| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 23, 2021 | 72M57 | SangamonDistrict 6 | Traffic signal modernization at the intersection along IL 29 at Walnut Street, State Street and Cardinal Hill in Rochester. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $854,122 · | ||
| Apr 23, 2021 | 72M58 | MontgomeryDistrict 6 | 150 feet of paved ditch repair on IL 16, 0.2 miles east of Lake Litchfield Road in Litchfield and culvert removal and replacement east of Hillsboro. | — | Executed | RCS Construction, Inc. $40,975 · | ||
| Apr 23, 2021 | 74550 | WayneDistrict 7 | 11.2 miles of patching, milling, resurfacing and replacing 3 culverts on IL 15 from Fairfield to the Edwards County line. | — | Executed | Howell Paving, Inc. $5,947,346 · | ||
| Apr 23, 2021 | 74760 | ShelbyDistrict 7 | Patching, overlay and replacement of 2 box culverts on IL 128 from Findlay Road to 0.2 miles north of 6th Street in Shelbyville. | — | Executed | Howell Paving, Inc. $4,608,621 · | ||
| Apr 23, 2021 | 74916 | EffinghamDistrict 7 | 2 miles of crack and joint sealing on I-57/70 from the Little Wabash River to US 40 and 2.75 miles on I-57/70 from 4th Street overpass to the North Tri- Level including exit and entrance ramps. | — | Executed | Kinney Contractors, Inc. $372,278 · | ||
| Apr 23, 2021 | 74939 | WabashDistrict 7 | 12.2 miles of surface removal, patching, pipe and culvert replacement, deck patching, joint repair and concrete wearing surface on SN 093-0020 on IL 1 from Greathouse Creek in Mt. Carmel to the Edwards County line. | — | Executed | Howell Paving, Inc. $7,017,712 · | ||
| Apr 23, 2021 | 74973 | CumberlandDistrict 7 | Expansion joints, bridge deck overlay, new approach slab, guardrail and HMA resurfacing on SN 018-0009 and SN 018-0010 on US 40 in Greenup. | — | Executed | White Construction LLC $1,230,347 · | ||
| Apr 23, 2021 | 74991 | ShelbyDistrict 7 | Bridge deck overlay, bridge joint replacement/repair and bridge deck repairs SN 087-0022 carrying IL 128 over Robinson Creek, 2 miles southwest of Shelbyville. | — | Executed | Sangamo Construction Company $743,990 · | ||
| Apr 23, 2021 | 74994 | MaconDistrict 7 | Replacing expansion joints, bearing replacement, steel beam structure repair, curb repair, parapet repair, full deck pavement patching, scarification and bridge deck concrete overlay on SN 058-0020 on US 36 over Lake Decatur in Decatur. | — | Executed | Sangamo Construction Company $1,523,472 · | ||
| Apr 23, 2021 | 74A34 | MoultrieDistrict 7 | 3.4 miles of underdrains at various locations in District 7. | — | Active | Howell Paving, Inc. $560,995 · | ||
| Apr 23, 2021 | 74A35 | MoultrieDistrict 7 | 4.79 miles of shoulder repairs on IL 133 from Cadwell Road to Vine Street in Arthur and on Cadwell Road from CR 1900N to 1200' north of CR 1700N. | — | Executed | Howell Paving, Inc. $494,861 · | ||
| Apr 23, 2021 | 74A36 | EffinghamShelbyDistrict 7 | 1.56 miles of partial depth resurfacing at various locations on US 40, IL 32 and IL 33. | — | Rejected | G. M. Sipes Construction, Inc. $614,328 · | ||
| Apr 23, 2021 | 74A37 | MaconDistrict 7 | 0.6 miles of milling with inlay of surface course on IL 105 from east of IL 121 to 0.1 miles east of 26th Street. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $537,399 · | ||
| Apr 23, 2021 | 74A44 | VariousDistrict 7 | Cleaning and painting 6 bridges on I-57 in various counties of District 7. | — | Executed | Venus Painting Co. $856,700 · | ||
| Apr 23, 2021 | 74A45 | VariousDistrict 7 | Steel plate beam guardrail repair/replacement throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $608,941 · | ||
| Apr 23, 2021 | 74A46 | MaconDistrict 7 | Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $237,284 · | ||
| Apr 23, 2021 | 74A48 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems within Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties. | — | Executed | Bodine Electric of Decatur $121,812 · | ||
| Apr 23, 2021 | 74A49 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems within Clark, Cumberland, Macon, Moultrie, Shelby and Coles Counties. | — | Executed | Bodine Electric of Decatur $168,939 · | ||
| Apr 23, 2021 | 76L89 | St. ClairDistrict 8 | Electrical upgrades at the Bowman Pump Station on Exchange Avenue in East St. Louis. | — | Executed | Wissehr Electric, Inc. $131,323 · | ||
| Apr 23, 2021 | 76N39 | St. ClairDistrict 8 | Bridge joint repair and HMA overlay with bridge repairs on St. Clair Avenue over Harding Ditch (SN 082-0033, 082-0034). | — | Executed | Keller Construction, Inc. $351,352 · | ||
| Apr 23, 2021 | 76N73 | JerseyMadisonDistrict 8 | 8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109. | — | Executed | Complete Asphalt Service Co. $91,891 · | ||
| Apr 23, 2021 | 76N78 | ClintonDistrict 8 | Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road. | — | Executed | Freehill Asphalt, Inc. $151,361 · | ||
| Apr 23, 2021 | 76N80 | MadisonDistrict 8 | Lighting improvements on I-55 at IL 143. | — | Executed | Gerstner Electric, Inc. $429,175 · | ||
| Apr 23, 2021 | 76P09 | MadisonDistrict 8 | Painting of the structure carrying IL 143 over I-55 (SN 060-0148). | — | Executed | ERA-Valdivia Contractors, Inc. $484,500 · | ||
| Apr 23, 2021 | 76P10 | St. ClairDistrict 8 | Bridge painting at 3 locations: 1) I-64 over St. Clair Avenue SN 82-0001, 2) I-55/64 over IC RR SN 082-0141, 3) I-55 WB over St. Clair Avenue SN 082-0015. | — | Executed | Thomas Industrial Coatings, Inc. $1,079,724 · | ||
| Apr 23, 2021 | 76P26 | VariousDistrict 8 | Installation, maintenance, and pickup/removal of Smart Traffic Monitoring Systems or Real-Time Traffic Control Systems on a work order basis for repair and maintenance activities at various locations within District 8. | — | Executed | Right Way Traffic Control, Inc. $177,850 · | ||
| Apr 23, 2021 | 76P27 | MadisonDistrict 8 | Flood repair at the Grey-s Farm Pump Station; Frontage Road A, west of I-255 and north of Horseshoe Lake Road. | — | Executed | Keller Construction, Inc. $77,000 · | ||
| Apr 23, 2021 | 76P35 | MadisonDistrict 8 | 0.49 miles of patching on I-55/70 at the Maryville Weigh Station westbound on and off ramps, and on eastbound I-55/70 near IL 159. | — | Executed | RCS Construction, Inc. $122,416 · | ||
| Apr 23, 2021 | 76P44 | St. ClairDistrict 8 | Bridge joint repair on SN 082-0319, westbound I-70 Illinois approach over the Mississippi River. | — | Executed | Keeley & Sons, Inc. $1,088,539 · | ||
| Apr 23, 2021 | 78151 | SalineDistrict 9 | Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032) | — | Executed | E. T. Simonds Construction Company $1,121,486 · | ||
| Apr 23, 2021 | 78622 | HamiltonDistrict 9 | Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro. | — | Executed | Sierra Bravo Contractors, LLC $145,664 · | ||
| Apr 23, 2021 | 78681 | JohnsonDistrict 9 | Replacing the existing 3-span deck beam bridge (SN 044-0053) with a new 3-span bridge carrying IL 146 over Little Cache Creek in Vienna. | — | Executed | Samron Midwest Contracting, Inc. $2,288,172 · | ||
| Apr 23, 2021 | 78819 | FranklinDistrict 9 | 6 miles of pcc pavement, milling, surfacing, HMA shoulders, aggregate shoulders and patching on IL 148 from one mile south of IL 154 to IL 14. | — | Executed | Samron Midwest Contracting, Inc. $1,928,223 · | ||
| Apr 23, 2021 | 78820 | JacksonDistrict 9 | 3.7 miles of patching, surface removal, surfacing and ADA ramp improvements on 14th and 11th Streets in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $1,216,661 · | ||
| Apr 23, 2021 | 78837 | MassacDistrict 9 | Removing and replacing PCC pavement, ADA ramp improvements and pavement marking at the intersection of US 45 / Ferry Street and 10th Street in Metropolis. | — | Executed | Samron Midwest Contracting, Inc. $183,441 · | ||
| Apr 23, 2021 | 78839 | WhiteDistrict 9 | 1.9 miles of patching, surface removal, surfacing, raised pavement markers and ADA ramp improvements on IL 1 northeast of Locust Street to Commerce Street in Carmi. | — | Executed | E. T. Simonds Construction Company $1,614,480 · | ||
| Apr 23, 2021 | 78840 | JeffersonDistrict 9 | 0.9 miles of patching, milling and resurfacing on IL 15 from west of Sparrow Lane (west of I-57) to west of Davidson Avenue. | — | Executed | Samron Midwest Contracting, Inc. $719,781 · | ||
| Apr 23, 2021 | 78851 | JacksonDistrict 9 | Pavement patching on North 6th Street from IL 13/127 to Lucier Street in Murphysboro. | — | Executed | E. T. Simonds Construction Company $117,195 · | ||
| Apr 23, 2021 | 78853 | JacksonDistrict 9 | Pavement patching at the intersection of IL 13 and Streigel Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $153,128 · | ||
| Apr 23, 2021 | 78860 | AlexanderDistrict 9 | Bridge preventative maintenance on SN 002-0001 carrying I-57 northbound over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line. | — | Executed | Samron Midwest Contracting, Inc. $853,555 · | ||
| Apr 23, 2021 | 85686 | Jo DaviessDistrict 2 | Replace the bridge carrying South Apple Road over the Apple River, 1.5 miles northwest of Woodbine. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,542,120 · | ||
| Apr 23, 2021 | 85705 | WhitesideDistrict 2 | Cold-In-Place Recycling and resurfacing on Lyndon Road from US 30 to Commercial Street. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,147,959 · | ||
| Apr 23, 2021 | 85711 | StephensonDistrict 2 | Replace the bridge carrying North Hulbert Road over Muddy Creek, 0.5 mile nort of McConnell. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $414,633 · | ||
| Apr 23, 2021 | 87660 | FordDistrict 3 | Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery. | — | Rejected | Tobey's Construction & Cartage, Inc. $426,709 · | ||
| Apr 23, 2021 | 87662 | DeKalbDistrict 3 | Replace the bridge carrying Suydam Road over Indian Creek, 7 miles south of Shabbona. | — | Executed | Martin & Company Excavating $1,041,745 · | ||
| Apr 23, 2021 | 87739 | DeKalbDistrict 3 | Replace the bridge carrying TR 175 over Battle Creek, 0.3 mile east of Hinckley Road. | — | Executed | Riber Construction, Inc. $693,852 · | ||
| Apr 23, 2021 | 87740 | FordDistrict 3 | Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery. | — | Rejected | Tobey's Construction & Cartage, Inc. $419,682 · | ||
| Apr 23, 2021 | 87743 | LaSalleDistrict 3 | Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road. | — | Executed | Riber Construction, Inc. $332,516 · | ||
| Apr 23, 2021 | 87746 | DeKalbDistrict 3 | Resurfacing Suydam Road from IL 23 to the city limits of Sandwich. | — | Executed | Curran Contracting Company $1,104,983 · | ||
| Apr 23, 2021 | 87757 | KankakeeDistrict 3 | Resurfacing CH9 from 5000 West Road to US 45. | — | Executed | Kankakee Valley Construction Company, Inc. $1,218,902 · | ||
| Apr 23, 2021 | 87764 | BureauDistrict 3 | Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet. | — | Executed | D. Construction, Inc. $338,614 · | ||
| Apr 23, 2021 | 87766 | LaSalleDistrict 3 | Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle. | — | Executed | Universal Asphalt & Excavating, Inc. $230,520 · | ||
| Apr 23, 2021 | 89723 | PeoriaDistrict 4 | Construction of Rock Island Trail Extension within the City of Peoria, along Park Avenue, from NE Perry Avenue to the old railroad crossing, and along the former Peoria and Peoria Heights railroad bed from Park Avenue to Harvard Avenue, including rehabilitation of the abandoned railroad bridge over War Memorial Drive. | — | Executed | Illinois Civil Contractors, Inc. $1,793,566 · | ||
| Apr 23, 2021 | 89777 | FultonDistrict 4 | Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38. | — | Executed | Phoenix Corporation of the Quad Cities $125,253 · | ||
| Apr 23, 2021 | 89783 | MercerDistrict 4 | Full Depth Reclamation, bituminous surface treatment, aggregate shoulders and guardrail replacement on CH 9 from the north village limits of Joy to 110th Street. | — | Executed | Brandt Construction Co. $882,001 · | ||
| Apr 23, 2021 | 89799 | FultonDistrict 4 | Remove and replace guardrail at various locations in Fulton County. | — | Rejected | Midwest Fence Corporation $872,639 · | ||
| Apr 23, 2021 | 91592 | ChampaignDistrict 5 | Pavement reconstruction including widening, Cold-in-Place recycling, HMA pavement and shoulder, box and pipe culverts, and ditch widening. Project is on CH 15 from IL 130 to Sidney. | — | Executed | Open Road Paving Company LLC $5,394,552 · | ||
| Apr 23, 2021 | 91600 | PiattDistrict 5 | Replace the bridge carrying TR 51 over a tributary to the Sangamon River, 2 miles north of White Heath. | — | Executed | Stark Excavating, Inc. $408,815 · | ||
| Apr 23, 2021 | 91601 | ChampaignDistrict 5 | Replace the bridge carrying CH 17 over Kaskaskia Ditch, 1.1 miles west of Sadorus. | — | Executed | White Construction LLC $1,256,245 · | ||
| Apr 23, 2021 | 91603 | McLeanDistrict 5 | Cold-in-Place recycling with HMA binder and surface course on CH 39 from White Oak Road to Ziebarth Road. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,305,243 · | ||
| Apr 23, 2021 | 93736 | MenardDistrict 6 | Reconstruct and resurface CH 2 from east of IL 97/123 for 1.05 miles. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,166,705 · | ||
| Apr 23, 2021 | 93747 | SangamonDistrict 6 | Remove the structures carrying the Norfolk Southern Railroad over Cook Street and South Grand Avenue, Construction of two railroad structures over Cook Street, construction of two railroad structures over South Grand Avenue, track removal, approach roadways, storm sewer, sanitary sewer, pump stations, curb and gutter, sidewalks, lighting, fencing and pavement markings all in the city of Springfield. | — | Executed | Freesen, a div of UCM, Inc. $23,761,224 · | ||
| Apr 23, 2021 | 93761 | LoganDistrict 6 | Remove and replace guardrail at various locations in Logan County. | — | Executed | COLLINS & HERMANN, INC. $1,064,939 · | ||
| Apr 23, 2021 | 93767 | SchuylerDistrict 6 | Resurfacing approaches to the bridge carrying CH 5 over the Lamoine River Slough, Cape Seal resufacting of CH 5 from County Road 3100E to the Rushville Corporate Limits, and on CH 1 from IL 103 to the Rushville Corporate limits. | — | Executed | A. C. Pavement Striping Co. $1,527,806 · | ||
| Apr 23, 2021 | 93768 | PikeDistrict 6 | Bituminous surface treatment at various locatinos in Pike County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,614,284 · | ||
| Apr 23, 2021 | 93769 | HancockDistrict 6 | Micrtosurfacing CH 24 from IL 96 to CH 29. | — | Executed | A. C. Pavement Striping Co. $207,353 · | ||
| Apr 23, 2021 | 94519 | FayetteDistrict 7 | Complete replacement of an existing bridge with a double barrel box culvert on US 51, 3.25 miles south of Vandalia. (SN 026-0088) | — | Executed | Keller Construction, Inc. $860,860 · | ||
| Apr 23, 2021 | 95822 | EffinghamDistrict 7 | Trailhead parking improvements, sidewalk crossing improvements, pedestrian path signals and lighting, sigage and pavement markings at various loactions in Effingham. | — | Rejected | A & R Mechanical Service, Inc. $863,284 · | ||
| Apr 23, 2021 | 95891 | ClarkDistrict 7 | Guardrail removal and replacement with terminals, box culvert extensions, precast box culverts, pipe culverts and riprap at various locations in Clark County. | — | Executed | Samron Midwest Contracting, Inc. $933,441 · | ||
| Apr 23, 2021 | 95895 | ShelbyDistrict 7 | Replace the bridge carrying TR 112 over Flat Branch Tributary, 4.8 miles southeast of Moweaqua. | — | Executed | Depew and Owen Builders, Inc. $318,888 · | ||
| Apr 23, 2021 | 97487 | MonroeDistrict 8 | Pavement removal, sub and aggregate base, HMA Pavement and shoulders with rumble strips, storm sewer, guardrail and pavement markings on TR 47 (HH Road) from 0.15 mile west of Waterloo City Limits to 0.3 mile west. | — | Executed | Baxmeyer Construction, Inc. $427,178 · | ||
| Apr 23, 2021 | 97719 | MonroeDistrict 8 | Pedestrian path alogn South Market Street from IL 3 to Bulldog Boulevard in Waterloo. | — | Executed | Baxmeyer Construction, Inc. $247,448 · | ||
| Apr 23, 2021 | 97748 | MonroeDistrict 8 | Resurfacing Hanover Road from D Road to 0.2 mile east of FF Road. | — | Executed | Christ Bros. Asphalt, Inc. $1,018,912 · | ||
| Apr 23, 2021 | 97750 | MadisonDistrict 8 | Resurfacing Serento Road from Main Street to the Madison/Bond County Line. | — | Executed | The Kilian Corporation $539,097 · | ||
| Jun 11, 2021 | 46567 | VariousDistrict 3 | Installing and replacement of raised reflective pavement markers and reflectors This work is located at various locations in Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. Work shall consist of installing and replacement of raised reflective pavement markers and reflectors. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,606 · | ||
| Jun 11, 2021 | 46568 | VariousDistrict 3 | Raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of ra This work is located on various interstate, multi-lane non-interstate and 2L-2W routes in Bureau, LaSalle, Dekalb, and Kendall Counties. This work shall consist of raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors. | — | Executed | STF, LLC d/b/a Traffic Control Company $461,546 · | ||
| Jun 11, 2021 | 46569 | VariousDistrict 4 | Removing damaged raised reflective pavement markers and perplacing them with new raised reflective pavement markers within the limits shown in the plans. | — | Executed | P & P Construction Co. $395,933 · | ||
| Jun 11, 2021 | 46570 | VariousDistrict 4 | Placing epoxy and modified urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,481,081 · | ||
| Jun 11, 2021 | 46571 | McHenryDistrict 1 | Removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, an This work shall consist of removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limit shown. | — | Executed | Superior Road Striping, Inc. $282,443 · | ||
| Jun 11, 2021 | 46572 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $635,000 · | ||
| Jun 11, 2021 | 46573 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $507,850 · | ||
| Jun 11, 2021 | 46574 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $423,000 · | ||
| Jun 11, 2021 | 46578 | VariousDistrict 9 | Repairing various widths and various types of pavement markings on a work order basis throughout District 9. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $798,480 · | ||
| Jun 11, 2021 | 46579 | VariousDistrict 5 | Pavement marking repair at various locations in Dewitt, Champaign, Vermilion, and District wide. | — | Executed | Varsity Striping & Construction Co. $923,675 · | ||
| Jun 11, 2021 | 46581 | VariousDistrict 6 | Pavement markings on various routes throughout the western part of District 6. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,212,457 · | ||
| Jun 11, 2021 | 46582 | VariousDistrict 6 | Pavement markings on various routes throughout the eastern part of District 6. | — | Executed | A. C. Pavement Striping Co. $1,473,367 · | ||
| Jun 11, 2021 | 46905 | SangamonDistrict 6 | Removal and reconstruction of the concrete retaining wall and walkway from the tomb to the receiving vault and parking lot repairs at the Lincoln-s Tomb State Historic Site in Springfield. | — | Rejected | White Construction LLC $597,216 · | ||
| Jun 11, 2021 | 46920 | St. ClairDistrict 8 | Site preparation and oil and chip treatment at Peabody River King State Fish and Wildlife Area. | — | Executed | DMS Contracting, Inc. $443,425 · | ||
| Jun 11, 2021 | 46926 | PeoriaDistrict 4 | Removal of the three 36-inch diameter culverts and replacing them witha 54-inch diameter culvert, and other drainage and signage work at Jubilee College State Park in Peoria County. | — | Executed | Stark Excavating, Inc. $272,935 · | ||
| Jun 11, 2021 | 46929 | McDonoughDistrict 4 | The slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and al These proposed improvements consist of the slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and all other necessary work to complete the project within the Argyle Lake State Park in McDonough County. net length 280' (0.053 mi.). | — | Executed | Brandt Construction Co. $531,591 · | ||
| Jun 11, 2021 | 60T15 | McHenryDistrict 1 | Intersection Improvement (channelization, traffic signal installation). Includes left and right turn lanes, re-alignment of Wright Rd, re-alignment of leg of Nish Rd and building demolition. Location: Intersection of IL 176 and Nish Road in unincorporated Nunda Township in McHenry County. | — | Executed | Campanella and Sons, Inc. $2,737,521 · | ||
| Jun 11, 2021 | 61B89 | WillDistrict 1 | Reconstruct the intersection of Cedar Road at Laraway Road in New Lenox. | — | Executed | P. T. Ferro Construction Co. $7,905,136 · | ||
| Jun 11, 2021 | 61G38 | DuPageDistrict 1 | Resurfacing, sidewalk, curb and gutter replacement on Chicago Avenue from IL 83 to Garfield Street and on 3rd. Street from Grant Street to Washington Street in Hinsdale. | — | Executed | Builders Paving, LLC $812,000 · | ||
| Jun 11, 2021 | 61G53 | WillDistrict 1 | Replace the bridge carrying Garnsey Avenue over Spring Creek, south of Columbia St. in the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $2,324,588 · | ||
| Jun 11, 2021 | 61G98 | CookDistrict 1 | Installation of a wireless interconnect system and traffic signal modificatons on 143rd St. from Wolf Rd. to LaGrange Rd. in Orland Park. | — | Executed | Hecker and Company, Inc. $192,511 · | ||
| Jun 11, 2021 | 61H05 | DuPageDistrict 1 | Replace the culverts carrying Brickvale Drive over Willow Creek with precast concrete box culvert, 0.10 mile south of Devon Ave. in Elk Grove Village. | — | Executed | Alliance Contractors, Inc. $1,229,833 · | ||
| Jun 11, 2021 | 61H10 | KaneDistrict 1 | Resuface Sleepy Hollow Road from 0.3 mile south of Crane Dr. to IL 72 in Sleepy Hollow. | — | Executed | Plote Construction, Inc. $363,000 · | ||
| Jun 11, 2021 | 61H11 | CookDistrict 1 | Resurface East Fullerton Ave. from North Worlf Rd. to Geneva Ave. in Northlake. | — | Executed | J. A. Johnson Paving Company $652,256 · | ||
| Jun 11, 2021 | 61H13 | CookDistrict 1 | Construction of a multi-use path and traffic signal modifications along Wolf Road from the Bemis Woods Trial to Ogden Avenue in Western Springs. | — | Executed | Martam Construction Incorporated $377,363 · | ||
| Jun 11, 2021 | 62F39 | CookDistrict 1 | Drainage Improvement (reinstating roadside berms, storm sewer, PS 17 improvements), Retaining Wall, Standard Overlay Location: IL 58, from West of US 45 (West Hospital Entrance) to East River Road, in the City of Des Plaines. | — | Executed | Martam Construction Incorporated $2,777,624 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.