| 1 | 100-6002 |
PREPARING ROW | 4 | STA |
$2,500.00 |
$7,500.00 |
$3,000.00 |
$6,000.00 |
$10,000.00 |
$4,400.00 |
| 2 | 110-6004 |
EXCAVATION (ROADWAY AND CHANNEL) | 125 | CY |
$30.00 |
$40.00 |
$28.00 |
$96.00 |
$30.00 |
$28.00 |
| 3 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 577 | CY |
$30.00 |
$40.00 |
$30.00 |
$50.00 |
$35.00 |
$32.00 |
| 4 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 1,043 | SY |
$1.00 |
$1.50 |
$2.45 |
$1.25 |
$1.50 |
$3.00 |
| 5 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 1,043 | SY |
$1.00 |
$1.50 |
$2.20 |
$1.25 |
$1.50 |
$3.00 |
| 6 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 1,043 | SY |
$8.30 |
$3.00 |
$3.70 |
$2.50 |
$4.00 |
$5.00 |
| 7 | 168-6001 |
VEGETATIVE WATERING | 12 | MG |
$500.00 |
$1.00 |
$100.00 |
$30.00 |
$100.00 |
$1,300.00 |
| 8 | 216-6001 |
PROOF ROLLING | 8 | HR |
$250.00 |
$20.00 |
$200.00 |
$300.00 |
$80.00 |
$700.00 |
| 9 | 247-6061 |
FL BS (CMP IN PLC)(TYA GR1-2) (6") | 1,468 | SY |
$50.00 |
$40.00 |
$30.00 |
$36.00 |
$25.00 |
$22.00 |
| 10 | 416-6002 |
DRILL SHAFT (24 IN) | 642 | LF |
$250.00 |
$168.00 |
$220.00 |
$196.00 |
$250.00 |
$260.00 |
| 11 | 420-6013 |
CL C CONC (ABUT) | 39.2 | CY |
$1,000.00 |
$1,600.00 |
$1,400.00 |
$1,900.00 |
$2,000.00 |
$1,900.00 |
| 12 | 420-6074 |
CL C CONC (MISC) | 6 | CY |
$675.00 |
$1,500.00 |
$1,000.00 |
$2,735.00 |
$1,500.00 |
$2,800.00 |
| 13 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 1,820 | SF |
$17.50 |
$30.00 |
$27.50 |
$45.00 |
$38.00 |
$55.00 |
| 14 | 425-6010 |
PRESTR CONC SLAB BEAM (5SB12) | 345 | LF |
$185.00 |
$320.00 |
$276.00 |
$330.00 |
$280.00 |
$370.00 |
| 15 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 687 | CY |
$125.00 |
$160.00 |
$140.00 |
$160.00 |
$200.00 |
$180.00 |
| 16 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 23.6 | CY |
$700.00 |
$600.00 |
$700.00 |
$800.00 |
$600.00 |
$900.00 |
| 17 | 450-6019 |
RAIL (TY T631LS) | 188 | LF |
$75.00 |
$80.00 |
$90.00 |
$75.00 |
$120.00 |
$110.00 |
| 18 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 2 | EA |
$30,000.00 |
$16,000.00 |
$20,000.00 |
$27,500.00 |
$40,000.00 |
$14,000.00 |
| 19 | 500-6001 |
MOBILIZATION | 1 | LS |
$73,758.58 |
$75,000.00 |
$84,000.00 |
$80,000.00 |
$100,000.00 |
$90,000.00 |
| 20 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$7,500.00 |
$6,500.00 |
$3,000.00 |
$1,600.00 |
$3,500.00 |
$4,300.00 |
| 21 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 180 | LF |
$30.00 |
$1.00 |
$40.00 |
$58.00 |
$65.00 |
$45.00 |
| 22 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 180 | LF |
$15.00 |
$1.00 |
$12.00 |
$23.00 |
$25.00 |
$20.00 |
| 23 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,200 | LF |
$2.25 |
$1.00 |
$3.85 |
$3.00 |
$5.00 |
$5.00 |
| 24 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,200 | LF |
$0.6500 |
$1.00 |
$1.15 |
$1.25 |
$1.30 |
$2.00 |
| 25 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 180 | LF |
$3.50 |
$5.00 |
$6.90 |
$6.50 |
$8.00 |
$14.00 |
| 26 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 180 | LF |
$1.25 |
$1.00 |
$1.50 |
$1.25 |
$1.30 |
$6.00 |
| 27 | 508-6001 |
CONSTRUCTING DETOURS | 722 | SY |
$65.00 |
$45.00 |
$115.00 |
$80.00 |
$35.00 |
$36.00 |
| 28 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 200 | LF |
$30.00 |
$25.00 |
$32.00 |
$22.00 |
$32.00 |
$35.00 |
| 29 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 8 | EA |
$1,850.00 |
$1,200.00 |
$1,350.00 |
$1,190.00 |
$700.00 |
$1,700.00 |
| 30 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 4 | EA |
$1,400.00 |
$1,500.00 |
$1,700.00 |
$1,470.00 |
$1,950.00 |
$2,200.00 |
| 31 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,500.00 |
$3,000.00 |
$3,400.00 |
$3,015.00 |
$3,200.00 |
$3,600.00 |
| 32 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 12 | EA |
$100.00 |
$30.00 |
$100.00 |
$45.00 |
$40.00 |
$120.00 |
| 33 | 4171-6001 |
INSTALL BRIDGE IDENTIFICATION NUMBERS | 4 | EA |
$100.00 |
$500.00 |
$476.00 |
$650.00 |
$500.00 |
$500.00 |