16-00369-00-BT
- Let date
- Friday, April 23, 2021
- Contract
- 89723 · job page
- District
- District 4
- County
- Peoria
- Highway
- Limits
- Construction of Rock Island Trail Extension within the City of Peoria, along Park Avenue, from NE Perry Avenue to the old railroad crossing, and along the former Peoria and Peoria Heights railroad bed from Park Avenue to Harvard Avenue, including rehabilitation of the abandoned railroad bridge over War Memorial Drive.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Civil Contractors, Inc. Low bidder | $1,793,566 | ||
| 2 | Otto Baum Company, Inc. | $1,850,505 | +3.2% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Civil … | #2 Otto Baum Compa… |
|---|---|---|---|---|---|---|---|
| 1 | K0026830 | SHRUB REMOVAL | 1 | EACH | $84.52 | $310.23 | |
| 2 | XX008979 | CONCRETE COLLAR | 1 | EACH | $2,527.12 | $1,946.52 | |
| 3 | X0324056 | REM EX WOOD BOLLARD | 2 | EACH | $63.83 | $77.84 | |
| 4 | X0350805 | FOLD DOWN BOLLARDS | 7 | EACH | $1,577.69 | $1,309.92 | |
| 5 | X0964700 | SHOULDERS SPL | 48 | SQ YD | $222.86 | $301.95 | |
| 6 | X1700022 | COMB C C&SIDEWLK 4 SP | 147 | SQ FT | $9.78 | $20.43 | |
| 7 | X4404700 | SIDEWALK REM SPL | 1,605 | SQ FT | $4.27 | $3.94 | |
| 8 | X4830020 | PCC SHOULDERS 6 SPL | 64 | SQ YD | $173.10 | $156.06 | |
| 9 | X6024502 | INLETS TB W/SPL F&G | 1 | EACH | $3,883.98 | $3,275.57 | |
| 10 | X6028000 | MAN RECONST SPL | 1 | EACH | $13,292.16 | $5,046.92 | |
| 11 | X6060097 | CLASS SI CONC OUT SPL | 0.8 | CU YD | $966.76 | $1,050.48 | |
| 12 | X6640300 | CH LK FENCE REMOV | 102 | FOOT | $14.03 | $53.16 | |
| 13 | X6640555 | CH LK FENCE 5 SPL | 2,562 | FOOT | $127.01 | $95.69 | |
| 14 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $46,588.00 | $48,410.95 | |
| 15 | Z0004002 | BOLLARDS | 14 | EACH | $488.53 | $799.56 | |
| 16 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $39,482.53 | $86,697.00 | |
| 17 | Z0012754 | STR REP CON DP = < 5 | 320 | SQ FT | $258.00 | $199.38 | |
| 18 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $20,847.30 | $31,530.85 | |
| 19 | 20100110 | TREE REMOV 6-15 | 72 | UNIT | $39.44 | $159.49 | |
| 20 | 20100210 | TREE REMOV OVER 15 | 18 | UNIT | $50.71 | $212.65 | |
| 21 | 20200100 | EARTH EXCAVATION | 2,485 | CU YD | $68.75 | $47.09 | |
| 22 | 20201200 | REM & DISP UNS MATL | 283 | CU YD | $43.86 | $32.44 | |
| 23 | 20800150 | TRENCH BACKFILL | 21 | CU YD | $43.95 | $40.48 | |
| 24 | 21001000 | GEOTECH FAB F/GR STAB | 1,699 | SQ YD | $2.87 | $2.69 | |
| 25 | 21101610 | TOPSOIL F & P 3 | 6,165 | SQ YD | $8.43 | $7.12 | |
| 26 | 25000210 | SEEDING CL 2A | 1.5 | ACRE | $1,825.55 | $2,658.14 | |
| 27 | 25000400 | NITROGEN FERT NUTR | 115 | POUND | $2.25 | $5.32 | |
| 28 | 25000500 | PHOSPHORUS FERT NUTR | 115 | POUND | $2.25 | $5.32 | |
| 29 | 25000600 | POTASSIUM FERT NUTR | 115 | POUND | $2.25 | $5.32 | |
| 30 | 25100115 | MULCH METHOD 2 | 1 | ACRE | $1,126.88 | $2,658.14 | |
| 31 | 25100630 | EROSION CONTR BLANKET | 2,396 | SQ YD | $1.69 | $4.25 | |
| 32 | 28000250 | TEMP EROS CONTR SEED | 1,147 | POUND | $5.63 | $5.32 | |
| 33 | 28000400 | PERIMETER EROS BAR | 11,197 | FOOT | $3.94 | $4.88 | |
| 34 | 28000500 | INLET & PIPE PROTECT | 5 | EACH | $394.41 | $372.14 | |
| 35 | 28000510 | INLET FILTERS | 5 | EACH | $450.75 | $425.30 | |
| 36 | 28100105 | STONE RIPRAP CL A3 | 78 | SQ YD | $89.58 | $47.08 | |
| 37 | 28200200 | FILTER FABRIC | 78 | SQ YD | $6.38 | $2.53 | |
| 38 | 31101000 | SUB GRAN MAT B | 552 | TON | $36.54 | $50.61 | |
| 39 | 35101400 | AGG BASE CSE B | 2,292 | TON | $42.40 | $48.83 | |
| 40 | 35300100 | PCC BSE CSE 6 | 49 | SQ YD | $57.53 | $80.78 | |
| 41 | 40600275 | BIT MATLS PR CT | 15,108 | POUND | $0.6200 | $0.5800 | |
| 42 | 40600290 | BIT MATLS TACK CT | 23 | POUND | $28.17 | $26.58 | |
| 43 | 40604050 | HMA SC IL-9.5 C N50 | 1,063 | TON | $157.76 | $148.86 | |
| 44 | 42300400 | PCC DRIVEWAY PAVT 8 | 88 | SQ YD | $79.04 | $95.25 | |
| 45 | 42400100 | PC CONC SIDEWALK 4 | 2,439 | SQ FT | $7.38 | $7.01 | |
| 46 | 42400800 | DETECTABLE WARNINGS | 162 | SQ FT | $29.05 | $24.97 | |
| 47 | 44000100 | PAVEMENT REM | 316 | SQ YD | $15.84 | $13.35 | |
| 48 | 44000200 | DRIVE PAVEMENT REM | 67 | SQ YD | $23.93 | $12.89 | |
| 49 | 48101200 | AGGREGATE SHLDS B | 1,222 | TON | $48.60 | $54.60 | |
| 50 | 50800105 | REINFORCEMENT BARS | 560 | POUND | $5.26 | $5.85 | |
| 51 | 50901720 | BICYCLE RAILING | 152 | FOOT | $710.66 | $491.19 | |
| 52 | 50901730 | BRIDGE FENCE RAILING | 145 | FOOT | $833.83 | $1,100.01 | |
| 53 | 50901735 | BR FEN RAIL (SDWALK) | 84 | FOOT | $638.09 | $820.95 | |
| 54 | 542C1063 | P CUL CL C 2 18 | 12 | FOOT | $95.61 | $115.21 | |
| 55 | 54213669 | PRC FLAR END SEC 24 | 1 | EACH | $1,757.57 | $1,503.93 | |
| 56 | 54262712 | METAL FL END SEC 12" | 1 | EACH | $713.44 | $1,049.38 | |
| 57 | 54262715 | METAL FL END SEC 15" | 1 | EACH | $719.06 | $1,125.93 | |
| 58 | 54262718 | METAL FL END SEC 18" | 1 | EACH | $1,045.85 | $1,460.64 | |
| 59 | 550A0410 | STORM SEW CL A 2 24 | 25 | FOOT | $111.11 | $100.85 | |
| 60 | 550B0050 | STORM SEW CL B 1 12 | 35 | FOOT | $88.77 | $74.92 | |
| 61 | 550B0360 | STORM SEW CL B 2 15 | 127 | FOOT | $101.24 | $70.09 | |
| 62 | 60260100 | INLETS ADJUST | 1 | EACH | $2,267.97 | $635.30 | |
| 63 | 60260400 | INLETS ADJ NEW T1F CL | 1 | EACH | $2,031.33 | $890.49 | |
| 64 | 60602500 | CONC GUTTER TA | 204 | FOOT | $65.35 | $57.07 | |
| 65 | 60602800 | CONC GUTTER TB | 206 | FOOT | $61.97 | $56.69 | |
| 66 | 60605000 | COMB CC&G TB6.24 | 438 | FOOT | $43.69 | $70.46 | |
| 67 | 66900200 | NON SPL WASTE DISPOSL | 145 | CU YD | $154.57 | $122.38 | |
| 68 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,014.20 | $1,382.23 | |
| 69 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,479.14 | $2,392.32 | |
| 70 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,479.14 | $2,498.65 | |
| 71 | 66901006 | REG SUB MON | 3 | CAL DA | $1,239.57 | $1,275.91 | |
| 72 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $1,629.22 | $2,373.56 | |
| 73 | 67100100 | MOBILIZATION | 1 | L SUM | $75,000.00 | $155,260.99 | |
| 74 | 72000100 | SIGN PANEL T1 | 119 | SQ FT | $27.05 | $25.52 | |
| 75 | 72900100 | METAL POST TY A | 240 | FOOT | $19.16 | $18.08 | |
| 76 | 73400100 | CONC FOUNDATION | 3.7 | CU YD | $2,619.12 | $2,124.01 | |
| 77 | 78009000 | MOD URETH PM LTR-SYM | 47 | SQ FT | $24.79 | $31.90 | |
| 78 | 78009012 | MOD URETH PM LINE 12 | 30 | FOOT | $16.90 | $30.22 | |
| 79 | 78009024 | MOD URETH PM LINE 24 | 247 | FOOT | $24.79 | $60.45 | |
| 80 | 89502385 | REMOV EX CONC FDN | 1 | EACH | $254.75 | $3,666.26 |