| Sep 18, 2026 | 61M10 |
Kane, DupageDistrict 1 | 57 SQ YD |
$112.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 62V90 |
CookDistrict 1 | 13 SQ YD |
$102.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 74D06 |
WayneDistrict 7 | 57 SQ YD |
$135.00 | Samron Midwest Contracting, Inc. |
| Sep 18, 2026 | 62V55 |
CookDistrict 1 | 15 SQ YD |
$140.00 | Gallagher Asphalt Corporation |
| Sep 18, 2026 | 62L58 |
CookDistrict 1 | 255 SQ YD |
$60.00 | Builders Paving, LLC |
| Sep 18, 2026 | 62W73 |
CookDistrict 1 | 340 SQ YD |
$105.00 | Peter Baker & Son Co. |
| Sep 18, 2026 | 97894 |
St. ClairDistrict 8 | 87 SQ YD |
$225.00 | Hank's Excavating & Landscaping, Inc. |
| Sep 18, 2026 | 80C95 |
WillDistrict 1 | 3 SQ YD |
$436.19 | Gallagher Asphalt Corporation |
| Jul 31, 2026 | 61K85 |
CookDistrict 1 | 623 SQ YD |
$120.00 | Plote Construction, Inc. |
| Jul 31, 2026 | 85781 |
Rock IslandDistrict 2 | 920 SQ YD |
$92.00 | Miller Trucking & Excavating Company |
| Jul 31, 2026 | 74829 |
MoultrieDistrict 7 | 36 SQ YD |
$101.00 | Howell Paving, Inc. |
| Jun 12, 2026 | 62U72 |
MchenryDistrict 1 | 1,454 SQ YD |
$93.13 | Martam Construction Incorporated |
| Jun 12, 2026 | 97899 |
St. ClairDistrict 8 | 192 SQ YD |
$155.00 | Hank's Excavating & Landscaping, Inc. |
| Jun 12, 2026 | 80B35 |
CookDistrict 1 | 42 SQ YD |
$95.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 68J50 |
WarrenDistrict 4 | 23 SQ YD |
$300.00 | Brandt Construction Co. |
| Jun 12, 2026 | 80B87 |
CookDistrict 1 | 60 SQ YD |
$90.00 | Builders Paving, LLC |
| Jun 12, 2026 | 68J72 |
MarshallDistrict 4 | 442 SQ YD |
$100.03 | Advanced Asphalt Company |
| Jun 12, 2026 | 80D00 |
CookDistrict 1 | 17 SQ YD |
$100.00 | Plote Construction, Inc. |
| Jun 12, 2026 | 80B22 |
CookDistrict 1 | 33 SQ YD |
$100.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 61M46 |
CookDistrict 1 | 300 SQ YD |
$99.00 | Builders Paving, LLC |
| Jun 12, 2026 | 97884 |
MadisonDistrict 8 | 133 SQ YD |
$152.00 | Stutz Excavating, Inc. |
| Jun 12, 2026 | 80B28 |
CookDistrict 1 | 426 SQ YD |
$100.65 | K-Five Construction Corporation |
| Jun 12, 2026 | 62R61 |
CookDistrict 1 | 116 SQ YD |
$221.65 | OHLA Central, Inc. |
| Jun 12, 2026 | 97896 |
MadisonDistrict 8 | 16 SQ YD |
$235.00 | Stutz Excavating, Inc. |
| Jun 12, 2026 | 80B33 |
CookDistrict 1 | 108 SQ YD |
$148.50 | D. Construction, Inc. |
| Apr 24, 2026 | 80C85 |
MchenryDistrict 1 | 175 SQ YD |
$163.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 80B26 |
CookDistrict 1 | 50 SQ YD |
$98.00 | Gallagher Asphalt Corporation |
| Apr 24, 2026 | 87899 |
KendallDistrict 3 | 47 SQ YD |
$120.00 | Austin Tyler Construction, Inc. |
| Apr 24, 2026 | 61L84 |
DupageDistrict 1 | 1,136 SQ YD |
$95.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 97840 |
MadisonDistrict 8 | 176 SQ YD |
$145.00 | Christ Bros. Asphalt, Inc. |
| Apr 24, 2026 | 97865 |
St. ClairDistrict 8 | 66 SQ YD |
$172.00 | Baxmeyer Construction, Inc. |
| Apr 24, 2026 | 62L85 |
CookDistrict 1 | 75 SQ YD |
$112.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 61L54 |
CookDistrict 1 | 73 SQ YD |
$155.24 | Martam Construction Incorporated |
| Apr 24, 2026 | 62X57 |
CookDistrict 1 | 53 SQ YD |
$165.00 | Schroeder Asphalt Services, Inc. |
| Apr 24, 2026 | 80B27 |
CookDistrict 1 | 381 SQ YD |
$105.00 | Plote Construction, Inc. |
| Apr 24, 2026 | 61M17 |
KaneDistrict 1 | 173 SQ YD |
$94.90 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 70F20 |
McleanDistrict 5 | 753 SQ YD |
$195.00 | Stark Excavating, Inc. |
| Apr 24, 2026 | 80B39 |
CookDistrict 1 | 22.2 SQ YD |
$125.30 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B09 |
CookDistrict 1 | 40 SQ YD |
$110.00 | Builders Paving, LLC |
| Feb 27, 2026 | 68J68 |
FultonDistrict 4 | 64 SQ YD |
$177.33 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Feb 27, 2026 | 61M16 |
CookDistrict 1 | 815 SQ YD |
$110.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 68J96 |
MarshallDistrict 4 | 257 SQ YD |
$141.00 | Advanced Asphalt Company |
| Feb 27, 2026 | 61M31 |
CookDistrict 1 | 76 SQ YD |
$128.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 80B15 |
DupageDistrict 1 | 219 SQ YD |
$78.06 | R. W. Dunteman Company |
| Feb 27, 2026 | 62R23 |
WillDistrict 1 | 38 SQ YD |
$100.00 | D. Construction, Inc. & Kraemer North America, LLC JV |
| Feb 27, 2026 | 72295 |
AdamsDistrict 6 | 1,661 SQ YD |
$285.00 | Diamond Construction Company |
| Feb 27, 2026 | 62X88 |
CookDistrict 1 | 63 SQ YD |
$115.00 | Peter Baker & Son Co. |
| Feb 27, 2026 | 97882 |
MadisonDistrict 8 | 976 SQ YD |
$146.00 | Stutz Excavating, Inc. |
| Feb 27, 2026 | 68F91 |
Fulton, McdonoughDistrict 4 | 85 SQ YD |
$227.70 | Gunther Construction, a div of UCM, Inc. |
| Feb 27, 2026 | 61L93 |
CookDistrict 1 | 29 SQ YD |
$105.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 91642 |
ChampaignDistrict 5 | 376 SQ YD |
$105.50 | William Charles Construction Company, LLC |
| Jan 16, 2026 | 62K65 |
CookDistrict 1 | 74 SQ YD |
$114.27 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 76A46 |
MadisonDistrict 8 | 278 SQ YD |
$150.00 | Keller Construction, Inc. |
| Jan 16, 2026 | 97876 |
MadisonDistrict 8 | 4 SQ YD |
$448.39 | Hank's Excavating & Landscaping, Inc. |
| Jan 16, 2026 | 93826 |
LoganDistrict 6 | 2,903 SQ YD |
$105.00 | Kinney Contractors, Inc. |
| Jan 16, 2026 | 62P93 |
CookDistrict 1 | 6 SQ YD |
$100.00 | Triggi Construction, Inc. |
| Jan 16, 2026 | 61M08 |
LakeDistrict 1 | 25 SQ YD |
$104.00 | Campanella and Sons, Inc. |
| Jan 16, 2026 | 61L36 |
DupageDistrict 1 | 90 SQ YD |
$90.00 | Acura Inc. |
| Jan 16, 2026 | 97881 |
MadisonDistrict 8 | 42 SQ YD |
$244.00 | Stutz Excavating, Inc. |
| Jan 16, 2026 | 62W47 |
CookDistrict 1 | 396 SQ YD |
$75.00 | D. Construction, Inc. |
| Jan 16, 2026 | 62321 |
CookDistrict 1 | 27 SQ YD |
$125.00 | MAT Construction Leasing, Inc. |
| Jan 16, 2026 | 61L44 |
DupageDistrict 1 | 269 SQ YD |
$108.00 | Builders Paving, LLC |
| Jan 16, 2026 | 99718 |
JacksonDistrict 9 | 143 SQ YD |
$140.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 76E84 |
Madison, St.clairDistrict 8 | 152 SQ YD |
$158.00 | The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture |
| Jan 16, 2026 | 62D34 |
CookDistrict 1 | 31 SQ YD |
$110.00 | Lorig Construction Company |
| Jan 16, 2026 | 99763 |
JacksonDistrict 9 | 192 SQ YD |
$90.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 80B36 |
WillDistrict 1 | 9 SQ YD |
$200.00 | D. Construction, Inc. |
| Jan 16, 2026 | 62F94 |
WillDistrict 1 | 56 SQ YD |
$90.00 | D. Construction, Inc. |
| Jan 16, 2026 | 72G90 |
ChristianDistrict 6 | 1,121 SQ YD |
$187.66 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 16, 2026 | 85780 |
Rock IslandDistrict 2 | 1,435 SQ YD |
$94.00 | McCarthy Improvement Company |
| Nov 7, 2025 | 61L92 |
CookDistrict 1 | 814 SQ YD |
$100.00 | Capitol Cement Co., Inc. |
| Nov 7, 2025 | 68F45 |
WoodfordDistrict 4 | 395 SQ YD |
$103.62 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Nov 7, 2025 | 89872 |
PeoriaDistrict 4 | 415 SQ YD |
$69.64 | Otto Baum Company, Inc. |
| Nov 7, 2025 | 61L43 |
CookDistrict 1 | 1,681 SQ YD |
$108.00 | K-Five Construction Corporation |
| Nov 7, 2025 | 70F19 |
McleanDistrict 5 | 535 SQ YD |
$186.63 | Rowe Construction, a div of UCM, Inc. |
| Nov 7, 2025 | 61K01 |
DupageDistrict 1 | 23 SQ YD |
$133.25 | Martam Construction Incorporated |
| Nov 7, 2025 | 93847 |
PikeDistrict 6 | 291 SQ YD |
$158.00 | Rees Construction Company of Quincy |
| Nov 7, 2025 | 61L82 |
CookDistrict 1 | 33 SQ YD |
$150.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 61L78 |
DupageDistrict 1 | 92 SQ YD |
$135.00 | A Lamp Concrete Contractors, Inc. |
| Sep 19, 2025 | 61K93 |
CookDistrict 1 | 982 SQ YD |
$94.85 | Lima Contractors |
| Sep 19, 2025 | 76F84 |
MadisonDistrict 8 | 870 SQ YD |
$142.00 | Stutz Excavating, Inc. |
| Sep 19, 2025 | 74608 |
EffinghamDistrict 7 | 6 SQ YD |
$387.49 | Howell Paving, Inc. |
| Sep 19, 2025 | 62B64 |
CookDistrict 1 | 140 SQ YD |
$81.83 | R. W. Dunteman Company |
| Sep 19, 2025 | 61L35 |
CookDistrict 1 | 314 SQ YD |
$122.00 | A Lamp Concrete Contractors, Inc. |
| Sep 19, 2025 | 62K78 |
KaneDistrict 1 | 500 SQ YD |
$115.00 | Plote Construction, Inc. |
| Sep 19, 2025 | 97869 |
MadisonDistrict 8 | 2,475 SQ YD |
$144.00 | Stutz Excavating, Inc. |
| Sep 19, 2025 | 62X87 |
CookDistrict 1 | 142 SQ YD |
$85.00 | D. Construction, Inc. |
| Sep 19, 2025 | 97868 |
MadisonDistrict 8 | 614 SQ YD |
$120.00 | Kinney Contractors, Inc. |
| Sep 19, 2025 | 70F21 |
McleanDistrict 5 | 1,771 SQ YD |
$188.68 | Rowe Construction, a div of UCM, Inc. |
| Aug 1, 2025 | 61L38 |
CookDistrict 1 | 368 SQ YD |
$130.00 | Plote Construction, Inc. |
| Aug 1, 2025 | 62N97 |
CookDistrict 1 | 684 SQ YD |
$104.00 | Everlast Blacktop Inc. |
| Aug 1, 2025 | 72K42 |
AdamsDistrict 6 | 125 SQ YD |
$165.00 | Diamond Construction Company |
| Aug 1, 2025 | 99284 |
WilliamsonDistrict 9 | 250 SQ YD |
$105.00 | Samron Midwest Contracting, Inc. |
| Aug 1, 2025 | 91653 |
McleanDistrict 5 | 1,072 SQ YD |
$140.00 | Rowe Construction, a div of UCM, Inc. |
| Aug 1, 2025 | 61L46 |
DupageDistrict 1 | 357 SQ YD |
$142.00 | A Lamp Concrete Contractors, Inc. |
| Aug 1, 2025 | 93833 |
SangamonDistrict 6 | 269 SQ YD |
$123.19 | Illinois Valley Paving, a div of UCM, Inc. |
| Aug 1, 2025 | 61L37 |
CookDistrict 1 | 626 SQ YD |
$110.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 74564 |
ColesDistrict 7 | 58 SQ YD |
$128.50 | Sangamo Construction Company |
| Jun 13, 2025 | 97859 |
St. ClairDistrict 8 | 429 SQ YD |
$113.85 | Keeley & Sons, Inc. |
| Jun 13, 2025 | 61L60 |
KaneDistrict 1 | 56 SQ YD |
$150.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 89859 |
TazewellDistrict 4 | 463 SQ YD |
$101.76 | William Charles Construction Company, LLC |
| Jun 13, 2025 | 61J86 |
LakeDistrict 1 | 326 SQ YD |
$84.85 | Lake County Grading Company, LLC |
| Jun 13, 2025 | 62V52 |
MchenryDistrict 1 | 9 SQ YD |
$184.25 | Curran Contracting Company |
| Jun 13, 2025 | 61L62 |
CookDistrict 1 | 44 SQ YD |
$102.75 | Peter Baker & Son Co. |
| Jun 13, 2025 | 62X61 |
LakeDistrict 1 | 91 SQ YD |
$110.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 61L64 |
CookDistrict 1 | 29 SQ YD |
$150.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 78943 |
FranklinDistrict 9 | 246 SQ YD |
$103.20 | E. T. Simonds Construction Company |
| Jun 13, 2025 | 62X62 |
CookDistrict 1 | 42 SQ YD |
$150.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 62X35 |
MchenryDistrict 1 | 9 SQ YD |
$155.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 97848 |
St. ClairDistrict 8 | 160 SQ YD |
$115.25 | Stutz Excavating, Inc. |
| Jun 13, 2025 | 62X64 |
CookDistrict 1 | 150 SQ YD |
$125.00 | K-Five Construction Corporation |
| Apr 25, 2025 | 93830 |
AdamsDistrict 6 | 62 SQ YD |
$141.00 | Diamond Construction Company |
| Apr 25, 2025 | 62V86 |
DupageDistrict 1 | 7 SQ YD |
$200.00 | K-Five Construction Corporation |
| Apr 25, 2025 | 61L18 |
MchenryDistrict 1 | 51 SQ YD |
$98.00 | PirTano Construction Co., LLC |
| Apr 25, 2025 | 95969 |
ClarkDistrict 7 | 40 SQ YD |
$125.00 | Feutz Contractors, Inc. |
| Apr 25, 2025 | 62X94 |
MchenryDistrict 1 | 1,447 SQ YD |
$111.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 25, 2025 | 61L31 |
LakeDistrict 1 | 30 SQ YD |
$120.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 62V54 |
CookDistrict 1 | 1 SQ YD |
$500.00 | Builders Paving, LLC |
| Apr 25, 2025 | 97862 |
MadisonDistrict 8 | 30 SQ YD |
$195.50 | Keller Construction, Inc. |
| Apr 25, 2025 | 85774 |
Rock IslandDistrict 2 | 1,391 SQ YD |
$100.00 | Valley Construction Co. |
| Apr 25, 2025 | 62J79 |
CookDistrict 1 | 167 SQ YD |
$80.00 | Plote Construction, Inc. |
| Apr 25, 2025 | 61G79 |
DupageDistrict 1 | 200 SQ YD |
$121.25 | OHLA Central, Inc. |
| Apr 25, 2025 | 89802 |
TazewellDistrict 4 | 470 SQ YD |
$129.32 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Apr 25, 2025 | 62V41 |
CookDistrict 1 | 30 SQ YD |
$165.00 | Plote Construction, Inc. |
| Apr 25, 2025 | 61K79 |
DupageDistrict 1 | 418 SQ YD |
$14.00 | Everlast Blacktop Inc. |
| Apr 25, 2025 | 89868 |
MercerDistrict 4 | 444 SQ YD |
$78.50 | Phoenix Corporation of the Quad Cities |
| Apr 25, 2025 | 62V61 |
CookDistrict 1 | 156 SQ YD |
$110.00 | K-Five Construction Corporation |
| Apr 25, 2025 | 61K95 |
DupageDistrict 1 | 509 SQ YD |
$76.47 | R. W. Dunteman Company |
| Mar 7, 2025 | 91640 |
McleanDistrict 5 | 189 SQ YD |
$122.73 | Rowe Construction, a div of UCM, Inc. |
| Mar 7, 2025 | 97856 |
MadisonDistrict 8 | 337 SQ YD |
$147.00 | Baxmeyer Construction, Inc. |
| Mar 7, 2025 | 61L25 |
CookDistrict 1 | 29 SQ YD |
$98.57 | D. Construction, Inc. |
| Mar 7, 2025 | 72759 |
SangamonDistrict 6 | 174 SQ YD |
$145.00 | Kinney Contractors, Inc. |
| Mar 7, 2025 | 61J84 |
KaneDistrict 1 | 126 SQ YD |
$78.63 | R. W. Dunteman Company |
| Mar 7, 2025 | 62R58 |
Cook, DupageDistrict 1 | 177 SQ YD |
$88.31 | R. W. Dunteman Company |
| Mar 7, 2025 | 89818 |
TazewellDistrict 4 | 50 SQ YD |
$106.67 | Otto Baum Company, Inc. |
| Jan 17, 2025 | 97843 |
MadisonDistrict 8 | 190 SQ YD |
$141.35 | Keller Construction, Inc. |
| Jan 17, 2025 | 61K84 |
WillDistrict 1 | 59 SQ YD |
$120.00 | D. Construction, Inc. |
| Jan 17, 2025 | 61J63 |
CookDistrict 1 | 478 SQ YD |
$90.00 | Martam Construction Incorporated |
| Jan 17, 2025 | 62W71 |
CookDistrict 1 | 27 SQ YD |
$180.00 | A Lamp Concrete Contractors, Inc. |
| Jan 17, 2025 | 61K07 |
CookDistrict 1 | 567 SQ YD |
$123.00 | Schroeder Asphalt Services, Inc. |
| Jan 17, 2025 | 78483 |
JeffersonDistrict 9 | 451 SQ YD |
$131.74 | E. T. Simonds Construction Company |
| Jan 17, 2025 | 89854 |
WoodfordDistrict 4 | 646 SQ YD |
$121.94 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 17, 2025 | 85767 |
Rock IslandDistrict 2 | 549 SQ YD |
$56.00 | McCarthy Improvement Company |
| Jan 17, 2025 | 93773 |
SangamonDistrict 6 | 1,776 SQ YD |
$119.68 | Freesen, a div of UCM, Inc. |
| Jan 17, 2025 | 87805 |
KankakeeDistrict 3 | 566 SQ YD |
$100.00 | Kankakee Valley Construction Company, Inc. |
| Jan 17, 2025 | 61K81 |
WillDistrict 1 | 173 SQ YD |
$113.00 | Austin Tyler Construction, Inc. |
| Dec 13, 2024 | 72122 |
SangamonDistrict 6 | 1,087 SQ YD |
$122.71 | Illinois Valley Paving, a div of UCM, Inc. |