| 1 | 105-6091 |
REMOVING STAB BASE & ASPH PAV (8"-12") | 23 | SY |
$5.00 |
$300.00 |
$11.00 |
$80.00 |
$41.25 |
$150.00 |
$100.00 |
| 2 | 110-6003 |
EXCAVATION (SPECIAL) | 735 | CY |
$10.00 |
$54.00 |
$35.00 |
$50.00 |
$22.00 |
$50.00 |
$100.00 |
| 3 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 735 | CY |
$15.00 |
$73.00 |
$100.00 |
$60.00 |
$35.65 |
$50.00 |
$200.00 |
| 4 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 3,411 | SY |
$0.2500 |
$0.5200 |
$0.3000 |
$0.6200 |
$0.7500 |
$0.6500 |
$1.00 |
| 5 | 164-6003 |
BROADCAST SEED (PERM) (RURAL) (CLAY) | 3,411 | SY |
$0.5000 |
$0.5200 |
$0.3000 |
$0.6200 |
$0.7500 |
$0.6500 |
$1.00 |
| 6 | 247-6227 |
FL BS (CMP IN PLC)(TY A OR B GR 4)(8") | 41 | SY |
$10.00 |
$81.00 |
$36.00 |
$85.00 |
$77.00 |
$130.00 |
$80.00 |
| 7 | 407-6006 |
SHEET PILING (PZ - 40) | 182,437 | SF |
$65.00 |
$54.00 |
$63.00 |
$60.00 |
$67.50 |
$64.00 |
$68.80 |
| 8 | 407-6009 |
STL H - PILING (HP 12 X 84) | 280 | LF |
$85.00 |
$230.00 |
$250.00 |
$165.00 |
$240.75 |
$200.00 |
$500.00 |
| 9 | 407-6014 |
STL H PILING (HP 10 X 42) | 300 | LF |
$85.00 |
$203.00 |
$250.00 |
$200.00 |
$294.50 |
$200.00 |
$300.00 |
| 10 | 410-6001 |
SOIL NAIL ANCHORS | 16,268 | LF |
$20.00 |
$71.00 |
$50.00 |
$75.00 |
$119.50 |
$120.00 |
$60.00 |
| 11 | 420-6064 |
CL C CONC (COPING) | 337.3 | CY |
$1,000.00 |
$2,000.00 |
$1,250.00 |
$1,210.00 |
$2,101.00 |
$1,500.00 |
$2,000.00 |
| 12 | 432-6050 |
RIPRAP (STONE COMMON)(DRY)(36 IN) | 1,510 | CY |
$200.00 |
$255.00 |
$150.00 |
$330.00 |
$185.00 |
$350.00 |
$500.00 |
| 13 | 442-6004 |
STR STEEL (ROLLED BEAM) | 295,700 | LB |
$2.00 |
$2.80 |
$2.50 |
$4.30 |
$2.37 |
$3.00 |
$10.00 |
| 14 | 496-6042 |
REMOV STR (SMALL) | 1 | EA |
$800.00 |
$26,900.00 |
$50,000.00 |
$30,000.00 |
$30,500.00 |
$10,000.00 |
$25,000.00 |
| 15 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,014,670.99 |
$1,169,700.00 |
$1,446,293.38 |
$1,227,000.00 |
$1,224,075.00 |
$1,700,000.00 |
$2,300,000.00 |
| 16 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$6,000.00 |
$2,500.00 |
$10,000.00 |
$1,000.00 |
$805.00 |
$7,000.00 |
$8,500.00 |
| 17 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 100 | LF |
$25.00 |
$34.75 |
$30.00 |
$50.00 |
$49.00 |
$50.00 |
$30.00 |
| 18 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 100 | LF |
$8.00 |
$8.10 |
$30.00 |
$17.00 |
$20.00 |
$10.00 |
$15.00 |
| 19 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 448 | SY |
$20.00 |
$32.75 |
$25.00 |
$40.00 |
$37.00 |
$45.00 |
$40.00 |
| 20 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 448 | SY |
$8.00 |
$8.10 |
$10.00 |
$12.00 |
$11.60 |
$10.00 |
$15.00 |
| 21 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,220 | LF |
$5.00 |
$2.90 |
$3.00 |
$3.00 |
$2.65 |
$5.00 |
$4.00 |
| 22 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,220 | LF |
$1.00 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
$1.50 |
$2.00 |
| 23 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 4,374 | LF |
$6.00 |
$4.75 |
$6.00 |
$7.00 |
$5.75 |
$6.00 |
$18.00 |
| 24 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 4,374 | LF |
$2.00 |
$1.10 |
$1.00 |
$0.8000 |
$0.8000 |
$3.65 |
$9.00 |
| 25 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 1 | MO |
$2,000.00 |
$4,950.00 |
$7,500.00 |
$22,000.00 |
$5,135.00 |
$17,000.00 |
$6,500.00 |
| 26 | 512-6001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 1,968 | LF |
$60.00 |
$96.00 |
$110.00 |
$90.00 |
$105.00 |
$100.00 |
$100.00 |
| 27 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 62.5 | LF |
$20.00 |
$31.00 |
$22.00 |
$50.00 |
$49.00 |
$50.00 |
$25.00 |
| 28 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 1 | EA |
$2,000.00 |
$1,600.00 |
$1,800.00 |
$3,100.00 |
$3,005.00 |
$3,000.00 |
$1,850.00 |
| 29 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 183 | LF |
$4.00 |
$4.10 |
$3.00 |
$6.00 |
$5.85 |
$7.00 |
$4.00 |
| 30 | 542-6003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 1 | EA |
$300.00 |
$260.00 |
$225.00 |
$430.00 |
$410.00 |
$700.00 |
$1,000.00 |
| 31 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 1 | EA |
$450.00 |
$260.00 |
$250.00 |
$600.00 |
$585.00 |
$1,050.00 |
$1,000.00 |
| 32 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 1 | EA |
$2,500.00 |
$2,550.00 |
$2,700.00 |
$4,000.00 |
$3,970.00 |
$3,000.00 |
$3,200.00 |
| 33 | 550-6015 |
REMOVE AND INSTALL EXISTING GATE | 1 | EA |
$2,000.00 |
$6,100.00 |
$1,200.00 |
$18,000.00 |
$2,235.00 |
$3,700.00 |
$10,000.00 |
| 34 | 552-6001 |
WIRE FENCE (TY A) | 50 | LF |
$10.00 |
$152.00 |
$13.00 |
$22.00 |
$30.00 |
$75.00 |
$30.00 |
| 35 | 5027-6001 |
TEMPORARY CONSTRUCTION MATTING | 1,000 | SY |
$8.00 |
$600.00 |
$3.00 |
$60.00 |
$95.00 |
$25.00 |
$100.00 |
| 36 | 5048-6002 |
FLOATING TURBIDITY BARRIER(FUR & INST) | 2,084 | LF |
$20.00 |
$100.00 |
$20.00 |
$35.00 |
$33.50 |
$85.00 |
$50.00 |
| 37 | 5048-6003 |
FLOATING TURBIDITY BARRIER (REMOVE) | 2,084 | LF |
$5.00 |
$52.00 |
$5.00 |
$3.00 |
$5.75 |
$25.00 |
$10.00 |
| 38 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$12,600.00 |
$8,800.00 |
$21,000.00 |
$42,065.00 |
$20,000.00 |
$20,000.00 |