[(35,36)B-1;(37B-1)BR-1]BRR
- Let date
- Friday, June 17, 2022
- Contract
- 68G43 · job page
- District
- District 4
- County
- Warren, Mcdonough
- Highway
- Limits
- Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Freesen, a div of UCM, Inc. Low bidder | $2,042,711 | ||
| 2 | Brandt Construction Co. | $2,186,200 | +7.0% | |
| 3 | Otto Baum Company, Inc. | $2,498,200 | +22.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Freesen, a div … | #2 Brandt Construc… | #3 Otto Baum Compa… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0326444 | SURFACE FILLER SPL | 6 | GALLON | $1,313.94 | $1,610.00 | $422.84 | |
| 2 | X0327809 | LINEAR DELIN PANELS 4 | 29 | EACH | $52.50 | $137.00 | $158.65 | |
| 3 | X2810128 | STONE RIPRAP CL B4 SP | 76.1 | SQ YD | $103.00 | $158.00 | $142.77 | |
| 4 | X5015225 | PIPE CULVERT REM SPL | 120 | FOOT | $40.73 | $62.00 | $42.84 | |
| 5 | X5030550 | PROTECTIVE COAT SPL | 18.9 | SQ YD | $488.63 | $490.00 | $494.34 | |
| 6 | X6330725 | SPBGR (SHORT RADIUS) | 100 | FOOT | $78.75 | $65.00 | $52.30 | |
| 7 | X7010208 | TC-PROT 701402 SPL | 6 | EACH | $22,553.94 | $20,000.00 | $34,595.84 | |
| 8 | Z0001002 | GDRL AGG EROS CONT | 479.3 | TON | $100.22 | $82.00 | $65.19 | |
| 9 | Z0012130 | BR DECK SCAR 3/4 | 3,921 | SQ YD | $56.87 | $85.00 | $65.73 | |
| 10 | Z0012162 | BR DK MIC C OVL 2 1/4 | 3,921 | SQ YD | $117.30 | $160.00 | $125.73 | |
| 11 | Z0018051 | DRAINAGE SCUPPERS ADJ | 2 | EACH | $1,985.32 | $2,400.00 | $2,477.07 | |
| 12 | Z0023600 | FILL EXIST CULVERTS | 4 | EACH | $980.19 | $1,750.00 | $1,714.43 | |
| 13 | Z0041895 | POLYMER CONCRETE | 18 | CU FT | $1,785.67 | $855.00 | $2,243.64 | |
| 14 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 15 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | |
| 16 | 28200200 | FILTER FABRIC | 101 | SQ YD | $11.71 | $28.00 | $76.64 | |
| 17 | 40600295 | P BIT MATLS TACK CT | 6,005 | POUND | $3.45 | $2.65 | $4.05 | |
| 18 | 40600982 | HMA SURF REM BUTT JT | 5,582 | SQ YD | $23.75 | $15.00 | $27.91 | |
| 19 | 40602978 | HMA BC IL-9.5 N50 | 231.5 | TON | $823.59 | $380.00 | $967.88 | |
| 20 | 40604060 | HMA SC IL-9.5 D N50 | 468.5 | TON | $485.98 | $245.00 | $571.12 | |
| 21 | 42001300 | PROTECTIVE COAT | 3,921 | SQ YD | $7.01 | $5.00 | $5.52 | |
| 22 | 50300260 | BR DECK GROOVING | 3,434 | SQ YD | $14.99 | $15.00 | $18.37 | |
| 23 | 60500305 | FILL INLETS | 9 | EACH | $559.12 | $1,300.00 | $666.09 | |
| 24 | 60600605 | CONC CURB TB | 8 | FOOT | $282.24 | $210.00 | $321.15 | |
| 25 | 63000001 | SPBGR TY A 6FT POSTS | 2,250 | FOOT | $34.65 | $42.00 | $46.95 | |
| 26 | 63100045 | TRAF BAR TERM T2 | 1 | EACH | $1,837.50 | $2,300.00 | $2,344.52 | |
| 27 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $3,360.00 | $5,400.00 | $4,577.39 | |
| 28 | 63100089 | TRAF BAR TERM T6B | 8 | EACH | $3,780.00 | $6,300.00 | $4,671.41 | |
| 29 | 63100167 | TR BAR TRM T1 SPL TAN | 11 | EACH | $3,570.00 | $4,500.00 | $5,047.47 | |
| 30 | 63200310 | GUARDRAIL REMOV | 3,420 | FOOT | $6.30 | $13.50 | $6.61 | |
| 31 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $3,224.81 | $3,200.00 | $1,500.00 | |
| 32 | 67100100 | MOBILIZATION | 1 | L SUM | $27,794.74 | $125,060.60 | $149,499.98 | |
| 33 | 70100420 | TRAF CONT-PROT 701411 | 4 | EACH | $831.60 | $850.00 | $940.16 | |
| 34 | 70107025 | CHANGEABLE MESSAGE SN | 42 | CAL DA | $52.50 | $75.00 | $117.52 | |
| 35 | 70300100 | SHORT TERM PAVT MKING | 13,710 | FOOT | $4.07 | $1.35 | $1.13 | |
| 36 | 70300150 | SHRT TRM PAVT MK REM | 4,569 | SQ FT | $3.38 | $4.00 | $3.54 | |
| 37 | 70400100 | TEMP CONC BARRIER | 2,000 | FOOT | $26.64 | $32.50 | $57.43 | |
| 38 | 70400200 | REL TEMP CONC BARRIER | 2,000 | FOOT | $5.35 | $10.00 | $7.79 | |
| 39 | 70600250 | IMP ATTN TEMP NRD TL3 | 6 | EACH | $5,895.31 | $3,025.00 | $5,848.40 | |
| 40 | 70600350 | IMP ATTN REL NRD TL3 | 6 | EACH | $713.75 | $2,500.00 | $1,030.09 | |
| 41 | 72501000 | TERMINAL MARKER - DA | 12 | EACH | $36.75 | $50.50 | $47.01 | |
| 42 | 78009000 | MOD URETH PM LTR-SYM | 93.6 | SQ FT | $5.78 | $7.00 | $6.46 | |
| 43 | 78009004 | MOD URETH PM LINE 4 | 4,119 | FOOT | $1.06 | $1.15 | $1.19 | |
| 44 | 78009006 | MOD URETH PM LINE 6 | 514 | FOOT | $1.33 | $1.45 | $1.49 | |
| 45 | 78009008 | MOD URETH PM LINE 8 | 504 | FOOT | $1.60 | $1.75 | $1.79 | |
| 46 | 78100100 | RAISED REFL PAVT MKR | 18 | EACH | $449.40 | $480.00 | $502.98 | |
| 47 | 78200005 | GRDRAIL REF TYPE A | 29 | EACH | $15.75 | $11.00 | $11.75 | |
| 48 | 78300200 | RAISED REF PVT MK REM | 18 | EACH | $22.19 | $130.00 | $83.10 | |
| 49 | 78300202 | PAVMT MRKG REM WTR BL | 2,896 | SQ FT | $3.11 | $3.40 | $3.48 |