| 1 | 100-6013 |
PREP ROW (TREE) (2" TO 12" DIA) | 32 | EA |
$315.00 |
$1,000.00 |
$500.00 |
$1,167.81 |
|
| 2 | 105-6104 |
REMOVING STAB BASE AND ASPH PAV (10.5") | 7,682 | SY |
$7.25 |
$6.40 |
$5.00 |
$4.81 |
|
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 217,290 | CY |
$7.10 |
$10.00 |
$8.00 |
$14.50 |
|
| 4 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 1,038 | STA |
$920.00 |
$1,500.00 |
$1,160.00 |
$210.12 |
|
| 5 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 53,975 | CY |
$14.00 |
$4.00 |
$9.00 |
$8.23 |
|
| 6 | 134-6002 |
BACKFILL (TY B) | 1,289 | STA |
$115.00 |
$51.00 |
$175.00 |
$173.29 |
|
| 7 | 150-6002 |
BLADING | 150 | HR |
$325.00 |
$150.00 |
$150.00 |
$254.51 |
|
| 8 | 216-6001 |
PROOF ROLLING | 150 | HR |
$125.00 |
$100.00 |
$100.00 |
$137.70 |
|
| 9 | 247-6213 |
FL BS (COMP IN PLACE)(TY A)(GR 4)(11") | 161,301 | SY |
$14.50 |
$12.00 |
$14.00 |
$12.75 |
|
| 10 | 247-6223 |
FL BS (CMP IN PLC)(TY A GR 4)(10") | 27,671 | SY |
$14.50 |
$10.00 |
$14.00 |
$10.85 |
|
| 11 | 251-6079 |
REWORK BS MTL (TY D)(SURF)(ORD COMP) | 7,682 | SY |
$1.65 |
$1.50 |
$5.00 |
$1.88 |
|
| 12 | 310-6005 |
PRIME COAT (AE-P) | 25,836 | GAL |
$4.20 |
$4.30 |
$4.00 |
$4.53 |
|
| 13 | 310-6006 |
PRIME COAT (CSS-1H) | 54,490 | GAL |
$3.75 |
$3.25 |
$4.00 |
$3.46 |
|
| 14 | 310-6009 |
PRIME COAT (MC-30) | 120,426 | GAL |
$5.00 |
$4.70 |
$4.00 |
$4.86 |
|
| 15 | 315-6004 |
FOG SEAL (CSS-1H) | 216,518 | GAL |
$2.55 |
$2.50 |
$4.00 |
$3.22 |
|
| 16 | 316-6017 |
ASPH (AC-20-5TR) | 66,869 | GAL |
$2.92 |
$3.40 |
$5.00 |
$3.98 |
|
| 17 | 316-6029 |
ASPH (RC-250) | 52,540 | GAL |
$4.50 |
$3.60 |
$6.00 |
$4.87 |
|
| 18 | 316-6078 |
AGGR(TY-B GR-4 SAC-A) | 957 | CY |
$92.00 |
$82.00 |
$225.00 |
$107.05 |
|
| 19 | 316-6080 |
AGGR(TY-B GR-5 SAC-A) | 834 | CY |
$90.00 |
$87.00 |
$225.00 |
$109.97 |
|
| 20 | 316-6126 |
AGGR(TY-PB GR-4 SAC-A) | 957 | CY |
$130.00 |
$114.00 |
$225.00 |
$141.67 |
|
| 21 | 316-6128 |
AGGR(TY-PB GR-5 SAC-A) | 834 | CY |
$120.00 |
$118.00 |
$225.00 |
$141.67 |
|
| 22 | 346-6040 |
STONE-MTRX-ASPH SMAR-F SAC-A | 78,804 | TON |
$100.00 |
$111.00 |
$125.00 |
$162.50 |
|
| 23 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 25,000 | SY |
$55.00 |
$37.00 |
$50.00 |
$72.47 |
|
| 24 | 354-6049 |
PLANE ASPH CONC PAV (6") | 440,747 | SY |
$3.75 |
$3.50 |
$3.00 |
$3.74 |
|
| 25 | 400-6001 |
STRUCT EXCAV | 314 | CY |
$38.00 |
$39.00 |
$35.00 |
$7.26 |
|
| 26 | 400-6005 |
CEM STABIL BKFL | 1,016 | CY |
$210.00 |
$188.00 |
$75.00 |
$238.04 |
|
| 27 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 200 | LF |
$36.75 |
$24.00 |
$1.00 |
$16.36 |
|
| 28 | 416-6029 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) | 130 | LF |
$245.00 |
$280.00 |
$550.00 |
$355.41 |
|
| 29 | 432-6001 |
RIPRAP (CONC)(4 IN) | 5 | CY |
$1,400.00 |
$2,000.00 |
$500.00 |
$703.79 |
|
| 30 | 432-6009 |
RIPRAP (CONC) (CL B) (4") | 16 | CY |
$650.00 |
$775.00 |
$550.00 |
$762.44 |
|
| 31 | 460-6003 |
CMP (GAL STL 24 IN) | 52 | LF |
$105.00 |
$213.00 |
$175.00 |
$105.57 |
|
| 32 | 460-6005 |
CMP (GAL STL 36 IN) | 34 | LF |
$220.00 |
$190.00 |
$200.00 |
$129.03 |
|
| 33 | 464-6003 |
RC PIPE (CL III)(18 IN) | 951 | LF |
$88.50 |
|
$85.00 |
$102.35 |
|
| 34 | 464-6008 |
RC PIPE (CL III)(36 IN) | 1,197 | LF |
$185.00 |
$180.00 |
$130.00 |
$269.79 |
|
| 35 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 36 | EA |
$1,750.00 |
$2,200.00 |
$1,600.00 |
$2,345.97 |
|
| 36 | 467-6375 |
SET (TY II) (24 IN) (CMP) (3: 1) (C) | 2 | EA |
$2,900.00 |
$2,250.00 |
$1,175.00 |
$2,580.57 |
|
| 37 | 467-6377 |
SET (TY II) (24 IN) (CMP) (4: 1) (C) | 2 | EA |
$2,000.00 |
$2,300.00 |
$1,295.00 |
$2,580.57 |
|
| 38 | 467-6379 |
SET (TY II) (24 IN) (CMP) (6: 1) (C) | 1 | EA |
$2,200.00 |
$2,500.00 |
$1,700.00 |
$2,815.16 |
|
| 39 | 467-6439 |
SET (TY II) (36 IN) (CMP) (3: 1) (C) | 1 | EA |
$3,900.00 |
$3,300.00 |
$5,000.00 |
$4,691.94 |
|
| 40 | 467-6443 |
SET (TY II) (36 IN) (CMP) (6: 1) (C) | 1 | EA |
$3,900.00 |
$4,500.00 |
$3,500.00 |
$4,926.54 |
|
| 41 | 467-6448 |
SET (TY II) (36 IN) (RCP) (3: 1) (C) | 3 | EA |
$2,750.00 |
$5,000.00 |
$2,500.00 |
$3,284.36 |
|
| 42 | 467-6450 |
SET (TY II) (36 IN) (RCP) (4: 1) (C) | 4 | EA |
$6,000.00 |
$5,300.00 |
$2,750.00 |
$3,518.95 |
|
| 43 | 467-6453 |
SET (TY II) (36 IN) (RCP) (6: 1) (C) | 5 | EA |
$6,900.00 |
$6,000.00 |
$4,100.00 |
$4,457.35 |
|
| 44 | 480-6001 |
CLEAN EXIST CULVERTS | 7 | EA |
$4,500.00 |
$3,500.00 |
$2,500.00 |
$2,345.97 |
|
| 45 | 496-6016 |
REMOV STR (PIPE) | 14 | EA |
$850.00 |
$180.00 |
$500.00 |
$791.76 |
|
| 46 | 500-6001 |
MOBILIZATION | 1 | LS |
$2,000,000.00 |
$6,300,000.00 |
$7,395,000.00 |
$7,933,416.00 |
|
| 47 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 25 | MO |
$20,000.00 |
$20,400.00 |
$10,000.00 |
$50,000.00 |
|
| 48 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 4,560 | LF |
$7.50 |
$10.00 |
$6.00 |
$6.07 |
|
| 49 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 4,560 | LF |
$1.25 |
$2.00 |
$1.00 |
$1.40 |
|
| 50 | 512-6072 |
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL) | 2,250 | LF |
$35.00 |
$80.00 |
$47.00 |
$141.31 |
|
| 51 | 512-6074 |
PTB (MOVE)(SGL SLP)(TY 1) OR (STL) | 6,750 | LF |
$8.25 |
$10.00 |
$5.00 |
$19.27 |
|
| 52 | 512-6076 |
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL) | 2,250 | LF |
$13.00 |
$4.00 |
$7.00 |
$16.05 |
|
| 53 | 530-6005 |
DRIVEWAYS (ACP) | 14,862 | SY |
$32.00 |
$57.00 |
$35.00 |
$70.41 |
|
| 54 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 302,503 | LF |
$0.1400 |
$0.1700 |
$0.1500 |
$0.1200 |
|
| 55 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 93,364 | LF |
$0.1400 |
$0.2200 |
$0.1500 |
$0.1200 |
|
| 56 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 100 | LF |
$43.00 |
$46.00 |
$27.00 |
$39.38 |
|
| 57 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$1,700.00 |
$2,000.00 |
$1,250.00 |
$1,998.42 |
|
| 58 | 540-6033 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 1 | EA |
$1,850.00 |
$2,100.00 |
$825.00 |
$2,115.98 |
|
| 59 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 1 | EA |
$3,750.00 |
$3,400.00 |
$2,750.00 |
$3,938.07 |
|
| 60 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 18 | EA |
$2,000.00 |
$1,000.00 |
$1,375.00 |
$2,938.86 |
|
| 61 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 12 | EA |
$1,850.00 |
$1,000.00 |
$875.00 |
$1,763.31 |
|
| 62 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 12 | EA |
$1,250.00 |
$10,000.00 |
$8,600.00 |
$9,992.11 |
|
| 63 | 610-6288 |
IN RD IL (TY SA) 50T-10 (400W EQ) LED | 5 | EA |
$4,750.00 |
$5,100.00 |
$3,750.00 |
$6,462.08 |
|
| 64 | 610-6289 |
IN RD IL (TY SA) 50T-10-10(400W EQ)LED | 8 | EA |
$5,950.00 |
$6,200.00 |
$4,600.00 |
$7,883.74 |
|
| 65 | 618-6023 |
CONDT (PVC) (SCH 40) (2") | 1,616 | LF |
$8.50 |
$6.10 |
$10.00 |
$7.75 |
|
| 66 | 618-6024 |
CONDT (PVC) (SCH 40) (2") (BORE) | 713 | LF |
$25.00 |
$31.00 |
$25.00 |
$38.77 |
|
| 67 | 620-6011 |
ELEC CONDR (NO.4) BARE | 2,588 | LF |
$2.00 |
$2.60 |
$1.50 |
$3.23 |
|
| 68 | 620-6012 |
ELEC CONDR (NO.4) INSULATED | 5,176 | LF |
$2.00 |
$2.80 |
$1.50 |
$3.55 |
|
| 69 | 624-6002 |
GROUND BOX TY A (122311)W/APRON | 9 | EA |
$1,650.00 |
$1,600.00 |
$882.00 |
$1,938.63 |
|
| 70 | 628-6045 |
ELC SRV TY A 240/480 060(NS)SS(E)SP(O) | 2 | EA |
$7,250.00 |
$6,400.00 |
$7,000.00 |
$8,142.24 |
|
| 71 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 96 | EA |
$575.00 |
$765.00 |
$500.00 |
$940.44 |
|
| 72 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 43 | EA |
$1,050.00 |
$890.00 |
$610.00 |
$1,057.99 |
|
| 73 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 17 | EA |
$1,150.00 |
$1,125.00 |
$750.00 |
$1,263.71 |
|
| 74 | 644-6028 |
IN SM RD SN SUP&AM TYS80(1)SA(P-BM) | 12 | EA |
$1,050.00 |
$1,190.00 |
$800.00 |
$1,322.49 |
|
| 75 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 2 | EA |
$1,250.00 |
$1,220.00 |
$750.00 |
$1,322.49 |
|
| 76 | 644-6033 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 2 | EA |
$1,350.00 |
$1,200.00 |
$785.00 |
$1,322.49 |
|
| 77 | 644-6034 |
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) | 1 | EA |
$1,400.00 |
$1,200.00 |
$825.00 |
$1,351.87 |
|
| 78 | 644-6035 |
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT) | 1 | EA |
$1,300.00 |
$1,250.00 |
$875.00 |
$1,410.65 |
|
| 79 | 644-6036 |
IN SM RD SN SUP&AM TYS80(1)SA(U-BM) | 1 | EA |
$1,500.00 |
$1,350.00 |
$840.00 |
$1,498.82 |
|
| 80 | 644-6038 |
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL) | 3 | EA |
$1,400.00 |
$1,250.00 |
$985.00 |
$1,410.65 |
|
| 81 | 644-6076 |
REMOVE SM RD SN SUP&AM | 169 | EA |
$55.00 |
$82.00 |
$90.00 |
$117.55 |
|
| 82 | 658-6001 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND | 75 | EA |
$110.00 |
$97.00 |
$66.00 |
$164.58 |
|
| 83 | 658-6041 |
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND | 67 | EA |
$115.00 |
$97.00 |
$110.00 |
$164.58 |
|
| 84 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 43 | EA |
$105.00 |
$97.00 |
$85.00 |
$164.58 |
|
| 85 | 658-6049 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 10 | EA |
$185.00 |
$97.00 |
$85.00 |
$164.58 |
|
| 86 | 662-6001 |
WK ZN PAV MRK NON-REMOV (W)4"(BRK) | 36,033 | LF |
$0.1200 |
$0.1800 |
$0.3500 |
$0.2000 |
|
| 87 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 693,624 | LF |
$0.1100 |
$0.1300 |
$0.2500 |
$0.1500 |
|
| 88 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 649,834 | LF |
$0.1100 |
$0.1300 |
$0.2500 |
$0.1500 |
|
| 89 | 662-6056 |
WK ZN PAV MRK REMOV (TRAF BTN) TY W | 1,280 | EA |
$3.50 |
$3.30 |
$2.65 |
$4.11 |
|
| 90 | 662-6058 |
WK ZN PAV MRK REMOV (TRAF BTN) TY Y | 276 | EA |
$3.50 |
$3.60 |
$4.00 |
$4.43 |
|
| 91 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 123,954 | EA |
$1.00 |
$2.00 |
$1.15 |
$2.34 |
|
| 92 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 140,522 | EA |
$1.00 |
$2.00 |
$0.8500 |
$2.34 |
|
| 93 | 666-6006 |
REFL PAV MRK TY I (W)4"(DOT)(100MIL) | 2,255 | LF |
$0.6000 |
$1.05 |
$1.10 |
$1.26 |
|
| 94 | 666-6030 |
REFL PAV MRK TY I (W)8"(DOT)(100MIL) | 503 | LF |
$1.38 |
$1.60 |
$1.36 |
$1.90 |
|
| 95 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 16,630 | LF |
$0.7500 |
$0.8000 |
$1.00 |
$0.8900 |
|
| 96 | 666-6141 |
REFL PAV MRK TY I (Y)12"(SLD)(100MIL) | 11,221 | LF |
$2.80 |
$1.80 |
$3.20 |
$2.22 |
|
| 97 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 18,649 | LF |
$0.3500 |
$0.4000 |
$0.3800 |
$0.4400 |
|
| 98 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 175,068 | LF |
$0.3700 |
$0.4000 |
$0.3500 |
$0.4100 |
|
| 99 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 345,444 | LF |
$0.3000 |
$0.4000 |
$0.3500 |
$0.4400 |
|
| 100 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 202 | LF |
$12.00 |
$14.25 |
$13.00 |
$17.73 |
|
| 101 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 52 | EA |
$200.00 |
$224.00 |
$215.00 |
$278.56 |
|
| 102 | 668-6083 |
PREFAB PAV MRK TY C (W) (LNDP ARROW) | 20 | EA |
$650.00 |
$376.00 |
$550.00 |
$468.48 |
|
| 103 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 48 | EA |
$250.00 |
$264.00 |
$275.00 |
$329.19 |
|
| 104 | 668-6092 |
PREFAB PAV MRK TY C (W) (36")(YLD TRI) | 158 | EA |
$28.00 |
$26.00 |
$40.00 |
$31.66 |
|
| 105 | 672-6007 |
REFL PAV MRKR TY I-C | 2,091 | EA |
$3.00 |
$3.05 |
$3.50 |
$3.80 |
|
| 106 | 672-6009 |
REFL PAV MRKR TY II-A-A | 6,238 | EA |
$2.50 |
$2.80 |
$3.00 |
$3.42 |
|
| 107 | 672-6010 |
REFL PAV MRKR TY II-C-R | 954 | EA |
$3.40 |
$3.05 |
$3.50 |
$3.80 |
|
| 108 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 179,218 | LF |
$0.4500 |
$0.4000 |
$0.5000 |
$0.4400 |
|
| 109 | 752-6015 |
TREE AND BRUSH REMOVAL | 2.5 | AC |
$2,500.00 |
$3,800.00 |
$1,300.00 |
$11,678.12 |
|
| 110 | 3003-6001 |
EMULSION | 765,472 | GAL |
$2.30 |
$3.00 |
$3.00 |
$3.13 |
|
| 111 | 3003-6005 |
CEMENT | 1,200 | TON |
$190.00 |
$200.00 |
$185.00 |
$214.40 |
|
| 112 | 3003-6015 |
EMUL TRTMNT (MX EXST MTRL)10" | 157,119 | SY |
$3.65 |
$3.50 |
$4.00 |
$1.72 |
|
| 113 | 3003-6018 |
EMUL TRTMNT(MX EXST MTRL & NEW BASE)10" | 115,287 | SY |
$4.00 |
$3.50 |
$4.00 |
$1.72 |
|
| 114 | 3077-6007 |
SP MIXES SP-B SAC-B PG70-22 | 411,758 | TON |
$75.00 |
$67.00 |
$88.00 |
$99.86 |
|
| 115 | 3077-6075 |
TACK COAT | 191,429 | GAL |
$1.45 |
$4.00 |
$4.00 |
$3.62 |
|
| 116 | 3084-6001 |
BONDING COURSE | 96,978 | GAL |
$3.00 |
$4.00 |
$4.00 |
$3.62 |
|
| 117 | 5092-6001 |
FILLING MILLED ASPHALT RUMBLE STRIPS | 96,084 | LF |
$3.00 |
$1.60 |
$3.00 |
$1.10 |
|
| 118 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$18,750.00 |
$25,000.00 |
$15,000.00 |
$24,247.32 |
|
| 119 | 6149-6001 |
REFL PAV MRK AWT (W) 4" (SLD) (100MIL) | 83,142 | LF |
$0.5500 |
$0.5000 |
$0.4000 |
$0.6100 |
|
| 120 | 6149-6002 |
REFL PAV MRK AWT (W) 4" (BRK) (100MIL) | 16,730 | LF |
$0.5000 |
$0.5000 |
$0.5500 |
$0.6100 |
|
| 121 | 6149-6003 |
REFL PAV MRK AWT (W) 4" (DOT) (100MIL) | 330 | LF |
$1.40 |
$5.10 |
$0.5500 |
$6.33 |
|
| 122 | 6149-6007 |
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL) | 119,212 | LF |
$0.4500 |
$0.5000 |
$0.5000 |
$0.6100 |
|
| 123 | 6158-6001 |
TMSP RADAR SPEED CONTROL MONITOR | 4 | EA |
$12,500.00 |
$8,000.00 |
$15,000.00 |
$10,510.30 |
|
| 124 | 6185-6002 |
TMA (STATIONARY) | 1,800 | DAY |
$65.00 |
$250.00 |
$250.00 |
$404.16 |
|
| 125 | 6185-6003 |
TMA (MOBILE OPERATION) | 1,181 | HR |
$85.00 |
$100.00 |
$50.00 |
$89.12 |
|
| 126 | 4122-6003 |
THERMOPLASTIC PIPE (SIZE)(PP) | 951 | LF |
$88.50 |
$51.00 |
|
|
|