| Sep 18, 2026 | 80D33 |
CookDistrict 1 | 487.5 FOOT |
$69.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 68E86 |
PeoriaDistrict 4 | 1,760 FOOT |
$43.00 | Stark Excavating, Inc. |
| Sep 18, 2026 | 64T43 |
HenryDistrict 2 | 16,750 FOOT |
$30.00 | D. Construction, Inc. |
| Sep 18, 2026 | 72406 |
AdamsDistrict 6 | 4,637.5 FOOT |
$35.21 | Freesen, a div of UCM, Inc. |
| Sep 18, 2026 | 80B49 |
DupageDistrict 1 | 1,000 FOOT |
$25.00 | Martam Construction Incorporated |
| Sep 18, 2026 | 72E59 |
LoganDistrict 6 | 600 FOOT |
$67.94 | Otto Baum Company, Inc. |
| Sep 18, 2026 | 64V52 |
WinnebagoDistrict 2 | 537.5 FOOT |
$40.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Sep 18, 2026 | 72E83 |
AdamsDistrict 6 | 450 FOOT |
$32.00 | County Contractors, Inc. |
| Sep 18, 2026 | 97892 |
St. ClairDistrict 8 | 625 FOOT |
$60.00 | Plocher Construction Company, Inc. |
| Sep 18, 2026 | 74D71 |
LawrenceDistrict 7 | 367 FOOT |
$45.00 | C-Hill Civil Contractors, Inc. |
| Sep 18, 2026 | 66926 |
LasalleDistrict 3 | 1,350 FOOT |
$30.00 | D. Construction, Inc. |
| Sep 18, 2026 | 74650 |
ColesDistrict 7 | 5,125 FOOT |
$41.81 | Sangamo Construction Company |
| Jul 31, 2026 | 78935 |
JeffersonDistrict 9 | 487.5 FOOT |
$26.10 | E. T. Simonds Construction Company |
| Jul 31, 2026 | 62Y20 |
CookDistrict 1 | 800 FOOT |
$32.00 | Martam Construction Incorporated |
| Jul 31, 2026 | 66N23 |
LivingstonDistrict 3 | 250 FOOT |
$37.00 | Riber Construction, Inc. |
| Jul 31, 2026 | 80B44 |
CookDistrict 1 | 712.5 FOOT |
$40.00 | D. Construction, Inc. |
| Jul 31, 2026 | 64T48 |
WhitesideDistrict 2 | 350 FOOT |
$35.00 | Martin & Company Excavating |
| Jul 31, 2026 | 64T49 |
OgleDistrict 2 | 437.5 FOOT |
$35.00 | Martin & Company Excavating |
| Jul 31, 2026 | 80C90 |
CookDistrict 1 | 1,912.5 FOOT |
$65.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jul 31, 2026 | 66M85 |
LivingstonDistrict 3 | 1,475 FOOT |
$40.00 | ICC Group Inc. |
| Jul 31, 2026 | 61M13 |
KaneDistrict 1 | 4,000 FOOT |
$2.96 | Dunnet Bay Construction Company |
| Jul 31, 2026 | 72J44 |
Brown, PikeDistrict 6 | 475 FOOT |
$39.05 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 62T84 |
CookDistrict 1 | 100 FOOT |
$40.00 | D. Construction, Inc. |
| Jul 31, 2026 | 78520 |
JeffersonDistrict 9 | 375 FOOT |
$37.48 | E. T. Simonds Construction Company |
| Jul 31, 2026 | 62W20 |
CookDistrict 1 | 883 FOOT |
$30.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80D46 |
LakeDistrict 1 | 637.5 FOOT |
$49.70 | Curran Contracting Company |
| Jun 12, 2026 | 68K18 |
TazewellDistrict 4 | 1,250 FOOT |
$71.23 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 12, 2026 | 62R61 |
CookDistrict 1 | 4,437.5 FOOT |
$26.76 | OHLA Central, Inc. |
| Jun 12, 2026 | 78A13 |
UnionDistrict 9 | 687.5 FOOT |
$25.68 | E. T. Simonds Construction Company |
| Jun 12, 2026 | 66M84 |
LasalleDistrict 3 | 200 FOOT |
$40.00 | D. Construction, Inc. |
| Jun 12, 2026 | 76R32 |
MadisonDistrict 8 | 1,962.5 FOOT |
$48.40 | Stutz Excavating, Inc. |
| Jun 12, 2026 | 64T47 |
OgleDistrict 2 | 418 FOOT |
$40.00 | Martin & Company Excavating |
| Jun 12, 2026 | 62U72 |
MchenryDistrict 1 | 913 FOOT |
$28.00 | Martam Construction Incorporated |
| Jun 12, 2026 | 72601 |
PikeDistrict 6 | 3,430 FOOT |
$35.05 | Freesen, a div of UCM, Inc. |
| Jun 12, 2026 | 70D62 |
EdgarDistrict 5 | 2,050 FOOT |
$55.25 | William Charles Construction Company, LLC |
| Jun 12, 2026 | 78C10 |
WhiteDistrict 9 | 1,212.5 FOOT |
$35.09 | E. T. Simonds Construction Company |
| Jun 12, 2026 | 66M92 |
LivingstonDistrict 3 | 350 FOOT |
$52.65 | Iroquois Paving Corporation |
| Jun 12, 2026 | 76R36 |
St. ClairDistrict 8 | 2,954 FOOT |
$56.00 | The Kilian Corporation |
| Jun 12, 2026 | 64T58 |
StephensonDistrict 2 | 329.3 FOOT |
$54.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 12, 2026 | 62W99 |
CookDistrict 1 | 36,437.5 FOOT |
$10.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 74705 |
MaconDistrict 7 | 1,600 FOOT |
$55.00 | William Charles Construction Company, LLC |
| Jun 12, 2026 | 70J03 |
Mclean, PiattDistrict 5 | 1,200 FOOT |
$28.00 | Civil Coatings and Construction Inc. |
| Jun 12, 2026 | 78C15 |
WhiteDistrict 9 | 900 FOOT |
$20.00 | Eagle Painting & Maintenance Company, Inc. |
| Jun 12, 2026 | 66R94 |
GrundyDistrict 3 | 400 FOOT |
$50.00 | Civil Coatings and Construction Inc. |
| Jun 12, 2026 | 76U77 |
MarionDistrict 8 | 610 FOOT |
$85.00 | Samron Midwest Contracting, Inc. |
| Jun 12, 2026 | 64V40 |
Rock IslandDistrict 2 | 2,612.5 FOOT |
$80.00 | Valley Construction Co. |
| Jun 12, 2026 | 62X52 |
DupageDistrict 1 | 225 FOOT |
$35.00 | D. Construction, Inc. |
| Jun 12, 2026 | 78791 |
AlexanderDistrict 9 | 950 FOOT |
$33.00 | Samron Midwest Contracting, Inc. |
| Jun 12, 2026 | 72J76 |
SchuylerDistrict 6 | 1,522.5 FOOT |
$35.55 | Otto Baum Company, Inc. |
| Jun 12, 2026 | 80B47 |
CookDistrict 1 | 175 FOOT |
$65.00 | Areatha Construction Co., Inc. |
| Jun 12, 2026 | 68J15 |
TazewellDistrict 4 | 200 FOOT |
$56.60 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 12, 2026 | 62L30 |
CookDistrict 1 | 15,595 FOOT |
$30.00 | D. Construction, Inc. |
| Jun 12, 2026 | 76U86 |
MadisonDistrict 8 | 500 FOOT |
$1.00 | Eagle Painting & Maintenance Company, Inc. |
| Jun 12, 2026 | 66A91 |
LasalleDistrict 3 | 937.5 FOOT |
$38.00 | Advanced Asphalt Company |
| Jun 12, 2026 | 64T07 |
OgleDistrict 2 | 658.7 FOOT |
$40.00 | Martin & Company Excavating |
| Jun 12, 2026 | 74B79 |
RichlandDistrict 7 | 438 FOOT |
$46.71 | Sangamo Construction Company |
| Jun 12, 2026 | 80B51 |
CookDistrict 1 | 1,355 FOOT |
$24.00 | Capital Industrial Services, LLC |
| Jun 12, 2026 | 68J70 |
WoodfordDistrict 4 | 850 FOOT |
$25.67 | Advanced Asphalt Company |
| Jun 12, 2026 | 62M71 |
Kane, KendallDistrict 1 | 5,000 FOOT |
$25.00 | D. Construction, Inc. |
| Jun 12, 2026 | 76V03 |
MadisonDistrict 8 | 10,912 FOOT |
$52.50 | Capital Industrial Services, LLC |
| Jun 12, 2026 | 66K39 |
FordDistrict 3 | 5,063 FOOT |
$46.00 | Stark Excavating, Inc. |
| Jun 12, 2026 | 64T46 |
WhitesideDistrict 2 | 342 FOOT |
$40.00 | Martin & Company Excavating |
| Jun 12, 2026 | 76M95 |
WashingtonDistrict 8 | 120,300 FOOT |
$22.00 | Samron Midwest Contracting, Inc. |
| Apr 24, 2026 | 61M15 |
CookDistrict 1 | 112.5 FOOT |
$43.35 | Dunnet Bay Construction Company |
| Apr 24, 2026 | 78B46 |
HamiltonDistrict 9 | 362.5 FOOT |
$46.67 | E. T. Simonds Construction Company |
| Apr 24, 2026 | 66R64 |
LasalleDistrict 3 | 700 FOOT |
$30.00 | D. Construction, Inc. |
| Apr 24, 2026 | 64U90 |
WinnebagoDistrict 2 | 988 FOOT |
$25.00 | Martin & Company Excavating |
| Apr 24, 2026 | 87899 |
KendallDistrict 3 | 4,800 FOOT |
$18.00 | Austin Tyler Construction, Inc. |
| Apr 24, 2026 | 62Y30 |
CookDistrict 1 | 410 FOOT |
$35.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 61M41 |
LakeDistrict 1 | 650 FOOT |
$35.50 | Alliance Contractors, Inc. |
| Apr 24, 2026 | 78B86 |
MassacDistrict 9 | 500 FOOT |
$28.00 | E. T. Simonds Construction Company |
| Apr 24, 2026 | 66R66 |
FordDistrict 3 | 650 FOOT |
$50.00 | Iroquois Paving Corporation |
| Apr 24, 2026 | 64U99 |
WhitesideDistrict 2 | 1,550 FOOT |
$6.00 | Venus Painting Co. |
| Apr 24, 2026 | 61L48 |
Kane, MchenryDistrict 1 | 213 FOOT |
$70.56 | William Charles Construction Company, LLC |
| Apr 24, 2026 | 66M55 |
LasalleDistrict 3 | 875 FOOT |
$30.00 | D. Construction, Inc. |
| Apr 24, 2026 | 74D61 |
VariousDistrict 7 | 4,200 FOOT |
$2.00 | ERA-Valdivia Contractors, Inc. |
| Apr 24, 2026 | 78B87 |
SalineDistrict 9 | 1,000 FOOT |
$25.15 | E. T. Simonds Construction Company |
| Apr 24, 2026 | 68J95 |
MarshallDistrict 4 | 350 FOOT |
$56.50 | Advanced Asphalt Company |
| Apr 24, 2026 | 66R68 |
KankakeeDistrict 3 | 387.5 FOOT |
$50.00 | Tobey's Construction & Cartage, Inc. |
| Apr 24, 2026 | 64T06 |
OgleDistrict 2 | 2,037.5 FOOT |
$30.00 | Martin & Company Excavating |
| Apr 24, 2026 | 66N58 |
GrundyDistrict 3 | 450 FOOT |
$25.00 | D. Construction, Inc. |
| Apr 24, 2026 | 74D63 |
WayneDistrict 7 | 1,200 FOOT |
$15.50 | Eagle Painting & Maintenance Company, Inc. |
| Apr 24, 2026 | 80B48 |
CookDistrict 1 | 708 FOOT |
$35.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 72669 |
MacoupinDistrict 6 | 850 FOOT |
$66.99 | Sangamo Construction Company |
| Apr 24, 2026 | 66R69 |
BureauDistrict 3 | 500 FOOT |
$41.83 | Gensini Excavating, Inc. |
| Apr 24, 2026 | 64T42 |
StephensonDistrict 2 | 2,525 FOOT |
$30.00 | Martin & Company Excavating |
| Apr 24, 2026 | 66R61 |
IroquoisDistrict 3 | 375 FOOT |
$58.00 | Iroquois Paving Corporation |
| Apr 24, 2026 | 78B45 |
AlexanderDistrict 9 | 387.5 FOOT |
$45.00 | Samron Midwest Contracting, Inc. |
| Apr 24, 2026 | 80B62 |
CookDistrict 1 | 525 FOOT |
$35.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 62K33 |
CookDistrict 1 | 6,237 FOOT |
$40.00 | Plote Construction, Inc. |
| Apr 24, 2026 | 78B36 |
FranklinDistrict 9 | 712.5 FOOT |
$32.64 | E. T. Simonds Construction Company |
| Apr 24, 2026 | 68K22 |
WoodfordDistrict 4 | 1,875 FOOT |
$55.00 | Stark Excavating, Inc. |
| Apr 24, 2026 | 64U89 |
WinnebagoDistrict 2 | 863 FOOT |
$30.00 | Martin & Company Excavating |
| Apr 24, 2026 | 66R63 |
BureauDistrict 3 | 550 FOOT |
$30.00 | D. Construction, Inc. |
| Apr 24, 2026 | 80B54 |
DupageDistrict 1 | 1,250 FOOT |
$2.50 | ERA-Valdivia Contractors, Inc. |
| Apr 24, 2026 | 80C85 |
MchenryDistrict 1 | 2,200 FOOT |
$24.50 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 62P51 |
CookDistrict 1 | 2,400 FOOT |
$29.12 | Martam Construction Incorporated |
| Feb 27, 2026 | 66R93 |
LivingstonDistrict 3 | 225 FOOT |
$1.00 | ERA-Valdivia Contractors, Inc. |
| Feb 27, 2026 | 68J51 |
PeoriaDistrict 4 | 650 FOOT |
$60.00 | Stark Excavating, Inc. |
| Feb 27, 2026 | 78967 |
JacksonDistrict 9 | 563 FOOT |
$23.79 | E. T. Simonds Construction Company |
| Feb 27, 2026 | 64R72 |
WinnebagoDistrict 2 | 13,801.5 FOOT |
$18.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 70H62 |
Douglas, EdgarDistrict 5 | 637.5 FOOT |
$53.20 | Sangamo Construction Company |
| Feb 27, 2026 | 61M26 |
CookDistrict 1 | 358 FOOT |
$25.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 66R95 |
BureauDistrict 3 | 600 FOOT |
$0.5000 | ERA-Valdivia Contractors, Inc. |
| Feb 27, 2026 | 68J57 |
PeoriaDistrict 4 | 237.5 FOOT |
$55.65 | Advanced Asphalt Company |
| Feb 27, 2026 | 78B34 |
JeffersonDistrict 9 | 3,302 FOOT |
$24.52 | E. T. Simonds Construction Company |
| Feb 27, 2026 | 64U96 |
Rock IslandDistrict 2 | 775 FOOT |
$25.00 | Eagle Painting & Maintenance Company, Inc. |
| Feb 27, 2026 | 72762 |
SchuylerDistrict 6 | 450 FOOT |
$49.35 | Illinois Valley Paving, a div of UCM, Inc. |
| Feb 27, 2026 | 62P01 |
WillDistrict 1 | 3,013 FOOT |
$27.00 | Austin Tyler Construction, Inc. |
| Feb 27, 2026 | 66T02 |
IroquoisDistrict 3 | 325 FOOT |
$1.00 | ERA-Valdivia Contractors, Inc. |
| Feb 27, 2026 | 68K58 |
HendersonDistrict 4 | 437.5 FOOT |
$54.00 | Laverdiere Construction, Inc. |
| Feb 27, 2026 | 78B37 |
WhiteDistrict 9 | 650 FOOT |
$34.70 | E. T. Simonds Construction Company |
| Feb 27, 2026 | 64U97 |
Rock Island WhitesideDistrict 2 | 800 FOOT |
$16.25 | Venus Painting Co. |
| Feb 27, 2026 | 72C96 |
SangamonDistrict 6 | 4,950 FOOT |
$35.75 | Illinois Valley Paving, a div of UCM, Inc. |
| Feb 27, 2026 | 62R23 |
WillDistrict 1 | 3,537.5 FOOT |
$30.00 | D. Construction, Inc. & Kraemer North America, LLC JV |
| Feb 27, 2026 | 66T06 |
BureauDistrict 3 | 550 FOOT |
$0.5000 | ERA-Valdivia Contractors, Inc. |
| Feb 27, 2026 | 68K62 |
VariousDistrict 4 | 4,925 FOOT |
$5.00 | Venus Painting Co. |
| Feb 27, 2026 | 78B38 |
JacksonDistrict 9 | 1,475 FOOT |
$30.00 | Samron Midwest Contracting, Inc. |
| Feb 27, 2026 | 66R92 |
BureauDistrict 3 | 1,650 FOOT |
$6.00 | Venus Painting Co. |
| Feb 27, 2026 | 74368 |
MaconDistrict 7 | 750 FOOT |
$60.95 | Sangamo Construction Company |
| Feb 27, 2026 | 62Y17 |
CookDistrict 1 | 1,021 FOOT |
$38.84 | MYS, Incorporated |
| Feb 27, 2026 | 62T82 |
LakeDistrict 1 | 662.5 FOOT |
$37.98 | Martam Construction Incorporated |
| Feb 27, 2026 | 70F37 |
McleanDistrict 5 | 1,325 FOOT |
$48.50 | Stark Excavating, Inc. |
| Feb 27, 2026 | 80B56 |
CookDistrict 1 | 485 FOOT |
$57.00 | Eagle Painting & Maintenance Company, Inc. |
| Feb 27, 2026 | 68E33 |
MarshallDistrict 4 | 487.5 FOOT |
$44.00 | Gillan Construction LLC |
| Feb 27, 2026 | 76T66 |
GreeneDistrict 8 | 1,150 FOOT |
$69.85 | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV |
| Feb 27, 2026 | 62Y26 |
WillDistrict 1 | 825 FOOT |
$36.50 | Iroquois Paving Corporation |
| Feb 27, 2026 | 70F77 |
McleanDistrict 5 | 1,300 FOOT |
$45.00 | Stark Excavating, Inc. |
| Jan 16, 2026 | 72K80 |
SangamonDistrict 6 | 1,200 FOOT |
$27.00 | Civil Coatings and Construction Inc. |
| Jan 16, 2026 | 78937 |
JacksonDistrict 9 | 1,488 FOOT |
$22.91 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 66R89 |
KendallDistrict 3 | 275 FOOT |
$1.00 | ERA-Valdivia Contractors, Inc. |
| Jan 16, 2026 | 70E65 |
PiattDistrict 5 | 762.5 FOOT |
$39.90 | Sangamo Construction Company |
| Jan 16, 2026 | 78A09 |
FranklinDistrict 9 | 255 FOOT |
$0.0100 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 62R76 |
WillDistrict 1 | 614 FOOT |
$35.00 | D. Construction, Inc. |
| Jan 16, 2026 | 61M07 |
MchenryDistrict 1 | 115 FOOT |
$79.00 | Curran Contracting Company |
| Jan 16, 2026 | 74168 |
MaconDistrict 7 | 400 FOOT |
$52.78 | Sangamo Construction Company |
| Jan 16, 2026 | 62D34 |
CookDistrict 1 | 482 FOOT |
$35.00 | Lorig Construction Company |
| Jan 16, 2026 | 66R90 |
DekalbDistrict 3 | 326 FOOT |
$1.00 | ERA-Valdivia Contractors, Inc. |
| Jan 16, 2026 | 70F93 |
McleanDistrict 5 | 2,988 FOOT |
$31.00 | Stark Excavating, Inc. |
| Jan 16, 2026 | 72653 |
LoganDistrict 6 | 1,400 FOOT |
$1.00 | Three Star Painting, Inc. |
| Jan 16, 2026 | 62U12 |
CookDistrict 1 | 1,550 FOOT |
$87.01 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 62W33 |
CookDistrict 1 | 300 FOOT |
$40.50 | Iroquois Paving Corporation |
| Jan 16, 2026 | 74893 |
EffinghamDistrict 7 | 6,112.5 FOOT |
$38.60 | William Charles Construction Company, LLC |
| Jan 16, 2026 | 62F94 |
WillDistrict 1 | 9,525 FOOT |
$25.00 | D. Construction, Inc. |
| Jan 16, 2026 | 66R91 |
BureauDistrict 3 | 326 FOOT |
$1.00 | ERA-Valdivia Contractors, Inc. |
| Jan 16, 2026 | 70H59 |
ChampaignDistrict 5 | 2,550 FOOT |
$1.00 | ERA-Valdivia Contractors, Inc. |
| Jan 16, 2026 | 72A25 |
Pike, ScottDistrict 6 | 1,200 FOOT |
$1.00 | Three Star Painting, Inc. |
| Jan 16, 2026 | 64L71 |
HenryDistrict 2 | 468 FOOT |
$29.50 | Phoenix Corporation of the Quad Cities |
| Jan 16, 2026 | 64L27 |
StephensonDistrict 2 | 975 FOOT |
$28.00 | Martin & Company Excavating |
| Jan 16, 2026 | 76E84 |
Madison, St.clairDistrict 8 | 65,135 FOOT |
$45.00 | The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture |