168BidsMar 9, 2018 to Sep 18, 2026
71Wins (low bidder)
42.3%Win rate
$316,958,521Total won
Competitor scorecard
Last 5 years in Illinois45.7%Win rate42 of 92 bids
—Average bid vs estimate
—Winning bids vs estimate
+22.9%Over the low bid when they loseAverage field: 3.3 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| Sangamo Construction Company | 50 | 36 | 14 | 72% |
| County Contractors, Inc. | 38 | 19 | 19 | 50% |
| Otto Baum Company, Inc. | 26 | 12 | 14 | 46% |
| White Construction LLC | 23 | 18 | 5 | 78% |
| William Charles Construction Company, LLC | 15 | 6 | 9 | 40% |
| Path Construction Company, Inc. | 13 | 6 | 7 | 46% |
| Laverdiere Construction, Inc. | 12 | 5 | 7 | 42% |
| Stark Excavating, Inc. | 7 | 4 | 3 | 57% |
| Phoenix Corporation of the Quad Cities | 7 | 4 | 3 | 57% |
| ERA-Valdivia Contractors, Inc. | 5 | 4 | 1 | 80% |
| Let date | Contract | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Sep 18, 2026 | 72406 | (1ZB1)BDR-1Adams · District 6 | 1 of 3 | $6,962,525 | $6,962,525 | Won |
| Sep 18, 2026 | 72E59 | (54-10HB-2)BDR,BP,BRR,BJRLogan · District 6 | 4 of 4 | $1,698,553 | $1,485,400Otto Baum Company, Inc. | +14.3% |
| Jun 12, 2026 | 72J76 | (11BR,10B-1,10B-5)BDRSchuyler · District 6 | 2 of 3 | $1,924,874 | $1,870,400Otto Baum Company, Inc. | +2.9% |
| Jun 12, 2026 | 72512 | (69-2B-2)BDRMorgan · District 6 | 1 of 4 | $145,221 | $145,221 | Won |
| Jun 12, 2026 | 72601 | (75-3VHB-1)BDR,BP,BJRPike · District 6 | 1 of 2 | $6,980,801 | $6,980,801 | Won |
| Jun 12, 2026 | 74705 | (58-63HVB)BRMacon · District 7 | 3 of 3 | $20,695,113 | $18,795,822William Charles Constructio… | +10.1% |
| Apr 24, 2026 | 72296 | (111B-1)BDRLogan · District 6 | 2 of 4 | $756,998 | $728,275County Contractors, Inc. | +3.9% |
| Apr 24, 2026 | 72511 | (14B-2)BDRPike · District 6 | 2 of 3 | $131,128 | $130,630County Contractors, Inc. | +0.4% |
| Feb 27, 2026 | 74368 | (128BR-1)B-1Macon · District 7 | 2 of 2 | $3,314,583 | $2,735,104Sangamo Construction Company | +21.2% |
| Jan 16, 2026 | 72978 | (140B-1)BDRSangamon · District 6 | 3 of 4 | $767,892 | $674,724Sangamo Construction Company | +13.8% |
| Jan 16, 2026 | 72F57 | (1B-2)BJR,BDR,BRRMenard · District 6 | 5 of 6 | $520,643 | $361,800Otto Baum Company, Inc. | +43.9% |
| Jan 16, 2026 | 72732 | 69-1BDRMorgan · District 6 | 1 of 4 | $485,061 | $485,061 | Won |
| Jan 16, 2026 | 72979 | (84-2HB-5)BDR,BRRSangamon · District 6 | 3 of 3 | $563,747 | $398,054Path Construction Company, … | +41.6% |
| Jan 16, 2026 | 70E65 | (76-00221-00)BR-1Piatt · District 5 | 2 of 2 | $1,789,689 | $1,304,781Sangamo Construction Company | +37.2% |
| Jan 16, 2026 | 72715 | 28VBR-BRRSangamon · District 6 | 2 of 3 | $350,002 | $329,894William Charles Constructio… | +6.1% |
| Jan 16, 2026 | 72913 | (69VBR)IMorgan · District 6 | 2 of 8 | $42,551 | $25,450Earth Worx Solutions LLC | +67.2% |
| Nov 7, 2025 | 72523 | (86B-1,87C)TRCass, Schuyler · District 6 | 1 of 2 | $765,687 | $765,687 | Won |
| Nov 7, 2025 | 72688 | D6 BRIDGE MG-DR,TRSangamon · District 6 | 1 of 4 | $97,470 | $97,470 | Won |
| Nov 7, 2025 | 93846 | 22-00103-02-BRLogan · District 6 | 5 of 5 | $650,044 | $474,620County Contractors, Inc. | +37.0% |
| Sep 19, 2025 | 72M33 | (75-4B-1)BDR,BJR,IPike · District 6 | 1 of 2 | $2,292,624 | $2,292,624 | Won |
| Sep 19, 2025 | 72286 | (75-2)BDR,BPPike · District 6 | 1 of 2 | $5,360,782 | $5,360,782 | Won |
| Sep 19, 2025 | 72324 | (86-9HB2)BDR,BRRScott · District 6 | 1 of 3 | $544,972 | $544,972 | Won |
| Aug 1, 2025 | 68J14 | D4 BRIDGE DECK OVERLAY 2025Fulton · District 4 | 1 of 4 | $2,366,430 | $2,366,430 | Won |
| Aug 1, 2025 | 68J13 | (15VB,F)BRRFulton · District 4 | 1 of 5 | $496,456 | $496,456 | Won |
| Aug 1, 2025 | 72958 | (84-10-1B-2)BJRSangamon · District 6 | 3 of 4 | $91,803 | $68,200Otto Baum Company, Inc. | +34.6% |
| Aug 1, 2025 | 72965 | 113B-1(BRR)Logan · District 6 | 2 of 3 | $142,582 | $94,400Otto Baum Company, Inc. | +51.0% |
| Jun 13, 2025 | 72942 | D6 BRIDGE MISC 2025Various · District 6 | 3 of 3 | $410,147 | $273,258County Contractors, Inc. | +50.1% |
| Jun 13, 2025 | 72973 | K(B-1)BJR,BDRMenard · District 6 | 2 of 3 | $1,981,958 | $1,947,800Otto Baum Company, Inc. | +1.8% |
| Jun 13, 2025 | 74C83 | D7 BRIDGE CLEANING 2024-1Macon · District 7 | 1 of 1 | $162,026 | $162,026 | Won |
| Apr 25, 2025 | 70H50 | MBPM 2025-1Dewitt · District 5 | 1 of 3 | $517,733 | $517,733 | Won |
| Apr 25, 2025 | 72220 | (54-4HB)DLogan · District 6 | 3 of 3 | $7,040,990 | $4,994,242Sangamo Construction Company | +41.0% |
| Apr 25, 2025 | 93829 | 22-16119-00-BRPike · District 6 | 2 of 3 | $497,203 | $391,972County Contractors, Inc. | +26.8% |
| Mar 7, 2025 | 72608 | (19-1,2)BDR,BRR,BJRScott · District 6 | 1 of 3 | $383,898 | $383,898 | Won |
| Mar 7, 2025 | 72749 | (142BR,BR-1,BR-2,143BR)BRRChristian · District 6 | 1 of 2 | $425,495 | $425,495 | Won |
| Mar 7, 2025 | 72748 | (2BR)BDRLogan · District 6 | 2 of 3 | $225,744 | $215,000Otto Baum Company, Inc. | +5.0% |
| Jan 17, 2025 | 72187 | 86B(BDR,BJR,BRR)Cass · District 6 | 3 of 4 | $3,217,239 | $2,949,140Path Construction Company, … | +9.1% |
| Jan 17, 2025 | 72609 | (84-10-1B-2)I-2Sangamon · District 6 | 5 of 5 | $145,072 | $130,080Kinney Contractors, Inc. | +11.5% |
| Jan 17, 2025 | 72747 | (2BR)BDR,BJRPike · District 6 | 2 of 2 | $331,956 | $272,212County Contractors, Inc. | +21.9% |
| Jan 17, 2025 | 74C56 | D7 BRIDGE REPAIRS 2025-7Moultrie · District 7 | 3 of 3 | $4,375,582 | $3,994,275Samron Midwest Contracting,… | +9.5% |
| Jan 17, 2025 | 93773 | 20-00492-00-BRSangamon · District 6 | 1 of 2 | $99,697,564 | $99,697,564 | Won |
| Nov 8, 2024 | 72745 | (6VBR,6VBR-1)BDR,BJRMorgan · District 6 | 1 of 2 | $396,391 | $396,391 | Won |
| Sep 20, 2024 | 74C54 | D7 BRIDGE REPAIRS 2025-5Macon · District 7 | 1 of 3 | $1,794,628 | $1,794,628 | Won |
| Sep 20, 2024 | 72627 | 18DR-1Pike · District 6 | 5 of 5 | $124,988 | $61,515Phoenix Corporation of the … | +103.2% |
| Sep 20, 2024 | 72994 | 2B-1Christian · District 6 | 4 of 4 | $2,115,448 | $1,478,000William Charles Constructio… | +43.1% |
| Aug 2, 2024 | 72743 | (84-3-2)DRSangamon · District 6 | 4 of 5 | $111,937 | $80,363Kinney Contractors, Inc. | +39.3% |
| Aug 2, 2024 | 93592 | 12-09115-00-BRCass · District 6 | 6 of 6 | $845,338 | $621,946Laverdiere Construction, In… | +35.9% |
| Aug 2, 2024 | 93809 | 22-00018-00-BRSangamon · District 6 | 3 of 4 | $1,473,639 | $1,285,105County Contractors, Inc. | +14.7% |
| Jun 14, 2024 | 72K98 | (84-2BR-1)D,BY,BP,BRRSangamon · District 6 | 1 of 2 | $29,560,161 | $29,560,161 | Won |
| Jun 14, 2024 | 93654 | 08-07116-00-BRSangamon · District 6 | 3 of 3 | $5,348,192 | $3,910,795Sangamo Construction Company | +36.8% |
| Apr 26, 2024 | 72893 | (84-2BR-1)SR,BDRSangamon · District 6 | 1 of 1 | $5,322,947 | $5,322,947 | Won |
| Jan 19, 2024 | 72728 | D6 BRIDGE REPAIR 2024Various · District 6 | 3 of 3 | $744,457 | $433,493County Contractors, Inc. | +71.7% |
| Jan 19, 2024 | 74B28 | D7 BRIDGE REPAIRS 2024-2Macon · District 7 | 1 of 4 | $1,145,239 | $1,145,239 | Won |
| Nov 17, 2023 | 72F59 | 6CR-1Cass · District 6 | 3 of 6 | $1,686,093 | $1,524,200Otto Baum Company, Inc. | +10.6% |
| Nov 17, 2023 | 72H57 | (22B)BDR,BJR1,BRR1Hancock · District 6 | 1 of 2 | $8,876,670 | $8,876,670 | Won |
| Nov 17, 2023 | 74B29 | D7 BRIDGE REPAIRS 2024-3Macon · District 7 | 1 of 3 | $1,224,997 | $1,224,997 | Won |
| Nov 17, 2023 | 74B30 | D7 BRIDGE REPAIRS 2024-4Macon · District 7 | 1 of 3 | $1,953,030 | $1,953,030 | Won |
| Nov 17, 2023 | 74B33 | D7 BRIDGE REPAIRS 2024-7Macon · District 7 | 1 of 3 | $498,028 | $498,028 | Won |
| Nov 17, 2023 | 74B39 | D7 BRIDGE REPAIRS 2024-10Macon · District 7 | 1 of 3 | $638,193 | $638,193 | Won |
| Nov 17, 2023 | 72K83 | 139CSangamon · District 6 | 3 of 4 | $1,250,934 | $952,366Kinney Contractors, Inc. | +31.4% |
| Aug 4, 2023 | 72711 | (4BR,4VBR)BDR,BJR,IPike · District 6 | 1 of 3 | $459,690 | $459,690 | Won |
| Aug 4, 2023 | 72712 | (75-10HB)BDR,BJRPike · District 6 | 1 of 4 | $140,703 | $140,703 | Won |
| Jun 16, 2023 | 72044 | (8BR-6)BDRSangamon · District 6 | 1 of 4 | $213,682 | $213,682 | Won |
| Jun 16, 2023 | 72136 | (86-8)BDR1,BJR1,BRR1,BPScott · District 6 | 1 of 1 | $2,757,903 | $2,757,903 | Won |
| Jun 16, 2023 | 72708 | (68,84-5-2HB-1)BRRMontgomery · District 6 | 2 of 4 | $37,644 | $37,500Path Construction Company, … | +0.4% |
| Jun 16, 2023 | 93804 | 18-00080-00-BRCass · District 6 | 2 of 3 | $1,559,322 | $1,329,997County Contractors, Inc. | +17.2% |
| Jun 16, 2023 | 95893 | 09-00933-01-BRMacon · District 7 | 2 of 2 | $69,706,717 | $68,927,124William Charles Constructio… | +1.1% |
| Apr 28, 2023 | 72G06 | 2B-2Christian · District 6 | 2 of 2 | $2,222,260 | $2,211,000White Construction LLC | +0.5% |
| Mar 10, 2023 | 72121 | (84-10-1B-2)BRRSangamon · District 6 | 3 of 4 | $43,998 | $39,802Otto Baum Company, Inc. | +10.5% |
| Mar 10, 2023 | 72M49 | (86)BDR-2,BRR,BJR-3Cass · District 6 | 1 of 4 | $1,071,686 | $1,071,686 | Won |
| Jan 20, 2023 | 72L78 | (21)SLPScott · District 6 | 2 of 3 | $2,994,139 | $2,476,190White Construction LLC | +20.9% |
| Nov 18, 2022 | 72N46 | P(B-2)-BDRSangamon · District 6 | 1 of 4 | $441,013 | $441,013 | Won |
| Nov 18, 2022 | 72N47 | (125B-1)BDRHancock · District 6 | 2 of 2 | $369,787 | $351,477County Contractors, Inc. | +5.2% |
| Nov 18, 2022 | 72N48 | (17B-1)BDRPike · District 6 | 1 of 2 | $452,663 | $452,663 | Won |
| Nov 18, 2022 | 72N49 | (75-1B-(3,4))BDR-BRR-BJR-BPPike · District 6 | 1 of 2 | $3,754,547 | $3,754,547 | Won |
| Nov 18, 2022 | 89796 | 20-00130-15-BRFulton · District 4 | 4 of 5 | $2,455,389 | $2,199,397Stark Excavating, Inc. | +11.6% |
| Jun 17, 2022 | 72N41 | (117B-3)BDRScott · District 6 | 1 of 6 | $130,203 | $130,203 | Won |
| Jun 17, 2022 | 72N42 | (18BR)BDR-BJRBrown · District 6 | 3 of 6 | $249,432 | $204,325County Contractors, Inc. | +22.1% |
| Jun 17, 2022 | 68G43 | [(35,36)B-1;(37B-1)BR-1]BRRWarren, Mcdonough · District 4 | 1 of 3 | $2,042,711 | $2,042,711 | Won |
| Jun 17, 2022 | 72M30 | (145)BDRCass · District 6 | 1 of 5 | $442,291 | $442,291 | Won |
| Jun 17, 2022 | 72N38 | (123B-1)BDRPike · District 6 | 2 of 6 | $87,771 | $86,959County Contractors, Inc. | +0.9% |
| Jun 17, 2022 | 72N40 | (1B-1)BDRMenard · District 6 | 3 of 4 | $345,572 | $330,698Path Construction Company, … | +4.5% |
| Apr 29, 2022 | 72M29 | (107Z)BDR-1Sangamon · District 6 | 1 of 2 | $551,176 | $551,176 | Won |
| Apr 29, 2022 | 72M31 | (84-3-2)BDRSangamon · District 6 | 1 of 2 | $1,576,577 | $1,576,577 | Won |
| Apr 29, 2022 | 93780 | 18-00081-00-BRCass · District 6 | 2 of 2 | $1,059,942 | $949,926County Contractors, Inc. | +11.6% |
| Mar 11, 2022 | 72A26 | (4B-1)BR;(4HB)D,BRRChristian · District 6 | 3 of 3 | $6,644,604 | $5,664,814Sangamo Construction Company | +17.3% |
| Mar 11, 2022 | 72M48 | (69-8)BDR, BRR-2, SLP-1Morgan · District 6 | 2 of 4 | $1,536,473 | $1,475,863County Contractors, Inc. | +4.1% |
| Mar 11, 2022 | 72N35 | (84-10-2,84-10-3-SLP)BRRSangamon · District 6 | 2 of 2 | $576,622 | $422,908White Construction LLC | +36.3% |
| Mar 11, 2022 | 93776 | 17-00091-01-BRLogan · District 6 | 2 of 2 | $824,006 | $657,571County Contractors, Inc. | +25.3% |
| Jan 21, 2022 | 72M27 | (3,4)BDRPike · District 6 | 1 of 3 | $502,104 | $502,104 | Won |
| Jan 21, 2022 | 72M65 | (116)BDR, BRR, BJRScott · District 6 | 1 of 2 | $691,200 | $691,200 | Won |
| Jan 21, 2022 | 72M67 | (114)BDR,BJRCass · District 6 | 2 of 4 | $525,280 | $489,497County Contractors, Inc. | +7.3% |
| Jan 21, 2022 | 93762 | 20-00491-00-BRSangamon · District 6 | 1 of 2 | $41,946,677 | $41,946,677 | Won |
| Nov 5, 2021 | 68F74 | [(Z-1D)BR-2,3;(Z-1B-15D)BR]BDRPeoria · District 4 | 2 of 3 | $1,061,581 | $993,747Stark Excavating, Inc. | +6.8% |
| Nov 5, 2021 | 72F35 | (141)CR, CR-1Mason · District 6 | 3 of 3 | $1,430,283 | $1,110,070Phoenix Corporation of the … | +28.8% |
| Nov 5, 2021 | 72M94 | 2(B-1,B-2)BDRScott · District 6 | 1 of 7 | $139,283 | $139,283 | Won |
| Nov 5, 2021 | 74996 | D7 BRIDGE REPAIRS 2022-2Macon · District 7 | 1 of 4 | $709,055 | $709,055 | Won |
| Sep 17, 2021 | 72D40 | 22CRScott · District 6 | 4 of 6 | $476,420 | $339,921Kinney Contractors, Inc. | +40.2% |
| Sep 17, 2021 | 72K08 | (87)B-2Schuyler · District 6 | 3 of 4 | $1,823,944 | $1,553,674County Contractors, Inc. | +17.4% |
| Jun 11, 2021 | 72M77 | (75-3)BDRPike · District 6 | 1 of 3 | $556,101 | $556,101 | Won |
| Jun 11, 2021 | 72M85 | (84-2VB-3)BDRSangamon · District 6 | 1 of 3 | $248,937 | $248,937 | Won |
| Jun 11, 2021 | 72M89 | 7BDRAdams · District 6 | 2 of 3 | $199,062 | $155,483County Contractors, Inc. | +28.0% |
| Apr 23, 2021 | 72L67 | (84-2)BDR,(84-2-2)BDR-1Sangamon · District 6 | 1 of 3 | $3,848,623 | $3,848,623 | Won |
| Apr 23, 2021 | 93747 | 19-00488-00-BRSangamon · District 6 | 1 of 4 | $23,761,224 | $23,761,224 | Won |
| Mar 5, 2021 | 72999 | 102B-2Sangamon · District 6 | 3 of 7 | $714,952 | $625,680Plocher Construction Compan… | +14.3% |
| Mar 5, 2021 | 93756 | 18-00069-00-BRMenard · District 6 | 8 of 8 | $1,189,435 | $620,888Perry Broughton Trucking an… | +91.6% |
| Mar 5, 2021 | 93757 | 18-00080-00-BRSchuyler · District 6 | 2 of 2 | $657,011 | $537,820County Contractors, Inc. | +22.2% |
| Jan 15, 2021 | 72L96 | (22)BDRLogan · District 6 | 1 of 4 | $434,690 | $434,690 | Won |
| Jan 15, 2021 | 72M42 | (75-3,123)BC(75,86)BJR-2,BCPike · District 6 | 2 of 2 | $327,518 | $315,819White Construction LLC | +3.7% |
| Jan 15, 2021 | 72M50 | (122)BDRBrown · District 6 | 2 of 4 | $165,992 | $145,423White Construction LLC | +14.1% |
| Jan 15, 2021 | 89720 | 16-00099-00-BRTazewell · District 4 | 4 of 5 | $628,999 | $559,587Illinois Civil Contractors,… | +12.4% |
| Jan 15, 2021 | 93753 | 07-00022-01-BRMason · District 6 | 2 of 5 | $5,601,879 | $4,954,821Stark Excavating, Inc. | +13.1% |
| Nov 6, 2020 | 72F27 | (B)CRSangamon · District 6 | 3 of 3 | $1,500,093 | $1,414,607Truman L. Flatt & Sons Co.,… | +6.0% |
| Nov 6, 2020 | 72L97 | (119) BDRSchuyler · District 6 | 1 of 3 | $597,124 | $597,124 | Won |
| Nov 6, 2020 | 72M47 | (69-6&7)BRR(69-8)BRR&BJR-1, SLPMorgan · District 6 | 1 of 5 | $578,512 | $578,512 | Won |
| Nov 6, 2020 | 74326 | 115BR-1Moultrie · District 7 | 1 of 4 | $716,028 | $716,028 | Won |
| Nov 6, 2020 | 89745 | 14-00113-04-BRPeoria · District 4 | 4 of 4 | $1,746,165 | $1,296,220Stark Excavating, Inc. | +34.7% |
| Nov 6, 2020 | 93751 | 19-00485-00-BRSangamon · District 6 | 2 of 4 | $590,637 | $543,000Plocher Construction Compan… | +8.8% |
| Sep 18, 2020 | 72M37 | (86-9) BRR-1Scott · District 6 | 2 of 3 | $68,931 | $53,431Halverson Construction Co.,… | +29.0% |
| Jul 31, 2020 | 72J51 | (F) BDR, BJR, BRR, BCMason · District 6 | 1 of 3 | $229,934 | $229,934 | Won |
| Jul 31, 2020 | 72M10 | (84-4-2)BRR, BJRSangamon · District 6 | 1 of 3 | $277,026 | $277,026 | Won |
| Jul 31, 2020 | 76N53 | 42-2DM-1Jersey · District 8 | 3 of 5 | $150,926 | $64,276Stutz Excavating, Inc. | +134.8% |
| Jun 12, 2020 | 72L74 | (103)BDRLogan · District 6 | 1 of 3 | $105,857 | $105,857 | Won |
| Jun 12, 2020 | 72L75 | (1)BDR,BJRScott · District 6 | 1 of 3 | $137,055 | $137,055 | Won |
| Jun 12, 2020 | 72L76 | (4)BDRChristian · District 6 | 2 of 2 | $240,564 | $184,349Otto Baum Company, Inc. | +30.5% |
| Jun 12, 2020 | 72L77 | (142)PCCChristian · District 6 | 2 of 2 | $214,948 | $184,691Otto Baum Company, Inc. | +16.4% |
| Jun 12, 2020 | 72L83 | (20)BRR,BDSPike · District 6 | 1 of 3 | $496,936 | $496,936 | Won |
| Jun 12, 2020 | 72L87 | (69-9)BRR-1,SLPMorgan · District 6 | 1 of 1 | $391,307 | $391,307 | Won |
| Jun 12, 2020 | 93714 | 10-00007-00-BTSangamon · District 6 | 4 of 5 | $3,030,791 | $2,793,598Otto Baum Company, Inc. | +8.5% |
| Jun 12, 2020 | 95874 | 15-00274-00-BRMacon · District 7 | 3 of 3 | $749,081 | $639,781County Contractors, Inc. | +17.1% |
| Apr 24, 2020 | 72L71 | (6)BDR,BJRSangamon · District 6 | 3 of 4 | $221,157 | $170,176Sangamo Construction Company | +30.0% |
| Mar 6, 2020 | 72K76 | (54-10)BRR,BDRLogan · District 6 | 4 of 4 | $1,673,608 | $1,347,949Sangamo Construction Company | +24.2% |
| Mar 6, 2020 | 72L43 | (34)BDRSangamon · District 6 | 1 of 3 | $364,864 | $364,864 | Won |
| Mar 6, 2020 | 74910 | D7 BRIDGE REPAIRS 2020-2Macon · District 7 | 3 of 4 | $484,562 | $411,566Halverson Construction Co.,… | +17.7% |
| Mar 6, 2020 | 93732 | 02-00082-00-FPMacoupin · District 6 | 4 of 4 | $2,399,797 | $1,287,148Kamadulski Excavating and G… | +86.4% |
| Jan 17, 2020 | 72L48 | (2)BRRMenard · District 6 | 1 of 4 | $320,133 | $320,133 | Won |
| Nov 8, 2019 | 72K07 | (84-1)D,(150)RS-2Sangamon · District 6 | 1 of 3 | $3,121,789 | $3,121,789 | Won |
| Nov 8, 2019 | 72K44 | (20)BDR,BJRScott · District 6 | 1 of 3 | $828,566 | $828,566 | Won |
| Aug 2, 2019 | 93733 | (109)VB, (110)VB-5, 18-00478-00-BRSangamon · District 6 | 1 of 3 | $32,059,959 | $32,059,959 | Won |
| Jun 14, 2019 | 72L14 | (S)BDRSangamon · District 6 | 1 of 1 | $208,212 | $208,212 | Won |
| Jun 14, 2019 | 72L15 | (54-2)BJRLogan · District 6 | 3 of 3 | $209,278 | $127,127Phoenix Corporation of the … | +64.6% |
| Jun 14, 2019 | 72L18 | (54-10)BRR-1Logan · District 6 | 3 of 3 | $107,959 | $56,790Otto Baum Company, Inc. | +90.1% |
| Jun 14, 2019 | 72L19 | (109)BDRPike · District 6 | 2 of 2 | $103,117 | $86,995County Contractors, Inc. | +18.5% |
| Apr 26, 2019 | 95798 | 12-00249-00-BRMacon · District 7 | 2 of 5 | $3,041,927 | $2,990,685County Contractors, Inc. | +1.7% |
| Apr 26, 2019 | 72L09 | (86-8)BDR,BJR,BRRScott · District 6 | 2 of 3 | $205,456 | $195,843ERA-Valdivia Contractors, I… | +4.9% |
| Mar 8, 2019 | 72J97 | (84-2)&(84-3)BRRSangamon · District 6 | 1 of 3 | $5,278,821 | $5,278,821 | Won |
| Mar 8, 2019 | 74884 | D7 BRIDGE REPAIRS 2019-1Macon · District 7 | 1 of 3 | $852,653 | $852,653 | Won |
| Jan 18, 2019 | 72C83 | 43 CRChristian · District 6 | 4 of 6 | $794,791 | $702,444Stutz Excavating, Inc. | +13.1% |
| Jan 18, 2019 | 72K97 | (107)BDR,BJR,BP,BRRMacoupin · District 6 | 4 of 4 | $480,736 | $365,553RCS Construction, Inc. | +31.5% |
| Jan 18, 2019 | 95841 | 17-00706-00-BRMacon · District 7 | 2 of 6 | $2,553,523 | $2,504,685Sangamo Construction Company | +1.9% |
| Nov 9, 2018 | 68D85 | [(102-HB)I]BRTazewell · District 4 | 3 of 4 | $2,193,987 | $1,885,363Halverson Construction Co.,… | +16.4% |
| Nov 9, 2018 | 68E17 | (34BR-1)BRRWoodford · District 4 | 3 of 4 | $548,463 | $434,382Stark Excavating, Inc. | +26.3% |
| Nov 9, 2018 | 72K66 | (75-3)BJRPike · District 6 | 1 of 3 | $1,184,709 | $1,184,709 | Won |
| Nov 9, 2018 | 72K86 | (2)BDR,BJR,BPMenard · District 6 | 1 of 4 | $453,745 | $453,745 | Won |
| Nov 9, 2018 | 74358 | (104BR)BR-1Moultrie · District 7 | 3 of 4 | $2,175,826 | $1,881,476Howell Paving, Inc. | +15.6% |
| Nov 9, 2018 | 89747 | 17-00108-00-BRMcdonough · District 4 | 2 of 3 | $533,191 | $429,858County Contractors, Inc. | +24.0% |
| Nov 9, 2018 | 91555 | 16-08137-00-BRPiatt · District 5 | 3 of 4 | $299,662 | $293,766Newell Construction Co., In… | +2.0% |
| Nov 9, 2018 | 93721 | 12-00038-06-BRLogan · District 6 | 1 of 7 | $1,921,914 | $1,921,914 | Won |
| Aug 3, 2018 | 93679 | 12-00008-00-BRSangamon · District 6 | 4 of 4 | $7,530,616 | $7,094,815Halverson Construction Co.,… | +6.1% |
| Aug 3, 2018 | 93718 | 15-00066-03-BRLogan · District 6 | 4 of 6 | $350,299 | $295,457Otto Baum Company, Inc. | +18.6% |
| Jun 15, 2018 | 72K54 | (75-1,75-4,75-5)BR,BDR,BJRPike · District 6 | 1 of 3 | $299,480 | $299,480 | Won |
| Jun 15, 2018 | 74436 | (119BR-1)B-1Moultrie · District 7 | 1 of 1 | $566,130 | $566,130 | Won |
| Jun 15, 2018 | 95838 | 16-11117-00-BRMacon · District 7 | 3 of 6 | $1,088,850 | $999,828County Contractors, Inc. | +8.9% |
| Apr 27, 2018 | 70B77 | 12BDRDewitt · District 5 | 2 of 5 | $758,200 | $754,779Halverson Construction Co.,… | +0.5% |
| Apr 27, 2018 | 72J20 | (84-5-2)BDR,BJRSangamon · District 6 | 2 of 4 | $1,220,973 | $1,064,274The Kilian Corporation | +14.7% |
| Mar 9, 2018 | 72J53 | (27)BDR,BJR,BRRSangamon · District 6 | 4 of 4 | $2,742,954 | $1,958,329Sangamo Construction Company | +40.1% |
| Mar 9, 2018 | 74605 | (58-62HB-2)BRMacon · District 7 | 2 of 5 | $2,250,656 | $2,250,343Sangamo Construction Company | +0.0% |
| Mar 9, 2018 | 93699 | 16-00078-00-BR & 16-00079-00-BRSchuyler · District 6 | 3 of 5 | $1,231,550 | $1,074,877County Contractors, Inc. | +14.6% |
| Mar 9, 2018 | 93708 | 15-00081-04-BRLogan · District 6 | 4 of 4 | $256,999 | $196,536Otto Baum Company, Inc. | +30.8% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.