCE (REMOVE)21LF $8.00 $12.00 $10.00 $10.00 $15.00 $20.00
56550-6013 CHAIN LINK FENCE GATE (INSTALL)(6'X10')1EA $1,100.00 $1,750.00 $750.00 $2,000.00 $2,000.00 $1,500.00
57644-6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P)6EA $750.00 $1,400.00 $956.00 $900.00 $1,000.00 $915.00
58644-6002 IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)5EA $850.00 $1,400.00 $1,352.00 $1,200.00 $1,300.00 $1,295.00
59644-6076 REMOVE SM RD SN SUP&AM7EA $100.00 $96.00 $109.00 $100.00 $100.00 $105.00
60662-6075 WK ZN PAV MRK REMOV (W)24"(SLD)10LF $10.00 $31.00 $28.75 $25.00 $30.00 $28.00
61662-6095 WK ZN PAV MRK REMOV (Y)4"(SLD)1,680LF $2.00 $6.00 $5.75 $5.00 $6.00 $5.50
62666-6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL)554LF $10.00 $12.50 $11.50 $10.00 $11.00 $11.00
63666-6170 REFL PAV MRK TY II (W) 4" (SLD)24LF $0.1000 $12.50 $11.50 $10.00 $11.00 $11.00
64666-6182 REFL PAV MRK TY II (W) 24" (SLD)554LF $4.00 $7.50 $6.90 $8.00 $7.00 $6.60
65666-6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)24LF $0.3000 $12.50 $11.50 $10.00 $11.00 $11.00
66677-6005 ELIM EXT PAV MRK & MRKS (12")347LF $3.00 $5.00 $4.60 $4.00 $5.00 $4.50
67677-6007 ELIM EXT PAV MRK & MRKS (24")18LF $4.50 $6.25 $5.75 $5.00 $6.00 $5.50
68678-6001 PAV SURF PREP FOR MRK (4")24LF $0.2000 $3.75 $3.45 $3.00 $4.00 $3.30
69678-6008 PAV SURF PREP FOR MRK (24")554LF $1.50 $6.25 $5.75 $5.00 $6.00 $5.50
70690-6030 REMOVAL OF PEDESTRIAN PUSH BUTTONS1EA $70.00 $1,425.00 $500.00 $20.00 $500.00 $250.00
71690-6032 INSTALL OF PEDESTRIAN PUSH BUTTONS1EA $850.00 $1,425.00 $500.00 $1,000.00 $1,000.00 $1,320.00
723077-6051 SP MIXES SP-D PG70-224TON $200.00 $250.00 $500.00 $250.00 $2,500.00 $685.00
733077-6075 TACK COAT4GAL $4.30 $90.00 $50.00 $10.00 $100.00 $160.00
744196-6004 PREFAB PED STL TRUSS BRG SPAN (40 FT)1EA $50,000.00 $63,250.00 $60,000.00 $70,000.00 $80,000.00 $100,000.00
755033-6004 REMOVE & REPLACE BOLLARD2EA $400.00 $625.00 $500.00 $500.00 $1,000.00 $1,000.00
766001-6002 PORTABLE CHANGEABLE MESSAGE SIGN3EA $15,000.00 $2,500.00 $18,000.00 $18,000.00 $12,000.00 $20,000.00
776185-6002 TMA (STATIONARY)30DAY $180.00 $150.00 $350.00 $200.00 $500.00 $275.00