| 1 | 100-6001 |
PREPARING ROW | 1 | AC |
$15,000.00 |
$2,500.00 |
$40,000.00 |
$65,000.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 1,178 | CY |
$25.00 |
$40.00 |
$40.00 |
$35.00 |
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 490 | CY |
$25.00 |
$80.00 |
$40.00 |
$35.00 |
| 4 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 1,325 | CY |
$25.00 |
$85.00 |
$40.00 |
$35.00 |
| 5 | 150-6002 |
BLADING | 8 | HR |
$200.00 |
$250.00 |
$20.00 |
$125.00 |
| 6 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 335 | SY |
$1.35 |
$2.00 |
$10.00 |
$10.00 |
| 7 | 247-6064 |
FL BS (CMP IN PLC)(TY A GR 4) (6") | 861 | SY |
$40.00 |
$65.00 |
$50.00 |
$45.00 |
| 8 | 400-6005 |
CEM STABIL BKFL | 46 | CY |
$350.00 |
$300.00 |
$350.00 |
$450.00 |
| 9 | 416-6003 |
DRILL SHAFT (30 IN) | 102 | LF |
$300.00 |
$650.00 |
$490.00 |
$650.00 |
| 10 | 420-6013 |
CL C CONC (ABUT) | 31 | CY |
$1,400.00 |
$1,300.00 |
$2,500.00 |
$2,500.00 |
| 11 | 420-6066 |
CL C CONC (RAIL FOUNDATION) | 20 | CY |
$650.00 |
$1,000.00 |
$1,200.00 |
$1,500.00 |
| 12 | 422-6005 |
REINF CONC SLAB (BOX BEAM) | 1,820 | SF |
$30.00 |
$34.00 |
$50.00 |
$45.00 |
| 13 | 425-6001 |
PRESTR CONC BOX BEAM (4B20) | 280 | LF |
$325.00 |
$400.00 |
$425.00 |
$650.00 |
| 14 | 425-6002 |
PRESTR CONC BOX BEAM (5B20) | 140 | LF |
$325.00 |
$400.00 |
$425.00 |
$650.00 |
| 15 | 432-6002 |
RIPRAP (CONC)(5 IN) | 61 | CY |
$600.00 |
$700.00 |
$800.00 |
$750.00 |
| 16 | 434-6002 |
ELASTOMERIC BEARING (LAMINATED) | 18 | EA |
$1,500.00 |
$300.00 |
$800.00 |
$250.00 |
| 17 | 450-6023 |
RAIL (TY SSTR) | 140 | LF |
$200.00 |
$150.00 |
$180.00 |
$250.00 |
| 18 | 454-6018 |
SEALED EXPANSION JOINT (4 IN) (SEJ - M) | 52 | LF |
$250.00 |
$300.00 |
$250.00 |
$300.00 |
| 19 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$50,000.00 |
$40,000.00 |
$40,000.00 |
$75,000.00 |
| 20 | 500-6001 |
MOBILIZATION | 1 | LS |
$61,682.30 |
$75,000.00 |
$85,000.00 |
$110,000.00 |
| 21 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$5,000.00 |
$5,000.00 |
$3,000.00 |
$3,000.00 |
| 22 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 680 | LF |
$4.50 |
$8.00 |
$1.00 |
$6.00 |
| 23 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 680 | LF |
$1.00 |
$2.00 |
$1.00 |
$2.00 |
| 24 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 209 | LF |
$10.00 |
$10.00 |
$10.00 |
$10.00 |
| 25 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 209 | LF |
$2.00 |
$2.00 |
$1.00 |
$2.00 |
| 26 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 25 | LF |
$30.00 |
$50.00 |
$55.00 |
$60.00 |
| 27 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 3 | EA |
$1,500.00 |
$2,000.00 |
$2,000.00 |
$3,000.00 |
| 28 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,500.00 |
$4,000.00 |
$5,000.00 |
$4,500.00 |
| 29 | 552-6003 |
WIRE FENCE (TY C) | 436 | LF |
$30.00 |
$25.00 |
$20.00 |
$25.00 |
| 30 | 552-6008 |
WIRE FENCE (WATER GAP) | 80 | LF |
$100.00 |
$150.00 |
$80.00 |
$80.00 |
| 31 | 644-6076 |
REMOVE SM RD SN SUP&AM | 2 | EA |
$120.00 |
$300.00 |
$50.00 |
$250.00 |
| 32 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$25.00 |
$60.00 |
$50.00 |
$75.00 |
| 33 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 12 | EA |
$45.00 |
$60.00 |
$50.00 |
$75.00 |